2. Technical Fields
• Material Engineering
• Plant Layout
• Stress Analysis and Support
• PDMS SPEC/CATA
• Proposals
2
3. Material Engineering
• Development of Specifications (especially
PMS)
• Wall thickness Calculation
• PID Mechanization
• Preparation of MRs
• Piping VDR
• TBE Preparation
3
4. Plant Layout
• Development of Specifications
• Plot Plan Preparation
• 3D-Model Development
• Preparation of SSLD and NOCL
• Vendor document review
• Preparation of isometric and piping plan
4
5. Stress Analysis
• Stress analysis calculation by CaesarII
• Determination of piping loads on SSLD and
NOCL
• Support of piping
• Preparation of stress analysis report and
support list
• Preparation of support MTO
5
8. PDMS CATA/SPEC
• Admin of PDMS
• Development of PDMS SPEC
• Definition of piping missing components
8
9. Proposal Execution Process
• ITB
• Proposal KOM
• Clarifications with Owner
• Base of Proposal
• Man-hour estimation
• Preparation of Structures Configuration and loads
• CIV Required UG data
• EED Required UG data
• Piping MTO
• Estimation of Inch-Dia.
• Tie-in point list
• Cost estimation
9
10. Project Execution
• PPD Process Flow Chart for Basic Engineering
Design
• PPD Process Flow Chart for Detail Engineering
Design
10
12. Master Document List
Type of Documents
• Specifications
• Plot Plan
• 3D-model
• Data Sheets
• Line List
• Piping Isometric
• Piping Plan
• Material Take off
• Material requisition
• TBE
• ITP
• Structural Single Line Diagram
• Equipment Study (nozzle orientation, Ladder, Platform and pipe clip)
• UG Route Study
12
14. Plot Plan
Overall Plot Plan
• Conceptual/Basic/Detail
• Prerequisite: PFD (basic)/PID (Detail), Equipment
List, Site visit report, consequence analysis,…
• Complex B.L., Main roads, coordination of units
B.L, buildings, gates, ramps, complex traces,…
14
15. Plot Plan
Zone/Unit Plot Plan
• Conceptual/Basic/Detail
• Prerequisite: PID, Equipment List, Site visit
report, consequence analysis,…
• Units B.L., Structures, piperacks, equipments,
access ways, equipment pits, equipment
installation elevation,…
15
16. Plot Plan
Plot Plan Review Meeting
• Multidisciplinary document
• Leadership of PEM
• PCD-EDX-006/ PCD-SAZ-002
• Meeting with owner is recommended
16
17. 3D-Model
• Purpose: preparation an integrated model and
extraction documents
• PDMS
• Responsibility Matrix (PCD-EDX-004)
• 3D-model review in 3 stages: 30%, 60%, 90%
according to (PCD-EDX-007)
• Very important target in project
17
18. 3D-Model
• 30% model review result:
- Issue of Single lines
- UG piping route study
- UG isometric (IFD)
- First MTO
18
19. 3D-Model
• 60% model review result:
- AG Isometric (IFD)
- Piping Plan (IFD)
- Second piping MTO
- Stress analysis report (IFD)
- Support List and special support drawing
- Plot Plan (IFC)
- UG Isometric (IFC)
19
20. 3D-Model
• 90% model review result:
- AG Isometric (IFC)
- Piping Plan (IFC)
- Third piping MTO
- Stress analysis report (IFD)
- Support List and special support drawing (IFC)
20
21. Line List Preparation
• Prerequisites
• Process information are required
• Prerequisite of other design activities
- PMS development
- Stress analysis activities
- Paint and insulation MTO
• Prerequisite of construction activities (Welding, NDT,
PWHT, hydro-test and cleaning)
21
22. Data Sheet Preparation
• About 21 documents
• Out put of material and stress analysis
• Some need to FSD data
• Sazeh format of data sheets
22
23. Requisitions, TBE and ITP
• More than 50 title of MR
• More than 50 title of TBE
• About 40 ITP
23
24. Internal Documents
• Structural Single Line Diagram
• Nozzle Orientation, Ladder, Platform and clip
information
• UG Route Study
24
25. Review of Other Departments
Documents
• P&ID
• Engineering Drawing
• Instrument Hook-Up
• Safety Layout
• Structure Drawing
• Civil UG Layout
• Vendor Drawings of RED, FEQ, EQP and INS
25