WORK STUDY METHODOLOGY
&
P.I CALCULATION
By Ankit Patra
Sigma Consultants Private Limited
WORK STUDY
 A system of assessing methods of working so as to achieve the maximum
output and efficiency.
 Classifications of work Study
 Time & Motion Study: For direct workmen
 Activity Sampling : For indirect workmen
 Method Study : Implement of new methods to enhance productivity
 Objectives
 Achieve Standard Man Hour (SMH).
 Achieve Standard Output
 Improve Productivity of machines, man & materials.
 Eliminate wastages to increase production with less fatigue.
TIME & MOTION STUDY
 Time Study is quantitative analysis Leading to establishing the time
standards whereas motion study is qualitative analysis leading to
establishment of time standard.
 Procedure
 Calculate the Net Available Time in a Shift/Day(N.A.T)
 Cover all measurable work element from a particular section.
 Decides the Unit of those working elements.
 Observe unit/Shift & Normal min./unit.
 Calculate Normal min./shift.
 Determine the no. of Squad & Gang involved .
 Calculate Normal man min.
CONT’D..
 Calculate Cycle Time of that work element.
 Cycle time can be conclude in two types
 Normal Cycle time : In General cases i.e. when single operation goes on.
 Controlling Cycle time: When Line Operation goes on.
***Line Operation
***Line Balancing
 Calculate Standard Man Hour(SMH) with Relaxation allowances and
contingency allowances.
 Calculate Standard output
 Calculation of SMH/unit production
 Calculate OMS(Output per Man Shift)
ACTIVITY SAMPLING
 A technique in which a large number of observations are made over a
period of time of one group of machines, processes or workers.
 Procedure
o Observe the no. of workmen engaged in a particular work.
o No. of active observation.
o No. of Idle observation.
o No. of forced Idle observation.
o Calculate Utilization %
o Calculate Idle %
o Calculate the workload.
o Calculate standard workload with standard relaxation allowances and
misc. Allowances.
o Calculate the Accuracy of the study.
METHOD STUDY
 Method study is the process of subjecting work to systematic,
critical scrutiny to make it more effective and/or more efficient.
It is one of the keys to achieving productivity improvement.
 Procedure
 Select the job – on which method study is to be applied.
 Gather information and record.
 Examine the information critically.
 Develop the most practical, economical and effective method by
considering real limitations of the situation.
 Install the new method as standard practice.
PRODUCTIVITY INDICES (P.I)
 The shift-wise standard hours of each individual in a Direct Group is calculated on the
basis of actual shift’s good output divided by the Output Norms. The cumulative monthly
standard hours for the individual divided by the actual monthly hours of the individual
gives the Labour Productivity for the individual and this is expressed as a percentage.
Mathematically, P.I. = (SMH Earned)*100/Total AMH
 SMH: Standard Man Hours
 AMH: Attendant Man Hours
 Procedure
 Collect last one year’s monthly production data from respective department.
 Collect the total AMH(including normal & overtime hrs.)from Time office/Plant HR.
 Calculate the SMH earned per month.
 Calculate the P.I month wise for a particular section by following previous described
mathematical formula.
 Similarly calculate the overall P.I for that particular section.
CONCLUSION
 Do better planning for existing manpower.
 Improvement of existing methods.
 Increased productivity & operational efficiency.
 Optimum utilisation of resources.
 Cut down the inefficient motions.
 Less Fatigue to the worker.
 Set up Incentive schemes for workmen.
THANK YOU

More Related Content

What's hot

3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
Lizzette Danan
 
Worksampling - Methods Engineering
Worksampling - Methods EngineeringWorksampling - Methods Engineering
Worksampling - Methods Engineering
Angelica Angelo Ocon
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
Pratibha Khemchandani
 
Time and motion study
Time and motion studyTime and motion study
Time and motion study
Vaithi2140
 

What's hot (20)

Work study and method study
Work study and method studyWork study and method study
Work study and method study
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
method study- micromotion vs memo motion
method study- micromotion vs memo motionmethod study- micromotion vs memo motion
method study- micromotion vs memo motion
 
Method study
Method studyMethod study
Method study
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
 
Time study
Time studyTime study
Time study
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Worksampling - Methods Engineering
Worksampling - Methods EngineeringWorksampling - Methods Engineering
Worksampling - Methods Engineering
 
Work study method-and_time_study-final
Work study method-and_time_study-finalWork study method-and_time_study-final
Work study method-and_time_study-final
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Work sample
Work sampleWork sample
Work sample
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
Time and motion study
Time and motion studyTime and motion study
Time and motion study
 
Introduction to time study
Introduction to time studyIntroduction to time study
Introduction to time study
 
Methods Engineering
Methods EngineeringMethods Engineering
Methods Engineering
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 

Similar to Work study and productivity index

Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
Rajeev Sharan
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
grubinm
 

Similar to Work study and productivity index (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Garments
Garments Garments
Garments
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
 
work sampling.pptx
work sampling.pptxwork sampling.pptx
work sampling.pptx
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
 
Work measurement
Work measurementWork measurement
Work measurement
 
Management tools
Management toolsManagement tools
Management tools
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
hublikarsn
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Recently uploaded (20)

Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 

Work study and productivity index

  • 1. WORK STUDY METHODOLOGY & P.I CALCULATION By Ankit Patra Sigma Consultants Private Limited
  • 2. WORK STUDY  A system of assessing methods of working so as to achieve the maximum output and efficiency.  Classifications of work Study  Time & Motion Study: For direct workmen  Activity Sampling : For indirect workmen  Method Study : Implement of new methods to enhance productivity  Objectives  Achieve Standard Man Hour (SMH).  Achieve Standard Output  Improve Productivity of machines, man & materials.  Eliminate wastages to increase production with less fatigue.
  • 3. TIME & MOTION STUDY  Time Study is quantitative analysis Leading to establishing the time standards whereas motion study is qualitative analysis leading to establishment of time standard.  Procedure  Calculate the Net Available Time in a Shift/Day(N.A.T)  Cover all measurable work element from a particular section.  Decides the Unit of those working elements.  Observe unit/Shift & Normal min./unit.  Calculate Normal min./shift.  Determine the no. of Squad & Gang involved .  Calculate Normal man min.
  • 4. CONT’D..  Calculate Cycle Time of that work element.  Cycle time can be conclude in two types  Normal Cycle time : In General cases i.e. when single operation goes on.  Controlling Cycle time: When Line Operation goes on. ***Line Operation ***Line Balancing  Calculate Standard Man Hour(SMH) with Relaxation allowances and contingency allowances.  Calculate Standard output  Calculation of SMH/unit production  Calculate OMS(Output per Man Shift)
  • 5. ACTIVITY SAMPLING  A technique in which a large number of observations are made over a period of time of one group of machines, processes or workers.  Procedure o Observe the no. of workmen engaged in a particular work. o No. of active observation. o No. of Idle observation. o No. of forced Idle observation. o Calculate Utilization % o Calculate Idle % o Calculate the workload. o Calculate standard workload with standard relaxation allowances and misc. Allowances. o Calculate the Accuracy of the study.
  • 6. METHOD STUDY  Method study is the process of subjecting work to systematic, critical scrutiny to make it more effective and/or more efficient. It is one of the keys to achieving productivity improvement.  Procedure  Select the job – on which method study is to be applied.  Gather information and record.  Examine the information critically.  Develop the most practical, economical and effective method by considering real limitations of the situation.  Install the new method as standard practice.
  • 7. PRODUCTIVITY INDICES (P.I)  The shift-wise standard hours of each individual in a Direct Group is calculated on the basis of actual shift’s good output divided by the Output Norms. The cumulative monthly standard hours for the individual divided by the actual monthly hours of the individual gives the Labour Productivity for the individual and this is expressed as a percentage. Mathematically, P.I. = (SMH Earned)*100/Total AMH  SMH: Standard Man Hours  AMH: Attendant Man Hours  Procedure  Collect last one year’s monthly production data from respective department.  Collect the total AMH(including normal & overtime hrs.)from Time office/Plant HR.  Calculate the SMH earned per month.  Calculate the P.I month wise for a particular section by following previous described mathematical formula.  Similarly calculate the overall P.I for that particular section.
  • 8. CONCLUSION  Do better planning for existing manpower.  Improvement of existing methods.  Increased productivity & operational efficiency.  Optimum utilisation of resources.  Cut down the inefficient motions.  Less Fatigue to the worker.  Set up Incentive schemes for workmen.