Manufactured and Marketed by
Jyoti Sugar Engineering Pvt Ltd.
Mill coupling is installed for torque
transmission from the final speed
reduction gear/ Planetary Gear to the
mill top roller.
In spite of the numerous shortcomings
of the tail bar system, it was universally
used simply because there was no better
alternative before the introduction of
Rope coupling / JPMA Mill Coupling.
JPMA Mill coupling completely replaces
the conventional tail bar and square
coupling assembly.
JPMA Coupling
JPMA Coupling
Tail bar couplingTail bar coupling
Tail bar coupling
Improves extraction performance of the mill due to
free floating of top roller.
Reduces final bagasse moisture on the last mill.
Misalignment between square end of the gear shaft
and the top roller either due to tilting of the top roller
or initial alignment error in installations is fully
absorbed by the JPMA mill coupling.
Reduced torque and power consumption at the drive side due to
reduction in losses.
The use of this coupling is particularly advantageous
when the space between the gearbox and mill is
limited.
Breakage of crown pinion and top roller is completely eliminated.
Also there will be no tail bars or square coupling breaking due to
their absence.
Negligible maintenance.
The coupling uses two yokes with
back sandwich plates one on each
shaft connected with Compression
strut.
Yokes are installed between in such
a way that slings transfer the loads
from the driving yoke via the
compression strut to the driven
yoke.
This configuration allows shaft and
coupling to have lateral, axial &
angular displacements.
This composite mechanism eliminates frictional resistance
(improving torque transmission efficiency), with no axial thrusts
and no bending moment loads on drive shaft.
Gear side Back sandwich plate & Driving yoke
Mill side Back sandwich plate and driven yokes.
A “compression plate” with head clevis
 Slings that transmit
the torque.
 Reversing mechanism
with reversing ropes.
JPMA can design couplings ranging from 200 kNm to 3400 kNm
Sr.No Mill size in Inches. Coupling size. kNm
1 30 x 60 550
2 33 x 66 700
3 36 x 72 900/1200
4 40 x 80 1200 /1400
5 42 x 84 1400/1600/1800
6 45 x 90 2100/2200
7 50 x 100 2400
The highest peak (for start up & jam up) is 115% of Nominal torque.
Usually we are compelled to size the coupling based on specified power
& the rated full speed of the mill. But preferably it should be on Mill size.
1 West Kenya Sugars Kenya
2 Thyssen Krupp a/c Sukhari Sugar Co. Kenya
3 Kwale International Sugar Co. Kenya
4 New Halfa Sugar Factory Sudan
5 KCP, Finchaa Ethiopia
6 NHEC A/C Tendaho sugar Factory Ethiopia
7 ISJEC, Wonji Shoa sugar Factory Ethiopia
8 M&H USA Enterprise. Mexico
9 BISCOM INC Philippines
10 M&H USA Enterprise USA
S.No Description Tail bar Coupling JPMA Mill Coupling
1 Misalignment capability Marginal Can take axial displacement, angular
misalignment along with end float
more than Tail bar coupling & can
handle all simultaneously without
breaking.
2 Ratio of (Bending moment)/
(Drive torque)
100% ≤ 5%
3 Amplitude of the cyclic bending
Stress
105 Mpa ≤5 Mpa
4 Bearing at Gear side & Mill side Wear out faster due to
end thrust
No thrust & no wear.
5 Vibration on the driving gear
plummer block
Vibrations are
moderate to heavy
Vibrations are eliminated
6 Gear teeth Surface Due to thrust loads
gear teeth surfaces
show signs wearing
out faster
No uneven wear pattern on gear.
Normally improves after installation.
7 Extraction Performance Obstruct the free
floating of the top
roller hence extraction
is less
Does not impose any constraining
thrust on the top roller shaft. Hence
free floating of top roller & improved
juice extraction performance.
8 Bagasse Moisture Since top roller
floating is restricted
moisture in bagasse is
higher.
Due to floating of top roller final
bagasse moisture will be lower.
S.No Description Tail bar Coupling JPMA Mill Coupling
9 Torque & Power Consumption Tail bar & Coupling
cause loss of Torque &
Power.
Since it removes the constraint on free
floating of top roller the mill is able to
operate with reduced friction losses &
hence saving in the operating torque
requirement of the mill & hence reduction
in power consumption.
10 Misalignment between Gear Shaft &
mill shaft
Causes damages to top
roller, Crown pinion &
drive system. Abnormal
wear & tear of the final
gear
Misalignments fully absorbed by JPMA
mill coupling, as a result no significant
lateral thrust or bending moment is
transmitted to the drive system.
Abnormal wear & tear to final gear is
eliminated.
11 Mill stoppages Chokes caused by tail
bar coupling restraints
No chokes due to this coupling since top
roller floating freely.
12 Space requirement Space between Gear
shaft & Mill shaft
required more
Can be accommodated in minimum space
between Mill & Gear shaft.
13 Initial Installation cost Less Higher
14 Payback period - Considering the above advantages it
justifies the initial higher cost of the
coupling.
15 Service Factor Mechanical construction has 1.75 S.F &
Rope has minimum of 2 based on nominal
design Torque.
Instructions on Pre-installation work required for Mill
coupling
Shaft squares should be new or built up and machined square to a
tolerance of +0 to 0.2 mm.
The square and end-faces of the shafts to be connected by the
coupling are to be drilled and tapped to match the round sandwich
plates and each supplied with suitable high-tensile steel bolts.
For ease of installation, it will be useful to make up two 400 mm long
steel rods with thread suiting to square end shaft at one end 50 mm
long to suit the holes drilled in the ends of the shafts.
Check that the friction pads are correctly fitted to the front and rear
faces of the hub plates.
Pre-check the fit of the hub-bores on their respective shafts and grind
the bores where necessary to ensure 4-line contact on the shaft
squares. Contact lines should be approximately 40 mm from the
corners after tilting to approx. 15 deg.
S. No Item Quantity
1 One pair of main driving ropes, Polyester
slings
1 working set / Mill coupling i.e
12 Nos or 8 Nos.
2 Wear pads 60 mm X 20 mm - 16 Nos.
3 Hex head screws M20 X 75 mm long - 16 Nos.
4 Pair of 13mm reversing ropes each with two
“cross by” clamps
- 2 Nos.
- 12 Nos
Care to be taken during installation of JPMA
Mill coupling
After installation of Mill coupling please observe
no wear & tear what so ever of the gear bearing.
Power consumption of the mill is reduced by 25
kW.
mill top roller started floating more freely there by
improving extraction performance of the mill &
vibrations on the driving gear Plummer blocks are
completely eliminated.
Completely eliminates frictional resistance caused
by tail bar.
No signs of pitting or uneven wear due to thrust
load on gear teeth surface.
With free floating of top roller mill operates at the
design settings & optimum hydraulic pressure &
consequently perform efficiently.
The mill couplings are built to transmit torque &
allow axial, angular& lateral misalignments of the
shaft w/o damaging the parts. These feature result
in reduction in crushing ,axial & bending loads,
which are harm full for all mill & gear components.
Slide the appropriate square bore Rear sandwich plate onto the shaft square, with chamfer side first
until it comes up hard against the back of the square.
Slide on the appropriate Yoke until it is hard up against the square bore sandwich plate already fitted.
Screw the two 400mm long steel rods into the two uppermost holes drilled in the end of the shaft.
Using the rods as a guide, slide on the appropriate round outer sandwich plate until it comes up hard
against the inside of the hub.
Loosely fit four bolts through the holes in the round plate and nip up hand tight but do not tighten to
full seating – torque at this stage.
Check that the plate does not come up and against the end face of the square shaft. (the gap should
be approximately 5 mm). If it does, please check dimensions and ensure that components have not
been mixed up. If there has been a mistake in manufacture, revert to us to check dimensions and
make recommendations about corrective action.
If all is well, remove the two threaded rods and replace with bolts and nip up. Also fit the two other
bolts. Note: do not tighten at this stage.
If the mill shaft YOkE has been fitted on the floor, install in the mill (you may have to turn the gear
shaft/gearbox by hand until the gear shaft/gearbox side yoke is vertical) or Using the same procedure
as above install the second YOkE on other square.
Turn both the gear shaft /gearbox and mill shafts until the yokes form an X, with the tongues of the
heads facing one another at the top and bottom.
Install one main driving rope between the lower heads to be connected. The rope should hang
loosely in the form of a cradle.
The COMPRESSION STRUT now needs to be installed between yokes in such way that slings transfer
the load from the driving yoke via the compression strut to the driven yoke.
Rotate the driving and driven shafts into a flattish cross-formation, such that the driving pins (on the
gearbox yoke) are nearly touching the driven pins on the mill yoke, when driving forward. The
reversing brackets should nearly touch one.
Before installing the compression-strut, first fit two pins onto one end, installing three/two
Polyester slings around each pin. Note, immediately before fitting the pins, liberally apply
Molybdenum -Disulphide Grease inside the strut clevis-holes and the inside of the spools.
Secure the pin using cap-screws provided.
Using a sling from each top pin, suspend the compression-strut vertically and lower it
through the gap between the yokes.
When through the gap, fit the lower pins on the compression strut, installing three/two slings
into each clevis (as above, don’t forget to grease clevises and spools).
Bar the drive backwards to make the cross more equal, and fit the pins into the lower yoke-
ends, at the same time fitting the nearest three slings from the compression-strut into the
clevises in the yoke ends.
Repeat this procedure in fitting the upper slings to the opposite yoke ends.
Make sure ALL the slings are not twisted and lie flat inside the spools (they are made
generally rectangular in shape).
Bar the drive forward to lightly tension the slings before following the next step.
INSTALL THE REVERSING ROPES by passing them twice through the reversing-brackets
at the backs of opposing yoke-heads, in the form a flattish oval, before fitting the Crosby
Clamps. Do not make them too tight or else they will not permit any misalignment without
themselves breaking.
Torque-up the high-tensile steel bolts in the front sandwich-plates to their relevant seating
torque (provided by the supplier).
Drive the mill forward lightly and check security of all bolts.
Clean the exposed pin-ends of grease and fit the back-up polyester –slings in parallel with
the already-fitted main driving slings, and fit the retaining plates. Note, the back-up slings
should be slack.
Sr. No. Description
With
Rope
coupling
Without
Rope
coupling
1 Plant Capacity tch 273
2 Fiber % 15
3 Season days 150
4 Mill Size 40' x 80' 4 Nos
5
Input power at Shaft kW / hr 1100
As per mill
Programme
6 Overall Efficiency % 0.85 0.77
7 Cosumed Power kW / hr 1294 1429
8 Savinig Power kW / hr 134
9
Total Power Saving per
Season kW 484034
10 Total Cost Saving Rs 2420168 @ 5 Rs/kW
11 JPMA Coupling Cost Rs 6000000 4 Nos
12 Pay Back Period Yrs 2.5
Pay back period
JPMA Mill Coupling Presentation
JPMA Mill Coupling Presentation

More Related Content

What's hot

Mechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kilnMechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kiln
mkpq pasha
 
DESIGN & ANALYSIS OF SCREW CONVEYOR
DESIGN & ANALYSIS OF SCREW CONVEYORDESIGN & ANALYSIS OF SCREW CONVEYOR
DESIGN & ANALYSIS OF SCREW CONVEYOR
Venkatesh Kokala
 
DESIGN OF MACHINE ELEMENTS QUESTION BANK
DESIGN OF MACHINE ELEMENTS QUESTION BANKDESIGN OF MACHINE ELEMENTS QUESTION BANK
DESIGN OF MACHINE ELEMENTS QUESTION BANK
ASHOK KUMAR RAJENDRAN
 
Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebook
Nael Shabana
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
mkpq pasha
 
Single Stage Centrifugal Pump Assembly
Single Stage Centrifugal Pump Assembly Single Stage Centrifugal Pump Assembly
Single Stage Centrifugal Pump Assembly IONEL DUTU
 
Chain drives
Chain drivesChain drives
Brake & clutch ppt
Brake & clutch pptBrake & clutch ppt
Brake & clutch ppt
husain252
 
Shaft
ShaftShaft
Gear coupling catalogue
Gear coupling catalogueGear coupling catalogue
Gear coupling catalogueKalyan Halder
 
Kiln Migration.pptx
Kiln Migration.pptxKiln Migration.pptx
Kiln Migration.pptx
FAisalNAdeem299673
 
Millsetting 170710142306
Millsetting 170710142306Millsetting 170710142306
Millsetting 170710142306
Akash1
 
Rope drives
Rope drivesRope drives
Rope drives
abdul ahad noohani
 
1.3 bearing designation system
1.3 bearing designation system1.3 bearing designation system
1.3 bearing designation system
Chetan vadodariya
 
Clamp or compression coupling
Clamp or compression couplingClamp or compression coupling
Clamp or compression coupling
abdul ahad noohani
 
The causes of rotary kiln girth gear vibration
The causes of rotary kiln girth gear vibrationThe causes of rotary kiln girth gear vibration
The causes of rotary kiln girth gear vibration
Iris Han
 
Roller grinding coal mill overhauling.
Roller grinding coal mill overhauling.Roller grinding coal mill overhauling.
Roller grinding coal mill overhauling.
OmprakashPatel30
 
Angular Contact Ball Bearings Id
Angular Contact Ball Bearings IdAngular Contact Ball Bearings Id
Angular Contact Ball Bearings IdIONEL DUTU
 
Gears and Gear Trains
Gears and Gear TrainsGears and Gear Trains
Gears and Gear Trains
Yatin Singh
 
Selection of v belt drive
Selection of v belt driveSelection of v belt drive
Selection of v belt drive
SAI SURYA PRAGADA
 

What's hot (20)

Mechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kilnMechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kiln
 
DESIGN & ANALYSIS OF SCREW CONVEYOR
DESIGN & ANALYSIS OF SCREW CONVEYORDESIGN & ANALYSIS OF SCREW CONVEYOR
DESIGN & ANALYSIS OF SCREW CONVEYOR
 
DESIGN OF MACHINE ELEMENTS QUESTION BANK
DESIGN OF MACHINE ELEMENTS QUESTION BANKDESIGN OF MACHINE ELEMENTS QUESTION BANK
DESIGN OF MACHINE ELEMENTS QUESTION BANK
 
Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebook
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
 
Single Stage Centrifugal Pump Assembly
Single Stage Centrifugal Pump Assembly Single Stage Centrifugal Pump Assembly
Single Stage Centrifugal Pump Assembly
 
Chain drives
Chain drivesChain drives
Chain drives
 
Brake & clutch ppt
Brake & clutch pptBrake & clutch ppt
Brake & clutch ppt
 
Shaft
ShaftShaft
Shaft
 
Gear coupling catalogue
Gear coupling catalogueGear coupling catalogue
Gear coupling catalogue
 
Kiln Migration.pptx
Kiln Migration.pptxKiln Migration.pptx
Kiln Migration.pptx
 
Millsetting 170710142306
Millsetting 170710142306Millsetting 170710142306
Millsetting 170710142306
 
Rope drives
Rope drivesRope drives
Rope drives
 
1.3 bearing designation system
1.3 bearing designation system1.3 bearing designation system
1.3 bearing designation system
 
Clamp or compression coupling
Clamp or compression couplingClamp or compression coupling
Clamp or compression coupling
 
The causes of rotary kiln girth gear vibration
The causes of rotary kiln girth gear vibrationThe causes of rotary kiln girth gear vibration
The causes of rotary kiln girth gear vibration
 
Roller grinding coal mill overhauling.
Roller grinding coal mill overhauling.Roller grinding coal mill overhauling.
Roller grinding coal mill overhauling.
 
Angular Contact Ball Bearings Id
Angular Contact Ball Bearings IdAngular Contact Ball Bearings Id
Angular Contact Ball Bearings Id
 
Gears and Gear Trains
Gears and Gear TrainsGears and Gear Trains
Gears and Gear Trains
 
Selection of v belt drive
Selection of v belt driveSelection of v belt drive
Selection of v belt drive
 

Similar to JPMA Mill Coupling Presentation

Crane Control Equipments, New Delhi, Crane Spare Parts
Crane Control Equipments, New Delhi, Crane Spare PartsCrane Control Equipments, New Delhi, Crane Spare Parts
Crane Control Equipments, New Delhi, Crane Spare Parts
IndiaMART InterMESH Limited
 
Sirling Engine Project Profile (ME04M-U16)
Sirling Engine Project Profile (ME04M-U16)Sirling Engine Project Profile (ME04M-U16)
Sirling Engine Project Profile (ME04M-U16)A Q
 
Ch8 steering
Ch8 steeringCh8 steering
Ch8 steering_AXE_PM
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
NIRBHAY KUMAR SINHA
 
Cummins Engine ISBe Block or Mechanical .ppt
Cummins Engine ISBe Block or Mechanical .pptCummins Engine ISBe Block or Mechanical .ppt
Cummins Engine ISBe Block or Mechanical .ppt
TeckYongKeng1
 
Eckstein, Nathan Resume Portfolio Doc
Eckstein, Nathan Resume Portfolio DocEckstein, Nathan Resume Portfolio Doc
Eckstein, Nathan Resume Portfolio DocNathan Eckstein
 
Zero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheZero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheSiddhesh Ozarkar
 
Case ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manualCase ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manual
fjjskekfsem
 
Trailmaster XRX 300 - Model 2012
Trailmaster XRX 300 - Model 2012Trailmaster XRX 300 - Model 2012
Trailmaster XRX 300 - Model 2012
jmhoff2
 
Gas scooter
Gas scooterGas scooter
Gas scooter
zebratwo
 
Case ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manualCase ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manual
jfjkskekemm
 
Case ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manualCase ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manual
fdjjjsekkskemm
 
Case ih 990 agricultural tractor service repair manual instant download
Case ih 990 agricultural tractor service repair manual instant downloadCase ih 990 agricultural tractor service repair manual instant download
Case ih 990 agricultural tractor service repair manual instant download
ufjjsjekkemmme
 
Embragues y Frenos
Embragues y FrenosEmbragues y Frenos
Embragues y Frenos
andresgasca15
 
Chapter 27
Chapter 27Chapter 27
Chapter 27mcfalltj
 
Superbolt solutions for Mining Equipment
Superbolt solutions for Mining EquipmentSuperbolt solutions for Mining Equipment
Superbolt solutions for Mining Equipment
Cliff Fong
 
Industrial training report
Industrial training report Industrial training report
Industrial training report Pritam Samanta
 
Shimpo circulute 3000_catalog
Shimpo circulute 3000_catalogShimpo circulute 3000_catalog
Shimpo circulute 3000_catalog
Electromate
 

Similar to JPMA Mill Coupling Presentation (20)

Crane Control Equipments, New Delhi, Crane Spare Parts
Crane Control Equipments, New Delhi, Crane Spare PartsCrane Control Equipments, New Delhi, Crane Spare Parts
Crane Control Equipments, New Delhi, Crane Spare Parts
 
Sirling Engine Project Profile (ME04M-U16)
Sirling Engine Project Profile (ME04M-U16)Sirling Engine Project Profile (ME04M-U16)
Sirling Engine Project Profile (ME04M-U16)
 
Ch8 steering
Ch8 steeringCh8 steering
Ch8 steering
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
Cummins Engine ISBe Block or Mechanical .ppt
Cummins Engine ISBe Block or Mechanical .pptCummins Engine ISBe Block or Mechanical .ppt
Cummins Engine ISBe Block or Mechanical .ppt
 
Eckstein, Nathan Resume Portfolio Doc
Eckstein, Nathan Resume Portfolio DocEckstein, Nathan Resume Portfolio Doc
Eckstein, Nathan Resume Portfolio Doc
 
Gearbox Class
Gearbox ClassGearbox Class
Gearbox Class
 
Zero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheZero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team Panache
 
Case ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manualCase ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manual
 
Trailmaster XRX 300 - Model 2012
Trailmaster XRX 300 - Model 2012Trailmaster XRX 300 - Model 2012
Trailmaster XRX 300 - Model 2012
 
Gas scooter
Gas scooterGas scooter
Gas scooter
 
Case ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manualCase ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manual
 
Case ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manualCase ih 990 agricultural tractor service repair manual
Case ih 990 agricultural tractor service repair manual
 
Case ih 990 agricultural tractor service repair manual instant download
Case ih 990 agricultural tractor service repair manual instant downloadCase ih 990 agricultural tractor service repair manual instant download
Case ih 990 agricultural tractor service repair manual instant download
 
Ringspinningframe
RingspinningframeRingspinningframe
Ringspinningframe
 
Embragues y Frenos
Embragues y FrenosEmbragues y Frenos
Embragues y Frenos
 
Chapter 27
Chapter 27Chapter 27
Chapter 27
 
Superbolt solutions for Mining Equipment
Superbolt solutions for Mining EquipmentSuperbolt solutions for Mining Equipment
Superbolt solutions for Mining Equipment
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Shimpo circulute 3000_catalog
Shimpo circulute 3000_catalogShimpo circulute 3000_catalog
Shimpo circulute 3000_catalog
 

Recently uploaded

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 

Recently uploaded (20)

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 

JPMA Mill Coupling Presentation

  • 1. Manufactured and Marketed by Jyoti Sugar Engineering Pvt Ltd.
  • 2. Mill coupling is installed for torque transmission from the final speed reduction gear/ Planetary Gear to the mill top roller. In spite of the numerous shortcomings of the tail bar system, it was universally used simply because there was no better alternative before the introduction of Rope coupling / JPMA Mill Coupling. JPMA Mill coupling completely replaces the conventional tail bar and square coupling assembly.
  • 3.
  • 4.
  • 5. JPMA Coupling JPMA Coupling Tail bar couplingTail bar coupling Tail bar coupling
  • 6. Improves extraction performance of the mill due to free floating of top roller. Reduces final bagasse moisture on the last mill. Misalignment between square end of the gear shaft and the top roller either due to tilting of the top roller or initial alignment error in installations is fully absorbed by the JPMA mill coupling. Reduced torque and power consumption at the drive side due to reduction in losses. The use of this coupling is particularly advantageous when the space between the gearbox and mill is limited. Breakage of crown pinion and top roller is completely eliminated. Also there will be no tail bars or square coupling breaking due to their absence. Negligible maintenance.
  • 7. The coupling uses two yokes with back sandwich plates one on each shaft connected with Compression strut. Yokes are installed between in such a way that slings transfer the loads from the driving yoke via the compression strut to the driven yoke. This configuration allows shaft and coupling to have lateral, axial & angular displacements. This composite mechanism eliminates frictional resistance (improving torque transmission efficiency), with no axial thrusts and no bending moment loads on drive shaft.
  • 8. Gear side Back sandwich plate & Driving yoke Mill side Back sandwich plate and driven yokes. A “compression plate” with head clevis  Slings that transmit the torque.  Reversing mechanism with reversing ropes.
  • 9. JPMA can design couplings ranging from 200 kNm to 3400 kNm Sr.No Mill size in Inches. Coupling size. kNm 1 30 x 60 550 2 33 x 66 700 3 36 x 72 900/1200 4 40 x 80 1200 /1400 5 42 x 84 1400/1600/1800 6 45 x 90 2100/2200 7 50 x 100 2400 The highest peak (for start up & jam up) is 115% of Nominal torque. Usually we are compelled to size the coupling based on specified power & the rated full speed of the mill. But preferably it should be on Mill size.
  • 10. 1 West Kenya Sugars Kenya 2 Thyssen Krupp a/c Sukhari Sugar Co. Kenya 3 Kwale International Sugar Co. Kenya 4 New Halfa Sugar Factory Sudan 5 KCP, Finchaa Ethiopia 6 NHEC A/C Tendaho sugar Factory Ethiopia 7 ISJEC, Wonji Shoa sugar Factory Ethiopia 8 M&H USA Enterprise. Mexico 9 BISCOM INC Philippines 10 M&H USA Enterprise USA
  • 11. S.No Description Tail bar Coupling JPMA Mill Coupling 1 Misalignment capability Marginal Can take axial displacement, angular misalignment along with end float more than Tail bar coupling & can handle all simultaneously without breaking. 2 Ratio of (Bending moment)/ (Drive torque) 100% ≤ 5% 3 Amplitude of the cyclic bending Stress 105 Mpa ≤5 Mpa 4 Bearing at Gear side & Mill side Wear out faster due to end thrust No thrust & no wear. 5 Vibration on the driving gear plummer block Vibrations are moderate to heavy Vibrations are eliminated 6 Gear teeth Surface Due to thrust loads gear teeth surfaces show signs wearing out faster No uneven wear pattern on gear. Normally improves after installation. 7 Extraction Performance Obstruct the free floating of the top roller hence extraction is less Does not impose any constraining thrust on the top roller shaft. Hence free floating of top roller & improved juice extraction performance. 8 Bagasse Moisture Since top roller floating is restricted moisture in bagasse is higher. Due to floating of top roller final bagasse moisture will be lower.
  • 12. S.No Description Tail bar Coupling JPMA Mill Coupling 9 Torque & Power Consumption Tail bar & Coupling cause loss of Torque & Power. Since it removes the constraint on free floating of top roller the mill is able to operate with reduced friction losses & hence saving in the operating torque requirement of the mill & hence reduction in power consumption. 10 Misalignment between Gear Shaft & mill shaft Causes damages to top roller, Crown pinion & drive system. Abnormal wear & tear of the final gear Misalignments fully absorbed by JPMA mill coupling, as a result no significant lateral thrust or bending moment is transmitted to the drive system. Abnormal wear & tear to final gear is eliminated. 11 Mill stoppages Chokes caused by tail bar coupling restraints No chokes due to this coupling since top roller floating freely. 12 Space requirement Space between Gear shaft & Mill shaft required more Can be accommodated in minimum space between Mill & Gear shaft. 13 Initial Installation cost Less Higher 14 Payback period - Considering the above advantages it justifies the initial higher cost of the coupling. 15 Service Factor Mechanical construction has 1.75 S.F & Rope has minimum of 2 based on nominal design Torque.
  • 13. Instructions on Pre-installation work required for Mill coupling Shaft squares should be new or built up and machined square to a tolerance of +0 to 0.2 mm. The square and end-faces of the shafts to be connected by the coupling are to be drilled and tapped to match the round sandwich plates and each supplied with suitable high-tensile steel bolts. For ease of installation, it will be useful to make up two 400 mm long steel rods with thread suiting to square end shaft at one end 50 mm long to suit the holes drilled in the ends of the shafts. Check that the friction pads are correctly fitted to the front and rear faces of the hub plates. Pre-check the fit of the hub-bores on their respective shafts and grind the bores where necessary to ensure 4-line contact on the shaft squares. Contact lines should be approximately 40 mm from the corners after tilting to approx. 15 deg.
  • 14. S. No Item Quantity 1 One pair of main driving ropes, Polyester slings 1 working set / Mill coupling i.e 12 Nos or 8 Nos. 2 Wear pads 60 mm X 20 mm - 16 Nos. 3 Hex head screws M20 X 75 mm long - 16 Nos. 4 Pair of 13mm reversing ropes each with two “cross by” clamps - 2 Nos. - 12 Nos
  • 15. Care to be taken during installation of JPMA Mill coupling
  • 16. After installation of Mill coupling please observe no wear & tear what so ever of the gear bearing. Power consumption of the mill is reduced by 25 kW. mill top roller started floating more freely there by improving extraction performance of the mill & vibrations on the driving gear Plummer blocks are completely eliminated. Completely eliminates frictional resistance caused by tail bar. No signs of pitting or uneven wear due to thrust load on gear teeth surface.
  • 17. With free floating of top roller mill operates at the design settings & optimum hydraulic pressure & consequently perform efficiently. The mill couplings are built to transmit torque & allow axial, angular& lateral misalignments of the shaft w/o damaging the parts. These feature result in reduction in crushing ,axial & bending loads, which are harm full for all mill & gear components.
  • 18. Slide the appropriate square bore Rear sandwich plate onto the shaft square, with chamfer side first until it comes up hard against the back of the square. Slide on the appropriate Yoke until it is hard up against the square bore sandwich plate already fitted. Screw the two 400mm long steel rods into the two uppermost holes drilled in the end of the shaft. Using the rods as a guide, slide on the appropriate round outer sandwich plate until it comes up hard against the inside of the hub. Loosely fit four bolts through the holes in the round plate and nip up hand tight but do not tighten to full seating – torque at this stage. Check that the plate does not come up and against the end face of the square shaft. (the gap should be approximately 5 mm). If it does, please check dimensions and ensure that components have not been mixed up. If there has been a mistake in manufacture, revert to us to check dimensions and make recommendations about corrective action. If all is well, remove the two threaded rods and replace with bolts and nip up. Also fit the two other bolts. Note: do not tighten at this stage. If the mill shaft YOkE has been fitted on the floor, install in the mill (you may have to turn the gear shaft/gearbox by hand until the gear shaft/gearbox side yoke is vertical) or Using the same procedure as above install the second YOkE on other square. Turn both the gear shaft /gearbox and mill shafts until the yokes form an X, with the tongues of the heads facing one another at the top and bottom. Install one main driving rope between the lower heads to be connected. The rope should hang loosely in the form of a cradle. The COMPRESSION STRUT now needs to be installed between yokes in such way that slings transfer the load from the driving yoke via the compression strut to the driven yoke. Rotate the driving and driven shafts into a flattish cross-formation, such that the driving pins (on the gearbox yoke) are nearly touching the driven pins on the mill yoke, when driving forward. The reversing brackets should nearly touch one.
  • 19. Before installing the compression-strut, first fit two pins onto one end, installing three/two Polyester slings around each pin. Note, immediately before fitting the pins, liberally apply Molybdenum -Disulphide Grease inside the strut clevis-holes and the inside of the spools. Secure the pin using cap-screws provided. Using a sling from each top pin, suspend the compression-strut vertically and lower it through the gap between the yokes. When through the gap, fit the lower pins on the compression strut, installing three/two slings into each clevis (as above, don’t forget to grease clevises and spools). Bar the drive backwards to make the cross more equal, and fit the pins into the lower yoke- ends, at the same time fitting the nearest three slings from the compression-strut into the clevises in the yoke ends. Repeat this procedure in fitting the upper slings to the opposite yoke ends. Make sure ALL the slings are not twisted and lie flat inside the spools (they are made generally rectangular in shape). Bar the drive forward to lightly tension the slings before following the next step. INSTALL THE REVERSING ROPES by passing them twice through the reversing-brackets at the backs of opposing yoke-heads, in the form a flattish oval, before fitting the Crosby Clamps. Do not make them too tight or else they will not permit any misalignment without themselves breaking. Torque-up the high-tensile steel bolts in the front sandwich-plates to their relevant seating torque (provided by the supplier). Drive the mill forward lightly and check security of all bolts. Clean the exposed pin-ends of grease and fit the back-up polyester –slings in parallel with the already-fitted main driving slings, and fit the retaining plates. Note, the back-up slings should be slack.
  • 20. Sr. No. Description With Rope coupling Without Rope coupling 1 Plant Capacity tch 273 2 Fiber % 15 3 Season days 150 4 Mill Size 40' x 80' 4 Nos 5 Input power at Shaft kW / hr 1100 As per mill Programme 6 Overall Efficiency % 0.85 0.77 7 Cosumed Power kW / hr 1294 1429 8 Savinig Power kW / hr 134 9 Total Power Saving per Season kW 484034 10 Total Cost Saving Rs 2420168 @ 5 Rs/kW 11 JPMA Coupling Cost Rs 6000000 4 Nos 12 Pay Back Period Yrs 2.5 Pay back period