ENGINEER
AMIR ALBOUKHARI
Syrian master plan of waste management: Seminars
Signing
contract with
Trivalor co
Syrian master plan of waste management: Seminars
GENERALITIES
ïź Main constraints for waste management in Syria :
- Outside burning, with generation of pollution,
- No landfill with total containment,
- No real operation in most of dumpsites,
- No treatment plant for hazardous waste,
- Important shortage of vehicles, containers and workers,
- No awareness about waste impact on environment.
Syrian master plan of waste management: Seminars
Current situation
In Syria
Syrian master plan of waste management: Seminars
Sorting waste
Damascus
Current situation
In Syria
Collecting batteries
Syrian master plan of waste management: Seminars
Current situation
In Syria
Ever clean co
Syrian master plan of waste management: Seminars
Damascus
Transfer station
Aleppo
Current situation
In Syria
Syrian master plan of waste management: Seminars
Damascus composting plant
Current situation
In Syria
Syrian master plan of waste management: Seminars
Salamya composting plant
Current situation
In Syria
Syrian master plan of waste management: Seminars
Damascus
Homs
Current situation
In Syria
landfills
Syrian master plan of waste management: Seminars
‫ۧ‏Latakia
Aleppo
landfills
Current situation
In Syria
Syrian master plan of waste management: Seminars
Idleb
Deir alzor
Current situation
In Syria
landfills
Syrian master plan of waste management: Seminars
Medical waste management in Damascus
Syrian master plan of waste management: Seminars
Solid waste
management
Master plan
Syrian master plan of waste management: Seminars
Basic network Generalization
1 OK NO
OK, in Damascus,
Lattakia and
Salameya
NO NO OK
2 OK NO OK NO NO OK
3 OK OK OK NO NO OK
3 bis OK OK OK NO NO OK
4 OK OK OK OK NO OK
5 OK OK OK OK
OK, in Damascus
and Aleppo (1)
OK
6 OK OK OK OK
OK, in :
Damascus (1),
Aleppo, Tartous,
Lattakia, Douma,
Suweida + Daraa
OK
(1) only for rejected waste from composting
Sanitary
landfilling
Composting
Scenario
Remediation
dumpsite
Recovery
of dry
materials
Thermic treatment
The seven scenarios for domestic waste management
in the Syrian Arab Republic
Syrian master plan of waste management: Seminars
GENERALITIES
ïź A rational waste management is :
- Keep a clean town,
- Minimize the current proportion of waste in dumpsite,
- Set up a network of landfill with waterproof and
leachate control,
- Increase training for operating of landfills and
composting plants,
- Ban outside burning.
Syrian master plan of waste management: Seminars
Domestic waste : 5 400 000 t/year
recovery bulky wastebiowaste inertMixed waste hazardous waste
sorting plant
Landfill
3 000 000 t
home
composting
spécific
treatment
7 400 t
10 000 t4 540 000 t600 000 t 70 000 t 90 000 t
780 000 t
medical waste
7 400 t 3 100 t
spécific
treatment
3 100 t
780 000 t
1 550 000 t
Compost
1 550 000 t
Mechanical
preparation
Inert landifilling
70 000 t
Recycling
790 000 t
1 550 000 t
190 000 t
3 850 000 t
650 000 t
Composting
3 100 000 t
Recycling
90 000 t
0,1%1,3%28%55%14% 0,1%1,6%
Domestic waste : 5 400 000 t/year
recovery bulky wastebiowaste inertMixed waste hazardous waste
sorting plant
Landfill
3 000 000 t
home
composting
spécific
treatment
7 400 t
10 000 t4 540 000 t600 000 t 70 000 t 90 000 t
780 000 t
medical waste
7 400 t 3 100 t
spécific
treatment
3 100 t
780 000 t
1 550 000 t
Compost
1 550 000 t
Mechanical
preparation
Inert landifilling
70 000 t
Recycling
790 000 t
1 550 000 t
190 000 t
3 850 000 t
650 000 t
Composting
3 100 000 t
Recycling
90 000 t
0,1%1,3%28%55%14% 0,1%1,6%
Syrian master plan of waste management: Seminars
GENERALITIES
ïź An optimal waste management needs also
to implement actions in the order below :
Waste minimization
Adapted collection
Adapted treatment
Landfill
Main aim : reduce
waste in landfill
Syrian master plan of waste management: Seminars
ïź IN PRACTICE, IT NEEDS :
- Technical means (vehicles, plants
),
- Technical organization (good managerial staff),
- Administrative organization (planification in each
governorate, intermunicipal organization),
- National policies,
- Financial ressources :
- Financing of investment,
- Financing of services.
Syrian master plan of waste management: Seminars
WASTE MINIMIZATION
Syrian master plan of waste management: Seminars
WASTE MINIMIZATION
Consciousness
raising
Financial
incentives
MINIMIZATION
OF WASTE
GENERATION
Promotion of eco-
responsible
purchase
MASS MEDIA
Promotion of « less
collected waste »
Syrian master plan of waste management: Seminars
WASTE MINIMIZATION
ï‚š Solutions :
ï‚š - Deposit system for
batteries, bottles,
tires, plastic bags,
ï‚š -Specific tax on
plastic bags You buy the first bag and
after you change old bag for
a new, free of charge
Syrian master plan of waste management: Seminars
WASTE MINIMIZATION
ï‚š Solutions :
ï‚š - Encourage reuse :
repair lists, support
second-hand
market

ï‚š - Home composting,
Syrian master plan of waste management: Seminars
WASTE COLLECTION
ïź IMPROVEMENT OF TRADITIONAL COLLECTION :
- Decrease the large shortage of collection containers,
- Decrease the large shortage of compactors for
collection,
- Increase the labor force for cleanliness and collection,
(2 workers for 1 000 inhabitants),
- Set up a managerial staff to optimize waste
management in each town,
- Promote partnership with private companies.
Syrian master plan of waste management: Seminars
Possible separative collection
glass
plastic
Cardboard
Packaging and old papers Biowaste
steel
Vegetables
Green waste
Syrian master plan of waste management: Seminars
RECYCLING CONTAINERS
Syrian master plan of waste management: Seminars
SEPARATIVE COLLECTION OF
BULKYWASTE IN DROP-OFF CENTRE
Principle : enclosed
place supervised,
where municipal
services,
households, and
small companies
bring and separate
bulky waste :
furniture, household
electrical appliance,
big objects
Syrian master plan of waste management: Seminars
WASTE TRANSPORT
ïź Waste transport is
not efficient with
tractor or
compactor on
long distances.
ïź Transfer station
and transport by
truck is necessary
to gather waste in
a big treatment
plant.
Main plant
Transfer stations for small centres
Syrian master plan of waste management: Seminars
WASTE TRANSPORT : MINIMUM DISTANCE
Ton/day
Distance
of
treatment
center
(km)
Transfer plant
advantageous area
Syrian master plan of waste management: Seminars
Transfer
station for
rural areas
Simple
skip
WASTE TRANSPORT
Syrian master plan of waste management: Seminars
Transfer station for urban areas
WASTE TRANSPORT
Syrian master plan of waste management: Seminars
Governorate
Nb. of
sites
Governorate Nb. of sites
Damascus City 1 Hama 12
Damascus countryside 11 Lattakia 13
Daa’ra 7 Tartous 9
Suweida 6 Deir Es Zor 8
Aleppo 14 Hasakeh 8
Idleb 3 Rakka 9
Homs 9 TOTAL 110
Number of transfer stations per governorate
Syrian master plan of waste management: Seminars
Network of transfer
stations : 1 to14
transfer station per
Governorate
WASTE TRANSPORT
ïź Provisional investment :
4 to 40 million SP/transfer
station,
ïź Transport cost : 80 to 100
SP/ton for medium and
long distance.
Syrian master plan of waste management: Seminars
DIFFERENT TYPE OF WASTE TREATMENT
ïź Sorting plant
ïź Composting
ïź Other treatment of organic matter
ïź Thermic treatment
Syrian master plan of waste management: Seminars
INTEGRATED CENTRE OF WASTE TREATMENT
Syrian master plan of waste management: Seminars
SORTING PLANT GENERAL ORGANISATION
Weighing
Reception area
Mechanical sorting
Manual sorting
To sell
Storage before conditionning
Weighing
Storage before evacuation
conditionning
Offices
Syrian master plan of waste management: Seminars
SORTING PLANT
P EN TE
OPENER
OF BAGS
ALIMENTATION
MECHANICAL
SORTING SORTING
CABIN
CONVEYOR OF
PRESS
PRESS
EVACUATION
Syrian master plan of waste management: Seminars
SORTING PLANT
Syrian master plan of waste management: Seminars
RECEIPTS OR EXPENSES FOR SORTING
FACILITIES (mixed waste)
5900
2600
1200
600
130 -10 10 -20 -50
-1000
0
1000
2000
3000
4000
5000
6000
1500
3000
6000
10000
15000
20000
30000
40000
50000
Annual recovery tonnage (t/year)
S.P./tonofrecovery
material
Syrian master plan of waste management: Seminars
COMPOSTING PLANT
ïź Organic matter treatment
ïź Aerobic way
ïź Different ways:
 Mixed domestic waste
 Green waste
 Organic matter from domestic waste after
separative collection
Syrian master plan of waste management: Seminars
COMPOSTING PLANT
MAIN ORGANISATION
RECEPTION AND
PREPARATION
FERMENTATION
PHASE
MATURATION
COMPOST
REFINING
STORAGE
AVOID SCHREDDING
SELLING
PREARE COMPOST FOR SELLING
Syrian master plan of waste management: Seminars
COMPOSTING PLANT
ïź Parameters involved to optimize composting
ïź Humidity,
ïź Aeration
ïź An efficient composting process has
to optimize these parameters in a
simple way
Syrian master plan of waste management: Seminars
COMPOSTING PLANT
OUTSIDE PLATEFORM WITH NATURAL AERATION
Syrian master plan of waste management: Seminars
COMPOSTING PLANT
OUTSIDE PLATEFORM WITH NATURAL AERATION
compost
Retourneur enjambeurTurner
GREEN WASTE
COMPOSTING
Syrian master plan of waste management: Seminars
COMPOSTING COSTS
920
500
320
260 230 220 220
0
500
1 000
5 000 15 000 50 000 100 000 160 000 225 000 260 000
t/year
S.P./ton
Syrian master plan of waste management: Seminars
DIFFERENT TYPE OF LANDFILL
ïź Depending on type of admitted waste
ïź 1st class: for hazardous waste
ïź 2nd class: for domestic waste or non hazardous
industrial waste
ïź 3th class: for demolition waste (inert)
Syrian master plan of waste management: Seminars
CHARACTERISTICS OF SITE FOR LANDFILLING
Criterion Characteristics
Localisation Distance : 5 km of habitations and
others activities.
Geology Limited ground settlement
Impermeable materials in bottom and
around the site.
Hydraulic Permeability:
1m with permeability < 1.10-9 m/s +
5m with permeability < 1.10-6 m/s
Hydro-geology Site basis over the maximum level of
the water table
Syrian master plan of waste management: Seminars
General design
Syrian master plan of waste management: Seminars
General designTypical multiple active and passive barrier
GĂ©otextile
GĂ©omembrane PEHD
groundwater
Clay1m – 10-9 m/s
Clayor equivalent
5m – 10-6 m/s
WASTE
At least 10 meters
Typical multiple active and passive barrier
Geotextile
GĂ©omembrane PEHD
groundwater
Clay1m – 10-9 m/s
Clayor equivalent
5m – 10-6 m/s
WASTE
At least 10 meters
passive
Substratum
Rock/soil
active
Syrian master plan of waste management: Seminars
Control and supervision
Underground water -monthly sampling and analysis,
-control of water level,
Superficial water -implementation of reject points,
-monthly analysis
Leachate -treatment to define in special
conditions,
-implementation of reject points,
-monthly analysis,
-quality of rejects to be define in
special conditions book,
Biogaz -analysis of composition (6 per
year),
-quality of rejects to be define in
book of special conditions
Documents -plan of operation,
-annual hydric balance
Syrian master plan of waste management: Seminars
BIOGAZ
NETWORK OF COLLECTION
CONTROLED BURNING PRODUCTION OF ENERGY
Syrian master plan of waste management: Seminars
LEACHATE
STORAGE AND
TREATMENT
Syrian master plan of waste management: Seminars
CONSTRUCTION OF COMPARTMENT
Syrian master plan of waste management: Seminars
Cost per ton landfilled in relation with the landfill annual
capacity
0
200
400
600
800
1000
1200
1400
1600
0 50 000 100 000 150 000 200 000 250 000 300 000 350 000 400 000 450 000 500 000
Capacity in tons
CostinSP/ton
Syrian master plan of waste management: Seminars
MEDICAL WASTE MANAGEMENT
The priority : separative collection
of medical waste in the
hospital
Syrian master plan of waste management: Seminars
Syria – Medical Waste Facilities Nominal Treatment capacities - 5000 t in 2014
Al Quneitra
JORDAN
Aleppo
El Hasakeh
Miadeen
Homs
As Suweida
Dar’a
Damascus
Edleb
Hama
Tartus
Lattakia
A’ Zaz Al Bab
Manbij
El Thaourah
Ar Raqqa
El Qamishli
Deir ez Zor
Abu kamal
Tadmor
Masyaf
Nabk
Duma
Busra
Orontes
Euphrates
Buhayrat al’ Asad
Jebleh
Yabroud
950 t/y
500 t/y
100 t/y
100 t/y
150 t/y
1 000 t/y
1 000 t/y
300 t/y
300 t/y
Medical Waste Treatment
Facility by Steam Disinfection
300 t/y
100 t/y
300 t/y
100 t/y
300 t/y
Syria – Medical Waste Facilities Nominal Treatment capacities - 5000 t in 2014
Al Quneitra
JORDAN
Aleppo
El Hasakeh
Miadeen
Homs
As Suweida
Dar’a
Damascus
Edleb
Hama
Tartus
Lattakia
A’ Zaz Al Bab
Manbij
El Thaourah
Ar Raqqa
El Qamishli
Deir ez Zor
Abu kamal
Tadmor
Masyaf
Nabk
Duma
Busra
Orontes
Euphrates
Buhayrat al’ Asad
Jebleh
Yabroud
950 t/y950 t/y
500 t/y500 t/y
100 t/y100 t/y
100 t/y100 t/y
150 t/y150 t/y
1 000 t/y1 000 t/y
1 000 t/y1 000 t/y
300 t/y300 t/y
300 t/y300 t/y
Medical Waste Treatment
Facility by Steam Disinfection
Medical Waste Treatment
Facility by Steam Disinfection
300 t/y300 t/y
100 t/y100 t/y
300 t/y300 t/y
100 t/y100 t/y
300 t/y300 t/y
Syrian master plan of waste management: Seminars
MEDICAL WASTE MANAGEMENT
ïź RECOMMENDATION :
A specific collection with
safety rules and
specific trucks for
medical waste, with
regular disinfection
Syrian master plan of waste management: Seminars
MEDICAL WASTE MANAGEMENT:
The best solution : steam
disinfection
Syrian master plan of waste management: Seminars
MEDICAL WASTE MANAGEMENT
ïź RECOMMENDATION FOR SYRIA:
1 plant per governorate for steam disinfection, with :
- 1 large plant in big areas (500 to 1 000 t/year),
- 1 small plant in other areas (100 to 150 ton/year).
New jobs : 4 to 6 persons per facility.
Syrian master plan of waste management: Seminars
Syria – Medical Waste Facilities Nominal Treatment capacities - 5000 t in 2014
Al Quneitra
JORDAN
Aleppo
El Hasakeh
Miadeen
Homs
As Suweida
Dar’a
Damascus
Edleb
Hama
Tartus
Lattakia
A’ Zaz Al Bab
Manbij
El Thaourah
Ar Raqqa
El Qamishli
Deir ez Zor
Abu kamal
Tadmor
Ariha
Ma’ arrar
Masyaf
Al Qusayr
Nabk
Duma
Busra
Orontes
Euphrates
Buhayrat al’ Asad
Jebleh
Yabroud
1000 t/y
150 t/y
100 t/y
100 t/y
Medical Waste Treatment
Facility by Steam Disinfection
Medical Waste Treatment
Facility by Incineration
1500 t/y
1500 t/y
1500 t/y
Syria – Medical Waste Facilities Nominal Treatment capacities - 5000 t in 2014
Al Quneitra
JORDAN
Aleppo
El Hasakeh
Miadeen
Homs
As Suweida
Dar’a
Damascus
Edleb
Hama
Tartus
Lattakia
A’ Zaz Al Bab
Manbij
El Thaourah
Ar Raqqa
El Qamishli
Deir ez Zor
Abu kamal
Tadmor
Ariha
Ma’ arrar
Masyaf
Al Qusayr
Nabk
Duma
Busra
Orontes
Euphrates
Buhayrat al’ Asad
Jebleh
Yabroud
1000 t/y
150 t/y
100 t/y
100 t/y
Medical Waste Treatment
Facility by Steam Disinfection
Medical Waste Treatment
Facility by Incineration
1500 t/y
1500 t/y
1500 t/y
Al Quneitra
JORDAN
Aleppo
El Hasakeh
Miadeen
Homs
As Suweida
Dar’a
Damascus
Edleb
Hama
Tartus
Lattakia
A’ Zaz Al Bab
Manbij
El Thaourah
Ar Raqqa
El Qamishli
Deir ez Zor
Abu kamal
Tadmor
Ariha
Ma’ arrar
Masyaf
Al Qusayr
Nabk
Duma
Busra
Orontes
Euphrates
Buhayrat al’ Asad
Jebleh
Yabroud
1000 t/y
150 t/y150 t/y
100 t/y100 t/y
100 t/y100 t/y
Medical Waste Treatment
Facility by Steam Disinfection
Medical Waste Treatment
Facility by Incineration
1500 t/y
1500 t/y
1500 t/y
Syrian master plan of waste management: Seminars
Typical multiple active and passive barrier
Geotextile
GĂ©omembrane HDPE
Drainage layer 0,5 m
K = 10 -4 m/s
Substratum
Rock/soil
groundwater
Clay or equivalent
5m K=10-9 m/s
Hazardous and medical WASTE
Typical multiple active and passive barrier
Geotextile
GĂ©omembrane HDPE
Drainage layer 0,5 m
K = 10 -4 m/s
Substratum
Rock/soil
groundwater
Clay or equivalent
5m K=10-9 m/s
Hazardous and medical WASTE
Syrian master plan of waste management: Seminars
HAZARDOUS WASTE
ïź Hazardous waste
collection is an
absolute priority :
great impact on
compost quality ,
on environment
and water
pollution
Syrian master plan of waste management: Seminars
HAZARDOUS WASTE STORAGE
ïź In municipal
services or fire
station : a
closed cupboard
with retention
system on the
soil
Syrian master plan of waste management: Seminars
HAZARDOUS WASTE TREATMENT
Aim for Syria : carry out
one plant for toxic waste
Several activities in the Syrian plant :
- Recovery,
- Physical and chemical treatment,
- Incineration.
- For specific toxic waste, export is necessary : PCB for
example (Europe, Asia
).
- Suggestion : partnership between Middle East countries
to set up a network of plant for all toxic waste
Syrian master plan of waste management: Seminars
FINANCING OF INVESTMENT
ïź Government or regional grant
ïź Budget of municipality (need financial
reserves)
ïź Bank loan
ïź Private ( by B.O.T: built, operate and
transfer tendering procedure)
Syrian master plan of waste management: Seminars
Al Quneitra
Aleppo
El Hasakeh
Miadeen
Homs
As Suweida
Dar’a
Damascus
Edleb
Hama
Tartus
Lattakia
A’ Zaz Al Bab
Manbej
Al Thora
Al Raqqa
El Qamishli
Deir ez Zor
Abu kamal
Tadmor
Masyaf
Nabk
Duma
Busra
Orontes
Euphrates
Buhayrat al’ Asad
Jebleh
Yabroud
Treatment unit
Sanitary landfill
Al Quneitra
Aleppo
El Hasakeh
Miadeen
Homs
As Suweida
Dar’a
Damascus
Edleb
Hama
Tartus
Lattakia
A’ Zaz Al Bab
Manbej
Al Thora
Al Raqqa
El Qamishli
Deir ez Zor
Abu kamal
Tadmor
Masyaf
Nabk
Duma
Busra
Orontes
Euphrates
Buhayrat al’ Asad
Jebleh
Yabroud
Treatment unit
Sanitary landfill
Treatment unit
Sanitary landfill
Map of main Syrian facilities (Integrated centres and landfill)
Syrian master plan of waste management: Seminars
Governorate of Hasakeh – 1 620 000 inhabitants in 2014 – 336 960 ton/year in 2014
Al Malkiye (81 820)
El Hasakeh (251 000)
Amuda (38
000)
Ash Sadaddih
Tall Tamir (3 500)
Qamischli (180 000)
Ain Diwar
( 7 000)
Tel Halaf ( 7 000)
Ras al Ein
(51 000)
Ad Dughayrat
Al Hawl (6 200)
Al Khatuniya (4 500)
Al ‘Ya Rubiyeh
Tall Brak
Darbasiyah (24 000)
39
27 28
27
50
42
13
30
35
60
41
56
Area A
Population 700 000
inh
Total domestic waste 145 600 ton/year
Transferred waste 43 800
ton/year
Sorting of recyclable 27 230 ton/year
Composting 93 450 ton/year
Landfilling 75 845 ton/year
Area C
Population 260 000
inh
Total domestic waste 54 080 ton/year
Transferred waste 37 800
ton/year
Sorting of recyclable 7 800 ton/year
Composting 0 ton/year
Landfilling 46 280 ton/year
Area B
Population 460 000
inh
Total domestic waste 95 680 ton/year
Transferred waste 57 600
ton/year
Sorting of recyclable 17 894 ton/year
Composting 61 410 ton/year
Landfilling 49 841 ton/year
Area D
Population 200 000
inh
Total domestic waste 41 600 ton/year
Transferred waste 31 500
ton/year
Sorting of recyclable 6 000 ton/year
Composting 0 ton/year
Landfilling 35 600 ton/year
10
Tal Hamies ( 20 000)
Al Qahtaniyeh (22 000)
Al Jawadiyah (3 270)
31
Marqadeh
39
35
30
44
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Deir Es Zor – 1 315 000 inhabitants in 2014 – 273 520 ton/year in 2014
Miadeen (50 000)
Der ez Zor (230 000)
Abu kamal (70
000)
Al Thibnah (10 000)
Suwar (10 000)
Al Kasrah (10
000)
Muhasan (22 000)
Al Asharah (23 000)
Hajin (43 200)
41 8
25
64
57
Ziban (14 000)
54
20
13
37
16
50
Bussayra (20 000)
Al Kharayej (27 000)
Area A
Population 1 115 000 inh
Total domestic waste 231 920 ton/year
Transferred waste 139 200 ton/year
Sorting of recyclable 43 374 ton/year
Composting 148 853 ton/year
Landfilling 120 810 ton/year
Area B
Population 200 000
inh
Total domestic waste 41 600 ton/year
Transferred waste 21 000 ton/year
Sorting of recyclable 6 000 ton/year
Composting 0 ton/year
Landfilling 35 600 ton/year
10
Sbeikhan (24
000)
Ash Shafeh (21 000)
16
40
16
15
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Raqqah – 910 000 inhabitants in 2014 – 226 590 ton/year in 2014
Al Thora (80 000)
Al Raqqa (250 000)
Sluk (16 000)
Halabiyeh
Al Madane (9
000)
Al Karamah (35 000)
Ayn Isa (16 800)
As Sabkha (26 000)
Tal Abiad (50 000)
21
28
52
30
26
33
24
27
23
42
Dibsi’Affnan (24 000) 32
Qantari11
17
58
Al Jirniyeh (18 000)
Area A
Population 460 000
inh
Total domestic waste 114 540 ton/year
Transferred waste 57 500
ton/year
Sorting of recyclable 18 837 ton/year
Composting 75 555 ton/year
Landfilling 60 686 ton/year
Area C
Population 170 000
inh
Total domestic waste 42 330 ton/year
Transferred waste 25 200ton/year
Sorting of recyclable 5 100 ton/year
Composting 0 ton/year
Landfilling 37 230 ton/year
Area B
Population 280 000
inh
Total domestic waste 69 720 ton/year
Transferred waste 42 000
ton/year
Sorting of recyclable 8 400 ton/year
Composting 0 ton/year
Landfilling 61 320 ton/year
Kafifeh
20
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Aleppo – 4 740 000 inhabitants in 2014 – 1 019 100 ton/year in 2014
Ain Al Arab (45000)
A’ Zaz (70
000)
Al Bab (120 000)
Manbij (186 000)
Maskaneh (10 000)
Tal Adaman (8000)
Daret Azze (40 000)
Der Hafer (26 400)
As Sufira (91 600)
Kanasir (14000)
Ifrin (46 000)
Nubul (29 000)
Tal Rifaat (31 000)
Mare (40 000)
Al Rai (12 300)
38
Jarablos (38 000)
32
15
13
18
10
23
40
25
Athareb ( 20 000)
28
60
45
Hreitan (17 000)
Rajo ( 6 600)
Jandires (13 000)
Cheikh Al Hadid (10 000)
Bolbol (10 500)
Sarba ( 4 600)
Akhtarin (14
000)
Tadef (33 000)
Al Ghandourah (7 000)
Abu Kolokol (5 000)
Khafseh (18 000)
Al Mahmoudyah (9 000)
35
35
47
37
15
Serrin Al
Chamalieh
(10 000)
18
30
24
24
26 10
8
31
18
20
20
16
40
40
Aleppo
(2 800 000)
Area A
Population 3 110 000
Total domestic waste 668 650 ton/year
Transferred waste 669 000 ton/year
Sorting of recyclable 107 295 ton/year
Composting 443 175 ton/year
Landfilling 355 318 ton/year
Area C
Population 300 000
inh
Total domestic waste 64 500 ton/year
Transferred waste 16 250 ton/year
Sorting of recyclable 7 500 ton/year
Composting 0 ton/year
Landfilling 57 000 ton/year
Area B
Population 560 000
inh
Total domestic waste 120 400 ton/year
Transferred waste 30 000 ton/year
Sorting of recyclable 19 320 ton/year
Composting 79 800 ton/year
Landfilling 63 980 ton/year
Area D
Population 280 000
inh
Total domestic waste 60 200 ton/year
Transferred waste 24 000 ton/year
Sorting of recyclable 7 000 ton/year
Composting 0 ton/year
Landfilling 53 200 ton/year
Area E
Population 90 000 inh
Total domestic waste 19 350 ton/year
Transferred waste 7 600 ton/year
Sorting of recyclable 2 700 ton/year
Composting 0 ton/year
Landfilling 16 650 ton/year
30
Area F
Population 400 000
Total domestic waste 86 000 ton/year
Transferred waste 60 200
ton/year
Sorting of recyclable 12 000 ton/year
Composting 0 ton/year
Landfilling 74 000 ton/year
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Idleb - 1 450 000 inhabitants in 2014 – 311 750 ton/year in 2014
Msebin
Idleb ( 113 000)
Taftanaz (10 000)
Sarahqueb (35 000)
Sinjar (3000)
30
16
15
27
Ma’ arrat an Numan (70000)
Ariha (50 000)
Abu Dhour
(12 000)
Khan Chekhoun (52 000)
Kafr Nobol (22
000)
Ehsem (11
000)
Mambel (8 000)
Jisr Al Shoghour (38 000)
Bdama
(6 000)
Harem (30 000)
Banesh (28 000)
Al Dana (20 000)
Ma’artamsrin (30 000)
20
15
22
15
10
12
12
37
29
25
20
9
30
7
S.landfill of
Hantoutin
27
NOTA: The site south of
Ehsem planned by the
municipalities in the SW area
is useless. The surrounding
municipalities could join the
Hantoutin landfill.
Area C
Population 280 000
inh
Total domestic waste 60 200 ton/year
Sorting of recyclable 8 400 ton/year
Composting 0 ton/year
Landfilling 51 800 ton/year
Area A
Population 460 000
inh
Total domestic waste 98 900 ton/year
Transferred waste 14 850
ton/year
Sorting of recyclable 18 055 ton/year
Composting 63 825 ton/year
Landfilling 51 693 ton/year
Area B
Population 460 000
inh
Total domestic waste 98 900 ton/year
Transferred waste 29 700 ton/year
Sorting of recyclable 18 055 ton/year
Composting 63 825 ton/year
Landfilling 51 693 ton/year
Area D
Population 250 000
inh
Total domestic waste 53 750 ton/year
Sorting of recyclable 7 500 ton/year
Composting 0 ton/year
Landfilling 46 250 ton/year
Salquin (29 000)
Kafr Takharim (21000)
Darkush (10 300)
Foua’a (21 000)
Sarmin (18 000)
Armanaz (20 000)
Kelli (11 000)
20
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Lattakia – 1 050 000 inhabitants in 2014 – 316 050 ton/year in 2014
Slinfa (2000)
Lattakia
465 000
Al Haffeh (12 000)
Jableh
(62 000)
Sharquiyah (4 000)
Kassab (4 000)
Jobet Birghal (3 000)
Al Qardaha (20 000)
20
22
20
14
20
Watal Khan
Rabiah (8 000)
Qastal Ma’ar (5 400)
Einl Baidah
Al Bahloulieh (9 400)
Kansabba (5 000)
Ayn al Tinah (4 500)
Fakhurah (10 000)
16
24
Projected S.landfill
of Al Qasia +
composting plant
Population 1 050 000
inh
Total domestic waste 316 050 ton/year
Transferred waste 221 200 ton/year
Sorting of recyclable 45 728 ton/year
Composting 213 413 ton/year
Landfilling 169 916 ton/year
Qutelbiya (15 000)
Ad Dalieh (12 000)
12
13
20
Rehabilitation of the
composting plant
25
20
45
41
28
24
5
12
16
20
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Tartus – 785 000 inhabitants in 2014 – 202 530 ton/year in 2014
Al Hamadiyah (10 000)
Banias (35 000)
Tartous
(150 000)
Dreykish (19000)
Al Quadmus (6 000)
Hamman wasel (5 000)
Sheikh Badr (15 100)
20
36
20
18
45
Al’Annazeh (6 000)
At Tawaheen (2 000)
Ar Rawda (6 000)
As Sawda (7 000)
Himmeen (9 000)
Mashtal’halu (7 000)
Safita (27 000)
As Safateh (7 000)
Kirbetl’Nizeh
35
Taleen (5
600)
17
14
9
9
11
23
24 16
29
18
13
26
Projected S.landfill
of Hade Valley
Arwad Island (18 000)
Population 785 000
inh
Total domestic waste 202 530 ton/year
Transferred waste 151 500
ton/year
Sorting of recyclable 32 499 ton/year
Composting 134 235 ton/year
Landfilling 107 624 ton/year16
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Hama – 1 700 000 inhabitants in 2014 – 365 500 ton/year in 2014
Misyaf (30 000)
Sabouhra (10 000)
Karnaz (13 000)
Al Sequelbiya (15 000)
Kafr zeta (20 000)
As Sa’an (10 000)
Bural Sharqi ( 6 000)
24
18
25
47
33
20
Qalaat Almadiq (18 000)
Muharde (20 000)
13
20 30
Al Hamra (28 000)
A’ Qeirbat (5 000)
15
25
40
Murek (16 000)
Hama ( 460 000)
Talsalhab (17 000)
Salameya
(85 600)
Area A
Population 1 340 000 inh
Total domestic waste 288 100 ton/year
Transferred waste 86 400 ton/year
Sorting of recyclable 52 595 ton/year
Composting 185 925 ton/year
Landfilling 150583 ton/year
Area C
Population 160 000 inh
Total domestic waste 34 400 ton/year
Transferred waste 13 600 ton/year
Sorting of recyclable 6 280 ton/year
Composting 22 200 ton/year
Landfilling 17 980 ton/year
Area B
Population 200 000 inh
Total domestic waste 43 000 ton/year
Transferred waste 32 250 ton/year
Sorting of recyclable 6 000 ton/year
Composting 0 ton/year
Landfilling 37 000 ton/year
Az’ziara (9 000)
Shat hat attahtah (8 600)
Kafrbhm (17 000)
Wadiel I’Youn (10 000)
Aoj (5 000)
Ein Halakim (5
000)
Al Hmeri (4 000)
Hilfaya (20 000)
Kafrnabude (15 000)
11
25
13
24
Soran (28 000) + Tibet Aliman (27 000)
5
6 8
12
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Homs – 1 900 000 inhabitants in 2014 – 490 200 ton/year in
2014
Area A
Population 1 425 000 inh
Total domestic waste 361 650 ton/year
Transferred waste 72 400
ton/year
Sorting of recyclable 58 695 ton/year
Composting 239 175 ton/year
Landfilling 191 918 ton/year
Talkalak (30 000)
An’Nasra
(21 000)
As Suknah (36 500)
Ar Rastan (50 000)
Tal Daw (21 000)
Talbissé (37 000)
Sadad (13 000) Al Quaryatayn (30 000)
120
115
25
40
25
Al Qseir (50 000)
Shin (15 000) 20
20
Hasya ( 6 400) Al Raqana (5 000)
Al Fruglos (7 000)
Mkharram Foqani (9 000)
Jibl Jarrah (4
000)
Mhin (12 500)
Al Basiri
24
35
25
40
25
35
Homs ( 1 037 000)
Area D
Population 60 000 inh
Total domestic waste 21 480 ton/year
Sorting of recyclable 2 784 ton/year
Composting 14 760 ton/year
Landfilling 11 676 ton/year
Area C
Population 110 000 inh
Total domestic waste 28 380 ton/year
Transferred waste 28 000 ton/year
Sorting of recyclable 3 300 ton/year
Composting 0 ton/year
Landfilling 25 080 ton/year
Area B
Population 180 000 inh
Total domestic waste 46 440 ton/year
Transferred waste 46 000
ton/year
Sorting of recyclable 5 400 ton/year
Composting 0 ton/year
Landfilling 41 040 ton/year
Tal Zahab (14 000)
Kafr laha (21 500)
Quateeneh (7 500)
Mishfreh (11 000)
Area F
Population 80 000 inh
Total domestic waste 20 640 ton/year
Transferred waste 12 600 ton/year
Sorting of recyclable 2 400 ton/year
Composting 0 ton/year
Landfilling 18 240 ton/year
(Maghliah in a second term)
75
Area E
Population 45 000 inh
Total domestic waste 11 610 ton/year
Sorting of recyclable 1 350 ton/year
Composting 0 ton/year
Landfilling 10 260 ton/year
85
14
3
4
15
17
30
32
33
10
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
*The Master plan recommends to
transfer the waste to Homs landfill.
Nevertheless the any municipality
could decide to implement a landfill in
condition a suitable site is found and
authorized by the governorate.
*
Syrian master plan of waste management: Seminars
Nabk (47 000)
Qtaifé (40 000)
Duma (300 000)
Yabroud (38 000)
Raqqleh
Al Kiswah (22 000)
Jeiroud (42 000)
Ar Ruhaybah (28
000)
Dumeir (40 000)
Sadaneya (10 000)
Zabadani (40 000)
Tall (50 000)
Harasta (150 000)
Al Gusnalié (10 000)
Quatana (47 000)
Daraya (85 000)
Governorate of Damascus Countryside – 3 140 000 inhabitants in 2014 – 945 140 t/year in 2014
30
15
5 35
26
39
12
9
40
7
Kanakir (13 000)
Sa’asa’a (47 000)
15
23
14
7
34
18
Projected S.landfill
of Jeiroud
Existing S.landfill of
Al Jaronia
18
Existing sorting plant
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Area A
Population 920 000 inh
Total domestic waste 276 920 ton/year
Transferred waste 166 200 ton/year
Sorting of recyclable 35 696 ton/year
Composting 190 440 ton/year
Landfilling 150 604 ton/year
Area B
Population 1 000 000 inh
Total domestic waste 301 000 ton/year
Transferred waste 255 850
ton/year
Sorting of recyclable 38 800 ton/year
Composting 207 000 ton/year
Landfilling 163 700 ton/year
Area C
Population 610 000 inh
Total domestic waste 183 610 ton/year
Transferred waste 128 800
ton/year
Sorting of recyclable 23 668 ton/year
Composting 126 270 ton/year
Landfilling 99 857 ton/year
Area D
Population 610 000 inh
Total domestic waste 183 610 ton/year
Transferred waste 138 000
ton/year
Sorting of recyclable 23 668 ton/year
Composting 126 270 ton/year
Landfilling 99 857 ton/year
Deir Atiyeh (20 000)
Qara (20 000)
9
8
To Al Quneitra
landfill
Syrian master plan of waste management: Seminars
Al Gusnalié
Governorate of Damascus – 3 400 000 inhabitants in 2014 - 584 800 ton/year in 2014
Damascus
40
Existing landfill of Al Jaronia
Transfer station to implement
Existing composting plant to extend
Population 3 400 000 inh
Total domestic waste 584 800 ton/year
Transferred waste 584 800 ton/year
Sorting of recyclable 93 840 ton/year
Composting 387 600 ton/year
Landfilling 310 760 ton/year
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of As Suweida – 360 000 inhabitants in 2014 – 74 880 ton/year in 2014
As Suweida (57 000)
Shaba (14000)
Ariqa (6500)
As Sijn (4400)
Shaqqa (7000)
Al Mushanaf (3 000)
Salkad (12700)
Mallah (10 000)Al Qraya (6000)
Dibin (4400)
15
18
15
22
17
13
Assoura
22
21
12
20
14
19
10
15
Population 360 000 inh
Total domestic waste 74 880 ton/year
Transferred waste 63 750
ton/year
Sorting of recyclable 14 004 ton/year
Composting 48 060 ton/year
Landfilling 39 006 ton/year
At Taleh (10
500)
Al Qanawat (10 000)
Arman (10 000)
At Theel ( 9 000)
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Al Musaifra (11 000)
Kirbeth Ghazaleh (17 000)
Bosral Harir (14 000)Tseel (16 000)
Ash Shajara (8 000) Daele (27 000)
Governorate of Daara – 1 040 000 inhabitants in 2014 – 216 320 ton/year in 2014
Nawa (55 000)
As Shaykh (23 400)
Izraa (25 000)
Al Harrak (22 000)Tafas (30 000)
Dar’a
(100 000)
Bosra (25000)
Khabab
Assanamein (24 000)
Al Harrah (18 400)
Jasem (38 000)
15
15
12
11
22
25
Seda (12 000)
Al Mismiyeh (4 000)
Ghabagheb (11 000)
Kafrshams (14 000)
5
10
25
30
10
8
15
15
18
Area A
Population 660 000 inh
Total domestic waste 137 280 ton/year
Transferred waste 82 200 ton/year
Sorting of recyclable 25 674 ton/year
Composting 88 110 ton/year
Landfilling 71 511 ton/year
Area B
Population 380 000 inh
Total domestic waste 79 040 ton/year
Transferred waste 63 200
ton/year
Sorting of recyclable 14 782 ton/year
Composting 50 730 ton/year
Landfilling 41 173 ton/year
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
Governorate of Al Quneitra – 190 000 inhabitants in 2014 – 38 000 ton/year in 2014
Al
Khshniyeh
Al Quneitra
Mas’ada
Ar’afie
d
Khan Arnabeh (10 000)
Afik
15
22
25
10
Population 190 000 inh
Total domestic waste 38 000 ton/year
Transferred waste 26 600
ton/year
Sorting of recyclable 4 608 ton/year
Composting 26 363 ton/year
Landfilling 20 781 ton/year
Waste from Sa’asa’a
transfer station
Occupied Area
Treatment unit
Sanitary landfill
Transfer plant
Sorting plant
Syrian master plan of waste management: Seminars
The total investment to set up
all the facilities and equipments
is about 21,20 billion SP, that is
about 2,12 billion SP per year.
The total annual cost including investment pay
off and operations (within 2014) will be about
11,5 billion SP/year without separative
collection,
Syrian master plan of waste management: Seminars
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
0 - Promote the national MSW Master Plan (documents, internet site, seminars) 5
A - Planification: Regional Master Plans 15 15
B - Waste Minimization 25 25 25 25 25 25 25 25 25 25
C - Pilot Project 16 24 19 8 5
Arward island 5 5 5
Home composting 1 1 1
Plastic bags reuse campaign 3 3 3
Dropp-off centres in rural and urban areas ( Damascus and Tartus) 10 5
Separative collection in 1 large city (to be chosen) 10 10 5 5
D - Collection 710 732 733 697 697 697 697 697 697 697
Containers 33 33 33
Trucks and compactors 670 670 670 670 670 670 670 670 670 670
Hazardous Waste storage 7 7 7 7 7 7 7 7 7 7
Dropp-off centres 22 23 20 20 20 20 20 20 20
E - Transfer and Transportation 172 172 172 172 172 172 172 172 172 172
E1 - Main towns of each Mohafazat : Lattakia, Tartus, Aleppo, Damascus, Damascus countryside (Duma, Jaronia), 172 172 172 172 172
Al Bab, Salameya,Daraa, Hasakeh, Hama,Sweida, Deir Es Zor,Homs,Magliah and urgent situations
E2 - Other towns of the mohafazats : Al Quneitra, Damascus countryside ( Rakkleh, Jeiroud,Sa'asaa), Idleb, Qamischli, 172 172 172 172 172
Jawadijeh, Al Thora, Ain al Arab, Kassab, Talkhalak, Al Qseir,Abu kamal,Al Dana, Maharde, As Suknah,
Raqqah, Manbej, Ma'ar'at, Tadmur, Khabab, Tall Tamir, Ayn Isa, Quaryatayn, Ifrin, Jisr Al Shoghur,
F - Integrated Centres (mechanical separation, composting and sorting plants) 770 770 770 770 770 770 770 770 770 770
F1 - Main towns of each Mohafazat : Lattakia, Tartus, Aleppo, Damascus, Damascus countryside (Duma, Jaronia), 770 770 770 770 770
Daraa, Hasakeh, Hama,Sweida, Deir Es Zor,Homs,
F2 - Other towns of the mohafazats : Al Quneitra, Damascus countryside ( Rakkleh, Jeiroud), Idleb, Qamischli, 770 770 770 770 770
Raqqah, Manbej, Ma'ar'at, Tadmur, Khabab
G - Sorting Centres 228 228 228 228 228 228 228 228 228 228
G1 - Main towns of each Mohafazat : Lattakia, Tartus, Aleppo, Damascus, Damascus countryside (Duma, Jaronia), 228 228 228 228 228
Daraa, Hasakeh, Hama,Sweida, Deir Es Zor,Homs,
G2 - Other towns of the mohafazats : Al Quneitra, Damascus countryside ( Rakkleh, Jeiroud), Idleb, Qamischli, 228 228 228 228 228
Raqqah, Manbej, Ma'ar'at, Tadmur, Khabab, Tall Tamir, Ayn Al Arab, Kanasir,Al Bab, Abu Kamal, Misyaf, Quaratayn,
Jisr Al Shogour, Salameya, Jawadiyeh, Ayn Isa, Talkhalak, Al Kseir,
H - Controlled Sanitary landfills 228 228 228 228 228 228 228 228 228 228
H1 - Main towns of each Mohafazat : Lattakia, Tartus, Aleppo, Damascus, Damascus countryside ( Duma, Jaronia), 228 228 228 228 228
Abu kamal, Salameya, Daraa, Sweida, Homs, Magliah,
H2 - Other towns of the mohafazats :Al Quneitra, Hasakeh, Damascus countryside ( Rakkleh, jeiroud), Idleb, Hama, 228 228 228 228 228
Jawadijeh, Al Thora, Ain Al Arab, Qamischli, Al Bab,Deir Es Zor,Manbej, Ma'ar'at, Tadmur, Khabab, Tall Tamir, Ayn Isa,
Raqqah,Al Dana, As Suknah, Quaryatayn, Ifrin, Jisr Al Shoghur, Sequelbiah
I - Rehabilitation of dumpsites
Plannification of rehabilitation
Choice of the sites (will depend upon the creation of the sanitary landfills)
Environmental Studies
Rehabilitation work
J - Medical Waste Treatment 25 25 25 25 25 25 25 25 25 25
Medical Waste Steam Disinfection in Damascus, Aleppo, Deir Es Zor, Douma, Homs, Lattakia 25 25 25 25 25
Medical Waste Steam Disinfection in Idleb, Tartus, Hama, Hasakeh, Raqqah, Tadmur, Daraa 25 25 25 25 25
Estimated Yearly Investment in 1000 SP 5 2 189 2 219 2 200 2 153 2 150 2 145 2 145 2 145 2 145 2 145
Previsionnal schedule for the implementation of the actions
evaluation after inventory of municipal dumpsites
Syrian master plan of waste management: Seminars
MINISTRY OF LOCAL
ADMINISTRATION
AND ENVIRONMENT

More Related Content

What's hot

Multi-dimensional nature of solid waste management in Mumbai
Multi-dimensional nature of solid waste management in MumbaiMulti-dimensional nature of solid waste management in Mumbai
Multi-dimensional nature of solid waste management in MumbaiRishi Aggarwal
 
Presentation to MCGM regarding Mumbai Development Plan 2014-34 - SWM
Presentation to MCGM regarding Mumbai Development Plan 2014-34 - SWMPresentation to MCGM regarding Mumbai Development Plan 2014-34 - SWM
Presentation to MCGM regarding Mumbai Development Plan 2014-34 - SWMRishi Aggarwal
 
Solid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCSolid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCInfotrex Services Pvt. Ltd.
 
Network full-engllish
Network full-engllishNetwork full-engllish
Network full-engllishFikru Tessema
 
Water Plus presentation by Sikander Zulkarnain
Water Plus presentation by Sikander ZulkarnainWater Plus presentation by Sikander Zulkarnain
Water Plus presentation by Sikander ZulkarnainSikanderZulkarnain1
 
Submission on the draft Eastern and Midland Region Waste Management Plan, Ire...
Submission on the draft Eastern and Midland Region Waste Management Plan, Ire...Submission on the draft Eastern and Midland Region Waste Management Plan, Ire...
Submission on the draft Eastern and Midland Region Waste Management Plan, Ire...Jack O'Sullivan
 
Solid waste management in Syria
Solid waste management in SyriaSolid waste management in Syria
Solid waste management in SyriaRohanChaugule
 
Integrated solid waste managemet of bangalore
Integrated solid waste managemet of bangaloreIntegrated solid waste managemet of bangalore
Integrated solid waste managemet of bangaloreYash Kotgirwar
 
Presentation of the Selected Technologies for Mix MSW Treatment Plants in Eas...
Presentation of the Selected Technologies for Mix MSW Treatment Plants in Eas...Presentation of the Selected Technologies for Mix MSW Treatment Plants in Eas...
Presentation of the Selected Technologies for Mix MSW Treatment Plants in Eas...Alfonsas BRAZAS
 
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...NITI Aayog
 
Solid waste mgt_india
Solid waste mgt_indiaSolid waste mgt_india
Solid waste mgt_indiashanawaj shareef
 

What's hot (13)

Indore waste management
Indore waste managementIndore waste management
Indore waste management
 
Multi-dimensional nature of solid waste management in Mumbai
Multi-dimensional nature of solid waste management in MumbaiMulti-dimensional nature of solid waste management in Mumbai
Multi-dimensional nature of solid waste management in Mumbai
 
Presentation to MCGM regarding Mumbai Development Plan 2014-34 - SWM
Presentation to MCGM regarding Mumbai Development Plan 2014-34 - SWMPresentation to MCGM regarding Mumbai Development Plan 2014-34 - SWM
Presentation to MCGM regarding Mumbai Development Plan 2014-34 - SWM
 
Solid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCSolid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMC
 
Network full-engllish
Network full-engllishNetwork full-engllish
Network full-engllish
 
Water Plus presentation by Sikander Zulkarnain
Water Plus presentation by Sikander ZulkarnainWater Plus presentation by Sikander Zulkarnain
Water Plus presentation by Sikander Zulkarnain
 
Submission on the draft Eastern and Midland Region Waste Management Plan, Ire...
Submission on the draft Eastern and Midland Region Waste Management Plan, Ire...Submission on the draft Eastern and Midland Region Waste Management Plan, Ire...
Submission on the draft Eastern and Midland Region Waste Management Plan, Ire...
 
Stree Mukti Sanghatana
Stree Mukti SanghatanaStree Mukti Sanghatana
Stree Mukti Sanghatana
 
Solid waste management in Syria
Solid waste management in SyriaSolid waste management in Syria
Solid waste management in Syria
 
Integrated solid waste managemet of bangalore
Integrated solid waste managemet of bangaloreIntegrated solid waste managemet of bangalore
Integrated solid waste managemet of bangalore
 
Presentation of the Selected Technologies for Mix MSW Treatment Plants in Eas...
Presentation of the Selected Technologies for Mix MSW Treatment Plants in Eas...Presentation of the Selected Technologies for Mix MSW Treatment Plants in Eas...
Presentation of the Selected Technologies for Mix MSW Treatment Plants in Eas...
 
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
 
Solid waste mgt_india
Solid waste mgt_indiaSolid waste mgt_india
Solid waste mgt_india
 

Viewers also liked

Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...Mark Kwabena Gadogbe
 
Sylva Rotary 11/7/2013
Sylva Rotary 11/7/2013Sylva Rotary 11/7/2013
Sylva Rotary 11/7/2013profcyclist
 
Argelia retocado1234567890
Argelia retocado1234567890Argelia retocado1234567890
Argelia retocado1234567890anaidelim
 
Landfill Mining Poster Presentation
Landfill Mining Poster PresentationLandfill Mining Poster Presentation
Landfill Mining Poster PresentationJones Edmunds
 
Towards Greening the Solid Waste Sector in the Middle East and North Africa R...
Towards Greening the Solid Waste Sector in the Middle East and North Africa R...Towards Greening the Solid Waste Sector in the Middle East and North Africa R...
Towards Greening the Solid Waste Sector in the Middle East and North Africa R...Humanidade2012
 
Tarfaoui Group Presentation (Algeria Oilfield and Construction Services Group)
Tarfaoui Group Presentation (Algeria Oilfield and Construction Services Group)Tarfaoui Group Presentation (Algeria Oilfield and Construction Services Group)
Tarfaoui Group Presentation (Algeria Oilfield and Construction Services Group)Bee Gee
 
Presentation and outlook of the Waste Management Business
Presentation and outlook of the Waste Management BusinessPresentation and outlook of the Waste Management Business
Presentation and outlook of the Waste Management Businessve-finance
 
Grady Road Landfill
Grady Road LandfillGrady Road Landfill
Grady Road Landfilltcooper66
 
Landfill Issues
Landfill IssuesLandfill Issues
Landfill Issuesrhendrix20
 
Chlor Alkali Plant - SARL SASKO, Algeria
Chlor Alkali Plant - SARL SASKO, AlgeriaChlor Alkali Plant - SARL SASKO, Algeria
Chlor Alkali Plant - SARL SASKO, AlgeriaNuberg Engineering
 
EfW Cost Model From Building Magazine
EfW Cost Model From Building MagazineEfW Cost Model From Building Magazine
EfW Cost Model From Building MagazineMatthew Hicks
 
TecnologÍa en la recogida de residuos URBASER
TecnologÍa en la recogida de residuos URBASERTecnologÍa en la recogida de residuos URBASER
TecnologÍa en la recogida de residuos URBASERANEPMA
 
Part 1 Water safety plans explained: What they are and how you can get involved
Part 1 Water safety plans explained: What they are and how you can get involvedPart 1 Water safety plans explained: What they are and how you can get involved
Part 1 Water safety plans explained: What they are and how you can get involvedInternational WaterCentre
 
Tendencia tecnologĂ­a en el tratamiento de residuos FCC
Tendencia tecnologĂ­a en el tratamiento de residuos FCCTendencia tecnologĂ­a en el tratamiento de residuos FCC
Tendencia tecnologĂ­a en el tratamiento de residuos FCCANEPMA
 
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...Andrea Drabicki
 
Sanitary Engineered Landfill Processes
Sanitary Engineered Landfill ProcessesSanitary Engineered Landfill Processes
Sanitary Engineered Landfill ProcessesMohammad Kanawaty
 

Viewers also liked (20)

Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
 
Sylva Rotary 11/7/2013
Sylva Rotary 11/7/2013Sylva Rotary 11/7/2013
Sylva Rotary 11/7/2013
 
Argelia retocado1234567890
Argelia retocado1234567890Argelia retocado1234567890
Argelia retocado1234567890
 
Landfill Mining Poster Presentation
Landfill Mining Poster PresentationLandfill Mining Poster Presentation
Landfill Mining Poster Presentation
 
Regulation of Landfill in Ireland
Regulation of Landfill in IrelandRegulation of Landfill in Ireland
Regulation of Landfill in Ireland
 
Towards Greening the Solid Waste Sector in the Middle East and North Africa R...
Towards Greening the Solid Waste Sector in the Middle East and North Africa R...Towards Greening the Solid Waste Sector in the Middle East and North Africa R...
Towards Greening the Solid Waste Sector in the Middle East and North Africa R...
 
Overliner or Landfill Mining?
Overliner or Landfill Mining?Overliner or Landfill Mining?
Overliner or Landfill Mining?
 
Tarfaoui Group Presentation (Algeria Oilfield and Construction Services Group)
Tarfaoui Group Presentation (Algeria Oilfield and Construction Services Group)Tarfaoui Group Presentation (Algeria Oilfield and Construction Services Group)
Tarfaoui Group Presentation (Algeria Oilfield and Construction Services Group)
 
Presentation and outlook of the Waste Management Business
Presentation and outlook of the Waste Management BusinessPresentation and outlook of the Waste Management Business
Presentation and outlook of the Waste Management Business
 
Grady Road Landfill
Grady Road LandfillGrady Road Landfill
Grady Road Landfill
 
Landfill Issues
Landfill IssuesLandfill Issues
Landfill Issues
 
Chlor Alkali Plant - SARL SASKO, Algeria
Chlor Alkali Plant - SARL SASKO, AlgeriaChlor Alkali Plant - SARL SASKO, Algeria
Chlor Alkali Plant - SARL SASKO, Algeria
 
EfW Cost Model From Building Magazine
EfW Cost Model From Building MagazineEfW Cost Model From Building Magazine
EfW Cost Model From Building Magazine
 
TecnologÍa en la recogida de residuos URBASER
TecnologÍa en la recogida de residuos URBASERTecnologÍa en la recogida de residuos URBASER
TecnologÍa en la recogida de residuos URBASER
 
Part 1 Water safety plans explained: What they are and how you can get involved
Part 1 Water safety plans explained: What they are and how you can get involvedPart 1 Water safety plans explained: What they are and how you can get involved
Part 1 Water safety plans explained: What they are and how you can get involved
 
Tendencia tecnologĂ­a en el tratamiento de residuos FCC
Tendencia tecnologĂ­a en el tratamiento de residuos FCCTendencia tecnologĂ­a en el tratamiento de residuos FCC
Tendencia tecnologĂ­a en el tratamiento de residuos FCC
 
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
 
Sanitary Engineered Landfill Processes
Sanitary Engineered Landfill ProcessesSanitary Engineered Landfill Processes
Sanitary Engineered Landfill Processes
 
Landfill revised
Landfill revisedLandfill revised
Landfill revised
 
Landfill - Basics
Landfill - BasicsLandfill - Basics
Landfill - Basics
 

Similar to SWM Master plan in Syria

Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)mamdouh sabour
 
Solid Waste Management_Practices_Presentation
Solid Waste Management_Practices_PresentationSolid Waste Management_Practices_Presentation
Solid Waste Management_Practices_PresentationBachiNano
 
solid waste municipal presentation paurri
solid waste municipal presentation paurrisolid waste municipal presentation paurri
solid waste municipal presentation paurrimiguelCondoriapaza2
 
greenLIFE and the World Water Day 2017
greenLIFE and the World Water Day 2017greenLIFE and the World Water Day 2017
greenLIFE and the World Water Day 2017greenLIFE project
 
Solid Waste Management / Case Studies / Erbil, Kurdistan Municipality.
Solid Waste Management / Case Studies / Erbil, Kurdistan Municipality.Solid Waste Management / Case Studies / Erbil, Kurdistan Municipality.
Solid Waste Management / Case Studies / Erbil, Kurdistan Municipality.Ahmad Zakariya Ahmad
 
Dia 2: Passos para implementar um sistema avançado de gestão integrada de res...
Dia 2: Passos para implementar um sistema avançado de gestão integrada de res...Dia 2: Passos para implementar um sistema avançado de gestão integrada de res...
Dia 2: Passos para implementar um sistema avançado de gestão integrada de res...RWM Brasil
 
Mapping of-informal-sector
Mapping of-informal-sectorMapping of-informal-sector
Mapping of-informal-sectorMEWM Egypt
 
Hazardous Waste
Hazardous WasteHazardous Waste
Hazardous WasteTareq Zarouni
 
Full cycle tanneries: the LCA between now and the future
Full cycle tanneries: the LCA between now and the future Full cycle tanneries: the LCA between now and the future
Full cycle tanneries: the LCA between now and the future greenLIFE project
 
Overview of faecal sludge management challenges and practices
Overview of faecal sludge management challenges and practicesOverview of faecal sludge management challenges and practices
Overview of faecal sludge management challenges and practicesIRC
 
Project on hazardous waste sacodi
Project on hazardous waste sacodiProject on hazardous waste sacodi
Project on hazardous waste sacodiBhargavi Rao
 
Project ppt final
Project ppt finalProject ppt final
Project ppt finalullasnaik4
 
JPP Samit (NALED, Ekonomsko odeljenje Francuske Ambasade u Srbiji i Privredna...
JPP Samit (NALED, Ekonomsko odeljenje Francuske Ambasade u Srbiji i Privredna...JPP Samit (NALED, Ekonomsko odeljenje Francuske Ambasade u Srbiji i Privredna...
JPP Samit (NALED, Ekonomsko odeljenje Francuske Ambasade u Srbiji i Privredna...NALED Serbia
 
Saudi Waste (Recycling, Energy, Composte, Water) Solution
Saudi Waste (Recycling, Energy, Composte, Water) SolutionSaudi Waste (Recycling, Energy, Composte, Water) Solution
Saudi Waste (Recycling, Energy, Composte, Water) SolutionPaul Dooley paul@firstaff.ie
 
Saudi waste (recycling, energy, composte, water) solution
Saudi waste (recycling, energy, composte, water) solutionSaudi waste (recycling, energy, composte, water) solution
Saudi waste (recycling, energy, composte, water) solutionBrandon Dooley
 
Fecal Sludge Management Challenge in Bidibidi Refugee Settlement
Fecal Sludge Management Challenge in Bidibidi Refugee SettlementFecal Sludge Management Challenge in Bidibidi Refugee Settlement
Fecal Sludge Management Challenge in Bidibidi Refugee SettlementCandia John
 
Controlling the Energy Cost through a Waste Strategy Plan
Controlling the Energy Cost through a Waste Strategy PlanControlling the Energy Cost through a Waste Strategy Plan
Controlling the Energy Cost through a Waste Strategy PlanEMEX
 
C40 Cities - Climate Leadership Group
C40 Cities - Climate Leadership GroupC40 Cities - Climate Leadership Group
C40 Cities - Climate Leadership GroupMilano Recycle City
 

Similar to SWM Master plan in Syria (20)

Mauritius Report
Mauritius ReportMauritius Report
Mauritius Report
 
Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)
 
Solid Waste Management_Practices_Presentation
Solid Waste Management_Practices_PresentationSolid Waste Management_Practices_Presentation
Solid Waste Management_Practices_Presentation
 
solid waste municipal presentation paurri
solid waste municipal presentation paurrisolid waste municipal presentation paurri
solid waste municipal presentation paurri
 
Msw Jns
Msw  JnsMsw  Jns
Msw Jns
 
greenLIFE and the World Water Day 2017
greenLIFE and the World Water Day 2017greenLIFE and the World Water Day 2017
greenLIFE and the World Water Day 2017
 
Solid Waste Management / Case Studies / Erbil, Kurdistan Municipality.
Solid Waste Management / Case Studies / Erbil, Kurdistan Municipality.Solid Waste Management / Case Studies / Erbil, Kurdistan Municipality.
Solid Waste Management / Case Studies / Erbil, Kurdistan Municipality.
 
Dia 2: Passos para implementar um sistema avançado de gestão integrada de res...
Dia 2: Passos para implementar um sistema avançado de gestão integrada de res...Dia 2: Passos para implementar um sistema avançado de gestão integrada de res...
Dia 2: Passos para implementar um sistema avançado de gestão integrada de res...
 
Mapping of-informal-sector
Mapping of-informal-sectorMapping of-informal-sector
Mapping of-informal-sector
 
Hazardous Waste
Hazardous WasteHazardous Waste
Hazardous Waste
 
Full cycle tanneries: the LCA between now and the future
Full cycle tanneries: the LCA between now and the future Full cycle tanneries: the LCA between now and the future
Full cycle tanneries: the LCA between now and the future
 
Overview of faecal sludge management challenges and practices
Overview of faecal sludge management challenges and practicesOverview of faecal sludge management challenges and practices
Overview of faecal sludge management challenges and practices
 
Project on hazardous waste sacodi
Project on hazardous waste sacodiProject on hazardous waste sacodi
Project on hazardous waste sacodi
 
Project ppt final
Project ppt finalProject ppt final
Project ppt final
 
JPP Samit (NALED, Ekonomsko odeljenje Francuske Ambasade u Srbiji i Privredna...
JPP Samit (NALED, Ekonomsko odeljenje Francuske Ambasade u Srbiji i Privredna...JPP Samit (NALED, Ekonomsko odeljenje Francuske Ambasade u Srbiji i Privredna...
JPP Samit (NALED, Ekonomsko odeljenje Francuske Ambasade u Srbiji i Privredna...
 
Saudi Waste (Recycling, Energy, Composte, Water) Solution
Saudi Waste (Recycling, Energy, Composte, Water) SolutionSaudi Waste (Recycling, Energy, Composte, Water) Solution
Saudi Waste (Recycling, Energy, Composte, Water) Solution
 
Saudi waste (recycling, energy, composte, water) solution
Saudi waste (recycling, energy, composte, water) solutionSaudi waste (recycling, energy, composte, water) solution
Saudi waste (recycling, energy, composte, water) solution
 
Fecal Sludge Management Challenge in Bidibidi Refugee Settlement
Fecal Sludge Management Challenge in Bidibidi Refugee SettlementFecal Sludge Management Challenge in Bidibidi Refugee Settlement
Fecal Sludge Management Challenge in Bidibidi Refugee Settlement
 
Controlling the Energy Cost through a Waste Strategy Plan
Controlling the Energy Cost through a Waste Strategy PlanControlling the Energy Cost through a Waste Strategy Plan
Controlling the Energy Cost through a Waste Strategy Plan
 
C40 Cities - Climate Leadership Group
C40 Cities - Climate Leadership GroupC40 Cities - Climate Leadership Group
C40 Cities - Climate Leadership Group
 

More from Amir Alboukhari

Ù‚Ű§Ù†ÙˆÙ† Ù†ŰžŰ§ÙŰ© ŰłÙˆŰ±ÙŠŰ©
Ù‚Ű§Ù†ÙˆÙ† Ù†ŰžŰ§ÙŰ© ŰłÙˆŰ±ÙŠŰ©Ù‚Ű§Ù†ÙˆÙ† Ù†ŰžŰ§ÙŰ© ŰłÙˆŰ±ÙŠŰ©
Ù‚Ű§Ù†ÙˆÙ† Ù†ŰžŰ§ÙŰ© ŰłÙˆŰ±ÙŠŰ©Amir Alboukhari
 
مŰčŰ§Ù„ŰŹŰ© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ
مŰčŰ§Ù„ŰŹŰ© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘمŰčŰ§Ù„ŰŹŰ© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ
مŰčŰ§Ù„ŰŹŰ© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘAmir Alboukhari
 
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚Ű§ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚Amir Alboukhari
 
â€«Ű§Ù„ÙŠÙ…Ű§Ù…Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ű© موقŰč ومŰčنى
â€«Ű§Ù„ÙŠÙ…Ű§Ù…Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ű© موقŰč ومŰčنى  â€«Ű§Ù„ÙŠÙ…Ű§Ù…Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ű© موقŰč ومŰčنى
â€«Ű§Ù„ÙŠÙ…Ű§Ù…Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ű© موقŰč ومŰčنى Amir Alboukhari
 
Ù…ÙƒŰ© Ű§Ù„Ù…ÙƒŰ±Ù…Ű© Ű­ŰŻÙˆŰŻ ÙˆÙ…ÙˆŰ§Ù‚ÙŠŰȘ
Ù…ÙƒŰ© Ű§Ù„Ù…ÙƒŰ±Ù…Ű© Ű­ŰŻÙˆŰŻ ÙˆÙ…ÙˆŰ§Ù‚ÙŠŰȘÙ…ÙƒŰ© Ű§Ù„Ù…ÙƒŰ±Ù…Ű© Ű­ŰŻÙˆŰŻ ÙˆÙ…ÙˆŰ§Ù‚ÙŠŰȘ
Ù…ÙƒŰ© Ű§Ù„Ù…ÙƒŰ±Ù…Ű© Ű­ŰŻÙˆŰŻ ÙˆÙ…ÙˆŰ§Ù‚ÙŠŰȘAmir Alboukhari
 
ÙˆŰ§Ù‚Űč ۄۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في Ű§Ù„ŰŹÙ…Ù‡ÙˆŰ±ÙŠŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłÙˆŰ±ÙŠŰ© 2003
   ÙˆŰ§Ù‚Űč ۄۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في Ű§Ù„ŰŹÙ…Ù‡ÙˆŰ±ÙŠŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłÙˆŰ±ÙŠŰ© 2003   ÙˆŰ§Ù‚Űč ۄۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في Ű§Ù„ŰŹÙ…Ù‡ÙˆŰ±ÙŠŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłÙˆŰ±ÙŠŰ© 2003
ÙˆŰ§Ù‚Űč ۄۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في Ű§Ù„ŰŹÙ…Ù‡ÙˆŰ±ÙŠŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłÙˆŰ±ÙŠŰ© 2003Amir Alboukhari
 
Ű§Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù…ŰȘÙƒŰ§Ù…Ù„Ű© Ù„Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
Ű§Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù…ŰȘÙƒŰ§Ù…Ù„Ű© Ù„Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©Ű§Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù…ŰȘÙƒŰ§Ù…Ù„Ű© Ù„Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
Ű§Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù…ŰȘÙƒŰ§Ù…Ù„Ű© Ù„Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©Amir Alboukhari
 
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚ 2004
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚ 2004ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚ 2004
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚ 2004Amir Alboukhari
 
Ű§Ù„ŰȘŰŽŰ±ÙŠŰčۧŰȘ Ű§Ù„Ù…ŰȘŰčÙ„Ù‚Ű© ŰšŰ§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§
Ű§Ù„ŰȘŰŽŰ±ÙŠŰčۧŰȘ Ű§Ù„Ù…ŰȘŰčÙ„Ù‚Ű© ŰšŰ§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§Ű§Ù„ŰȘŰŽŰ±ÙŠŰčۧŰȘ Ű§Ù„Ù…ŰȘŰčÙ„Ù‚Ű© ŰšŰ§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§
Ű§Ù„ŰȘŰŽŰ±ÙŠŰčۧŰȘ Ű§Ù„Ù…ŰȘŰčÙ„Ù‚Ű© ŰšŰ§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§Amir Alboukhari
 
Ű§Ù„ŰčŰČل Ű§Ù„Ù‚Ű§ŰčŰŻ ÙˆŰ§Ù„ŰłŰ·Ű­ÙŠ Ù„Ù…Ű·Ű§Ù…Ű± Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
Ű§Ù„ŰčŰČل Ű§Ù„Ù‚Ű§ŰčŰŻ ÙˆŰ§Ù„ŰłŰ·Ű­ÙŠ Ù„Ù…Ű·Ű§Ù…Ű± Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©Ű§Ù„ŰčŰČل Ű§Ù„Ù‚Ű§ŰčŰŻ ÙˆŰ§Ù„ŰłŰ·Ű­ÙŠ Ù„Ù…Ű·Ű§Ù…Ű± Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
Ű§Ù„ŰčŰČل Ű§Ù„Ù‚Ű§ŰčŰŻ ÙˆŰ§Ù„ŰłŰ·Ű­ÙŠ Ù„Ù…Ű·Ű§Ù…Ű± Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©Amir Alboukhari
 
ŰŁÙƒÙŠŰ§Űł Ű§Ù„ŰšÙ„Ű§ŰłŰȘيك في Ű§Ù„Ù…Ù…Ù„ÙƒŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłŰčÙˆŰŻÙŠŰ©
ŰŁÙƒÙŠŰ§Űł Ű§Ù„ŰšÙ„Ű§ŰłŰȘيك في Ű§Ù„Ù…Ù…Ù„ÙƒŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłŰčÙˆŰŻÙŠŰ©ŰŁÙƒÙŠŰ§Űł Ű§Ù„ŰšÙ„Ű§ŰłŰȘيك في Ű§Ù„Ù…Ù…Ù„ÙƒŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłŰčÙˆŰŻÙŠŰ©
ŰŁÙƒÙŠŰ§Űł Ű§Ù„ŰšÙ„Ű§ŰłŰȘيك في Ű§Ù„Ù…Ù…Ù„ÙƒŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłŰčÙˆŰŻÙŠŰ©Amir Alboukhari
 
Ű§Ù„Ù…ŰźŰ·Ű· Ű§Ù„ŰȘÙˆŰŹÙŠÙ‡ÙŠ Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§ 2004
Ű§Ù„Ù…ŰźŰ·Ű· Ű§Ù„ŰȘÙˆŰŹÙŠÙ‡ÙŠ Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§ 2004Ű§Ù„Ù…ŰźŰ·Ű· Ű§Ù„ŰȘÙˆŰŹÙŠÙ‡ÙŠ Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§ 2004
Ű§Ù„Ù…ŰźŰ·Ű· Ű§Ù„ŰȘÙˆŰŹÙŠÙ‡ÙŠ Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§ 2004Amir Alboukhari
 

More from Amir Alboukhari (13)

Ù‚Ű§Ù†ÙˆÙ† Ù†ŰžŰ§ÙŰ© ŰłÙˆŰ±ÙŠŰ©
Ù‚Ű§Ù†ÙˆÙ† Ù†ŰžŰ§ÙŰ© ŰłÙˆŰ±ÙŠŰ©Ù‚Ű§Ù†ÙˆÙ† Ù†ŰžŰ§ÙŰ© ŰłÙˆŰ±ÙŠŰ©
Ù‚Ű§Ù†ÙˆÙ† Ù†ŰžŰ§ÙŰ© ŰłÙˆŰ±ÙŠŰ©
 
مŰčŰ§Ù„ŰŹŰ© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ
مŰčŰ§Ù„ŰŹŰ© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘمŰčŰ§Ù„ŰŹŰ© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ
مŰčŰ§Ù„ŰŹŰ© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ
 
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚Ű§ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚
 
Waste management
Waste managementWaste management
Waste management
 
â€«Ű§Ù„ÙŠÙ…Ű§Ù…Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ű© موقŰč ومŰčنى
â€«Ű§Ù„ÙŠÙ…Ű§Ù…Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ű© موقŰč ومŰčنى  â€«Ű§Ù„ÙŠÙ…Ű§Ù…Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ű© موقŰč ومŰčنى
â€«Ű§Ù„ÙŠÙ…Ű§Ù…Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ù€Ű© موقŰč ومŰčنى
 
Ù…ÙƒŰ© Ű§Ù„Ù…ÙƒŰ±Ù…Ű© Ű­ŰŻÙˆŰŻ ÙˆÙ…ÙˆŰ§Ù‚ÙŠŰȘ
Ù…ÙƒŰ© Ű§Ù„Ù…ÙƒŰ±Ù…Ű© Ű­ŰŻÙˆŰŻ ÙˆÙ…ÙˆŰ§Ù‚ÙŠŰȘÙ…ÙƒŰ© Ű§Ù„Ù…ÙƒŰ±Ù…Ű© Ű­ŰŻÙˆŰŻ ÙˆÙ…ÙˆŰ§Ù‚ÙŠŰȘ
Ù…ÙƒŰ© Ű§Ù„Ù…ÙƒŰ±Ù…Ű© Ű­ŰŻÙˆŰŻ ÙˆÙ…ÙˆŰ§Ù‚ÙŠŰȘ
 
ÙˆŰ§Ù‚Űč ۄۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في Ű§Ù„ŰŹÙ…Ù‡ÙˆŰ±ÙŠŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłÙˆŰ±ÙŠŰ© 2003
   ÙˆŰ§Ù‚Űč ۄۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في Ű§Ù„ŰŹÙ…Ù‡ÙˆŰ±ÙŠŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłÙˆŰ±ÙŠŰ© 2003   ÙˆŰ§Ù‚Űč ۄۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في Ű§Ù„ŰŹÙ…Ù‡ÙˆŰ±ÙŠŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłÙˆŰ±ÙŠŰ© 2003
ÙˆŰ§Ù‚Űč ۄۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في Ű§Ù„ŰŹÙ…Ù‡ÙˆŰ±ÙŠŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłÙˆŰ±ÙŠŰ© 2003
 
Ű§Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù…ŰȘÙƒŰ§Ù…Ù„Ű© Ù„Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
Ű§Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù…ŰȘÙƒŰ§Ù…Ù„Ű© Ù„Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©Ű§Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù…ŰȘÙƒŰ§Ù…Ù„Ű© Ù„Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
Ű§Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù…ŰȘÙƒŰ§Ù…Ù„Ű© Ù„Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
 
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚ 2004
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚ 2004ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚ 2004
ۧۯۧ۱۩ Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰŻÙ…ŰŽÙ‚ 2004
 
Ű§Ù„ŰȘŰŽŰ±ÙŠŰčۧŰȘ Ű§Ù„Ù…ŰȘŰčÙ„Ù‚Ű© ŰšŰ§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§
Ű§Ù„ŰȘŰŽŰ±ÙŠŰčۧŰȘ Ű§Ù„Ù…ŰȘŰčÙ„Ù‚Ű© ŰšŰ§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§Ű§Ù„ŰȘŰŽŰ±ÙŠŰčۧŰȘ Ű§Ù„Ù…ŰȘŰčÙ„Ù‚Ű© ŰšŰ§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§
Ű§Ù„ŰȘŰŽŰ±ÙŠŰčۧŰȘ Ű§Ù„Ù…ŰȘŰčÙ„Ù‚Ű© ŰšŰ§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§
 
Ű§Ù„ŰčŰČل Ű§Ù„Ù‚Ű§ŰčŰŻ ÙˆŰ§Ù„ŰłŰ·Ű­ÙŠ Ù„Ù…Ű·Ű§Ù…Ű± Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
Ű§Ù„ŰčŰČل Ű§Ù„Ù‚Ű§ŰčŰŻ ÙˆŰ§Ù„ŰłŰ·Ű­ÙŠ Ù„Ù…Ű·Ű§Ù…Ű± Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©Ű§Ù„ŰčŰČل Ű§Ù„Ù‚Ű§ŰčŰŻ ÙˆŰ§Ù„ŰłŰ·Ű­ÙŠ Ù„Ù…Ű·Ű§Ù…Ű± Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
Ű§Ù„ŰčŰČل Ű§Ù„Ù‚Ű§ŰčŰŻ ÙˆŰ§Ù„ŰłŰ·Ű­ÙŠ Ù„Ù…Ű·Ű§Ù…Ű± Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ©
 
ŰŁÙƒÙŠŰ§Űł Ű§Ù„ŰšÙ„Ű§ŰłŰȘيك في Ű§Ù„Ù…Ù…Ù„ÙƒŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłŰčÙˆŰŻÙŠŰ©
ŰŁÙƒÙŠŰ§Űł Ű§Ù„ŰšÙ„Ű§ŰłŰȘيك في Ű§Ù„Ù…Ù…Ù„ÙƒŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłŰčÙˆŰŻÙŠŰ©ŰŁÙƒÙŠŰ§Űł Ű§Ù„ŰšÙ„Ű§ŰłŰȘيك في Ű§Ù„Ù…Ù…Ù„ÙƒŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłŰčÙˆŰŻÙŠŰ©
ŰŁÙƒÙŠŰ§Űł Ű§Ù„ŰšÙ„Ű§ŰłŰȘيك في Ű§Ù„Ù…Ù…Ù„ÙƒŰ© Ű§Ù„ŰčŰ±ŰšÙŠŰ© Ű§Ù„ŰłŰčÙˆŰŻÙŠŰ©
 
Ű§Ù„Ù…ŰźŰ·Ű· Ű§Ù„ŰȘÙˆŰŹÙŠÙ‡ÙŠ Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§ 2004
Ű§Ù„Ù…ŰźŰ·Ű· Ű§Ù„ŰȘÙˆŰŹÙŠÙ‡ÙŠ Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§ 2004Ű§Ù„Ù…ŰźŰ·Ű· Ű§Ù„ŰȘÙˆŰŹÙŠÙ‡ÙŠ Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§ 2004
Ű§Ù„Ù…ŰźŰ·Ű· Ű§Ù„ŰȘÙˆŰŹÙŠÙ‡ÙŠ Ù„Ű„ŰŻŰ§Ű±Ű© Ű§Ù„Ù†ÙŰ§ÙŠŰ§ŰȘ Ű§Ù„Ű”Ù„ŰšŰ© في ŰłÙˆŰ±ÙŠŰ§ 2004
 

Recently uploaded

ćŠžç†ć­ŠäœèŻ(KUèŻäčŠ)ć Șèšæ–Żć€§ć­ŠæŻ•äžšèŻæˆç»©ć•ćŽŸç‰ˆäž€æŻ”äž€
ćŠžç†ć­ŠäœèŻ(KUèŻäčŠ)ć Șèšæ–Żć€§ć­ŠæŻ•äžšèŻæˆç»©ć•ćŽŸç‰ˆäž€æŻ”äž€ćŠžç†ć­ŠäœèŻ(KUèŻäčŠ)ć Șèšæ–Żć€§ć­ŠæŻ•äžšèŻæˆç»©ć•ćŽŸç‰ˆäž€æŻ”äž€
ćŠžç†ć­ŠäœèŻ(KUèŻäčŠ)ć Șèšæ–Żć€§ć­ŠæŻ•äžšèŻæˆç»©ć•ćŽŸç‰ˆäž€æŻ”äž€F dds
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
Green Marketing Strategies and Challenges
Green Marketing Strategies and ChallengesGreen Marketing Strategies and Challenges
Green Marketing Strategies and ChallengesDr. Salem Baidas
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxAgrodome projects LLP
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresvasubhanot1234
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhidelih Escorts
 
ćŽŸç‰ˆćźšćˆ¶copyæŸłæŽČè©čć§†æ–Żćș“ć…‹ć€§ć­ŠæŻ•äžšèŻJCUæŻ•äžšèŻæˆç»©ć•ç•™äżĄć­ŠćŽ†èź€èŻäżéšœèŽšé‡
ćŽŸç‰ˆćźšćˆ¶copyæŸłæŽČè©čć§†æ–Żćș“ć…‹ć€§ć­ŠæŻ•äžšèŻJCUæŻ•äžšèŻæˆç»©ć•ç•™äżĄć­ŠćŽ†èź€èŻäżéšœèŽšé‡ćŽŸç‰ˆćźšćˆ¶copyæŸłæŽČè©čć§†æ–Żćș“ć…‹ć€§ć­ŠæŻ•äžšèŻJCUæŻ•äžšèŻæˆç»©ć•ç•™äżĄć­ŠćŽ†èź€èŻäżéšœèŽšé‡
ćŽŸç‰ˆćźšćˆ¶copyæŸłæŽČè©čć§†æ–Żćș“ć…‹ć€§ć­ŠæŻ•äžšèŻJCUæŻ•äžšèŻæˆç»©ć•ç•™äżĄć­ŠćŽ†èź€èŻäżéšœèŽšé‡sehgh15heh
 

Recently uploaded (20)

Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
E-Waste Management
E-Waste ManagementE-Waste Management
E-Waste Management
 
ćŠžç†ć­ŠäœèŻ(KUèŻäčŠ)ć Șèšæ–Żć€§ć­ŠæŻ•äžšèŻæˆç»©ć•ćŽŸç‰ˆäž€æŻ”äž€
ćŠžç†ć­ŠäœèŻ(KUèŻäčŠ)ć Șèšæ–Żć€§ć­ŠæŻ•äžšèŻæˆç»©ć•ćŽŸç‰ˆäž€æŻ”äž€ćŠžç†ć­ŠäœèŻ(KUèŻäčŠ)ć Șèšæ–Żć€§ć­ŠæŻ•äžšèŻæˆç»©ć•ćŽŸç‰ˆäž€æŻ”äž€
ćŠžç†ć­ŠäœèŻ(KUèŻäčŠ)ć Șèšæ–Żć€§ć­ŠæŻ•äžšèŻæˆç»©ć•ćŽŸç‰ˆäž€æŻ”äž€
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
Green Marketing Strategies and Challenges
Green Marketing Strategies and ChallengesGreen Marketing Strategies and Challenges
Green Marketing Strategies and Challenges
 
Green Banking
Green Banking Green Banking
Green Banking
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measures
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
 
ćŽŸç‰ˆćźšćˆ¶copyæŸłæŽČè©čć§†æ–Żćș“ć…‹ć€§ć­ŠæŻ•äžšèŻJCUæŻ•äžšèŻæˆç»©ć•ç•™äżĄć­ŠćŽ†èź€èŻäżéšœèŽšé‡
ćŽŸç‰ˆćźšćˆ¶copyæŸłæŽČè©čć§†æ–Żćș“ć…‹ć€§ć­ŠæŻ•äžšèŻJCUæŻ•äžšèŻæˆç»©ć•ç•™äżĄć­ŠćŽ†èź€èŻäżéšœèŽšé‡ćŽŸç‰ˆćźšćˆ¶copyæŸłæŽČè©čć§†æ–Żćș“ć…‹ć€§ć­ŠæŻ•äžšèŻJCUæŻ•äžšèŻæˆç»©ć•ç•™äżĄć­ŠćŽ†èź€èŻäżéšœèŽšé‡
ćŽŸç‰ˆćźšćˆ¶copyæŸłæŽČè©čć§†æ–Żćș“ć…‹ć€§ć­ŠæŻ•äžšèŻJCUæŻ•äžšèŻæˆç»©ć•ç•™äżĄć­ŠćŽ†èź€èŻäżéšœèŽšé‡
 

SWM Master plan in Syria

  • 1. Overview on the current situation and future master plan For Solid waste management in Syria ENGINEER AMIR ALBOUKHARI
  • 2. Syrian master plan of waste management: Seminars Signing contract with Trivalor co
  • 3. Syrian master plan of waste management: Seminars GENERALITIES ïź Main constraints for waste management in Syria : - Outside burning, with generation of pollution, - No landfill with total containment, - No real operation in most of dumpsites, - No treatment plant for hazardous waste, - Important shortage of vehicles, containers and workers, - No awareness about waste impact on environment.
  • 4. Syrian master plan of waste management: Seminars Current situation In Syria
  • 5. Syrian master plan of waste management: Seminars Sorting waste Damascus Current situation In Syria Collecting batteries
  • 6. Syrian master plan of waste management: Seminars Current situation In Syria Ever clean co
  • 7. Syrian master plan of waste management: Seminars Damascus Transfer station Aleppo Current situation In Syria
  • 8. Syrian master plan of waste management: Seminars Damascus composting plant Current situation In Syria
  • 9. Syrian master plan of waste management: Seminars Salamya composting plant Current situation In Syria
  • 10. Syrian master plan of waste management: Seminars Damascus Homs Current situation In Syria landfills
  • 11. Syrian master plan of waste management: Seminars ‫ۧ‏Latakia Aleppo landfills Current situation In Syria
  • 12. Syrian master plan of waste management: Seminars Idleb Deir alzor Current situation In Syria landfills
  • 13. Syrian master plan of waste management: Seminars Medical waste management in Damascus
  • 14. Syrian master plan of waste management: Seminars Solid waste management Master plan
  • 15. Syrian master plan of waste management: Seminars Basic network Generalization 1 OK NO OK, in Damascus, Lattakia and Salameya NO NO OK 2 OK NO OK NO NO OK 3 OK OK OK NO NO OK 3 bis OK OK OK NO NO OK 4 OK OK OK OK NO OK 5 OK OK OK OK OK, in Damascus and Aleppo (1) OK 6 OK OK OK OK OK, in : Damascus (1), Aleppo, Tartous, Lattakia, Douma, Suweida + Daraa OK (1) only for rejected waste from composting Sanitary landfilling Composting Scenario Remediation dumpsite Recovery of dry materials Thermic treatment The seven scenarios for domestic waste management in the Syrian Arab Republic
  • 16. Syrian master plan of waste management: Seminars GENERALITIES ïź A rational waste management is : - Keep a clean town, - Minimize the current proportion of waste in dumpsite, - Set up a network of landfill with waterproof and leachate control, - Increase training for operating of landfills and composting plants, - Ban outside burning.
  • 17. Syrian master plan of waste management: Seminars Domestic waste : 5 400 000 t/year recovery bulky wastebiowaste inertMixed waste hazardous waste sorting plant Landfill 3 000 000 t home composting spĂ©cific treatment 7 400 t 10 000 t4 540 000 t600 000 t 70 000 t 90 000 t 780 000 t medical waste 7 400 t 3 100 t spĂ©cific treatment 3 100 t 780 000 t 1 550 000 t Compost 1 550 000 t Mechanical preparation Inert landifilling 70 000 t Recycling 790 000 t 1 550 000 t 190 000 t 3 850 000 t 650 000 t Composting 3 100 000 t Recycling 90 000 t 0,1%1,3%28%55%14% 0,1%1,6% Domestic waste : 5 400 000 t/year recovery bulky wastebiowaste inertMixed waste hazardous waste sorting plant Landfill 3 000 000 t home composting spĂ©cific treatment 7 400 t 10 000 t4 540 000 t600 000 t 70 000 t 90 000 t 780 000 t medical waste 7 400 t 3 100 t spĂ©cific treatment 3 100 t 780 000 t 1 550 000 t Compost 1 550 000 t Mechanical preparation Inert landifilling 70 000 t Recycling 790 000 t 1 550 000 t 190 000 t 3 850 000 t 650 000 t Composting 3 100 000 t Recycling 90 000 t 0,1%1,3%28%55%14% 0,1%1,6%
  • 18. Syrian master plan of waste management: Seminars GENERALITIES ïź An optimal waste management needs also to implement actions in the order below : Waste minimization Adapted collection Adapted treatment Landfill Main aim : reduce waste in landfill
  • 19. Syrian master plan of waste management: Seminars ïź IN PRACTICE, IT NEEDS : - Technical means (vehicles, plants
), - Technical organization (good managerial staff), - Administrative organization (planification in each governorate, intermunicipal organization), - National policies, - Financial ressources : - Financing of investment, - Financing of services.
  • 20. Syrian master plan of waste management: Seminars WASTE MINIMIZATION
  • 21. Syrian master plan of waste management: Seminars WASTE MINIMIZATION Consciousness raising Financial incentives MINIMIZATION OF WASTE GENERATION Promotion of eco- responsible purchase MASS MEDIA Promotion of « less collected waste »
  • 22. Syrian master plan of waste management: Seminars WASTE MINIMIZATION ï‚š Solutions : ï‚š - Deposit system for batteries, bottles, tires, plastic bags, ï‚š -Specific tax on plastic bags You buy the first bag and after you change old bag for a new, free of charge
  • 23. Syrian master plan of waste management: Seminars WASTE MINIMIZATION ï‚š Solutions : ï‚š - Encourage reuse : repair lists, support second-hand market
 ï‚š - Home composting,
  • 24. Syrian master plan of waste management: Seminars WASTE COLLECTION ïź IMPROVEMENT OF TRADITIONAL COLLECTION : - Decrease the large shortage of collection containers, - Decrease the large shortage of compactors for collection, - Increase the labor force for cleanliness and collection, (2 workers for 1 000 inhabitants), - Set up a managerial staff to optimize waste management in each town, - Promote partnership with private companies.
  • 25. Syrian master plan of waste management: Seminars Possible separative collection glass plastic Cardboard Packaging and old papers Biowaste steel Vegetables Green waste
  • 26. Syrian master plan of waste management: Seminars RECYCLING CONTAINERS
  • 27. Syrian master plan of waste management: Seminars SEPARATIVE COLLECTION OF BULKYWASTE IN DROP-OFF CENTRE Principle : enclosed place supervised, where municipal services, households, and small companies bring and separate bulky waste : furniture, household electrical appliance, big objects
  • 28. Syrian master plan of waste management: Seminars WASTE TRANSPORT ïź Waste transport is not efficient with tractor or compactor on long distances. ïź Transfer station and transport by truck is necessary to gather waste in a big treatment plant. Main plant Transfer stations for small centres
  • 29. Syrian master plan of waste management: Seminars WASTE TRANSPORT : MINIMUM DISTANCE Ton/day Distance of treatment center (km) Transfer plant advantageous area
  • 30. Syrian master plan of waste management: Seminars Transfer station for rural areas Simple skip WASTE TRANSPORT
  • 31. Syrian master plan of waste management: Seminars Transfer station for urban areas WASTE TRANSPORT
  • 32. Syrian master plan of waste management: Seminars Governorate Nb. of sites Governorate Nb. of sites Damascus City 1 Hama 12 Damascus countryside 11 Lattakia 13 Daa’ra 7 Tartous 9 Suweida 6 Deir Es Zor 8 Aleppo 14 Hasakeh 8 Idleb 3 Rakka 9 Homs 9 TOTAL 110 Number of transfer stations per governorate
  • 33. Syrian master plan of waste management: Seminars Network of transfer stations : 1 to14 transfer station per Governorate WASTE TRANSPORT ïź Provisional investment : 4 to 40 million SP/transfer station, ïź Transport cost : 80 to 100 SP/ton for medium and long distance.
  • 34. Syrian master plan of waste management: Seminars DIFFERENT TYPE OF WASTE TREATMENT ïź Sorting plant ïź Composting ïź Other treatment of organic matter ïź Thermic treatment
  • 35. Syrian master plan of waste management: Seminars INTEGRATED CENTRE OF WASTE TREATMENT
  • 36. Syrian master plan of waste management: Seminars SORTING PLANT GENERAL ORGANISATION Weighing Reception area Mechanical sorting Manual sorting To sell Storage before conditionning Weighing Storage before evacuation conditionning Offices
  • 37. Syrian master plan of waste management: Seminars SORTING PLANT P EN TE OPENER OF BAGS ALIMENTATION MECHANICAL SORTING SORTING CABIN CONVEYOR OF PRESS PRESS EVACUATION
  • 38. Syrian master plan of waste management: Seminars SORTING PLANT
  • 39. Syrian master plan of waste management: Seminars RECEIPTS OR EXPENSES FOR SORTING FACILITIES (mixed waste) 5900 2600 1200 600 130 -10 10 -20 -50 -1000 0 1000 2000 3000 4000 5000 6000 1500 3000 6000 10000 15000 20000 30000 40000 50000 Annual recovery tonnage (t/year) S.P./tonofrecovery material
  • 40. Syrian master plan of waste management: Seminars COMPOSTING PLANT ïź Organic matter treatment ïź Aerobic way ïź Different ways:  Mixed domestic waste  Green waste  Organic matter from domestic waste after separative collection
  • 41. Syrian master plan of waste management: Seminars COMPOSTING PLANT MAIN ORGANISATION RECEPTION AND PREPARATION FERMENTATION PHASE MATURATION COMPOST REFINING STORAGE AVOID SCHREDDING SELLING PREARE COMPOST FOR SELLING
  • 42. Syrian master plan of waste management: Seminars COMPOSTING PLANT ïź Parameters involved to optimize composting ïź Humidity, ïź Aeration ïź An efficient composting process has to optimize these parameters in a simple way
  • 43. Syrian master plan of waste management: Seminars COMPOSTING PLANT OUTSIDE PLATEFORM WITH NATURAL AERATION
  • 44. Syrian master plan of waste management: Seminars COMPOSTING PLANT OUTSIDE PLATEFORM WITH NATURAL AERATION compost Retourneur enjambeurTurner GREEN WASTE COMPOSTING
  • 45. Syrian master plan of waste management: Seminars COMPOSTING COSTS 920 500 320 260 230 220 220 0 500 1 000 5 000 15 000 50 000 100 000 160 000 225 000 260 000 t/year S.P./ton
  • 46. Syrian master plan of waste management: Seminars DIFFERENT TYPE OF LANDFILL ïź Depending on type of admitted waste ïź 1st class: for hazardous waste ïź 2nd class: for domestic waste or non hazardous industrial waste ïź 3th class: for demolition waste (inert)
  • 47. Syrian master plan of waste management: Seminars CHARACTERISTICS OF SITE FOR LANDFILLING Criterion Characteristics Localisation Distance : 5 km of habitations and others activities. Geology Limited ground settlement Impermeable materials in bottom and around the site. Hydraulic Permeability: 1m with permeability < 1.10-9 m/s + 5m with permeability < 1.10-6 m/s Hydro-geology Site basis over the maximum level of the water table
  • 48. Syrian master plan of waste management: Seminars General design
  • 49. Syrian master plan of waste management: Seminars General designTypical multiple active and passive barrier GĂ©otextile GĂ©omembrane PEHD groundwater Clay1m – 10-9 m/s Clayor equivalent 5m – 10-6 m/s WASTE At least 10 meters Typical multiple active and passive barrier Geotextile GĂ©omembrane PEHD groundwater Clay1m – 10-9 m/s Clayor equivalent 5m – 10-6 m/s WASTE At least 10 meters passive Substratum Rock/soil active
  • 50. Syrian master plan of waste management: Seminars Control and supervision Underground water -monthly sampling and analysis, -control of water level, Superficial water -implementation of reject points, -monthly analysis Leachate -treatment to define in special conditions, -implementation of reject points, -monthly analysis, -quality of rejects to be define in special conditions book, Biogaz -analysis of composition (6 per year), -quality of rejects to be define in book of special conditions Documents -plan of operation, -annual hydric balance
  • 51. Syrian master plan of waste management: Seminars BIOGAZ NETWORK OF COLLECTION CONTROLED BURNING PRODUCTION OF ENERGY
  • 52. Syrian master plan of waste management: Seminars LEACHATE STORAGE AND TREATMENT
  • 53. Syrian master plan of waste management: Seminars CONSTRUCTION OF COMPARTMENT
  • 54. Syrian master plan of waste management: Seminars Cost per ton landfilled in relation with the landfill annual capacity 0 200 400 600 800 1000 1200 1400 1600 0 50 000 100 000 150 000 200 000 250 000 300 000 350 000 400 000 450 000 500 000 Capacity in tons CostinSP/ton
  • 55. Syrian master plan of waste management: Seminars MEDICAL WASTE MANAGEMENT The priority : separative collection of medical waste in the hospital
  • 56. Syrian master plan of waste management: Seminars Syria – Medical Waste Facilities Nominal Treatment capacities - 5000 t in 2014 Al Quneitra JORDAN Aleppo El Hasakeh Miadeen Homs As Suweida Dar’a Damascus Edleb Hama Tartus Lattakia A’ Zaz Al Bab Manbij El Thaourah Ar Raqqa El Qamishli Deir ez Zor Abu kamal Tadmor Masyaf Nabk Duma Busra Orontes Euphrates Buhayrat al’ Asad Jebleh Yabroud 950 t/y 500 t/y 100 t/y 100 t/y 150 t/y 1 000 t/y 1 000 t/y 300 t/y 300 t/y Medical Waste Treatment Facility by Steam Disinfection 300 t/y 100 t/y 300 t/y 100 t/y 300 t/y Syria – Medical Waste Facilities Nominal Treatment capacities - 5000 t in 2014 Al Quneitra JORDAN Aleppo El Hasakeh Miadeen Homs As Suweida Dar’a Damascus Edleb Hama Tartus Lattakia A’ Zaz Al Bab Manbij El Thaourah Ar Raqqa El Qamishli Deir ez Zor Abu kamal Tadmor Masyaf Nabk Duma Busra Orontes Euphrates Buhayrat al’ Asad Jebleh Yabroud 950 t/y950 t/y 500 t/y500 t/y 100 t/y100 t/y 100 t/y100 t/y 150 t/y150 t/y 1 000 t/y1 000 t/y 1 000 t/y1 000 t/y 300 t/y300 t/y 300 t/y300 t/y Medical Waste Treatment Facility by Steam Disinfection Medical Waste Treatment Facility by Steam Disinfection 300 t/y300 t/y 100 t/y100 t/y 300 t/y300 t/y 100 t/y100 t/y 300 t/y300 t/y
  • 57. Syrian master plan of waste management: Seminars MEDICAL WASTE MANAGEMENT ïź RECOMMENDATION : A specific collection with safety rules and specific trucks for medical waste, with regular disinfection
  • 58. Syrian master plan of waste management: Seminars MEDICAL WASTE MANAGEMENT: The best solution : steam disinfection
  • 59. Syrian master plan of waste management: Seminars MEDICAL WASTE MANAGEMENT ïź RECOMMENDATION FOR SYRIA: 1 plant per governorate for steam disinfection, with : - 1 large plant in big areas (500 to 1 000 t/year), - 1 small plant in other areas (100 to 150 ton/year). New jobs : 4 to 6 persons per facility.
  • 60. Syrian master plan of waste management: Seminars Syria – Medical Waste Facilities Nominal Treatment capacities - 5000 t in 2014 Al Quneitra JORDAN Aleppo El Hasakeh Miadeen Homs As Suweida Dar’a Damascus Edleb Hama Tartus Lattakia A’ Zaz Al Bab Manbij El Thaourah Ar Raqqa El Qamishli Deir ez Zor Abu kamal Tadmor Ariha Ma’ arrar Masyaf Al Qusayr Nabk Duma Busra Orontes Euphrates Buhayrat al’ Asad Jebleh Yabroud 1000 t/y 150 t/y 100 t/y 100 t/y Medical Waste Treatment Facility by Steam Disinfection Medical Waste Treatment Facility by Incineration 1500 t/y 1500 t/y 1500 t/y Syria – Medical Waste Facilities Nominal Treatment capacities - 5000 t in 2014 Al Quneitra JORDAN Aleppo El Hasakeh Miadeen Homs As Suweida Dar’a Damascus Edleb Hama Tartus Lattakia A’ Zaz Al Bab Manbij El Thaourah Ar Raqqa El Qamishli Deir ez Zor Abu kamal Tadmor Ariha Ma’ arrar Masyaf Al Qusayr Nabk Duma Busra Orontes Euphrates Buhayrat al’ Asad Jebleh Yabroud 1000 t/y 150 t/y 100 t/y 100 t/y Medical Waste Treatment Facility by Steam Disinfection Medical Waste Treatment Facility by Incineration 1500 t/y 1500 t/y 1500 t/y Al Quneitra JORDAN Aleppo El Hasakeh Miadeen Homs As Suweida Dar’a Damascus Edleb Hama Tartus Lattakia A’ Zaz Al Bab Manbij El Thaourah Ar Raqqa El Qamishli Deir ez Zor Abu kamal Tadmor Ariha Ma’ arrar Masyaf Al Qusayr Nabk Duma Busra Orontes Euphrates Buhayrat al’ Asad Jebleh Yabroud 1000 t/y 150 t/y150 t/y 100 t/y100 t/y 100 t/y100 t/y Medical Waste Treatment Facility by Steam Disinfection Medical Waste Treatment Facility by Incineration 1500 t/y 1500 t/y 1500 t/y
  • 61. Syrian master plan of waste management: Seminars Typical multiple active and passive barrier Geotextile GĂ©omembrane HDPE Drainage layer 0,5 m K = 10 -4 m/s Substratum Rock/soil groundwater Clay or equivalent 5m K=10-9 m/s Hazardous and medical WASTE Typical multiple active and passive barrier Geotextile GĂ©omembrane HDPE Drainage layer 0,5 m K = 10 -4 m/s Substratum Rock/soil groundwater Clay or equivalent 5m K=10-9 m/s Hazardous and medical WASTE
  • 62. Syrian master plan of waste management: Seminars HAZARDOUS WASTE ïź Hazardous waste collection is an absolute priority : great impact on compost quality , on environment and water pollution
  • 63. Syrian master plan of waste management: Seminars HAZARDOUS WASTE STORAGE ïź In municipal services or fire station : a closed cupboard with retention system on the soil
  • 64. Syrian master plan of waste management: Seminars HAZARDOUS WASTE TREATMENT Aim for Syria : carry out one plant for toxic waste Several activities in the Syrian plant : - Recovery, - Physical and chemical treatment, - Incineration. - For specific toxic waste, export is necessary : PCB for example (Europe, Asia
). - Suggestion : partnership between Middle East countries to set up a network of plant for all toxic waste
  • 65. Syrian master plan of waste management: Seminars FINANCING OF INVESTMENT ïź Government or regional grant ïź Budget of municipality (need financial reserves) ïź Bank loan ïź Private ( by B.O.T: built, operate and transfer tendering procedure)
  • 66. Syrian master plan of waste management: Seminars Al Quneitra Aleppo El Hasakeh Miadeen Homs As Suweida Dar’a Damascus Edleb Hama Tartus Lattakia A’ Zaz Al Bab Manbej Al Thora Al Raqqa El Qamishli Deir ez Zor Abu kamal Tadmor Masyaf Nabk Duma Busra Orontes Euphrates Buhayrat al’ Asad Jebleh Yabroud Treatment unit Sanitary landfill Al Quneitra Aleppo El Hasakeh Miadeen Homs As Suweida Dar’a Damascus Edleb Hama Tartus Lattakia A’ Zaz Al Bab Manbej Al Thora Al Raqqa El Qamishli Deir ez Zor Abu kamal Tadmor Masyaf Nabk Duma Busra Orontes Euphrates Buhayrat al’ Asad Jebleh Yabroud Treatment unit Sanitary landfill Treatment unit Sanitary landfill Map of main Syrian facilities (Integrated centres and landfill)
  • 67. Syrian master plan of waste management: Seminars Governorate of Hasakeh – 1 620 000 inhabitants in 2014 – 336 960 ton/year in 2014 Al Malkiye (81 820) El Hasakeh (251 000) Amuda (38 000) Ash Sadaddih Tall Tamir (3 500) Qamischli (180 000) Ain Diwar ( 7 000) Tel Halaf ( 7 000) Ras al Ein (51 000) Ad Dughayrat Al Hawl (6 200) Al Khatuniya (4 500) Al ‘Ya Rubiyeh Tall Brak Darbasiyah (24 000) 39 27 28 27 50 42 13 30 35 60 41 56 Area A Population 700 000 inh Total domestic waste 145 600 ton/year Transferred waste 43 800 ton/year Sorting of recyclable 27 230 ton/year Composting 93 450 ton/year Landfilling 75 845 ton/year Area C Population 260 000 inh Total domestic waste 54 080 ton/year Transferred waste 37 800 ton/year Sorting of recyclable 7 800 ton/year Composting 0 ton/year Landfilling 46 280 ton/year Area B Population 460 000 inh Total domestic waste 95 680 ton/year Transferred waste 57 600 ton/year Sorting of recyclable 17 894 ton/year Composting 61 410 ton/year Landfilling 49 841 ton/year Area D Population 200 000 inh Total domestic waste 41 600 ton/year Transferred waste 31 500 ton/year Sorting of recyclable 6 000 ton/year Composting 0 ton/year Landfilling 35 600 ton/year 10 Tal Hamies ( 20 000) Al Qahtaniyeh (22 000) Al Jawadiyah (3 270) 31 Marqadeh 39 35 30 44 Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 68. Syrian master plan of waste management: Seminars Governorate of Deir Es Zor – 1 315 000 inhabitants in 2014 – 273 520 ton/year in 2014 Miadeen (50 000) Der ez Zor (230 000) Abu kamal (70 000) Al Thibnah (10 000) Suwar (10 000) Al Kasrah (10 000) Muhasan (22 000) Al Asharah (23 000) Hajin (43 200) 41 8 25 64 57 Ziban (14 000) 54 20 13 37 16 50 Bussayra (20 000) Al Kharayej (27 000) Area A Population 1 115 000 inh Total domestic waste 231 920 ton/year Transferred waste 139 200 ton/year Sorting of recyclable 43 374 ton/year Composting 148 853 ton/year Landfilling 120 810 ton/year Area B Population 200 000 inh Total domestic waste 41 600 ton/year Transferred waste 21 000 ton/year Sorting of recyclable 6 000 ton/year Composting 0 ton/year Landfilling 35 600 ton/year 10 Sbeikhan (24 000) Ash Shafeh (21 000) 16 40 16 15 Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 69. Syrian master plan of waste management: Seminars Governorate of Raqqah – 910 000 inhabitants in 2014 – 226 590 ton/year in 2014 Al Thora (80 000) Al Raqqa (250 000) Sluk (16 000) Halabiyeh Al Madane (9 000) Al Karamah (35 000) Ayn Isa (16 800) As Sabkha (26 000) Tal Abiad (50 000) 21 28 52 30 26 33 24 27 23 42 Dibsi’Affnan (24 000) 32 Qantari11 17 58 Al Jirniyeh (18 000) Area A Population 460 000 inh Total domestic waste 114 540 ton/year Transferred waste 57 500 ton/year Sorting of recyclable 18 837 ton/year Composting 75 555 ton/year Landfilling 60 686 ton/year Area C Population 170 000 inh Total domestic waste 42 330 ton/year Transferred waste 25 200ton/year Sorting of recyclable 5 100 ton/year Composting 0 ton/year Landfilling 37 230 ton/year Area B Population 280 000 inh Total domestic waste 69 720 ton/year Transferred waste 42 000 ton/year Sorting of recyclable 8 400 ton/year Composting 0 ton/year Landfilling 61 320 ton/year Kafifeh 20 Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 70. Syrian master plan of waste management: Seminars Governorate of Aleppo – 4 740 000 inhabitants in 2014 – 1 019 100 ton/year in 2014 Ain Al Arab (45000) A’ Zaz (70 000) Al Bab (120 000) Manbij (186 000) Maskaneh (10 000) Tal Adaman (8000) Daret Azze (40 000) Der Hafer (26 400) As Sufira (91 600) Kanasir (14000) Ifrin (46 000) Nubul (29 000) Tal Rifaat (31 000) Mare (40 000) Al Rai (12 300) 38 Jarablos (38 000) 32 15 13 18 10 23 40 25 Athareb ( 20 000) 28 60 45 Hreitan (17 000) Rajo ( 6 600) Jandires (13 000) Cheikh Al Hadid (10 000) Bolbol (10 500) Sarba ( 4 600) Akhtarin (14 000) Tadef (33 000) Al Ghandourah (7 000) Abu Kolokol (5 000) Khafseh (18 000) Al Mahmoudyah (9 000) 35 35 47 37 15 Serrin Al Chamalieh (10 000) 18 30 24 24 26 10 8 31 18 20 20 16 40 40 Aleppo (2 800 000) Area A Population 3 110 000 Total domestic waste 668 650 ton/year Transferred waste 669 000 ton/year Sorting of recyclable 107 295 ton/year Composting 443 175 ton/year Landfilling 355 318 ton/year Area C Population 300 000 inh Total domestic waste 64 500 ton/year Transferred waste 16 250 ton/year Sorting of recyclable 7 500 ton/year Composting 0 ton/year Landfilling 57 000 ton/year Area B Population 560 000 inh Total domestic waste 120 400 ton/year Transferred waste 30 000 ton/year Sorting of recyclable 19 320 ton/year Composting 79 800 ton/year Landfilling 63 980 ton/year Area D Population 280 000 inh Total domestic waste 60 200 ton/year Transferred waste 24 000 ton/year Sorting of recyclable 7 000 ton/year Composting 0 ton/year Landfilling 53 200 ton/year Area E Population 90 000 inh Total domestic waste 19 350 ton/year Transferred waste 7 600 ton/year Sorting of recyclable 2 700 ton/year Composting 0 ton/year Landfilling 16 650 ton/year 30 Area F Population 400 000 Total domestic waste 86 000 ton/year Transferred waste 60 200 ton/year Sorting of recyclable 12 000 ton/year Composting 0 ton/year Landfilling 74 000 ton/year Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 71. Syrian master plan of waste management: Seminars Governorate of Idleb - 1 450 000 inhabitants in 2014 – 311 750 ton/year in 2014 Msebin Idleb ( 113 000) Taftanaz (10 000) Sarahqueb (35 000) Sinjar (3000) 30 16 15 27 Ma’ arrat an Numan (70000) Ariha (50 000) Abu Dhour (12 000) Khan Chekhoun (52 000) Kafr Nobol (22 000) Ehsem (11 000) Mambel (8 000) Jisr Al Shoghour (38 000) Bdama (6 000) Harem (30 000) Banesh (28 000) Al Dana (20 000) Ma’artamsrin (30 000) 20 15 22 15 10 12 12 37 29 25 20 9 30 7 S.landfill of Hantoutin 27 NOTA: The site south of Ehsem planned by the municipalities in the SW area is useless. The surrounding municipalities could join the Hantoutin landfill. Area C Population 280 000 inh Total domestic waste 60 200 ton/year Sorting of recyclable 8 400 ton/year Composting 0 ton/year Landfilling 51 800 ton/year Area A Population 460 000 inh Total domestic waste 98 900 ton/year Transferred waste 14 850 ton/year Sorting of recyclable 18 055 ton/year Composting 63 825 ton/year Landfilling 51 693 ton/year Area B Population 460 000 inh Total domestic waste 98 900 ton/year Transferred waste 29 700 ton/year Sorting of recyclable 18 055 ton/year Composting 63 825 ton/year Landfilling 51 693 ton/year Area D Population 250 000 inh Total domestic waste 53 750 ton/year Sorting of recyclable 7 500 ton/year Composting 0 ton/year Landfilling 46 250 ton/year Salquin (29 000) Kafr Takharim (21000) Darkush (10 300) Foua’a (21 000) Sarmin (18 000) Armanaz (20 000) Kelli (11 000) 20 Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 72. Syrian master plan of waste management: Seminars Governorate of Lattakia – 1 050 000 inhabitants in 2014 – 316 050 ton/year in 2014 Slinfa (2000) Lattakia 465 000 Al Haffeh (12 000) Jableh (62 000) Sharquiyah (4 000) Kassab (4 000) Jobet Birghal (3 000) Al Qardaha (20 000) 20 22 20 14 20 Watal Khan Rabiah (8 000) Qastal Ma’ar (5 400) Einl Baidah Al Bahloulieh (9 400) Kansabba (5 000) Ayn al Tinah (4 500) Fakhurah (10 000) 16 24 Projected S.landfill of Al Qasia + composting plant Population 1 050 000 inh Total domestic waste 316 050 ton/year Transferred waste 221 200 ton/year Sorting of recyclable 45 728 ton/year Composting 213 413 ton/year Landfilling 169 916 ton/year Qutelbiya (15 000) Ad Dalieh (12 000) 12 13 20 Rehabilitation of the composting plant 25 20 45 41 28 24 5 12 16 20 Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 73. Syrian master plan of waste management: Seminars Governorate of Tartus – 785 000 inhabitants in 2014 – 202 530 ton/year in 2014 Al Hamadiyah (10 000) Banias (35 000) Tartous (150 000) Dreykish (19000) Al Quadmus (6 000) Hamman wasel (5 000) Sheikh Badr (15 100) 20 36 20 18 45 Al’Annazeh (6 000) At Tawaheen (2 000) Ar Rawda (6 000) As Sawda (7 000) Himmeen (9 000) Mashtal’halu (7 000) Safita (27 000) As Safateh (7 000) Kirbetl’Nizeh 35 Taleen (5 600) 17 14 9 9 11 23 24 16 29 18 13 26 Projected S.landfill of Hade Valley Arwad Island (18 000) Population 785 000 inh Total domestic waste 202 530 ton/year Transferred waste 151 500 ton/year Sorting of recyclable 32 499 ton/year Composting 134 235 ton/year Landfilling 107 624 ton/year16 Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 74. Syrian master plan of waste management: Seminars Governorate of Hama – 1 700 000 inhabitants in 2014 – 365 500 ton/year in 2014 Misyaf (30 000) Sabouhra (10 000) Karnaz (13 000) Al Sequelbiya (15 000) Kafr zeta (20 000) As Sa’an (10 000) Bural Sharqi ( 6 000) 24 18 25 47 33 20 Qalaat Almadiq (18 000) Muharde (20 000) 13 20 30 Al Hamra (28 000) A’ Qeirbat (5 000) 15 25 40 Murek (16 000) Hama ( 460 000) Talsalhab (17 000) Salameya (85 600) Area A Population 1 340 000 inh Total domestic waste 288 100 ton/year Transferred waste 86 400 ton/year Sorting of recyclable 52 595 ton/year Composting 185 925 ton/year Landfilling 150583 ton/year Area C Population 160 000 inh Total domestic waste 34 400 ton/year Transferred waste 13 600 ton/year Sorting of recyclable 6 280 ton/year Composting 22 200 ton/year Landfilling 17 980 ton/year Area B Population 200 000 inh Total domestic waste 43 000 ton/year Transferred waste 32 250 ton/year Sorting of recyclable 6 000 ton/year Composting 0 ton/year Landfilling 37 000 ton/year Az’ziara (9 000) Shat hat attahtah (8 600) Kafrbhm (17 000) Wadiel I’Youn (10 000) Aoj (5 000) Ein Halakim (5 000) Al Hmeri (4 000) Hilfaya (20 000) Kafrnabude (15 000) 11 25 13 24 Soran (28 000) + Tibet Aliman (27 000) 5 6 8 12 Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 75. Syrian master plan of waste management: Seminars Governorate of Homs – 1 900 000 inhabitants in 2014 – 490 200 ton/year in 2014 Area A Population 1 425 000 inh Total domestic waste 361 650 ton/year Transferred waste 72 400 ton/year Sorting of recyclable 58 695 ton/year Composting 239 175 ton/year Landfilling 191 918 ton/year Talkalak (30 000) An’Nasra (21 000) As Suknah (36 500) Ar Rastan (50 000) Tal Daw (21 000) TalbissĂ© (37 000) Sadad (13 000) Al Quaryatayn (30 000) 120 115 25 40 25 Al Qseir (50 000) Shin (15 000) 20 20 Hasya ( 6 400) Al Raqana (5 000) Al Fruglos (7 000) Mkharram Foqani (9 000) Jibl Jarrah (4 000) Mhin (12 500) Al Basiri 24 35 25 40 25 35 Homs ( 1 037 000) Area D Population 60 000 inh Total domestic waste 21 480 ton/year Sorting of recyclable 2 784 ton/year Composting 14 760 ton/year Landfilling 11 676 ton/year Area C Population 110 000 inh Total domestic waste 28 380 ton/year Transferred waste 28 000 ton/year Sorting of recyclable 3 300 ton/year Composting 0 ton/year Landfilling 25 080 ton/year Area B Population 180 000 inh Total domestic waste 46 440 ton/year Transferred waste 46 000 ton/year Sorting of recyclable 5 400 ton/year Composting 0 ton/year Landfilling 41 040 ton/year Tal Zahab (14 000) Kafr laha (21 500) Quateeneh (7 500) Mishfreh (11 000) Area F Population 80 000 inh Total domestic waste 20 640 ton/year Transferred waste 12 600 ton/year Sorting of recyclable 2 400 ton/year Composting 0 ton/year Landfilling 18 240 ton/year (Maghliah in a second term) 75 Area E Population 45 000 inh Total domestic waste 11 610 ton/year Sorting of recyclable 1 350 ton/year Composting 0 ton/year Landfilling 10 260 ton/year 85 14 3 4 15 17 30 32 33 10 Treatment unit Sanitary landfill Transfer plant Sorting plant *The Master plan recommends to transfer the waste to Homs landfill. Nevertheless the any municipality could decide to implement a landfill in condition a suitable site is found and authorized by the governorate. *
  • 76. Syrian master plan of waste management: Seminars Nabk (47 000) QtaifĂ© (40 000) Duma (300 000) Yabroud (38 000) Raqqleh Al Kiswah (22 000) Jeiroud (42 000) Ar Ruhaybah (28 000) Dumeir (40 000) Sadaneya (10 000) Zabadani (40 000) Tall (50 000) Harasta (150 000) Al GusnaliĂ© (10 000) Quatana (47 000) Daraya (85 000) Governorate of Damascus Countryside – 3 140 000 inhabitants in 2014 – 945 140 t/year in 2014 30 15 5 35 26 39 12 9 40 7 Kanakir (13 000) Sa’asa’a (47 000) 15 23 14 7 34 18 Projected S.landfill of Jeiroud Existing S.landfill of Al Jaronia 18 Existing sorting plant Treatment unit Sanitary landfill Transfer plant Sorting plant Area A Population 920 000 inh Total domestic waste 276 920 ton/year Transferred waste 166 200 ton/year Sorting of recyclable 35 696 ton/year Composting 190 440 ton/year Landfilling 150 604 ton/year Area B Population 1 000 000 inh Total domestic waste 301 000 ton/year Transferred waste 255 850 ton/year Sorting of recyclable 38 800 ton/year Composting 207 000 ton/year Landfilling 163 700 ton/year Area C Population 610 000 inh Total domestic waste 183 610 ton/year Transferred waste 128 800 ton/year Sorting of recyclable 23 668 ton/year Composting 126 270 ton/year Landfilling 99 857 ton/year Area D Population 610 000 inh Total domestic waste 183 610 ton/year Transferred waste 138 000 ton/year Sorting of recyclable 23 668 ton/year Composting 126 270 ton/year Landfilling 99 857 ton/year Deir Atiyeh (20 000) Qara (20 000) 9 8 To Al Quneitra landfill
  • 77. Syrian master plan of waste management: Seminars Al GusnaliĂ© Governorate of Damascus – 3 400 000 inhabitants in 2014 - 584 800 ton/year in 2014 Damascus 40 Existing landfill of Al Jaronia Transfer station to implement Existing composting plant to extend Population 3 400 000 inh Total domestic waste 584 800 ton/year Transferred waste 584 800 ton/year Sorting of recyclable 93 840 ton/year Composting 387 600 ton/year Landfilling 310 760 ton/year Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 78. Syrian master plan of waste management: Seminars Governorate of As Suweida – 360 000 inhabitants in 2014 – 74 880 ton/year in 2014 As Suweida (57 000) Shaba (14000) Ariqa (6500) As Sijn (4400) Shaqqa (7000) Al Mushanaf (3 000) Salkad (12700) Mallah (10 000)Al Qraya (6000) Dibin (4400) 15 18 15 22 17 13 Assoura 22 21 12 20 14 19 10 15 Population 360 000 inh Total domestic waste 74 880 ton/year Transferred waste 63 750 ton/year Sorting of recyclable 14 004 ton/year Composting 48 060 ton/year Landfilling 39 006 ton/year At Taleh (10 500) Al Qanawat (10 000) Arman (10 000) At Theel ( 9 000) Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 79. Syrian master plan of waste management: Seminars Al Musaifra (11 000) Kirbeth Ghazaleh (17 000) Bosral Harir (14 000)Tseel (16 000) Ash Shajara (8 000) Daele (27 000) Governorate of Daara – 1 040 000 inhabitants in 2014 – 216 320 ton/year in 2014 Nawa (55 000) As Shaykh (23 400) Izraa (25 000) Al Harrak (22 000)Tafas (30 000) Dar’a (100 000) Bosra (25000) Khabab Assanamein (24 000) Al Harrah (18 400) Jasem (38 000) 15 15 12 11 22 25 Seda (12 000) Al Mismiyeh (4 000) Ghabagheb (11 000) Kafrshams (14 000) 5 10 25 30 10 8 15 15 18 Area A Population 660 000 inh Total domestic waste 137 280 ton/year Transferred waste 82 200 ton/year Sorting of recyclable 25 674 ton/year Composting 88 110 ton/year Landfilling 71 511 ton/year Area B Population 380 000 inh Total domestic waste 79 040 ton/year Transferred waste 63 200 ton/year Sorting of recyclable 14 782 ton/year Composting 50 730 ton/year Landfilling 41 173 ton/year Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 80. Syrian master plan of waste management: Seminars Governorate of Al Quneitra – 190 000 inhabitants in 2014 – 38 000 ton/year in 2014 Al Khshniyeh Al Quneitra Mas’ada Ar’afie d Khan Arnabeh (10 000) Afik 15 22 25 10 Population 190 000 inh Total domestic waste 38 000 ton/year Transferred waste 26 600 ton/year Sorting of recyclable 4 608 ton/year Composting 26 363 ton/year Landfilling 20 781 ton/year Waste from Sa’asa’a transfer station Occupied Area Treatment unit Sanitary landfill Transfer plant Sorting plant
  • 81. Syrian master plan of waste management: Seminars The total investment to set up all the facilities and equipments is about 21,20 billion SP, that is about 2,12 billion SP per year. The total annual cost including investment pay off and operations (within 2014) will be about 11,5 billion SP/year without separative collection,
  • 82. Syrian master plan of waste management: Seminars 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 0 - Promote the national MSW Master Plan (documents, internet site, seminars) 5 A - Planification: Regional Master Plans 15 15 B - Waste Minimization 25 25 25 25 25 25 25 25 25 25 C - Pilot Project 16 24 19 8 5 Arward island 5 5 5 Home composting 1 1 1 Plastic bags reuse campaign 3 3 3 Dropp-off centres in rural and urban areas ( Damascus and Tartus) 10 5 Separative collection in 1 large city (to be chosen) 10 10 5 5 D - Collection 710 732 733 697 697 697 697 697 697 697 Containers 33 33 33 Trucks and compactors 670 670 670 670 670 670 670 670 670 670 Hazardous Waste storage 7 7 7 7 7 7 7 7 7 7 Dropp-off centres 22 23 20 20 20 20 20 20 20 E - Transfer and Transportation 172 172 172 172 172 172 172 172 172 172 E1 - Main towns of each Mohafazat : Lattakia, Tartus, Aleppo, Damascus, Damascus countryside (Duma, Jaronia), 172 172 172 172 172 Al Bab, Salameya,Daraa, Hasakeh, Hama,Sweida, Deir Es Zor,Homs,Magliah and urgent situations E2 - Other towns of the mohafazats : Al Quneitra, Damascus countryside ( Rakkleh, Jeiroud,Sa'asaa), Idleb, Qamischli, 172 172 172 172 172 Jawadijeh, Al Thora, Ain al Arab, Kassab, Talkhalak, Al Qseir,Abu kamal,Al Dana, Maharde, As Suknah, Raqqah, Manbej, Ma'ar'at, Tadmur, Khabab, Tall Tamir, Ayn Isa, Quaryatayn, Ifrin, Jisr Al Shoghur, F - Integrated Centres (mechanical separation, composting and sorting plants) 770 770 770 770 770 770 770 770 770 770 F1 - Main towns of each Mohafazat : Lattakia, Tartus, Aleppo, Damascus, Damascus countryside (Duma, Jaronia), 770 770 770 770 770 Daraa, Hasakeh, Hama,Sweida, Deir Es Zor,Homs, F2 - Other towns of the mohafazats : Al Quneitra, Damascus countryside ( Rakkleh, Jeiroud), Idleb, Qamischli, 770 770 770 770 770 Raqqah, Manbej, Ma'ar'at, Tadmur, Khabab G - Sorting Centres 228 228 228 228 228 228 228 228 228 228 G1 - Main towns of each Mohafazat : Lattakia, Tartus, Aleppo, Damascus, Damascus countryside (Duma, Jaronia), 228 228 228 228 228 Daraa, Hasakeh, Hama,Sweida, Deir Es Zor,Homs, G2 - Other towns of the mohafazats : Al Quneitra, Damascus countryside ( Rakkleh, Jeiroud), Idleb, Qamischli, 228 228 228 228 228 Raqqah, Manbej, Ma'ar'at, Tadmur, Khabab, Tall Tamir, Ayn Al Arab, Kanasir,Al Bab, Abu Kamal, Misyaf, Quaratayn, Jisr Al Shogour, Salameya, Jawadiyeh, Ayn Isa, Talkhalak, Al Kseir, H - Controlled Sanitary landfills 228 228 228 228 228 228 228 228 228 228 H1 - Main towns of each Mohafazat : Lattakia, Tartus, Aleppo, Damascus, Damascus countryside ( Duma, Jaronia), 228 228 228 228 228 Abu kamal, Salameya, Daraa, Sweida, Homs, Magliah, H2 - Other towns of the mohafazats :Al Quneitra, Hasakeh, Damascus countryside ( Rakkleh, jeiroud), Idleb, Hama, 228 228 228 228 228 Jawadijeh, Al Thora, Ain Al Arab, Qamischli, Al Bab,Deir Es Zor,Manbej, Ma'ar'at, Tadmur, Khabab, Tall Tamir, Ayn Isa, Raqqah,Al Dana, As Suknah, Quaryatayn, Ifrin, Jisr Al Shoghur, Sequelbiah I - Rehabilitation of dumpsites Plannification of rehabilitation Choice of the sites (will depend upon the creation of the sanitary landfills) Environmental Studies Rehabilitation work J - Medical Waste Treatment 25 25 25 25 25 25 25 25 25 25 Medical Waste Steam Disinfection in Damascus, Aleppo, Deir Es Zor, Douma, Homs, Lattakia 25 25 25 25 25 Medical Waste Steam Disinfection in Idleb, Tartus, Hama, Hasakeh, Raqqah, Tadmur, Daraa 25 25 25 25 25 Estimated Yearly Investment in 1000 SP 5 2 189 2 219 2 200 2 153 2 150 2 145 2 145 2 145 2 145 2 145 Previsionnal schedule for the implementation of the actions evaluation after inventory of municipal dumpsites
  • 83. Syrian master plan of waste management: Seminars MINISTRY OF LOCAL ADMINISTRATION AND ENVIRONMENT