1. Presentation on Majid
Sarani
Presented by :
Group: 13
Roll: 1723051, 1723052, 1723053,
1723054, 1723059
Course Title : Landscape Design
Course No : BECM 3208
Topic : Problem Identification of the landscape of
Majid Sarani Road, Khulna
2. Majid Sarani is located in Khulna,
Bangladesh.
Majid Sarani has a length of 1.26
km.
The annual average temperature on
this site is 26.3 °C (79.3 °F) &
annual average rainfall is 1,809.4
millimeters (71.24 in)
Short description of Majid Sarani Road, Khulna
3. Major Problems on Majid Sarani Road :
Damage Road
Improper Drainage System
Lidless Drain & Manhole
Under Construction Buildings Beside
The Road
Lack of Parking System
Illegal Sidewalk Occupation
Unplanned Connecting Road
5. Reason behind this problem
Low quality materials
Unawareness of traffic rules
Corruption
Solutions
Using proper materials
Construct in layers
Designing for worst case scenario
Regular maintenance
7. Reason behind this problem
Over and above disposal of solid waste into the drains
and drainage paths are accounted for the prime causes
of blockage in drainage system and water logging
Inadequate drainage sections
Absence of inlets and outlets
Lack of proper maintenance of existing drainage system
Solutions
Using impermeable materials
Installing under path drainage system
The existing drains and also those will be constructed
shall have to cleaned at regular interval
Maintenance and cleaning of drains shall have to done at
least once in every year specially before starting of
monsoon season
8. Lidless Drain & Manhole
Lidless drains in several places occurs bad odor and
sometimes accidents too.
Reason behind this problem
Theft of manhole covers due to the lack of monitoring
of the road safety
For cleaning purpose
Solutions
Cover the manholes & strict rules for stealing those.
Regular maintenance
9. Under Construction Buildings Beside The Road
Some buildings that are currently being constructed beside the road without providing any
safety. That may causes accident and public harm.
Reason behind this problem
Ignorance to the basic rules of construction safety by
the companies.
Unawareness about the danger that can happen from it
Solutions
Maintain strict rules about safety materials so that all
construction companies must follow
Using safety net
Using modern instruments
Using skilled workers
10. Lack of Parking System
Cars are parked on the road which causes the road to be narrowed and occurs traffic jam in peak
hours.
11. Reason behind this problem
Lack of proper planning
Insufficient space
Tendency of breaking rules
Solutions
Properly utilize the space on the road
side.
90° car parking
12.
13. Illegal occupancy of sidewalk by parking,
hawkers obstruct the movement of
pedestrian and often causes traffic jam
Illegal Sidewalk Occupation
14. Reason behind this problem
Unplanned parking
Hawker/ Illegal small shop
Solutions
Eviction of the hawker/ small shop
Make appropriate arrangement for parking
15. There are several roads connected with the
main road which are unplanned and those cause
traffic jam, road crossing problem and
unwanted accidents too.
Unplanned Connecting Road
16.
17. Reason behind this problem
Narrow connecting point
Absence of traffic signal system
Absence of road/ over head crossing
Vehicle parking
Solutions
Setting up the signal system
Make appropriate arrangement for
parking
Build up over head / road crossing
18. Presentation on Majid
Sarani
Presented by :
Group: 13
Roll: 1723051, 1723052, 1723053,
1723054, 1723059
Course Title : Landscape Design
Course No : BECM 3208
Topic : Case Study on Various Streets
20. Information
• Champs-Élysées Avenue
• The name is French for the Elysian Field, the place for
dead heroes in Greek Mythology
• From Place La de la Concorde to Arc de Triomphe
• 8th Arrondissement in northwestern Paris,France
• 1.91 Km Long, 70m (230ft) Wide
• 8 Lane Highway
21. Speciality
• Popular tourist spot
• Two major public squire at both end
• Consists many shopping mall
• Avg. 64000 vehicles pass through per day
• Foot traffic average 100000 people
23. Problems & Re-Design
• Air pollution from the estimated 3,000 vehicles per hour
• Since 2016, the avenue has been closed to motor traffic on the
first Sunday of every month
• It is announced that the city would transform the Champs-
Élysées into an "extraordinary garden"
• Vision 2030 has taken to create more pedestrian space, and
create "tunnels of trees" for improved air quality
• The plans are meant to make the avenue more "ecological,
desirable and inclusive"
24. Walkway and Crossing
• 2 lane of walkway each side
• Broad walkway
• Separated from main road by vegetation
• Setting arrangement is installed in walkway
zone
• Lighting feature is added between the
walkway lane
Lighting
Feature
25. Walkway and Crossing[Cont.]
• Setting arrangement is installed in walkway
zone
• Traffic signal system is used in every crossing
• Zebra Crossing is used
• Space for cycle crossing alongside zebra
crossing
26. Transport
• Avg. 64000 vehicles pass through per day
• Paris Metro Line runs under the Champs-Élysées
• 4 metro station nearby the road
• This heavy traffic is controlled by advance traffic
system
Metro Station
Entry
Metro Station
Drainage System
• Underground Drainage System is used
27. Potential Issues
• High rent is causing the loss of its small businesses and thus the street’s original identity
• The street requires constant maintenance to keep the corridor safe and clean
• Crossing wide, heavy trafficked roads is challenging for pedestrians
• The outdoor dining and kiosks on the sidewalk sometimes block the pedestrian flow
29. About
• Orchard Road
• Named from nutmeg, pepper and fruit
orchards or the plantations that the road
once led to
• Central Area, Singapore
• 2.5 km long
30. Speciality
• Famous Shopping HUB in Singapore
• Tourist Spot
• Famous street in South East Asia
• Consists over 20 shopping malls
33. Drainage
• Underground drainage is used
• The Stamford Diversion Canal (SDC) and Stamford
Detention Tank (SDT) is aimed to keep the roads flood-
free
• This detention tank has a capacity of 38000 cubic m
storage
Fig.: STD
Fig.: Deep Sewer
35. Transport
• Orchard road can be accessed via three main stops on the
Singapore MRT Network
• Buses of several companies provided access to Orchard
Road
• Bus stop positions are marked on the last lane of the road
Fig.: Bus Stops
Fig.: MRT Map
37. Street Name: Slovenska Cesta in Ljubljana
Location: Ljubljana, Slovenia
Area: 14000 m2
Renovation Completion Date: 2015
Architect: Dekleva Gregorič arhitekti, Katušič
Kocbek arhitekti, Sadar + Vuga, Scapelab, Studio
Krištof
The New Slovenska Street project is based on cutting-edge
concepts in public space design.
The former four-lane road was transformed into the central
city avenue.
Information
38. The main street of the city is the Slovenska
which crosses the city in the north-south
direction.
Two pairs of large bus stations are placed on
the street
Specification
It is also the stage for many important events in
the city, such as the marathon and the annual
cycling race, various demonstrations, and the
record-breaking square dance of the city's high-
school graduates.
39. Zoning
Vehicle road
Pedestrian walkway
Bus stoppage
Vegetation
Cycle lane
The street is divided in
to tree sections, with a
concrete road surface
and paved pedestrian
area.
Through narrowing of
the roadway there is
now more space for
pedestrians, cyclists
and restaurant and bar
gardens.
41. Problems & Renovation
It was a busy four-lane road with
the large volume of pedestrian and
bus traffic
A car-oriented traffic road
Vegetation was low
No safety & space for pedestrian
42. From car-oriented, the road is transformed into
a space which gives priority to public transport,
pedestrians and cyclists
By placing two pairs of large bus stations the
street truly becomes a central transport hub for
public transport
The complete arrangement ties the fragmented
area together into a uniform space with a
prominently green character.
Problems &
Renovation
43. Pedestrian Area
Through narrowing of the roadway there is now
more space for pedestrians, cyclists and
restaurant and bar gardens
The urban furniture of the street encourages
people to stop and rest in the space
Despite the large volume of pedestrian and bus
traffic it is designed as a “shared space”, a space,
where users participate equally, and height
differences are reduced to a minimum.
44. Transport System
By designing a space which promotes
sustainable mobility and public transport in the
very center, the city has made a key step in it's
transport policy
The absence of personal motor traffic allows for
the expansion of programs and the creation of
a space with its own character.
This allows for an optimized bus transportation
service
45. Vegetation & Drainage System
• A new tree line of manna ash trees was planted
on the eastern side of the street, which is lit by
the afternoon sun.
• The manna ash trees are resistant to the urban
environment, and will adorn the space with
white flowers in the spring and bright yellow
foliage in the fall.
• Drainage system is connected with the vegetation
as it is established within the tree plantation
system.