1. Liverpool Street Project – Brodgate Ticket Hall – RAMS Boards performance
Delivery on site 2015/04/27 – outdoors position. Construction Site Set Up version.
RAMS Board was relocated as site entry has changed – still outdoors – slightly less exposed
2. RAMS board – relocated to the same position fully outdoors. Layout changed to suit contractor
needs.
Anchors installed – Board fully compliant to EN 1991-1-4:2005. Paper documents inside of the A4
transparent pockets - despite outdoor location quality is good.
3. Close view of documents in A4 transparent pockets.
Roof providing protection and minimising rain affecting inside part of RAMS Board
4. Liverpool Street Project – Moorgate Ticket Hall – RAMS Boards performance
Two Construction Site Set Up boards delivered on 2015/04/28 – project has two independent
stages.
5.
6. RAMS Board – after 6 months of demolition being carried out on site
Daily information