Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

2015 Resume

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to comment

  • Be the first to like this

2015 Resume

  1. 1. RESUME Wade Kirk Mobile: 0448853108 Email : kirkwadekirk@gmail.com 17 Capembah Street Coochiemudlo Island Brisbane 4184 Employment History Current Position JS Electrical November 2015 - Current • Building and wiring switchboards and control panels • Shutdowns and Installs Primero Roy Hill HA Electrician September 2015 - October 2015 • Installation of cable tray / ladder • Installation of cable support systems • Pulling in cables BAEC Bechtel Curtis Island GLNG Plant HA Electrician December 2014 - September 2015 • Installation of cable tray / ladder • Installation of cable support systems • Pulling in cables • Glanding of S.W.A cables in hazardous areas • Termination of motors, instruments
  2. 2. Broadspectrum QCLNG Chincilla Quality Assurance/Hazardous Area Inspector August 2014 - November 2014 HA inspections and QA on installationsHazardous Area Inspections of various protection techniques and ensure compliance to relevant standards. Quality Assurance to client specifications and current Australian standards. Electrical testing including insulation resistance and loop checks to technical drawings for control, LV and fire rated cabling. Rectification of construction works, terminations, SWA, Barrier, Compression glands. Submitting Inspection and test records. Job prioritising and time management to meet required deadlines. Adhere to all controls of Permit To Work Systems. Communicate issues and ongoing development to increase project efficiency. FLUOR Australia – Roma GLNG Project - Quality Assurance/Precommissioning Leading Hand Sept 2013 - July 2014 • Interpreting project specifications and applying them in the field to ensure no punchlist items arise during hand over to the customer • Inspections of motorised valves, Instrument Junction Boxes, Power Junction Boxes and glands in hazardous areas • Ensuring all equipment and core labels are correct as per drawings • Loop Checks on power and control cables • Earth continuity checks • Insulation resistance tests on power and control circuits • Testing of Earth grid using GEO earth ground tester • Point to Point testing on all equipment • Low resistance ohms test on busbars • Earth continuity • Polarity • RCD trip tests
  3. 3. • Inputting VSD communication parameters • VSD capacitor reforming • Inputting Circuit breaker protection settings • Battery Recharging Construction of Wellpads • Earthing grids • Installation of cable support systems • Pulling in cables • Glanding of S.W.A cables in hazardous areas • Termination of motors, instruments • Termination of DCS panels, MCC’s and backup battery panels • Completion of Quality Verification Documents ABB – Fairview GLNG – Field Service Technician April 2013 – Sept 2013 Permanent Pre-commissioning testing (both de-energised and live) on wellpad MCC’s and recording results. • Point to Point testing on all equipment • Insulation resistance tests • Low resistance ohms test on busbars • Earth continuity • Polarity • RCD trip tests • Inputting VSD communication parameters • VSD capacitor reforming • Inputting Circuit breaker protection settings • Battery Recharging • Filling out QVD’s ABB – Darra – Electrician Nov 2012 – April 2013 Permanent • Building and wiring C.S.G Switchrooms • Point to point testing • Switchboard wiring • Ensuring labelling is as per drawings • Installing gland plates both internally and externally JS Electrical– Switchgear and controls Electrician
  4. 4. Switchboard Builder and General Contracting , JS Electrical 2004 - 2012 • Building electrical components such as; Distribution boards, Pump panels, Junction boxes, Control panels, Motor control centres and Power factor panels • Building main switch boards 100 - 2500 amps (Incl copper Busbar construction of cubic modular system) • Installing and terminating equipment in the field • Inwards and outwards goods processing • Estimating jobs and providing quotes to customers • Drawing plans to suit customers needs • Ordering parts for the successful completion of jobs • Domestic residential prewire and fit off work • Commercial rough in and fit off work • Shutdown works • Testing of Electrical Equipment, cables and sensors • Fault finding • Reading and Understanding wiring schematics • Termination of Power and Control switchboards • Wiring of motors and VSD’s • Termination of sensors such as pressure, temperature and Airflow • Issuing Instructions to co-workers EDUCATIONAL BACKGROUND ANDLICENSES • Installation and Maintenance of electrical equipmentin Hazardous Areas • National certificate in Electrical Engineering level 4 • WA Electrical Licence number EW190493 • QLD Electrical mechanic practicing licence number E 259270 • High risk work licence number 0003315488 • Working at Heights • CPR/LVR • Construction industry white card • C Class drivers License • LF Forklift Truck- Certificate # 01435290 • Hornby High School year 12 • Confined spaces
  5. 5. • REFEREES Mark Spooner - Bechtel supervisor, Curtis Island GLNG - Mobile 0412 451 742 Matt Dillion-Leading hand Primero/Roy Hill Mobile 0458369131 John Lydiard- Project Manager, Curtis Isand GLNG - Mobile 0427 736 485 Craig Stewart-Electrical Superintendant Broadspectrum- Mobile 0421513165 Neil Wilkinson- Electrical Superintendent, Roma GLNG - Mobile 0419 917 989 Doug Gernetzky- Head Instrument Engineer, Roma GLNG - Mobile 0439 794 093 Bill Radford – ABB Supervisor - 0419 774 923 John Steele, Managing Director - JS Electrical - Mobile:+64 274 450-871

    Be the first to comment

    Login to see the comments

Views

Total views

220

On Slideshare

0

From embeds

0

Number of embeds

11

Actions

Downloads

4

Shares

0

Comments

0

Likes

0

×