SlideShare a Scribd company logo
1 of 5
Download to read offline
CURRICULUM VITAE
ANSHUMAN MISHRA
Munnekolala,Marathalli.
Bangalore.
Karnataka:- 560037
MOBILE :- +91-9620907850
EMAIL :- anshuman236@gmail.com
CAREER OBJECTIVE:
Intend to build a bright career, working as a key player in a challenging and creative
environment and to pursue a challenging position in a progressive organization that will provide
all the help I want to build my career more rigorously and also for the development of that
organisation.
EDUCATIONAL QUALIFICATIONS:
 B.TECH in Electronics & Telecommunication Engineering from BPUT, Odisha.
 PDIS(Post Diploma In Safety) in BASTIA, Rourkela, 2014 with 83.2 %.
WORK EXPERIENCE:
 Worked as a service/site/project engineer in world Link Corporation on ABB Ltd
Company project for 3.5 years.
 Worked as a Service/ Maintenance Automation Engineer in Vedvyas Automation on
ABB Automation systems for 1.9 years.
JOB DETAILS:
 WORLD LINK CORPORATION:
 Project/Role-1
Playing a Role of Project Management/Site manager/Site Engineer with proper
planning of site requirements in up-gradation of Electrification of old WG
machines having 5 Nos.
 Site requirements were to establish/engage electrical and
mechanical man power into their scope of work.
 New ABB panels of ABB Automation AC800M and ABB drive Panels
ACS800 were erected with MCC and PDB panels.
 New cables were drawn to all the 5 machines from new ABB
panels accordingly taking one by one machine into shutdown
planning.
 Schedule making all shutdowns.
 Cabling, Termination schedule making.
 Relative motors erection and cable connections with 2 nos special
servo motors and its encoder connection.
 Being a part of Commissioning ABB team.
 Automation and Drive panel wiring making schedule, panel wiring
and online testing was done.
 Commissioning and installation of ABB Automation system
AC800M with scada systems having InTouch wonderware
software.
 Commissioning and installation of ABB Drives system
ACS800,tuning,ID run and all.
 Cold and Hot trail with new HMI CP430 on machine configuration
was done.
 Relating with ABB team Bangalore, As built drawing and after
commissioning the As commissioned drawing making and
handover of the project.
 After Handover till Final Acceptance Certificate worked as
Maintenance Engineer for the project relating to the machines
stabilization, some program related changes, Wonderware related
changes in scada, troubleshooting in logic failure by tracing in the
program logic, troubleshooting in drive related any problems were
also in roles.
 Project/Role-2
Full supervision and undertaking of WIRELESS project in CASTER, SMS-2, SAIL,
ROURKELA STEEL PLANT.
 Site requirements were to establish/engage electrical and
mechanical man power into their scope of work.
 New ABB panels for Wireless systems was erected.
 New ABB system load cell for weighing system was erected on the
laddle turret.
 Schedule making all shutdowns.
 Cabling, Termination schedule making.
 Being a part of commissioning team of Lotus Wireless system
which was installed in ABB helping out to capture the signals of
ABB load cell values wirelessly.
 Project/Role-3
Worked as a representative for ABB in MCNALLY BHARAT project in New Blast
Furnace #5 site, SAIL, Rourkela Steel Plant.
 Testing of ABB AC induction motors for Vibro Feeder application.
 Supplying of electrification was in the scope of M/s McNally
Bharat.
 One by one motors were tested and done ready by measuring its
actual values of megger.
 Supervision of Wiring and testing of ABB drives and Automation
links in south area of New blast furnace#5 area.
 Project/Role-4
Commissioning of Training kit having ACS800, DCS800 drives and AC800XA,
AC450 automation at HRDC, SAIL,RSP.
 Setup of the training Kit.
 Engaging of Man power for cabling of training Kits.
 Wiring and testing of test kit panels.
 Installation and Commissioning was with the ABB team of 3
including me.
 ID run of DCS800 and ACS800 Drive was done.
 Installation of 800xa was done on the engineering station.
 All the systems were synchronized.
 As built and as commissioned drawing was handed over.
 Project/Role-5
Worked as Sales and Service Engineer.
 Worked as ABB drive service engineer for some time.
 Travelling and touring for any service call for ABB drive related
issues in RSP as well as other Plants.
 Recommendation of drive related spares were done to
customers.
 Load test or small changes in parameters were done according
site requirements.
 Troubleshooting like changing of spare cards in ABB drives in
place of faulty cards, etc.
 Telephonic support was also given for drives related small issues
to the customers.
 VEDVYAS AUTOMATION:
Worked as an Automation Service/Maintenance Engineer in Annual Maintenance
Contract taken by ABB for LV drives and Automations installed in different
department in Rourkela Steel Plant. Automations systems having 800xA DCS
systems, AC450,MP200 systems.
 Making of shutdown and maintenance plan every week covering
every department of SAIL,RSP one by one.
 Travelling to the particular department as per shutdown taken.
 Maintenance of different ABB servers( Aspect Servers, Connectivity
Servers).
 Maintenance of Engineering and Operating Stations.
 Practically checking of servers performance whether running speed
by opening different pages.
 Cleaning of all the temporary files from servers to make it fast.
 Taking all the partial backups and maintenance backups from
aspect servers in 800xa systems.
 Maintaining it as a record in DVD.
 Checking of System load and maintaining it as record.
 In redundant server systems making one by one switch off and
switch on of the servers network switch.
 Checking network cables i.e plant and control network cables
tightness from servers as well as switches.
 Cleaning of Panels and network switches dust in every shutdowns.
 Running of ABB health checkup tool and taking of record as
systems healthiness report.
 Checking of RNRP nodes and its Services.
 All tightness checkup of all power and control cables.
 Alarm and events monitoring.
 Checking of all necessary communications with drives and field
devices.
 Checking of healthiness of OPC server in Connectivity Server.
 Checking of License nos., its usages and license validity in servers.
 Checking of IP addresses of Plant and control networks etc.
 Installation of OS and 800xa if required during any troubleshooting.
 Small changes in program or tracing of particular logic in program
during any troubleshooting.
 Cleaning of MP200 DSPC and related DI/DO rack cards.
 Taking Application Dump of MP200 systems.
 Checking of loads and maintaining it as record.
 Making of all works records and maintaining it as excel sheet and
sending it as report to the end customers on after every
maintenance and trouble shootings.
 Scope for recommendation of no. of spares as servers,
DI/DO/AO/AI cards(differently for MP200 and AC800M systems).
Other cards like Network cards and Communication Interface cards
were also done.
EXTRA CURRICULAR INVOLVEMENT:
 Project leader in college.
 Participated in every type of sports in School & College.
TRAINING:
 Attended training on ABB Drives: ACS 850,ACS 800,DCS 800 at ABB India Ltd.,
BANGALORE.
 Attended training on ABB Automations: AC-800XA and AC-450 at ABB India Ltd.,
BANGALORE.
PERSONAL PROFILE:
Date of Birth : 8th september,1986
Gender : Male
Nationality : Indian
Languages : English, Hindi, Odia

More Related Content

What's hot

What's hot (19)

ajayuikey
ajayuikeyajayuikey
ajayuikey
 
latest resume
latest resumelatest resume
latest resume
 
Resume
ResumeResume
Resume
 
Siddhartha_Saxena_25_Feb_2016
Siddhartha_Saxena_25_Feb_2016Siddhartha_Saxena_25_Feb_2016
Siddhartha_Saxena_25_Feb_2016
 
Infinity Engineering Co., Pune, Electrical Products
Infinity Engineering Co., Pune, Electrical ProductsInfinity Engineering Co., Pune, Electrical Products
Infinity Engineering Co., Pune, Electrical Products
 
arvind_resume_new (1)
arvind_resume_new (1)arvind_resume_new (1)
arvind_resume_new (1)
 
S.Manikandan_Resume.doc
S.Manikandan_Resume.docS.Manikandan_Resume.doc
S.Manikandan_Resume.doc
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
 
Abrar Haidar Tasneem
Abrar Haidar TasneemAbrar Haidar Tasneem
Abrar Haidar Tasneem
 
PRAJINKUMAR T ELECTRONICS AND COMMUNICATION ENGINEER
PRAJINKUMAR T  ELECTRONICS AND COMMUNICATION ENGINEERPRAJINKUMAR T  ELECTRONICS AND COMMUNICATION ENGINEER
PRAJINKUMAR T ELECTRONICS AND COMMUNICATION ENGINEER
 
Murletharan CV
Murletharan CVMurletharan CV
Murletharan CV
 
Resume of Kalaiyappan Thannirmalai
Resume of Kalaiyappan ThannirmalaiResume of Kalaiyappan Thannirmalai
Resume of Kalaiyappan Thannirmalai
 
Ajay Uikey
Ajay UikeyAjay Uikey
Ajay Uikey
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resume
 
Alam CV
Alam CVAlam CV
Alam CV
 
PUNIT_GUPTA
PUNIT_GUPTAPUNIT_GUPTA
PUNIT_GUPTA
 
upadted_1-Krishnaraj
upadted_1-Krishnarajupadted_1-Krishnaraj
upadted_1-Krishnaraj
 
Soorya Prabba1
Soorya Prabba1Soorya Prabba1
Soorya Prabba1
 

Similar to AnshumanResume1pdf (20)

kumaresan_SAS Engg
kumaresan_SAS Enggkumaresan_SAS Engg
kumaresan_SAS Engg
 
new resume 2016
new resume 2016new resume 2016
new resume 2016
 
ABB
ABBABB
ABB
 
ABB
ABBABB
ABB
 
Facebook 1 abb
Facebook 1 abbFacebook 1 abb
Facebook 1 abb
 
Shakeer_Electrical Engineer
Shakeer_Electrical EngineerShakeer_Electrical Engineer
Shakeer_Electrical Engineer
 
Gokul resume
Gokul resumeGokul resume
Gokul resume
 
Kewal Summary Switchgear
Kewal Summary SwitchgearKewal Summary Switchgear
Kewal Summary Switchgear
 
Sherif CV
Sherif CVSherif CV
Sherif CV
 
VikramShete_New-1
VikramShete_New-1VikramShete_New-1
VikramShete_New-1
 
Deep_resume
Deep_resumeDeep_resume
Deep_resume
 
RAPELLY_resume1
RAPELLY_resume1RAPELLY_resume1
RAPELLY_resume1
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
NISSI PROFILE
NISSI PROFILENISSI PROFILE
NISSI PROFILE
 
Resume
ResumeResume
Resume
 
14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv
 
Sujit Das
Sujit DasSujit Das
Sujit Das
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
Resume_Rachit Khandelwal
Resume_Rachit KhandelwalResume_Rachit Khandelwal
Resume_Rachit Khandelwal
 
noorCV
noorCVnoorCV
noorCV
 

AnshumanResume1pdf

  • 1. CURRICULUM VITAE ANSHUMAN MISHRA Munnekolala,Marathalli. Bangalore. Karnataka:- 560037 MOBILE :- +91-9620907850 EMAIL :- anshuman236@gmail.com CAREER OBJECTIVE: Intend to build a bright career, working as a key player in a challenging and creative environment and to pursue a challenging position in a progressive organization that will provide all the help I want to build my career more rigorously and also for the development of that organisation. EDUCATIONAL QUALIFICATIONS:  B.TECH in Electronics & Telecommunication Engineering from BPUT, Odisha.  PDIS(Post Diploma In Safety) in BASTIA, Rourkela, 2014 with 83.2 %. WORK EXPERIENCE:  Worked as a service/site/project engineer in world Link Corporation on ABB Ltd Company project for 3.5 years.  Worked as a Service/ Maintenance Automation Engineer in Vedvyas Automation on ABB Automation systems for 1.9 years.
  • 2. JOB DETAILS:  WORLD LINK CORPORATION:  Project/Role-1 Playing a Role of Project Management/Site manager/Site Engineer with proper planning of site requirements in up-gradation of Electrification of old WG machines having 5 Nos.  Site requirements were to establish/engage electrical and mechanical man power into their scope of work.  New ABB panels of ABB Automation AC800M and ABB drive Panels ACS800 were erected with MCC and PDB panels.  New cables were drawn to all the 5 machines from new ABB panels accordingly taking one by one machine into shutdown planning.  Schedule making all shutdowns.  Cabling, Termination schedule making.  Relative motors erection and cable connections with 2 nos special servo motors and its encoder connection.  Being a part of Commissioning ABB team.  Automation and Drive panel wiring making schedule, panel wiring and online testing was done.  Commissioning and installation of ABB Automation system AC800M with scada systems having InTouch wonderware software.  Commissioning and installation of ABB Drives system ACS800,tuning,ID run and all.  Cold and Hot trail with new HMI CP430 on machine configuration was done.  Relating with ABB team Bangalore, As built drawing and after commissioning the As commissioned drawing making and handover of the project.  After Handover till Final Acceptance Certificate worked as Maintenance Engineer for the project relating to the machines stabilization, some program related changes, Wonderware related changes in scada, troubleshooting in logic failure by tracing in the program logic, troubleshooting in drive related any problems were also in roles.
  • 3.  Project/Role-2 Full supervision and undertaking of WIRELESS project in CASTER, SMS-2, SAIL, ROURKELA STEEL PLANT.  Site requirements were to establish/engage electrical and mechanical man power into their scope of work.  New ABB panels for Wireless systems was erected.  New ABB system load cell for weighing system was erected on the laddle turret.  Schedule making all shutdowns.  Cabling, Termination schedule making.  Being a part of commissioning team of Lotus Wireless system which was installed in ABB helping out to capture the signals of ABB load cell values wirelessly.  Project/Role-3 Worked as a representative for ABB in MCNALLY BHARAT project in New Blast Furnace #5 site, SAIL, Rourkela Steel Plant.  Testing of ABB AC induction motors for Vibro Feeder application.  Supplying of electrification was in the scope of M/s McNally Bharat.  One by one motors were tested and done ready by measuring its actual values of megger.  Supervision of Wiring and testing of ABB drives and Automation links in south area of New blast furnace#5 area.  Project/Role-4 Commissioning of Training kit having ACS800, DCS800 drives and AC800XA, AC450 automation at HRDC, SAIL,RSP.  Setup of the training Kit.  Engaging of Man power for cabling of training Kits.  Wiring and testing of test kit panels.  Installation and Commissioning was with the ABB team of 3 including me.  ID run of DCS800 and ACS800 Drive was done.  Installation of 800xa was done on the engineering station.  All the systems were synchronized.  As built and as commissioned drawing was handed over.
  • 4.  Project/Role-5 Worked as Sales and Service Engineer.  Worked as ABB drive service engineer for some time.  Travelling and touring for any service call for ABB drive related issues in RSP as well as other Plants.  Recommendation of drive related spares were done to customers.  Load test or small changes in parameters were done according site requirements.  Troubleshooting like changing of spare cards in ABB drives in place of faulty cards, etc.  Telephonic support was also given for drives related small issues to the customers.  VEDVYAS AUTOMATION: Worked as an Automation Service/Maintenance Engineer in Annual Maintenance Contract taken by ABB for LV drives and Automations installed in different department in Rourkela Steel Plant. Automations systems having 800xA DCS systems, AC450,MP200 systems.  Making of shutdown and maintenance plan every week covering every department of SAIL,RSP one by one.  Travelling to the particular department as per shutdown taken.  Maintenance of different ABB servers( Aspect Servers, Connectivity Servers).  Maintenance of Engineering and Operating Stations.  Practically checking of servers performance whether running speed by opening different pages.  Cleaning of all the temporary files from servers to make it fast.  Taking all the partial backups and maintenance backups from aspect servers in 800xa systems.  Maintaining it as a record in DVD.  Checking of System load and maintaining it as record.  In redundant server systems making one by one switch off and switch on of the servers network switch.  Checking network cables i.e plant and control network cables tightness from servers as well as switches.  Cleaning of Panels and network switches dust in every shutdowns.  Running of ABB health checkup tool and taking of record as systems healthiness report.  Checking of RNRP nodes and its Services.
  • 5.  All tightness checkup of all power and control cables.  Alarm and events monitoring.  Checking of all necessary communications with drives and field devices.  Checking of healthiness of OPC server in Connectivity Server.  Checking of License nos., its usages and license validity in servers.  Checking of IP addresses of Plant and control networks etc.  Installation of OS and 800xa if required during any troubleshooting.  Small changes in program or tracing of particular logic in program during any troubleshooting.  Cleaning of MP200 DSPC and related DI/DO rack cards.  Taking Application Dump of MP200 systems.  Checking of loads and maintaining it as record.  Making of all works records and maintaining it as excel sheet and sending it as report to the end customers on after every maintenance and trouble shootings.  Scope for recommendation of no. of spares as servers, DI/DO/AO/AI cards(differently for MP200 and AC800M systems). Other cards like Network cards and Communication Interface cards were also done. EXTRA CURRICULAR INVOLVEMENT:  Project leader in college.  Participated in every type of sports in School & College. TRAINING:  Attended training on ABB Drives: ACS 850,ACS 800,DCS 800 at ABB India Ltd., BANGALORE.  Attended training on ABB Automations: AC-800XA and AC-450 at ABB India Ltd., BANGALORE. PERSONAL PROFILE: Date of Birth : 8th september,1986 Gender : Male Nationality : Indian Languages : English, Hindi, Odia