J E G A D E E S H . M
E N G I N E E R
I N D I A N C A N E P O W E R L I M I T E D
MILL SETTING
DEFINITIONS :
Mean effective diameter of Top Roller D
= (Outside diameter of roller - Depth of grooving)
Work Opening : Actual opening between any two points on the
surface of the two rollers in their common
axial plane when the mills are in operation.
Mill Setting opening : Actual opening between PCD to PCD of concerned
opening rollers, when mills are at rest and empty.
DATA REQUIRED FOR MILL SETTING
C = Crush rate desired in tons (Metric)/hr.
f = fibre % cane
D = Mean effective diameter of Top Roller (mm)
L = Length of the roller (mm)
n = Speed of rotation (rpm) {To be determined based on
No. of rollers in mill tandem, crush rate, preparatory
index, specific fibre loading, power availability at setting
speed etc.}
PROCEDURE FOR CALCULATION OF MILL SETTING
V = Mill Roller surface speed
 x D x n
V = ------------- m/min.
1000
Calculate fibre rate 'F' as per formula given below:
F = C x f x 0.166 Kg / min.
Calculate the discharge work opening as
per formula given below:
F x 63429.6
Discharge work opening = ---------------------- mm.
S x V x L
Where ‘S’ denotes the Fibre Index to be read from Table – 1.
Actual Discharge Work Opening = (Discharge work opening – Roller
Rise) mm.
The 'Roller Rise' considered for the mills shall be taken as per Table 2.
Mills 12 Roller Tandem 15 Roller Tandem
2nd of `B’ Tandem 38 40
3rd of `B’ Tandem 45 46
4th of `I’ Tandem 52 52
TABLE – 1
Values of Fibre Index ‘S’
Mill No. 12 Roller Tandem 15 Roller Tandem
Roller Trash Roller Trash
2nd of `B’
Tandem
7 8 7 8
3rd of `B’ Tandem 6 7 6 7
4th of `I’ Tandem 5 6 6 6
TABLE – 2
ROLLER RISE
Calculate the Feed work opening as per formula given below:
Feed work opening = Discharge work opening X (Ratio of feed
to discharge opening) mm.
The Ratio of Feed to Discharge opening for the mills shall be taken as per
Table 3.
Actual Feed Work Opening = (Feed work opening – Roller Rise) mm.
Mills 12 Roller Tandem 15 Roller Tandem
2nd of `B’Tandem 2.00 2.05
3rd of `B’Tandem 2.15 2.10
4th of `I’Tandem 2.20 2.15
TABLE – 3
Ratio of Feed to Discharge Opening presumed for calculations
Calculate the Trash plate work opening as per formula given
below:
Trash Plate work opening = Feed work opening X (Ratio of trash
plate to
feed opening ) mm.
The Ratio of Trash Plate to Feed opening for the mills shall be taken as
per
Table 4.
Actual Trash Plate Work Opening = (Trash Plate work opening – Roller
Rise)mm.
Mill No. 12 Roller Tandem 15 Roller Tandem
2nd of `B’Tandem 1.70 1.75
3rd of `B’ Tandem 1.80 1.80
4th of `I’Tandem 1.80 1.85
TABLE – 4
Ratios of trash plate to feed opening presumed for calculations
SPECIMEN CALCULATIONS

 DATA

 Crushing Rate (c) : 250 Tons (Metric) of Cane per hour (TCH)

 Fibre % Cane (f) : 13%

 Roller Length (L) : 78 1/8 inches

 Mill Size (D x L) : 39 inches O.D. x 78 1/8 inches

 Speed selected (n): 5.5 r.p.m.

 Now calculate the factor 'F' for the above conditions
  x D x n 3.1416 x 915 x 5.5
 V = --------------- m/min. = ------------------------
 1000 1000
 = 15.81 m / min.
Calculate factor 'F' as per formula given below:

 F = C x f x 0.3733 lb / min.

 = 250 x 13 x 0.166
 = 539.5 Kg / min.
Calculation of Discharge work opening
 F x 63429.6
 Discharge work opening = -----------------mm.
 S x V xL
 For value of ‘S’ see table - 1
 539.5 x 63429.6
 = ------------------------
40 x 15.81 x 1980

 = 27.3 mm

Calculation of Feed work opening
 Feed work opening = Discharge work opening X
 (Ratio of feed to discharge
Opening)
 For value of ‘Ratio’ see TABLE-3

 = 27.32 x 2.05

 = 56 mm
Calculation of Trash plate work opening
 Trash Plate work opening= Feed work opening X
(Ratio of trash plate
to Feed Opening)
 For value of ‘Ratio’ see TABLE-3

 = 56 x 1.75

 = 98 mm.
Mill No. Feed Side Opening
(mm)
Discharge Side Opening
(mm)
Trash Plate
Opening
(mm)
2nd of `B’
Tandem
56 27.3 98
3rd of `B’ Tandem 50 23.8 89.8
4th of `I’ Tandem 45 21 83.7
The discharge, feed and trash plate openings for all the four mills are
tabulated below.
Mill No. Feed Setting =
Actual opening- roller
rise
Discharge Opening =
Actual opening- roller
rise
Trash Plate Setting =
Actual opening- roller
rise
2nd of
`B’
Tandem
56 – 7 = 49 27.3 – 7 = 20.3 98 – 8 = 90
3rd of `B’
Tandem
50 – 6 = 44 23.8 – 6 = 17.8 89.8 – 7 = 82.8
4th of `I’
Tandem
45 – 6 = 39 21 – 6 = 15 83.7 – 6 = 77.7
The ‘Mill Settings’ for all four mills can be calculated as given
below:
Mill Settings in mm
The mill settings calculated should be rounded off for practical adjustment
purpose.

More Related Content

What's hot

Thuyetminh banh rang truc vit
Thuyetminh banh rang truc vitThuyetminh banh rang truc vit
Thuyetminh banh rang truc vit
HenriKimono
 

What's hot (20)

Theory of machines solution ch 11
Theory of machines solution ch 11 Theory of machines solution ch 11
Theory of machines solution ch 11
 
Taller de bocatomas ramos castillo sandro enrique
Taller de bocatomas ramos castillo sandro enriqueTaller de bocatomas ramos castillo sandro enrique
Taller de bocatomas ramos castillo sandro enrique
 
Thuyetminh banh rang truc vit
Thuyetminh banh rang truc vitThuyetminh banh rang truc vit
Thuyetminh banh rang truc vit
 
Unit ii helical gears
Unit ii helical gearsUnit ii helical gears
Unit ii helical gears
 
5.5 gyroscope effect in 4 wheeler vehicle
5.5 gyroscope effect in 4 wheeler vehicle5.5 gyroscope effect in 4 wheeler vehicle
5.5 gyroscope effect in 4 wheeler vehicle
 
Numerical problems on spur gear (type i)
Numerical problems on spur gear (type i)Numerical problems on spur gear (type i)
Numerical problems on spur gear (type i)
 
List of formulae (spur gear)
List of formulae (spur gear)List of formulae (spur gear)
List of formulae (spur gear)
 
Mc conkey 13-pb
Mc conkey 13-pbMc conkey 13-pb
Mc conkey 13-pb
 
Bevel gear
Bevel gearBevel gear
Bevel gear
 
lecture 4 (design procedure of journal bearing)
lecture 4 (design procedure of journal bearing)lecture 4 (design procedure of journal bearing)
lecture 4 (design procedure of journal bearing)
 
Design and Simulation of Hydraulic Jack
Design and Simulation of Hydraulic JackDesign and Simulation of Hydraulic Jack
Design and Simulation of Hydraulic Jack
 
Ch 8 slides_m
Ch 8 slides_mCh 8 slides_m
Ch 8 slides_m
 
Turning moment-diagram-flywheel
Turning moment-diagram-flywheelTurning moment-diagram-flywheel
Turning moment-diagram-flywheel
 
Lab report
Lab report Lab report
Lab report
 
Design of Roller Chain Drive theory by Prof. Sagar A. Dhotare
Design of Roller Chain Drive theory  by Prof. Sagar A. DhotareDesign of Roller Chain Drive theory  by Prof. Sagar A. Dhotare
Design of Roller Chain Drive theory by Prof. Sagar A. Dhotare
 
Thiết Kế Hệ Thống Dẫn Động Băng Tải (Phương Án Số 15)
Thiết Kế Hệ Thống Dẫn Động Băng Tải (Phương Án Số 15) Thiết Kế Hệ Thống Dẫn Động Băng Tải (Phương Án Số 15)
Thiết Kế Hệ Thống Dẫn Động Băng Tải (Phương Án Số 15)
 
IRJET- A Review on Design and Development of Corn Peeling and Shelling Machine
IRJET- A Review on Design and Development of Corn Peeling and Shelling MachineIRJET- A Review on Design and Development of Corn Peeling and Shelling Machine
IRJET- A Review on Design and Development of Corn Peeling and Shelling Machine
 
Hoop strain2
Hoop strain2Hoop strain2
Hoop strain2
 
Design of 14 speed gear box
Design of 14 speed gear boxDesign of 14 speed gear box
Design of 14 speed gear box
 
U3 design of connecting rod-(i section, big&small eng, bolt, whipping str...
U3 design of connecting rod-(i section, big&small eng, bolt, whipping str...U3 design of connecting rod-(i section, big&small eng, bolt, whipping str...
U3 design of connecting rod-(i section, big&small eng, bolt, whipping str...
 

Similar to Millsetting 170710142306

Similar to Millsetting 170710142306 (20)

Vb
VbVb
Vb
 
construction equpment Chapter 2.pdf
construction equpment Chapter 2.pdfconstruction equpment Chapter 2.pdf
construction equpment Chapter 2.pdf
 
Design of Machine Elements - Unit 5 Procedure
Design of Machine Elements - Unit 5 ProcedureDesign of Machine Elements - Unit 5 Procedure
Design of Machine Elements - Unit 5 Procedure
 
pressure drop calculation in sieve plate distillation column
pressure drop calculation in sieve plate distillation columnpressure drop calculation in sieve plate distillation column
pressure drop calculation in sieve plate distillation column
 
Textile calculations
Textile calculationsTextile calculations
Textile calculations
 
78607049-Ventilacion-para-un-taller-de-soldadura.pdf
78607049-Ventilacion-para-un-taller-de-soldadura.pdf78607049-Ventilacion-para-un-taller-de-soldadura.pdf
78607049-Ventilacion-para-un-taller-de-soldadura.pdf
 
Textile calculations - Vignesh Dhanabalan
Textile calculations - Vignesh DhanabalanTextile calculations - Vignesh Dhanabalan
Textile calculations - Vignesh Dhanabalan
 
Development of Machine for Opening and Cleaning of Cotton Fibre in Laboratories
Development of Machine for Opening and Cleaning of Cotton Fibre in LaboratoriesDevelopment of Machine for Opening and Cleaning of Cotton Fibre in Laboratories
Development of Machine for Opening and Cleaning of Cotton Fibre in Laboratories
 
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
 
IRJET- Theoretical Analysis of Rocker Arm
IRJET- Theoretical Analysis of Rocker ArmIRJET- Theoretical Analysis of Rocker Arm
IRJET- Theoretical Analysis of Rocker Arm
 
Unit 3.2 Design of Clutches
Unit 3.2 Design of ClutchesUnit 3.2 Design of Clutches
Unit 3.2 Design of Clutches
 
"Design Criteria of Lift Irrigation Scheme"
"Design Criteria of Lift Irrigation Scheme""Design Criteria of Lift Irrigation Scheme"
"Design Criteria of Lift Irrigation Scheme"
 
Yarn calculations By Samrat Dewan
Yarn calculations By Samrat DewanYarn calculations By Samrat Dewan
Yarn calculations By Samrat Dewan
 
HYDRAULIC SYSTEM DESIGN from hydraulics .pptx
HYDRAULIC SYSTEM DESIGN from hydraulics .pptxHYDRAULIC SYSTEM DESIGN from hydraulics .pptx
HYDRAULIC SYSTEM DESIGN from hydraulics .pptx
 
K0342060066
K0342060066K0342060066
K0342060066
 
Wells & Pumps Project Report
Wells & Pumps Project ReportWells & Pumps Project Report
Wells & Pumps Project Report
 
B012460814
B012460814B012460814
B012460814
 
O44097379
O44097379O44097379
O44097379
 
Vertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectVertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design Project
 
Blow room
Blow room Blow room
Blow room
 

Recently uploaded

一比一原版(毕业证书)新西兰怀特克利夫艺术设计学院毕业证原件一模一样
一比一原版(毕业证书)新西兰怀特克利夫艺术设计学院毕业证原件一模一样一比一原版(毕业证书)新西兰怀特克利夫艺术设计学院毕业证原件一模一样
一比一原版(毕业证书)新西兰怀特克利夫艺术设计学院毕业证原件一模一样
AS
 
Abortion Clinic in Germiston +27791653574 WhatsApp Abortion Clinic Services i...
Abortion Clinic in Germiston +27791653574 WhatsApp Abortion Clinic Services i...Abortion Clinic in Germiston +27791653574 WhatsApp Abortion Clinic Services i...
Abortion Clinic in Germiston +27791653574 WhatsApp Abortion Clinic Services i...
mikehavy0
 
一比一原版田纳西大学毕业证如何办理
一比一原版田纳西大学毕业证如何办理一比一原版田纳西大学毕业证如何办理
一比一原版田纳西大学毕业证如何办理
F
 
一比一原版澳大利亚迪肯大学毕业证如何办理
一比一原版澳大利亚迪肯大学毕业证如何办理一比一原版澳大利亚迪肯大学毕业证如何办理
一比一原版澳大利亚迪肯大学毕业证如何办理
SS
 
一比一原版(Curtin毕业证书)科廷大学毕业证原件一模一样
一比一原版(Curtin毕业证书)科廷大学毕业证原件一模一样一比一原版(Curtin毕业证书)科廷大学毕业证原件一模一样
一比一原版(Curtin毕业证书)科廷大学毕业证原件一模一样
ayvbos
 
一比一原版桑佛德大学毕业证成绩单申请学校Offer快速办理
一比一原版桑佛德大学毕业证成绩单申请学校Offer快速办理一比一原版桑佛德大学毕业证成绩单申请学校Offer快速办理
一比一原版桑佛德大学毕业证成绩单申请学校Offer快速办理
apekaom
 
如何办理(UCLA毕业证)加州大学洛杉矶分校毕业证成绩单本科硕士学位证留信学历认证
如何办理(UCLA毕业证)加州大学洛杉矶分校毕业证成绩单本科硕士学位证留信学历认证如何办理(UCLA毕业证)加州大学洛杉矶分校毕业证成绩单本科硕士学位证留信学历认证
如何办理(UCLA毕业证)加州大学洛杉矶分校毕业证成绩单本科硕士学位证留信学历认证
hfkmxufye
 
一比一原版(NYU毕业证书)美国纽约大学毕业证学位证书
一比一原版(NYU毕业证书)美国纽约大学毕业证学位证书一比一原版(NYU毕业证书)美国纽约大学毕业证学位证书
一比一原版(NYU毕业证书)美国纽约大学毕业证学位证书
c6eb683559b3
 
一比一原版英国格林多大学毕业证如何办理
一比一原版英国格林多大学毕业证如何办理一比一原版英国格林多大学毕业证如何办理
一比一原版英国格林多大学毕业证如何办理
AS
 
一比一原版(USYD毕业证书)悉尼大学毕业证原件一模一样
一比一原版(USYD毕业证书)悉尼大学毕业证原件一模一样一比一原版(USYD毕业证书)悉尼大学毕业证原件一模一样
一比一原版(USYD毕业证书)悉尼大学毕业证原件一模一样
ayvbos
 

Recently uploaded (20)

Lowongan Kerja LC Yogyakarta Terbaru 085746015303
Lowongan Kerja LC Yogyakarta Terbaru 085746015303Lowongan Kerja LC Yogyakarta Terbaru 085746015303
Lowongan Kerja LC Yogyakarta Terbaru 085746015303
 
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
 
一比一原版(毕业证书)新西兰怀特克利夫艺术设计学院毕业证原件一模一样
一比一原版(毕业证书)新西兰怀特克利夫艺术设计学院毕业证原件一模一样一比一原版(毕业证书)新西兰怀特克利夫艺术设计学院毕业证原件一模一样
一比一原版(毕业证书)新西兰怀特克利夫艺术设计学院毕业证原件一模一样
 
Abortion Clinic in Germiston +27791653574 WhatsApp Abortion Clinic Services i...
Abortion Clinic in Germiston +27791653574 WhatsApp Abortion Clinic Services i...Abortion Clinic in Germiston +27791653574 WhatsApp Abortion Clinic Services i...
Abortion Clinic in Germiston +27791653574 WhatsApp Abortion Clinic Services i...
 
一比一原版田纳西大学毕业证如何办理
一比一原版田纳西大学毕业证如何办理一比一原版田纳西大学毕业证如何办理
一比一原版田纳西大学毕业证如何办理
 
一比一原版澳大利亚迪肯大学毕业证如何办理
一比一原版澳大利亚迪肯大学毕业证如何办理一比一原版澳大利亚迪肯大学毕业证如何办理
一比一原版澳大利亚迪肯大学毕业证如何办理
 
一比一原版(Curtin毕业证书)科廷大学毕业证原件一模一样
一比一原版(Curtin毕业证书)科廷大学毕业证原件一模一样一比一原版(Curtin毕业证书)科廷大学毕业证原件一模一样
一比一原版(Curtin毕业证书)科廷大学毕业证原件一模一样
 
Loker Pemandu Lagu LC Semarang 085746015303
Loker Pemandu Lagu LC Semarang 085746015303Loker Pemandu Lagu LC Semarang 085746015303
Loker Pemandu Lagu LC Semarang 085746015303
 
一比一原版桑佛德大学毕业证成绩单申请学校Offer快速办理
一比一原版桑佛德大学毕业证成绩单申请学校Offer快速办理一比一原版桑佛德大学毕业证成绩单申请学校Offer快速办理
一比一原版桑佛德大学毕业证成绩单申请学校Offer快速办理
 
20240508 QFM014 Elixir Reading List April 2024.pdf
20240508 QFM014 Elixir Reading List April 2024.pdf20240508 QFM014 Elixir Reading List April 2024.pdf
20240508 QFM014 Elixir Reading List April 2024.pdf
 
[Hackersuli] Élő szövet a fémvázon: Python és gépi tanulás a Zeek platformon
[Hackersuli] Élő szövet a fémvázon: Python és gépi tanulás a Zeek platformon[Hackersuli] Élő szövet a fémvázon: Python és gépi tanulás a Zeek platformon
[Hackersuli] Élő szövet a fémvázon: Python és gépi tanulás a Zeek platformon
 
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrStory Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
 
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...
 
Research Assignment - NIST SP800 [172 A] - Presentation.pptx
Research Assignment - NIST SP800 [172 A] - Presentation.pptxResearch Assignment - NIST SP800 [172 A] - Presentation.pptx
Research Assignment - NIST SP800 [172 A] - Presentation.pptx
 
Meaning of On page SEO & its process in detail.
Meaning of On page SEO & its process in detail.Meaning of On page SEO & its process in detail.
Meaning of On page SEO & its process in detail.
 
如何办理(UCLA毕业证)加州大学洛杉矶分校毕业证成绩单本科硕士学位证留信学历认证
如何办理(UCLA毕业证)加州大学洛杉矶分校毕业证成绩单本科硕士学位证留信学历认证如何办理(UCLA毕业证)加州大学洛杉矶分校毕业证成绩单本科硕士学位证留信学历认证
如何办理(UCLA毕业证)加州大学洛杉矶分校毕业证成绩单本科硕士学位证留信学历认证
 
一比一原版(NYU毕业证书)美国纽约大学毕业证学位证书
一比一原版(NYU毕业证书)美国纽约大学毕业证学位证书一比一原版(NYU毕业证书)美国纽约大学毕业证学位证书
一比一原版(NYU毕业证书)美国纽约大学毕业证学位证书
 
20240507 QFM013 Machine Intelligence Reading List April 2024.pdf
20240507 QFM013 Machine Intelligence Reading List April 2024.pdf20240507 QFM013 Machine Intelligence Reading List April 2024.pdf
20240507 QFM013 Machine Intelligence Reading List April 2024.pdf
 
一比一原版英国格林多大学毕业证如何办理
一比一原版英国格林多大学毕业证如何办理一比一原版英国格林多大学毕业证如何办理
一比一原版英国格林多大学毕业证如何办理
 
一比一原版(USYD毕业证书)悉尼大学毕业证原件一模一样
一比一原版(USYD毕业证书)悉尼大学毕业证原件一模一样一比一原版(USYD毕业证书)悉尼大学毕业证原件一模一样
一比一原版(USYD毕业证书)悉尼大学毕业证原件一模一样
 

Millsetting 170710142306

  • 1. J E G A D E E S H . M E N G I N E E R I N D I A N C A N E P O W E R L I M I T E D MILL SETTING
  • 2. DEFINITIONS : Mean effective diameter of Top Roller D = (Outside diameter of roller - Depth of grooving) Work Opening : Actual opening between any two points on the surface of the two rollers in their common axial plane when the mills are in operation. Mill Setting opening : Actual opening between PCD to PCD of concerned opening rollers, when mills are at rest and empty.
  • 3. DATA REQUIRED FOR MILL SETTING C = Crush rate desired in tons (Metric)/hr. f = fibre % cane D = Mean effective diameter of Top Roller (mm) L = Length of the roller (mm) n = Speed of rotation (rpm) {To be determined based on No. of rollers in mill tandem, crush rate, preparatory index, specific fibre loading, power availability at setting speed etc.}
  • 4. PROCEDURE FOR CALCULATION OF MILL SETTING V = Mill Roller surface speed  x D x n V = ------------- m/min. 1000 Calculate fibre rate 'F' as per formula given below: F = C x f x 0.166 Kg / min.
  • 5. Calculate the discharge work opening as per formula given below: F x 63429.6 Discharge work opening = ---------------------- mm. S x V x L Where ‘S’ denotes the Fibre Index to be read from Table – 1. Actual Discharge Work Opening = (Discharge work opening – Roller Rise) mm. The 'Roller Rise' considered for the mills shall be taken as per Table 2.
  • 6. Mills 12 Roller Tandem 15 Roller Tandem 2nd of `B’ Tandem 38 40 3rd of `B’ Tandem 45 46 4th of `I’ Tandem 52 52 TABLE – 1 Values of Fibre Index ‘S’ Mill No. 12 Roller Tandem 15 Roller Tandem Roller Trash Roller Trash 2nd of `B’ Tandem 7 8 7 8 3rd of `B’ Tandem 6 7 6 7 4th of `I’ Tandem 5 6 6 6 TABLE – 2 ROLLER RISE
  • 7. Calculate the Feed work opening as per formula given below: Feed work opening = Discharge work opening X (Ratio of feed to discharge opening) mm. The Ratio of Feed to Discharge opening for the mills shall be taken as per Table 3. Actual Feed Work Opening = (Feed work opening – Roller Rise) mm. Mills 12 Roller Tandem 15 Roller Tandem 2nd of `B’Tandem 2.00 2.05 3rd of `B’Tandem 2.15 2.10 4th of `I’Tandem 2.20 2.15 TABLE – 3 Ratio of Feed to Discharge Opening presumed for calculations
  • 8. Calculate the Trash plate work opening as per formula given below: Trash Plate work opening = Feed work opening X (Ratio of trash plate to feed opening ) mm. The Ratio of Trash Plate to Feed opening for the mills shall be taken as per Table 4. Actual Trash Plate Work Opening = (Trash Plate work opening – Roller Rise)mm.
  • 9. Mill No. 12 Roller Tandem 15 Roller Tandem 2nd of `B’Tandem 1.70 1.75 3rd of `B’ Tandem 1.80 1.80 4th of `I’Tandem 1.80 1.85 TABLE – 4 Ratios of trash plate to feed opening presumed for calculations
  • 10. SPECIMEN CALCULATIONS   DATA   Crushing Rate (c) : 250 Tons (Metric) of Cane per hour (TCH)   Fibre % Cane (f) : 13%   Roller Length (L) : 78 1/8 inches   Mill Size (D x L) : 39 inches O.D. x 78 1/8 inches   Speed selected (n): 5.5 r.p.m.   Now calculate the factor 'F' for the above conditions   x D x n 3.1416 x 915 x 5.5  V = --------------- m/min. = ------------------------  1000 1000  = 15.81 m / min.
  • 11. Calculate factor 'F' as per formula given below:   F = C x f x 0.3733 lb / min.   = 250 x 13 x 0.166  = 539.5 Kg / min.
  • 12. Calculation of Discharge work opening  F x 63429.6  Discharge work opening = -----------------mm.  S x V xL  For value of ‘S’ see table - 1  539.5 x 63429.6  = ------------------------ 40 x 15.81 x 1980   = 27.3 mm 
  • 13. Calculation of Feed work opening  Feed work opening = Discharge work opening X  (Ratio of feed to discharge Opening)  For value of ‘Ratio’ see TABLE-3   = 27.32 x 2.05   = 56 mm
  • 14. Calculation of Trash plate work opening  Trash Plate work opening= Feed work opening X (Ratio of trash plate to Feed Opening)  For value of ‘Ratio’ see TABLE-3   = 56 x 1.75   = 98 mm.
  • 15. Mill No. Feed Side Opening (mm) Discharge Side Opening (mm) Trash Plate Opening (mm) 2nd of `B’ Tandem 56 27.3 98 3rd of `B’ Tandem 50 23.8 89.8 4th of `I’ Tandem 45 21 83.7 The discharge, feed and trash plate openings for all the four mills are tabulated below.
  • 16. Mill No. Feed Setting = Actual opening- roller rise Discharge Opening = Actual opening- roller rise Trash Plate Setting = Actual opening- roller rise 2nd of `B’ Tandem 56 – 7 = 49 27.3 – 7 = 20.3 98 – 8 = 90 3rd of `B’ Tandem 50 – 6 = 44 23.8 – 6 = 17.8 89.8 – 7 = 82.8 4th of `I’ Tandem 45 – 6 = 39 21 – 6 = 15 83.7 – 6 = 77.7 The ‘Mill Settings’ for all four mills can be calculated as given below: Mill Settings in mm The mill settings calculated should be rounded off for practical adjustment purpose.