 Majid Sarani is located in Khulna,
Bangladesh.
 Majid Sarani has a length of 1.26
km.
 The annual average temperature on
this site is 26.3 °C (79.3 °F) &
annual average rainfall is 1,809.4
millimeters (71.24 in)
Short description of Majid Sarani Road, Khulna
Major Problems on Majid Sarani Road :
 Damage Road
 Improper Drainage System
 Lidless Drain & Manhole
 Under Construction Buildings Beside
The Road
 Lack of Parking System
 Illegal Sidewalk Occupation
 Unplanned Connecting Road
Damage Road
At several point, the road is highly damaged and unfit to be in use.
Reason behind this problem
 Low quality materials
 Unawareness of traffic rules
 Corruption
Solutions
 Using proper materials
 Construct in layers
 Designing for worst case scenario
 Regular maintenance
Improper Drainage System
Improper drainage system causes waterlogging on the road.
Reason behind this problem
 Over and above disposal of solid waste into the drains
and drainage paths are accounted for the prime causes
of blockage in drainage system and water logging
 Inadequate drainage sections
 Absence of inlets and outlets
 Lack of proper maintenance of existing drainage system
Solutions
 Using impermeable materials
 Installing under path drainage system
 The existing drains and also those will be constructed
shall have to cleaned at regular interval
 Maintenance and cleaning of drains shall have to done at
least once in every year specially before starting of
monsoon season
Lidless Drain & Manhole
Lidless drains in several places occurs bad odor and
sometimes accidents too.
Reason behind this problem
 Theft of manhole covers due to the lack of monitoring
of the road safety
 For cleaning purpose
Solutions
 Cover the manholes & strict rules for stealing those.
 Regular maintenance
Under Construction Buildings Beside The Road
Some buildings that are currently being constructed beside the road without providing any
safety. That may causes accident and public harm.
Reason behind this problem
 Ignorance to the basic rules of construction safety by
the companies.
 Unawareness about the danger that can happen from it
Solutions
 Maintain strict rules about safety materials so that all
construction companies must follow
 Using safety net
 Using modern instruments
 Using skilled workers
Lack of Parking System
Cars are parked on the road which causes the road to be narrowed and occurs traffic jam in peak
hours.
Reason behind this problem
 Lack of proper planning
 Insufficient space
 Tendency of breaking rules
Solutions
 Properly utilize the space on the road
side.
 90° car parking
Illegal occupancy of sidewalk by parking,
hawkers obstruct the movement of
pedestrian and often causes traffic jam
Illegal Sidewalk Occupation
Reason behind this problem
 Unplanned parking
 Hawker/ Illegal small shop
Solutions
 Eviction of the hawker/ small shop
 Make appropriate arrangement for parking
There are several roads connected with the
main road which are unplanned and those cause
traffic jam, road crossing problem and
unwanted accidents too.
Unplanned Connecting Road
Reason behind this problem
 Narrow connecting point
 Absence of traffic signal system
 Absence of road/ over head crossing
 Vehicle parking
Solutions
 Setting up the signal system
 Make appropriate arrangement for
parking
 Build up over head / road crossing
Presentation on Majid
Sarani
Presented by :
Group: 13
Roll: 1723051, 1723052, 1723053,
1723054, 1723059
Course Title : Landscape Design
Course No : BECM 3208
Topic : Case Study on Various Streets
Champs-Élysées
Avenue
Paris, France
Information
• Champs-Élysées Avenue
• The name is French for the Elysian Field, the place for
dead heroes in Greek Mythology
• From Place La de la Concorde to Arc de Triomphe
• 8th Arrondissement in northwestern Paris,France
• 1.91 Km Long, 70m (230ft) Wide
• 8 Lane Highway
Speciality
• Popular tourist spot
• Two major public squire at both end
• Consists many shopping mall
• Avg. 64000 vehicles pass through per day
• Foot traffic average 100000 people
Zoning
Vehicle road
Cycle lane
Parking
Vegetation
Pedestrian walkway
Vegetation
Pedestrian walkway
Problems & Re-Design
• Air pollution from the estimated 3,000 vehicles per hour
• Since 2016, the avenue has been closed to motor traffic on the
first Sunday of every month
• It is announced that the city would transform the Champs-
Élysées into an "extraordinary garden"
• Vision 2030 has taken to create more pedestrian space, and
create "tunnels of trees" for improved air quality
• The plans are meant to make the avenue more "ecological,
desirable and inclusive"
Walkway and Crossing
• 2 lane of walkway each side
• Broad walkway
• Separated from main road by vegetation
• Setting arrangement is installed in walkway
zone
• Lighting feature is added between the
walkway lane
Lighting
Feature
Walkway and Crossing[Cont.]
• Setting arrangement is installed in walkway
zone
• Traffic signal system is used in every crossing
• Zebra Crossing is used
• Space for cycle crossing alongside zebra
crossing
Transport
• Avg. 64000 vehicles pass through per day
• Paris Metro Line runs under the Champs-Élysées
• 4 metro station nearby the road
• This heavy traffic is controlled by advance traffic
system
Metro Station
Entry
Metro Station
Drainage System
• Underground Drainage System is used
Potential Issues
• High rent is causing the loss of its small businesses and thus the street’s original identity
• The street requires constant maintenance to keep the corridor safe and clean
• Crossing wide, heavy trafficked roads is challenging for pedestrians
• The outdoor dining and kiosks on the sidewalk sometimes block the pedestrian flow
Orchard Road
Singapore
About
• Orchard Road
• Named from nutmeg, pepper and fruit
orchards or the plantations that the road
once led to
• Central Area, Singapore
• 2.5 km long
Speciality
• Famous Shopping HUB in Singapore
• Tourist Spot
• Famous street in South East Asia
• Consists over 20 shopping malls
Zoning
Vehicle road
Parking
Vegetation and setting
Arrangement
Pedestrian walkway
Walkway
• Broad sidewalks
• Well constructed
• Setting Arrangement is installed
Drainage
• Underground drainage is used
• The Stamford Diversion Canal (SDC) and Stamford
Detention Tank (SDT) is aimed to keep the roads flood-
free
• This detention tank has a capacity of 38000 cubic m
storage
Fig.: STD
Fig.: Deep Sewer
Drainage System Mechanism
Transport
• Orchard road can be accessed via three main stops on the
Singapore MRT Network
• Buses of several companies provided access to Orchard
Road
• Bus stop positions are marked on the last lane of the road
Fig.: Bus Stops
Fig.: MRT Map
Slovenska Street
Ljubljana City, Slovenia
Street Name: Slovenska Cesta in Ljubljana
Location: Ljubljana, Slovenia
Area: 14000 m2
Renovation Completion Date: 2015
Architect: Dekleva Gregorič arhitekti, Katušič
Kocbek arhitekti, Sadar + Vuga, Scapelab, Studio
Krištof
 The New Slovenska Street project is based on cutting-edge
concepts in public space design.
 The former four-lane road was transformed into the central
city avenue.
Information
 The main street of the city is the Slovenska
which crosses the city in the north-south
direction.
 Two pairs of large bus stations are placed on
the street
Specification
 It is also the stage for many important events in
the city, such as the marathon and the annual
cycling race, various demonstrations, and the
record-breaking square dance of the city's high-
school graduates.
Zoning
Vehicle road
Pedestrian walkway
Bus stoppage
Vegetation
Cycle lane
 The street is divided in
to tree sections, with a
concrete road surface
and paved pedestrian
area.
 Through narrowing of
the roadway there is
now more space for
pedestrians, cyclists
and restaurant and bar
gardens.
Section View of The Road
Problems & Renovation
 It was a busy four-lane road with
the large volume of pedestrian and
bus traffic
 A car-oriented traffic road
 Vegetation was low
 No safety & space for pedestrian
 From car-oriented, the road is transformed into
a space which gives priority to public transport,
pedestrians and cyclists
 By placing two pairs of large bus stations the
street truly becomes a central transport hub for
public transport
 The complete arrangement ties the fragmented
area together into a uniform space with a
prominently green character.
Problems &
Renovation
Pedestrian Area
 Through narrowing of the roadway there is now
more space for pedestrians, cyclists and
restaurant and bar gardens
 The urban furniture of the street encourages
people to stop and rest in the space
 Despite the large volume of pedestrian and bus
traffic it is designed as a “shared space”, a space,
where users participate equally, and height
differences are reduced to a minimum.
Transport System
 By designing a space which promotes
sustainable mobility and public transport in the
very center, the city has made a key step in it's
transport policy
 The absence of personal motor traffic allows for
the expansion of programs and the creation of
a space with its own character.
 This allows for an optimized bus transportation
service
Vegetation & Drainage System
• A new tree line of manna ash trees was planted
on the eastern side of the street, which is lit by
the afternoon sun.
• The manna ash trees are resistant to the urban
environment, and will adorn the space with
white flowers in the spring and bright yellow
foliage in the fall.
• Drainage system is connected with the vegetation
as it is established within the tree plantation
system.
Case study on Majid Sarani & various streets

More Related Content

What's hot

Al hamra arts complex Lahore complete Plans,Sections & Elevations
Al hamra arts complex Lahore complete Plans,Sections & ElevationsAl hamra arts complex Lahore complete Plans,Sections & Elevations
Al hamra arts complex Lahore complete Plans,Sections & ElevationsSaqib Haroon
 
CAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYCAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYSheraniDaniel
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City CentreRashmi Gautam
 
Jawahar kala kendra Case study
Jawahar kala kendra Case studyJawahar kala kendra Case study
Jawahar kala kendra Case studymichellesahay
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre finalJYOTSNA MISHRA
 
Casestudy landscape ip park.
Casestudy landscape ip park.Casestudy landscape ip park.
Casestudy landscape ip park.Antima Kuda
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case studyRadhikaJadhav8
 
Garden of five senses
Garden of five sensesGarden of five senses
Garden of five sensesDhir Dhwaj
 
Kala academy, goa
Kala academy, goaKala academy, goa
Kala academy, goaAkthar
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention centerKiruthika Selvi K J
 
Bangalore international exhibition centre case study
Bangalore international exhibition centre case studyBangalore international exhibition centre case study
Bangalore international exhibition centre case studyself employer
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Amir Azhar
 
school of architecture case study
school of architecture case study school of architecture case study
school of architecture case study Moin Khan Gorijo
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasSustainable Performance Institute
 

What's hot (20)

Manaav sadhna, Ahmedabad
Manaav sadhna, AhmedabadManaav sadhna, Ahmedabad
Manaav sadhna, Ahmedabad
 
Al hamra arts complex Lahore complete Plans,Sections & Elevations
Al hamra arts complex Lahore complete Plans,Sections & ElevationsAl hamra arts complex Lahore complete Plans,Sections & Elevations
Al hamra arts complex Lahore complete Plans,Sections & Elevations
 
CAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYCAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDY
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City Centre
 
Jawahar kala kendra Case study
Jawahar kala kendra Case studyJawahar kala kendra Case study
Jawahar kala kendra Case study
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre final
 
Casestudy landscape ip park.
Casestudy landscape ip park.Casestudy landscape ip park.
Casestudy landscape ip park.
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case study
 
Garden of five senses
Garden of five sensesGarden of five senses
Garden of five senses
 
Dilli haat
Dilli haatDilli haat
Dilli haat
 
MARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDYMARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDY
 
Kala academy, goa
Kala academy, goaKala academy, goa
Kala academy, goa
 
cannaught place
cannaught place cannaught place
cannaught place
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention center
 
Case study on group housing - Architectural design
Case study on group housing - Architectural designCase study on group housing - Architectural design
Case study on group housing - Architectural design
 
Bangalore international exhibition centre case study
Bangalore international exhibition centre case studyBangalore international exhibition centre case study
Bangalore international exhibition centre case study
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
 
school of architecture case study
school of architecture case study school of architecture case study
school of architecture case study
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
Indian Habitat Centre
Indian Habitat CentreIndian Habitat Centre
Indian Habitat Centre
 

Similar to Case study on Majid Sarani & various streets

Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesTiE Bangalore
 
Anmol hoon roads
Anmol hoon roadsAnmol hoon roads
Anmol hoon roadsAnmol Hoon
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition surveyapu roy
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoSJ Ohi
 
Brad Strader - downtown transportation
Brad Strader - downtown transportationBrad Strader - downtown transportation
Brad Strader - downtown transportationsenecasuccess
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyTim Pheby
 
Redesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, WarangalRedesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, Warangalshrikrishna kesharwani
 
Paul Froggatt - KWR presentation
Paul Froggatt - KWR presentationPaul Froggatt - KWR presentation
Paul Froggatt - KWR presentationJumpingJaq
 
L8 issues for people living in urban areas in rich countries traffic
L8 issues for people living in urban areas in rich countries   trafficL8 issues for people living in urban areas in rich countries   traffic
L8 issues for people living in urban areas in rich countries traffictudorgeog
 
Task 9 Kajang Local Plan For Sustainable Development (a133921)
Task 9    Kajang Local Plan For Sustainable Development (a133921)Task 9    Kajang Local Plan For Sustainable Development (a133921)
Task 9 Kajang Local Plan For Sustainable Development (a133921)izham27
 
BRTS Delhi transportation
BRTS Delhi transportation BRTS Delhi transportation
BRTS Delhi transportation Tanzil Faraz
 
Analysis and key findings
Analysis and key findingsAnalysis and key findings
Analysis and key findingsIsha Kirti
 

Similar to Case study on Majid Sarani & various streets (20)

Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building Envelopes
 
Anmol hoon roads
Anmol hoon roadsAnmol hoon roads
Anmol hoon roads
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition survey
 
Presentration 2
Presentration 2Presentration 2
Presentration 2
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: Chicago
 
Urban redevelopment
Urban redevelopmentUrban redevelopment
Urban redevelopment
 
Brad Strader - downtown transportation
Brad Strader - downtown transportationBrad Strader - downtown transportation
Brad Strader - downtown transportation
 
Complete Streets in Large Urban Counties
Complete Streets in Large Urban CountiesComplete Streets in Large Urban Counties
Complete Streets in Large Urban Counties
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
 
GW-Codman-all
GW-Codman-allGW-Codman-all
GW-Codman-all
 
Redesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, WarangalRedesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, Warangal
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
 
Bhubaneswar Street Design Guidelines
Bhubaneswar Street Design GuidelinesBhubaneswar Street Design Guidelines
Bhubaneswar Street Design Guidelines
 
Paul Froggatt - KWR presentation
Paul Froggatt - KWR presentationPaul Froggatt - KWR presentation
Paul Froggatt - KWR presentation
 
L8 issues for people living in urban areas in rich countries traffic
L8 issues for people living in urban areas in rich countries   trafficL8 issues for people living in urban areas in rich countries   traffic
L8 issues for people living in urban areas in rich countries traffic
 
Nehru place - Case Study
Nehru place - Case StudyNehru place - Case Study
Nehru place - Case Study
 
Task 9 Kajang Local Plan For Sustainable Development (a133921)
Task 9    Kajang Local Plan For Sustainable Development (a133921)Task 9    Kajang Local Plan For Sustainable Development (a133921)
Task 9 Kajang Local Plan For Sustainable Development (a133921)
 
BRTS Delhi transportation
BRTS Delhi transportation BRTS Delhi transportation
BRTS Delhi transportation
 
Analysis and key findings
Analysis and key findingsAnalysis and key findings
Analysis and key findings
 
SITCE_v10
SITCE_v10SITCE_v10
SITCE_v10
 

Recently uploaded

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 

Recently uploaded (20)

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 

Case study on Majid Sarani & various streets

  • 1. Presentation on Majid Sarani Presented by : Group: 13 Roll: 1723051, 1723052, 1723053, 1723054, 1723059 Course Title : Landscape Design Course No : BECM 3208 Topic : Problem Identification of the landscape of Majid Sarani Road, Khulna
  • 2.  Majid Sarani is located in Khulna, Bangladesh.  Majid Sarani has a length of 1.26 km.  The annual average temperature on this site is 26.3 °C (79.3 °F) & annual average rainfall is 1,809.4 millimeters (71.24 in) Short description of Majid Sarani Road, Khulna
  • 3. Major Problems on Majid Sarani Road :  Damage Road  Improper Drainage System  Lidless Drain & Manhole  Under Construction Buildings Beside The Road  Lack of Parking System  Illegal Sidewalk Occupation  Unplanned Connecting Road
  • 4. Damage Road At several point, the road is highly damaged and unfit to be in use.
  • 5. Reason behind this problem  Low quality materials  Unawareness of traffic rules  Corruption Solutions  Using proper materials  Construct in layers  Designing for worst case scenario  Regular maintenance
  • 6. Improper Drainage System Improper drainage system causes waterlogging on the road.
  • 7. Reason behind this problem  Over and above disposal of solid waste into the drains and drainage paths are accounted for the prime causes of blockage in drainage system and water logging  Inadequate drainage sections  Absence of inlets and outlets  Lack of proper maintenance of existing drainage system Solutions  Using impermeable materials  Installing under path drainage system  The existing drains and also those will be constructed shall have to cleaned at regular interval  Maintenance and cleaning of drains shall have to done at least once in every year specially before starting of monsoon season
  • 8. Lidless Drain & Manhole Lidless drains in several places occurs bad odor and sometimes accidents too. Reason behind this problem  Theft of manhole covers due to the lack of monitoring of the road safety  For cleaning purpose Solutions  Cover the manholes & strict rules for stealing those.  Regular maintenance
  • 9. Under Construction Buildings Beside The Road Some buildings that are currently being constructed beside the road without providing any safety. That may causes accident and public harm. Reason behind this problem  Ignorance to the basic rules of construction safety by the companies.  Unawareness about the danger that can happen from it Solutions  Maintain strict rules about safety materials so that all construction companies must follow  Using safety net  Using modern instruments  Using skilled workers
  • 10. Lack of Parking System Cars are parked on the road which causes the road to be narrowed and occurs traffic jam in peak hours.
  • 11. Reason behind this problem  Lack of proper planning  Insufficient space  Tendency of breaking rules Solutions  Properly utilize the space on the road side.  90° car parking
  • 12.
  • 13. Illegal occupancy of sidewalk by parking, hawkers obstruct the movement of pedestrian and often causes traffic jam Illegal Sidewalk Occupation
  • 14. Reason behind this problem  Unplanned parking  Hawker/ Illegal small shop Solutions  Eviction of the hawker/ small shop  Make appropriate arrangement for parking
  • 15. There are several roads connected with the main road which are unplanned and those cause traffic jam, road crossing problem and unwanted accidents too. Unplanned Connecting Road
  • 16.
  • 17. Reason behind this problem  Narrow connecting point  Absence of traffic signal system  Absence of road/ over head crossing  Vehicle parking Solutions  Setting up the signal system  Make appropriate arrangement for parking  Build up over head / road crossing
  • 18. Presentation on Majid Sarani Presented by : Group: 13 Roll: 1723051, 1723052, 1723053, 1723054, 1723059 Course Title : Landscape Design Course No : BECM 3208 Topic : Case Study on Various Streets
  • 20. Information • Champs-Élysées Avenue • The name is French for the Elysian Field, the place for dead heroes in Greek Mythology • From Place La de la Concorde to Arc de Triomphe • 8th Arrondissement in northwestern Paris,France • 1.91 Km Long, 70m (230ft) Wide • 8 Lane Highway
  • 21. Speciality • Popular tourist spot • Two major public squire at both end • Consists many shopping mall • Avg. 64000 vehicles pass through per day • Foot traffic average 100000 people
  • 22. Zoning Vehicle road Cycle lane Parking Vegetation Pedestrian walkway Vegetation Pedestrian walkway
  • 23. Problems & Re-Design • Air pollution from the estimated 3,000 vehicles per hour • Since 2016, the avenue has been closed to motor traffic on the first Sunday of every month • It is announced that the city would transform the Champs- Élysées into an "extraordinary garden" • Vision 2030 has taken to create more pedestrian space, and create "tunnels of trees" for improved air quality • The plans are meant to make the avenue more "ecological, desirable and inclusive"
  • 24. Walkway and Crossing • 2 lane of walkway each side • Broad walkway • Separated from main road by vegetation • Setting arrangement is installed in walkway zone • Lighting feature is added between the walkway lane Lighting Feature
  • 25. Walkway and Crossing[Cont.] • Setting arrangement is installed in walkway zone • Traffic signal system is used in every crossing • Zebra Crossing is used • Space for cycle crossing alongside zebra crossing
  • 26. Transport • Avg. 64000 vehicles pass through per day • Paris Metro Line runs under the Champs-Élysées • 4 metro station nearby the road • This heavy traffic is controlled by advance traffic system Metro Station Entry Metro Station Drainage System • Underground Drainage System is used
  • 27. Potential Issues • High rent is causing the loss of its small businesses and thus the street’s original identity • The street requires constant maintenance to keep the corridor safe and clean • Crossing wide, heavy trafficked roads is challenging for pedestrians • The outdoor dining and kiosks on the sidewalk sometimes block the pedestrian flow
  • 29. About • Orchard Road • Named from nutmeg, pepper and fruit orchards or the plantations that the road once led to • Central Area, Singapore • 2.5 km long
  • 30. Speciality • Famous Shopping HUB in Singapore • Tourist Spot • Famous street in South East Asia • Consists over 20 shopping malls
  • 31. Zoning Vehicle road Parking Vegetation and setting Arrangement Pedestrian walkway
  • 32. Walkway • Broad sidewalks • Well constructed • Setting Arrangement is installed
  • 33. Drainage • Underground drainage is used • The Stamford Diversion Canal (SDC) and Stamford Detention Tank (SDT) is aimed to keep the roads flood- free • This detention tank has a capacity of 38000 cubic m storage Fig.: STD Fig.: Deep Sewer
  • 35. Transport • Orchard road can be accessed via three main stops on the Singapore MRT Network • Buses of several companies provided access to Orchard Road • Bus stop positions are marked on the last lane of the road Fig.: Bus Stops Fig.: MRT Map
  • 37. Street Name: Slovenska Cesta in Ljubljana Location: Ljubljana, Slovenia Area: 14000 m2 Renovation Completion Date: 2015 Architect: Dekleva Gregorič arhitekti, Katušič Kocbek arhitekti, Sadar + Vuga, Scapelab, Studio Krištof  The New Slovenska Street project is based on cutting-edge concepts in public space design.  The former four-lane road was transformed into the central city avenue. Information
  • 38.  The main street of the city is the Slovenska which crosses the city in the north-south direction.  Two pairs of large bus stations are placed on the street Specification  It is also the stage for many important events in the city, such as the marathon and the annual cycling race, various demonstrations, and the record-breaking square dance of the city's high- school graduates.
  • 39. Zoning Vehicle road Pedestrian walkway Bus stoppage Vegetation Cycle lane  The street is divided in to tree sections, with a concrete road surface and paved pedestrian area.  Through narrowing of the roadway there is now more space for pedestrians, cyclists and restaurant and bar gardens.
  • 40. Section View of The Road
  • 41. Problems & Renovation  It was a busy four-lane road with the large volume of pedestrian and bus traffic  A car-oriented traffic road  Vegetation was low  No safety & space for pedestrian
  • 42.  From car-oriented, the road is transformed into a space which gives priority to public transport, pedestrians and cyclists  By placing two pairs of large bus stations the street truly becomes a central transport hub for public transport  The complete arrangement ties the fragmented area together into a uniform space with a prominently green character. Problems & Renovation
  • 43. Pedestrian Area  Through narrowing of the roadway there is now more space for pedestrians, cyclists and restaurant and bar gardens  The urban furniture of the street encourages people to stop and rest in the space  Despite the large volume of pedestrian and bus traffic it is designed as a “shared space”, a space, where users participate equally, and height differences are reduced to a minimum.
  • 44. Transport System  By designing a space which promotes sustainable mobility and public transport in the very center, the city has made a key step in it's transport policy  The absence of personal motor traffic allows for the expansion of programs and the creation of a space with its own character.  This allows for an optimized bus transportation service
  • 45. Vegetation & Drainage System • A new tree line of manna ash trees was planted on the eastern side of the street, which is lit by the afternoon sun. • The manna ash trees are resistant to the urban environment, and will adorn the space with white flowers in the spring and bright yellow foliage in the fall. • Drainage system is connected with the vegetation as it is established within the tree plantation system.