Installation Instruction
Heatshrink Termination For 3 Core
Polymeric Cables 7.2kV to 36kV
* PLEASE READ INSTRUCTIONS THOROUGHLY BEFORE PROCEEDING *
UNITS E3 CROWN WAY CROWN PARK INDUSTRIAL ESTATE RUSHDEN NORTHANTS NN10 6FD
TEL: +44(0) 1933 356758 FAX: +44(0) 1933 413821 E-MAIL:info@shrinkpolymersystems.co.uk
WEB: www.shrinkpolymersystems.co.uk
INDOOR OUTDOOR
ISSUE DATE: 05.11.14
Download free QR code scanning software
on your smartphone and scan to see a jointer
training video on a termination with earthing
VOLTAGE
INDOOR
L
OUTDOOR
L
X
7.2kV 650mm 700mm
12kV 650mm 700mm LENGTH OF LUG
17.5kV 650mm 700mm BARREL + 5mm
24kV 700mm 800mm
36kV 800mm 900mm
Remove Outer Cable Sheath:
3 Core Cable With Armour
If the cable is armoured, bonding of the armours must be completed using the appropriate
armour earthing kit.
A) For indoor terminations (cable end box) - Order kits Ref: SPS 180, SPS 193 *
B) For outdoor terminations (pole top) - Please advise conductor size and voltage.
2
* SPS 180 - 16-95mm at 7.2 to 17.5kV
2
SPS 193 - 120-300mm at 7.2 to 17.5kV
(For other voltages see selection chart in general catalogue)
IMPORTANT NOTICE TO PURCHASER:- Sellers and Manufacturere’s only obligation shall be to replace such quantity of the product proved to be defective. Neither the Seller nor
Manufacturer shall be liable for any injury, loss or damage, direct or consequential, arising out of the use or inability to use the product. Before using, User shall determine the
suitability of the product for his or her intended use and User assumes all risk and liability whatsoever in connection therewith.
Table 1
General Fitting Instructions
* It is highly recommended that a tool suitable for the removal of the
semi-conductive screen is used to provide a reliable discharge free
termination screen point
* Use a propane gas torch with a soft flame
* Avoid a pencil like blue flame which is caused by unregulated supply
* Keep the flame on the move to ensure even shrinkage of all the
materials and also helps to reduce scorching
* Ensure that all components are kept clean and grease free during
installation
* Allow to cool before applying any mechanical strain
Note:- Dimension “L” is a guide only. The actual
length is determined by the overall geometry of the
equipment.
1. Installation
Prepare the cable as shown.
Note:- The “L” dimension should not be
longer than the distance between bushing
centres and base plate.
De-grease and abrade the cable for a
distance of 100mm below the outer
sheath cut.
Note:- User may wish to alter bedding
and armour dimensions to suit the type of
gland/earthing arrangement to be used.
2. Screen Preparation
Copper Wire Screen
Apply one layer of sealant tape around the
outer cable sheath 30mm below the
sheath cut.
Bend back each screen wires and press
them into the sealant tape. Apply another
layer of tape over the bent back wires.
Twist together to form a conductor and
bond to a suitable earth point.
Note:- If cable has copper screen wires
on each core, bend these back and press
into the mastic tape. Just like the overall
copper screen wires, twist together and
bond to earth.
Copper Tape Screen
Secure the earth braids to the copper tape
screens so that the solder block is
positioned upon the cable bedding. A turn
of mastic sealant tape should be applied
beneath and on top of the solder block.
If a constant force spring is used to
connect the earth braids, the spring
should preferably be positioned above the
fingers of the breakout boot.
These braids will either be bonded to the
earth gland or other suitable earth point.
30mm
SEALANT TAPE
ROLL
SPRINGS
SEALANT TAPE
COPPER
BRAIDS
COPPER TAPE
SCREEN
Bushing centre
100mm
Armours
100mm
Bedding
L
X
100mm
Remove the copper tape screen to length
A+X as indicated in Table 2.
Note:- If the cores are to be crossed the
copper screen should be removed after
the initial setting of the cores.
It may be necessary to temporarily secure
the copper tapes to prevent them from
unwinding.
VOLTAGE A B X
7.2kV 130mm 110mm
12kV 185mm 165mm
17.5kV 185mm 165mm
24kV 310mm 290mm
36kV 460mm 440mm
LUG BARREL
LENGTH
+5MM
3. Conductive Layer Treatment
Extruded Conductive Screen Layer
Remove the semi-conductive screen layer
using a suitable tool to dimension B+X as
indicated in Table 2.
Note:- It is very important that the
screen is removed leaving a clean straight
cut and that no scoring or damage is done
to the primary insulation. We highly
recommend the use of approved screen
removal tools (see our website for tools
and demonstration videos). It is good
practice to flame brush the primary
insulation and conductive screen cut, this
has the effect of removing any minor
surface irregularities or burrs that may be
present.
Apply Stress Control Tape
De-grease the insulation and screen using
the solvent tissues provided.
Remove the release paper from the yellow
stress control tape (TS31785Y). Stretch to
approx. 50% width and apply the tape
around the end of each core screen to
cover the copper tape (If present) and
insulation by 10mm either way.
Table 2
B
10mm
10mm
COPPER TAPE
SCREEN
YELLOW STRESS
CONTROL TAPE
X
A
B
4. Stress Control Tubes
Position the stress control tubes onto each
core so that the bottom of each tube is
covering the yellow stress control mastic
by approx 10mm.
Starting at the end closest to the cable
crutch, Shrink each tube one at a time
keep the flame on the move to ensure an
even wall thickness.
5. Installing Cable Lugs
Remove the insulation from each core to
the X dimension in Table 1.
Install cable lug and remove any burrs or
sharp points that may be present.
Preheat each Lug and wrap two layers of
Red Sealant Tape over the Lug barrel and
extend onto the Insulation by approx
10mm. Ensure the Tape is applied as
shown. Important:- use more tape to
build up the diameter to ensure tube
recovers upon it and creates a moisture
seal.
6. Installing The Breakout Boot
Slide the three legged boot over the cores
and push down into the crutch of the
cable. Shrink from the shoulder of the
breakout and down to the cable sheath,
then from the shoulder to the cores.
Apply a turn of red sealant tape around
each breakout turret as shown.
7. Installing The Anti-Track Tube
Position the anti-track tubes so that they
cover the turrets of the breakout boot and
the barrels of the lugs.
Starting from the cable crutch area,
Shrink the tubes in place. Keeping the
flame moving to ensure an even wall
thickness, ensure the tubes are fully
recovered and wrinkle free.
Allow the tubes to cool to hand hot and
trim at the lug end with a sharp knife if
necessary.
ROLL
SPRINGS
X
ANTI-TRACK
TUBE
RED SEALANT
TAPE
Indoor Terminations
To ensure long term performance of
medium voltage terminations, certain
separation distances are required as
indicated in Table 3.
DISTANCE (d) PHASE/PHASE TOP OF STRESS TUBE
& PHASE/GROUND TO LUG BARREL
VOLTAGE d (mm) E
7.2kV 15mm 30mm
12kV 20mm 50mm
17.5kV 20mm 75mm
24kV 40mm 95mm
36kV 50mm 250mm
Note:- Bushing protection boots will be
required for the majority of installations.
If it is necessary to cross the cores, the
cross MUST be in a screened area as
shown.
8. Installation Of Rain Sheds
On outdoor terminations the sheds should
be fitted from the bottom up as indicated
in the drawing opposite.
Indoor 36kV terminations are supplied
with one shed per phase and four sheds
per phase for outdoor.
Table 3
NUMBER OF SHEDS PER PHASE
VOLTAGE INDOOR OUTDOOR
7.2kV - 1
12kV - 2
17.5kV - 2
24kV - 3
36kV 1 4
Table 4
The first shed should be fitted at a
distance 200mm from the lower edge of
the anti-track tube to the edge of the
shed. All subsequent sheds should be
fitted at a distance of 80mm from edge to
edge.
Note:- It is advisable not to position rain
sheds at the top of stress control tubes,
re-position if necessary.
d
E
d
AIR CLEARANCE TO
LOCAL SPEC
80mm
200mm
d = SEE
TABLE 4
MIN BENDING
RADIUS r = 15xD
D
Inverted Connections
If a termination is to mounted for
connection from above the equipment i.e
in the inverted position, sheds should be
installed through 180° as shown
Cable Bending Radius
During installation care should be taken
not to over bend the cable. In cold
condition it may be necessary to gently
heat the cable to prevent damage whilst
bending.

More Related Content

What's hot

11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
Thorne & Derrick International
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
Thorne & Derrick International
 
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...Thorne & Derrick International
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Thorne & Derrick International
 
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
Thorne & Derrick International
 
Cable joint n end connector
Cable joint n end connectorCable joint n end connector
Cable joint n end connector
BHAGWAN PRASAD
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
PremanandDesai
 
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
AKBAR TRADING
 
Underground cables
Underground cablesUnderground cables
Underground cables
Anu71
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
Engr Numan Sarwar
 
Power cable - Installation methods
Power cable - Installation methodsPower cable - Installation methods
Power cable - Installation methods
Leonardo ENERGY
 
UNDERGROUND CABLES PRESENTATION
UNDERGROUND CABLES  PRESENTATIONUNDERGROUND CABLES  PRESENTATION
UNDERGROUND CABLES PRESENTATION
PANKAJ KUMAR
 
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Thorne & Derrick International
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Gensol Engineering Limited
 
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Thorne & Derrick International
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Thorne & Derrick International
 
Overhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptxOverhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptx
EdlirPeci1
 
IMPLEMENTATION OF LONG AC HV AND EHV CABLE SYSTEMS
IMPLEMENTATION OF LONG AC HV AND EHV CABLE SYSTEMSIMPLEMENTATION OF LONG AC HV AND EHV CABLE SYSTEMS
IMPLEMENTATION OF LONG AC HV AND EHV CABLE SYSTEMS
Power System Operation
 
SPS Heat Shrink Cable Terminations 11kV 33kV - Minimum Air Clearances (Cable...
SPS Heat Shrink Cable Terminations 11kV 33kV  - Minimum Air Clearances (Cable...SPS Heat Shrink Cable Terminations 11kV 33kV  - Minimum Air Clearances (Cable...
SPS Heat Shrink Cable Terminations 11kV 33kV - Minimum Air Clearances (Cable...
Thorne & Derrick International
 
Underground cables
Underground cablesUnderground cables
Underground cables
Jatinder Singh
 

What's hot (20)

11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
 
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
 
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
 
Cable joint n end connector
Cable joint n end connectorCable joint n end connector
Cable joint n end connector
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
 
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
 
Power cable - Installation methods
Power cable - Installation methodsPower cable - Installation methods
Power cable - Installation methods
 
UNDERGROUND CABLES PRESENTATION
UNDERGROUND CABLES  PRESENTATIONUNDERGROUND CABLES  PRESENTATION
UNDERGROUND CABLES PRESENTATION
 
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
 
Overhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptxOverhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptx
 
IMPLEMENTATION OF LONG AC HV AND EHV CABLE SYSTEMS
IMPLEMENTATION OF LONG AC HV AND EHV CABLE SYSTEMSIMPLEMENTATION OF LONG AC HV AND EHV CABLE SYSTEMS
IMPLEMENTATION OF LONG AC HV AND EHV CABLE SYSTEMS
 
SPS Heat Shrink Cable Terminations 11kV 33kV - Minimum Air Clearances (Cable...
SPS Heat Shrink Cable Terminations 11kV 33kV  - Minimum Air Clearances (Cable...SPS Heat Shrink Cable Terminations 11kV 33kV  - Minimum Air Clearances (Cable...
SPS Heat Shrink Cable Terminations 11kV 33kV - Minimum Air Clearances (Cable...
 
Underground cables
Underground cablesUnderground cables
Underground cables
 

Similar to 1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables

Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cablesHeat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cablesThorne & Derrick International
 
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Thorne & Derrick International
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
Thorne & Derrick International
 
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
Thorne & Derrick International
 
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Thorne & Derrick International
 
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Thorne & Derrick International
 
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Thorne & Derrick International
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
ssuser8298f2
 
Nexans Euromold Interface F 900 Series Cable Connectors
Nexans Euromold Interface F 900 Series Cable Connectors Nexans Euromold Interface F 900 Series Cable Connectors
Nexans Euromold Interface F 900 Series Cable Connectors
Thorne & Derrick International
 
Nexans Euromold MV Separable Connectors & Bushings - Interface F
Nexans Euromold MV Separable Connectors & Bushings - Interface FNexans Euromold MV Separable Connectors & Bushings - Interface F
Nexans Euromold MV Separable Connectors & Bushings - Interface F
Thorne & Derrick International
 
Hawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionHawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation Instruction
Thorne & Derrick International
 
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Thorne & Derrick International
 
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
Thorne & Derrick International
 
STI 7555AED Instruction Manual
STI 7555AED Instruction ManualSTI 7555AED Instruction Manual
STI 7555AED Instruction Manual
JMAC Supply
 
STI 7554 Instruction Manual
STI 7554 Instruction ManualSTI 7554 Instruction Manual
STI 7554 Instruction Manual
JMAC Supply
 
Prysmian BICAST - LV Cable Joints Hydrocarbon Resistant for Oil, Gas, Petroch...
Prysmian BICAST - LV Cable Joints Hydrocarbon Resistant for Oil, Gas, Petroch...Prysmian BICAST - LV Cable Joints Hydrocarbon Resistant for Oil, Gas, Petroch...
Prysmian BICAST - LV Cable Joints Hydrocarbon Resistant for Oil, Gas, Petroch...
Thorne & Derrick International
 
Easy Heat Trace Heating Cables Brochure
Easy Heat Trace Heating Cables BrochureEasy Heat Trace Heating Cables Brochure
Easy Heat Trace Heating Cables BrochureThorne & Derrick UK
 

Similar to 1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables (20)

Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cablesHeat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
 
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
 
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
 
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
 
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
Cable Joint Instruction - Zero Halogen Fire Resistant Power Cable Joint (BS7846)
 
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
 
Quick guide
Quick guideQuick guide
Quick guide
 
Nexans Euromold Interface F 900 Series Cable Connectors
Nexans Euromold Interface F 900 Series Cable Connectors Nexans Euromold Interface F 900 Series Cable Connectors
Nexans Euromold Interface F 900 Series Cable Connectors
 
Nexans Euromold MV Separable Connectors & Bushings - Interface F
Nexans Euromold MV Separable Connectors & Bushings - Interface FNexans Euromold MV Separable Connectors & Bushings - Interface F
Nexans Euromold MV Separable Connectors & Bushings - Interface F
 
Foc pulling
Foc pullingFoc pulling
Foc pulling
 
Hawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionHawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation Instruction
 
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
Heat Shrink Cable Joints Instruction - Low Voltage XLPE SWA 0.6kV-3.3kV SPS H...
 
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
 
LV & MV Hydrocarbon Resistant_cable_joints-
LV & MV Hydrocarbon Resistant_cable_joints-LV & MV Hydrocarbon Resistant_cable_joints-
LV & MV Hydrocarbon Resistant_cable_joints-
 
STI 7555AED Instruction Manual
STI 7555AED Instruction ManualSTI 7555AED Instruction Manual
STI 7555AED Instruction Manual
 
STI 7554 Instruction Manual
STI 7554 Instruction ManualSTI 7554 Instruction Manual
STI 7554 Instruction Manual
 
Prysmian BICAST - LV Cable Joints Hydrocarbon Resistant for Oil, Gas, Petroch...
Prysmian BICAST - LV Cable Joints Hydrocarbon Resistant for Oil, Gas, Petroch...Prysmian BICAST - LV Cable Joints Hydrocarbon Resistant for Oil, Gas, Petroch...
Prysmian BICAST - LV Cable Joints Hydrocarbon Resistant for Oil, Gas, Petroch...
 
Easy Heat Trace Heating Cables Brochure
Easy Heat Trace Heating Cables BrochureEasy Heat Trace Heating Cables Brochure
Easy Heat Trace Heating Cables Brochure
 

More from Thorne & Derrick International

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
Thorne & Derrick International
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
Thorne & Derrick International
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
Thorne & Derrick International
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
Thorne & Derrick International
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
Thorne & Derrick International
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Thorne & Derrick International
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
Thorne & Derrick International
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Thorne & Derrick International
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
Thorne & Derrick International
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
Thorne & Derrick International
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
Thorne & Derrick International
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick International
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
Thorne & Derrick International
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
Thorne & Derrick International
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
Thorne & Derrick International
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
Thorne & Derrick International
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Thorne & Derrick International
 
Eltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating CablesEltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating Cables
Thorne & Derrick International
 

More from Thorne & Derrick International (20)

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 
Eltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating CablesEltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating Cables
 

Recently uploaded

FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 

1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables

  • 1. Installation Instruction Heatshrink Termination For 3 Core Polymeric Cables 7.2kV to 36kV * PLEASE READ INSTRUCTIONS THOROUGHLY BEFORE PROCEEDING * UNITS E3 CROWN WAY CROWN PARK INDUSTRIAL ESTATE RUSHDEN NORTHANTS NN10 6FD TEL: +44(0) 1933 356758 FAX: +44(0) 1933 413821 E-MAIL:info@shrinkpolymersystems.co.uk WEB: www.shrinkpolymersystems.co.uk INDOOR OUTDOOR ISSUE DATE: 05.11.14 Download free QR code scanning software on your smartphone and scan to see a jointer training video on a termination with earthing
  • 2. VOLTAGE INDOOR L OUTDOOR L X 7.2kV 650mm 700mm 12kV 650mm 700mm LENGTH OF LUG 17.5kV 650mm 700mm BARREL + 5mm 24kV 700mm 800mm 36kV 800mm 900mm Remove Outer Cable Sheath: 3 Core Cable With Armour If the cable is armoured, bonding of the armours must be completed using the appropriate armour earthing kit. A) For indoor terminations (cable end box) - Order kits Ref: SPS 180, SPS 193 * B) For outdoor terminations (pole top) - Please advise conductor size and voltage. 2 * SPS 180 - 16-95mm at 7.2 to 17.5kV 2 SPS 193 - 120-300mm at 7.2 to 17.5kV (For other voltages see selection chart in general catalogue) IMPORTANT NOTICE TO PURCHASER:- Sellers and Manufacturere’s only obligation shall be to replace such quantity of the product proved to be defective. Neither the Seller nor Manufacturer shall be liable for any injury, loss or damage, direct or consequential, arising out of the use or inability to use the product. Before using, User shall determine the suitability of the product for his or her intended use and User assumes all risk and liability whatsoever in connection therewith. Table 1 General Fitting Instructions * It is highly recommended that a tool suitable for the removal of the semi-conductive screen is used to provide a reliable discharge free termination screen point * Use a propane gas torch with a soft flame * Avoid a pencil like blue flame which is caused by unregulated supply * Keep the flame on the move to ensure even shrinkage of all the materials and also helps to reduce scorching * Ensure that all components are kept clean and grease free during installation * Allow to cool before applying any mechanical strain Note:- Dimension “L” is a guide only. The actual length is determined by the overall geometry of the equipment.
  • 3. 1. Installation Prepare the cable as shown. Note:- The “L” dimension should not be longer than the distance between bushing centres and base plate. De-grease and abrade the cable for a distance of 100mm below the outer sheath cut. Note:- User may wish to alter bedding and armour dimensions to suit the type of gland/earthing arrangement to be used. 2. Screen Preparation Copper Wire Screen Apply one layer of sealant tape around the outer cable sheath 30mm below the sheath cut. Bend back each screen wires and press them into the sealant tape. Apply another layer of tape over the bent back wires. Twist together to form a conductor and bond to a suitable earth point. Note:- If cable has copper screen wires on each core, bend these back and press into the mastic tape. Just like the overall copper screen wires, twist together and bond to earth. Copper Tape Screen Secure the earth braids to the copper tape screens so that the solder block is positioned upon the cable bedding. A turn of mastic sealant tape should be applied beneath and on top of the solder block. If a constant force spring is used to connect the earth braids, the spring should preferably be positioned above the fingers of the breakout boot. These braids will either be bonded to the earth gland or other suitable earth point. 30mm SEALANT TAPE ROLL SPRINGS SEALANT TAPE COPPER BRAIDS COPPER TAPE SCREEN Bushing centre 100mm Armours 100mm Bedding L X 100mm
  • 4. Remove the copper tape screen to length A+X as indicated in Table 2. Note:- If the cores are to be crossed the copper screen should be removed after the initial setting of the cores. It may be necessary to temporarily secure the copper tapes to prevent them from unwinding. VOLTAGE A B X 7.2kV 130mm 110mm 12kV 185mm 165mm 17.5kV 185mm 165mm 24kV 310mm 290mm 36kV 460mm 440mm LUG BARREL LENGTH +5MM 3. Conductive Layer Treatment Extruded Conductive Screen Layer Remove the semi-conductive screen layer using a suitable tool to dimension B+X as indicated in Table 2. Note:- It is very important that the screen is removed leaving a clean straight cut and that no scoring or damage is done to the primary insulation. We highly recommend the use of approved screen removal tools (see our website for tools and demonstration videos). It is good practice to flame brush the primary insulation and conductive screen cut, this has the effect of removing any minor surface irregularities or burrs that may be present. Apply Stress Control Tape De-grease the insulation and screen using the solvent tissues provided. Remove the release paper from the yellow stress control tape (TS31785Y). Stretch to approx. 50% width and apply the tape around the end of each core screen to cover the copper tape (If present) and insulation by 10mm either way. Table 2 B 10mm 10mm COPPER TAPE SCREEN YELLOW STRESS CONTROL TAPE X A B
  • 5. 4. Stress Control Tubes Position the stress control tubes onto each core so that the bottom of each tube is covering the yellow stress control mastic by approx 10mm. Starting at the end closest to the cable crutch, Shrink each tube one at a time keep the flame on the move to ensure an even wall thickness. 5. Installing Cable Lugs Remove the insulation from each core to the X dimension in Table 1. Install cable lug and remove any burrs or sharp points that may be present. Preheat each Lug and wrap two layers of Red Sealant Tape over the Lug barrel and extend onto the Insulation by approx 10mm. Ensure the Tape is applied as shown. Important:- use more tape to build up the diameter to ensure tube recovers upon it and creates a moisture seal. 6. Installing The Breakout Boot Slide the three legged boot over the cores and push down into the crutch of the cable. Shrink from the shoulder of the breakout and down to the cable sheath, then from the shoulder to the cores. Apply a turn of red sealant tape around each breakout turret as shown. 7. Installing The Anti-Track Tube Position the anti-track tubes so that they cover the turrets of the breakout boot and the barrels of the lugs. Starting from the cable crutch area, Shrink the tubes in place. Keeping the flame moving to ensure an even wall thickness, ensure the tubes are fully recovered and wrinkle free. Allow the tubes to cool to hand hot and trim at the lug end with a sharp knife if necessary. ROLL SPRINGS X ANTI-TRACK TUBE RED SEALANT TAPE
  • 6. Indoor Terminations To ensure long term performance of medium voltage terminations, certain separation distances are required as indicated in Table 3. DISTANCE (d) PHASE/PHASE TOP OF STRESS TUBE & PHASE/GROUND TO LUG BARREL VOLTAGE d (mm) E 7.2kV 15mm 30mm 12kV 20mm 50mm 17.5kV 20mm 75mm 24kV 40mm 95mm 36kV 50mm 250mm Note:- Bushing protection boots will be required for the majority of installations. If it is necessary to cross the cores, the cross MUST be in a screened area as shown. 8. Installation Of Rain Sheds On outdoor terminations the sheds should be fitted from the bottom up as indicated in the drawing opposite. Indoor 36kV terminations are supplied with one shed per phase and four sheds per phase for outdoor. Table 3 NUMBER OF SHEDS PER PHASE VOLTAGE INDOOR OUTDOOR 7.2kV - 1 12kV - 2 17.5kV - 2 24kV - 3 36kV 1 4 Table 4 The first shed should be fitted at a distance 200mm from the lower edge of the anti-track tube to the edge of the shed. All subsequent sheds should be fitted at a distance of 80mm from edge to edge. Note:- It is advisable not to position rain sheds at the top of stress control tubes, re-position if necessary. d E d AIR CLEARANCE TO LOCAL SPEC 80mm 200mm d = SEE TABLE 4
  • 7. MIN BENDING RADIUS r = 15xD D Inverted Connections If a termination is to mounted for connection from above the equipment i.e in the inverted position, sheds should be installed through 180° as shown Cable Bending Radius During installation care should be taken not to over bend the cable. In cold condition it may be necessary to gently heat the cable to prevent damage whilst bending.