Environmental Impact Assessment
(EIA)
of
Thermal Power Plant
By:-
Vandana Bharti
Department of Environmental Engineering
Ch. B.P. Government Engineering College
New Delhi (India)
1
2
SUMMARY TABLE OF ELECTRIC POWER
GENERATION
3
Source India Japan U.S.
Coal 59.2% 21.2% 51.8%
Oil 13.9% 16.6% 03.1%
Gas 06.3% 22.1% 15.7%
Nuclear 02.5% 30.0% 19.9%
Hydro 17.8% 08.2% 07.4%
Others 00.3% 01.9% 02.2%
Ref:-CPCB-2012
INTRODUCTION
 A thermal power station is a power plant in which
the prime mover is steam driven. Water is heated,
turns into steam and spins a steam turbine which
drives an electrical generator.
 After it passes through the turbine, the steam is
condensed in a condenser and recycled to where it
was heated; this is known as a Rankine cycle .
4
MECHANICAL DESIGN
• Boiler.
• Furnace.
• Turbine.
• Super Heater & Re- Heater.
• PA,FD & ID Fan.
• Cooling Tower
FUNCTION HELD IN PLANT
• Coal Flow
• Steam Flow
• Water Flow
• Ash Handeling
FEED WATER SYSTEM
• High Pressure Heaters
• Boiler Feed Pump (BFP)
• Feed Regulating System
• Drip & Drain System
5
6
PROCESS
7
 Coal supply
After haulers drop off the coal, a set of crusher and
conveyor prepare and deliver the coal to the power
plant. When the plant need coal, coal hopper crush coal
to a few inches in size and the conveyor belt bringing
the coal inside.
 WAGON TIPPLER:
It is the machine which is used to tip the coal from the
wagon. The coal tipped is directly feed to conveyor belt.
Its capacity is 12 wagon per hour.
 CRUSHER:
It crushes the coal into small pieces.
 COAL MILLS:
In it small pieces of coal are converted into pulverized
from.
 FURNACE:
It is the chamber in which fuel burns & fire blows.
 BOILER DRUM:
It contains water for boiling.
 ELECTROSTATIC PRECIPITATOR:
In this we have electrodes which attract fly ash and extract it
from flue gases so that it cannot enter atmosphere.
 CHIMENY:
It is used to release flue gases into the atmosphere.
 TURBINE:
Turbine is the part which revolves due to steam pressure. It is of
three types.
a) High pressure turbine.
b) Intermediate pressure turbine.
c) Low pressure turbine.
8
 TURBO GENERATOR:
It is the main machine which produces250 MW electricity .
 CONDENSER:
It condenses steam coming from low pressure turbine (L.P.T.) to
hot water. By removing air and other non-condensable gases
from steam while passing through them.
 COOLING WATER (C.W.) PUMP:
This pump send water from cooling tower to condenser.
 COOLING TOWER:
It is used to cool the water its height is near about 143.5 mtrs.
The hot water is led to the tower top and falls down through the
tower and is broken into small particles while passing over the
baffing devices. Air enters the tower from the bottom and flow
upwards. The air vaporizes a small percentage of water,
thereby cooling water falls down into tank below the tower from
where it is pumped to the condenser and cycle is repeated.
9
10
11
Air Pollution :-High particulate matter emission levels due to burning
of inferior grade coal which leads to generation
of large quantity of flyash
Emissions of SO2, NOx & Green house gas (CO2) are also
matter of concern
Water Pollution :- Mainly caused by the effluent discharge from ash
ponds, condenser cooling /cooling tower, DM
plant and Boiler blow down.
Noise Pollution :- High noise levels due to release of high pressure
steam and running of fans and motors
Land Degradation :- About 100 million tonnes of fly ash is generated by
use of coal far energy production. The disposal of such large
quantity of fly ash has occupied thousands
hectares of land which includes agricultural
and forest land too.
ENVIRONMENTAL ISSUES IN COAL BASED POWER GENERATION
12
POLLUTION LOAD FROM COAL
BASED THERMAL POWER PLANT
13
Pollutants Emissions (in tones/day)
CO2 424650
Particulate
Matter
4374
SO2 3311
NOx 4966
Ref:-CPCB
2012
Status of Pollution Control in Thermal Power
Plants in India
Total number of power plants : 81
Air Pollution
 Power plants complying with emission : 43
standards
 Power plants not complying with emission : 35
standards
 Power plants closed : 03
Water Pollution
 Power plants complying with ash pond : 49
Effluent standards
 Power plants not complying with ash pond : 29
Effluent standards
 Power plants closed : 03
Ref:-CPCB
2012
14
Activities involved and their Impacts
Change in land use pattern/ Site clearing:-
•Erosion
•Loss of biodiversity
•Loss or change of soil quality and quantity
•Huge diversion and acquisition of land in case of power plant with Captive mining
Civil works:-
•Dust pollution
•Noise pollution
Operational Activities:-
•Air pollution
•Waste generation
•Water consumption
•Emission of mercury
•Greenhouse emission
Local biodiversity
Solid waste management
15
Activities involved and their Impacts
Air pollution from point sources:-
Particulate matter, Gaseous emission- SOx,, NOx,CO, CO2, hydrocarbon etc…
Air pollution from non-point sources:-
Transport of coal, loading/unloading, coal storage, fly-ash handeling
Sources of water pollution:-
Cooling tower blow down, Boiler blow down, Demineralisation (DM), plant effluent,
Leachate of heavy metal (ash pond) contaminate ground water, Effluent from oil handeling
and transformer areas, power house and turbine Area Effluent , Domestic waste water
16
REASONS FOR NON-COMPLIANCE OF
ENVIRONMENTAL STANDARDS IN
THERMAL POWER PLANTS
Inconsistent supply of coal
High resistivity of coal
Inefficient operation of ESPs
Delay in supply of ESPs
Low Specific Collection Area (SCA) of ESPs
Inefficient management of ash ponds
Large quantities of ash generation
17
An Indian Case Study
On
Comprehensive EIA
Of
THERMAL POWER PLANT
at
Raigarh district of Chattisgarh
by
Jindal Steel and Power Ltd (JSPL)
For better understanding of EIA
18
Project Proposal
• JSPL is operating a open cast coal mine, along with
Crushing, Screening and Washing plant
•JSPL is now proposing to set up a 2*150 MW thermal power
plant which will use the middling and coal fines generated
during coal washing as Raw material
•The company runs a steel plant in Raigarh and proposes to
transmit the power generated by this thermal power plant to
its steel plant through its own dedicated transmission network
19
Salient features of the project
Location
Village- Dongamahua, 50kms away from Raigarh
The KELO river flows at a distance of around 3.5 kms from this proposed site.
There are many seasonal drains and tributeries of the Kelo, which ultemately merge
into the river
Fuel
Coal
Requires 2.47 million tonnes of coal per annum (@ 312tonnes/hr for 330 days)
Middlings and coal fines will be tranported to plant site via road or conveyor belts
The project will also require some light diesel oil (LDO)
Water Requirement
7.46 MCM which will be sourced from ground water collected in the mine sump, and
from bore borewell
Land use
Requires 56 acres (22.7 hectares of land), Flat topography, either agricultural or
wasteland
Human habitation
94 inhabited revenue villages
20
IMPACT ANALYSIS
→ Type biophysical, social, health or economic
→ Nature direct or indirect, cumulative, etc.
→ Magnitude or
severity
high, moderate, low
→ Extent local, regional, trans-boundary or global
→ Timing immediate/long term
→ Duration temporary/permanent
→ Uncertainty low likelihood/high probability
→ Reversibility reversible/irreversible
→ Significance* unimportant/important
21
TOOLS FOR IMPACT ANALYSIS
 checklists
 matrices
 networks
 overlays and geographical information systems
(GIS)
 expert systems
 professional judgement
22
IMPACT MITIGATION
 to avoid, minimise or remedy adverse
impacts
 to ensure that residual impacts are within
acceptable levels
 to enhance environmental and social
benefits
23
FRAMEWORK FOR IMPACT MITIGATION
Common (desirable)
Rare (undesirable)
Alternative sites or
technology to
eliminate habitat loss
Actions during
design, construction and
operation to minimise
or eliminate habitat
loss
Used as a last resort
to offset habitat loss
Avoidance
Mitigation
Compensation
24
REPORTING
Different name of EIA reports
 Environmental Impact Assessment Report (EIA
Report)
 Environmental Impact Statement (EIS)
 Environmental Statement (ES)
 Environmental Assessment Report (EA Report)
 Environmental Effects Statement (EES)
25
Remediation Measures in Thermal power plant
Air pollution control:-
For boiler stacks ESP/ Bag house
Coal crusher Bag filter
Coal mill Bag filter
SOx control:-
Use of alternative fuel
Low sulphur containing fuel
Lime dosing
High stack
NOx control:-
Ammonia injection
Low NOx burner
Flue gas recirculation
26
Remediation Measures in Thermal power plant
Fugitive Dust control:-
Covered storage yard for coal
Closed unloading of coal with adequate dust suction device
Closed conveyor belt for transportation of raw
Fly ash management:-
Ash disposal site should be lined to prevent metal contamination
Construction of green barrier all around the ash pond
Construction of piezometric holes
Recycling of ash pond effluents
New technologies practices:-
Water conservation techniques:-
Practices to reduce transportation impact:-
Practices for soil management:-
27
REFRENCES:-
1. CPCB
2. An India case study on Thermal power plants
3. International journal of Environmental Engineering and management
4. www.envfor.nic.in
5. www.harmo.org/confrences
6. www.environmental-experts.com
7. Dr. Amit Jain
28

More Related Content

What's hot

Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
Kumar
 
Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams  Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams
Sodiq Rasaq
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
Chandrakant Singh
 

What's hot (20)

Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
Environmental impact assessment case study
Environmental impact assessment case studyEnvironmental impact assessment case study
Environmental impact assessment case study
 
Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams  Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Issues almatti dam_gurudath_ret15004
Issues almatti dam_gurudath_ret15004Issues almatti dam_gurudath_ret15004
Issues almatti dam_gurudath_ret15004
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
Gaussian model (kabani & sumeet)
Gaussian model (kabani & sumeet)Gaussian model (kabani & sumeet)
Gaussian model (kabani & sumeet)
 
EIA for Major development projects - Mining projects
EIA for Major development projects - Mining projectsEIA for Major development projects - Mining projects
EIA for Major development projects - Mining projects
 
EIA Methodologies
EIA MethodologiesEIA Methodologies
EIA Methodologies
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
AIR POLLUTION CONTROL L 12 and 13
AIR POLLUTION CONTROL L  12 and 13AIR POLLUTION CONTROL L  12 and 13
AIR POLLUTION CONTROL L 12 and 13
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
Presentation on stack monitoring for industries
Presentation on stack monitoring for industriesPresentation on stack monitoring for industries
Presentation on stack monitoring for industries
 
Public participation in eia
Public participation in eiaPublic participation in eia
Public participation in eia
 
High volume air sampler
High volume air samplerHigh volume air sampler
High volume air sampler
 
EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project  EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
 

Viewers also liked

Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
Intan Ayuna
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
Bibhabasu Mohanty
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
NAVER Engineering
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Bahadur Prasad
 

Viewers also liked (20)

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Deep Learning with PyTorch
Deep Learning with PyTorchDeep Learning with PyTorch
Deep Learning with PyTorch
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
Seminar on Environmental Impact Assessment
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessment
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Environmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact Assessment
 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
 
Deep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive LandscapeDeep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive Landscape
 
Pytorch for tf_developers
Pytorch for tf_developersPytorch for tf_developers
Pytorch for tf_developers
 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
 
Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)
 
PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 

Similar to EIA thermal power plant

Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01
Abha Tripathi
 
Presentation of thermal_power_plant
Presentation of thermal_power_plantPresentation of thermal_power_plant
Presentation of thermal_power_plant
prakash2704
 
Energy Efficiency Based on Sectors
Energy Efficiency Based on SectorsEnergy Efficiency Based on Sectors
Energy Efficiency Based on Sectors
Leonardo ENERGY
 

Similar to EIA thermal power plant (20)

ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
V.T ppt
V.T pptV.T ppt
V.T ppt
 
Htps
HtpsHtps
Htps
 
INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT
  INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT  INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT
INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT
 
Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPC
 
Overview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVCOverview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVC
 
Neyveli uttar pradesh power limited
Neyveli uttar pradesh power limitedNeyveli uttar pradesh power limited
Neyveli uttar pradesh power limited
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
 
Presentation of thermal_power_plant
Presentation of thermal_power_plantPresentation of thermal_power_plant
Presentation of thermal_power_plant
 
Thermal Power Generation
Thermal Power GenerationThermal Power Generation
Thermal Power Generation
 
Energy Efficiency Based on Sectors
Energy Efficiency Based on SectorsEnergy Efficiency Based on Sectors
Energy Efficiency Based on Sectors
 
Waste heat recovery from hot gasses in cement industry
Waste heat recovery from hot gasses in cement industryWaste heat recovery from hot gasses in cement industry
Waste heat recovery from hot gasses in cement industry
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptx
 
DPL Project
DPL ProjectDPL Project
DPL Project
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
 
Thermal power plant term project
Thermal power plant term projectThermal power plant term project
Thermal power plant term project
 

Recently uploaded

Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
kauryashika82
 

Recently uploaded (20)

Deforestation
DeforestationDeforestation
Deforestation
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 

EIA thermal power plant

  • 1. Environmental Impact Assessment (EIA) of Thermal Power Plant By:- Vandana Bharti Department of Environmental Engineering Ch. B.P. Government Engineering College New Delhi (India) 1
  • 2. 2
  • 3. SUMMARY TABLE OF ELECTRIC POWER GENERATION 3 Source India Japan U.S. Coal 59.2% 21.2% 51.8% Oil 13.9% 16.6% 03.1% Gas 06.3% 22.1% 15.7% Nuclear 02.5% 30.0% 19.9% Hydro 17.8% 08.2% 07.4% Others 00.3% 01.9% 02.2% Ref:-CPCB-2012
  • 4. INTRODUCTION  A thermal power station is a power plant in which the prime mover is steam driven. Water is heated, turns into steam and spins a steam turbine which drives an electrical generator.  After it passes through the turbine, the steam is condensed in a condenser and recycled to where it was heated; this is known as a Rankine cycle . 4
  • 5. MECHANICAL DESIGN • Boiler. • Furnace. • Turbine. • Super Heater & Re- Heater. • PA,FD & ID Fan. • Cooling Tower FUNCTION HELD IN PLANT • Coal Flow • Steam Flow • Water Flow • Ash Handeling FEED WATER SYSTEM • High Pressure Heaters • Boiler Feed Pump (BFP) • Feed Regulating System • Drip & Drain System 5
  • 6. 6
  • 7. PROCESS 7  Coal supply After haulers drop off the coal, a set of crusher and conveyor prepare and deliver the coal to the power plant. When the plant need coal, coal hopper crush coal to a few inches in size and the conveyor belt bringing the coal inside.  WAGON TIPPLER: It is the machine which is used to tip the coal from the wagon. The coal tipped is directly feed to conveyor belt. Its capacity is 12 wagon per hour.  CRUSHER: It crushes the coal into small pieces.  COAL MILLS: In it small pieces of coal are converted into pulverized from.
  • 8.  FURNACE: It is the chamber in which fuel burns & fire blows.  BOILER DRUM: It contains water for boiling.  ELECTROSTATIC PRECIPITATOR: In this we have electrodes which attract fly ash and extract it from flue gases so that it cannot enter atmosphere.  CHIMENY: It is used to release flue gases into the atmosphere.  TURBINE: Turbine is the part which revolves due to steam pressure. It is of three types. a) High pressure turbine. b) Intermediate pressure turbine. c) Low pressure turbine. 8
  • 9.  TURBO GENERATOR: It is the main machine which produces250 MW electricity .  CONDENSER: It condenses steam coming from low pressure turbine (L.P.T.) to hot water. By removing air and other non-condensable gases from steam while passing through them.  COOLING WATER (C.W.) PUMP: This pump send water from cooling tower to condenser.  COOLING TOWER: It is used to cool the water its height is near about 143.5 mtrs. The hot water is led to the tower top and falls down through the tower and is broken into small particles while passing over the baffing devices. Air enters the tower from the bottom and flow upwards. The air vaporizes a small percentage of water, thereby cooling water falls down into tank below the tower from where it is pumped to the condenser and cycle is repeated. 9
  • 10. 10
  • 11. 11
  • 12. Air Pollution :-High particulate matter emission levels due to burning of inferior grade coal which leads to generation of large quantity of flyash Emissions of SO2, NOx & Green house gas (CO2) are also matter of concern Water Pollution :- Mainly caused by the effluent discharge from ash ponds, condenser cooling /cooling tower, DM plant and Boiler blow down. Noise Pollution :- High noise levels due to release of high pressure steam and running of fans and motors Land Degradation :- About 100 million tonnes of fly ash is generated by use of coal far energy production. The disposal of such large quantity of fly ash has occupied thousands hectares of land which includes agricultural and forest land too. ENVIRONMENTAL ISSUES IN COAL BASED POWER GENERATION 12
  • 13. POLLUTION LOAD FROM COAL BASED THERMAL POWER PLANT 13 Pollutants Emissions (in tones/day) CO2 424650 Particulate Matter 4374 SO2 3311 NOx 4966 Ref:-CPCB 2012
  • 14. Status of Pollution Control in Thermal Power Plants in India Total number of power plants : 81 Air Pollution  Power plants complying with emission : 43 standards  Power plants not complying with emission : 35 standards  Power plants closed : 03 Water Pollution  Power plants complying with ash pond : 49 Effluent standards  Power plants not complying with ash pond : 29 Effluent standards  Power plants closed : 03 Ref:-CPCB 2012 14
  • 15. Activities involved and their Impacts Change in land use pattern/ Site clearing:- •Erosion •Loss of biodiversity •Loss or change of soil quality and quantity •Huge diversion and acquisition of land in case of power plant with Captive mining Civil works:- •Dust pollution •Noise pollution Operational Activities:- •Air pollution •Waste generation •Water consumption •Emission of mercury •Greenhouse emission Local biodiversity Solid waste management 15
  • 16. Activities involved and their Impacts Air pollution from point sources:- Particulate matter, Gaseous emission- SOx,, NOx,CO, CO2, hydrocarbon etc… Air pollution from non-point sources:- Transport of coal, loading/unloading, coal storage, fly-ash handeling Sources of water pollution:- Cooling tower blow down, Boiler blow down, Demineralisation (DM), plant effluent, Leachate of heavy metal (ash pond) contaminate ground water, Effluent from oil handeling and transformer areas, power house and turbine Area Effluent , Domestic waste water 16
  • 17. REASONS FOR NON-COMPLIANCE OF ENVIRONMENTAL STANDARDS IN THERMAL POWER PLANTS Inconsistent supply of coal High resistivity of coal Inefficient operation of ESPs Delay in supply of ESPs Low Specific Collection Area (SCA) of ESPs Inefficient management of ash ponds Large quantities of ash generation 17
  • 18. An Indian Case Study On Comprehensive EIA Of THERMAL POWER PLANT at Raigarh district of Chattisgarh by Jindal Steel and Power Ltd (JSPL) For better understanding of EIA 18
  • 19. Project Proposal • JSPL is operating a open cast coal mine, along with Crushing, Screening and Washing plant •JSPL is now proposing to set up a 2*150 MW thermal power plant which will use the middling and coal fines generated during coal washing as Raw material •The company runs a steel plant in Raigarh and proposes to transmit the power generated by this thermal power plant to its steel plant through its own dedicated transmission network 19
  • 20. Salient features of the project Location Village- Dongamahua, 50kms away from Raigarh The KELO river flows at a distance of around 3.5 kms from this proposed site. There are many seasonal drains and tributeries of the Kelo, which ultemately merge into the river Fuel Coal Requires 2.47 million tonnes of coal per annum (@ 312tonnes/hr for 330 days) Middlings and coal fines will be tranported to plant site via road or conveyor belts The project will also require some light diesel oil (LDO) Water Requirement 7.46 MCM which will be sourced from ground water collected in the mine sump, and from bore borewell Land use Requires 56 acres (22.7 hectares of land), Flat topography, either agricultural or wasteland Human habitation 94 inhabited revenue villages 20
  • 21. IMPACT ANALYSIS → Type biophysical, social, health or economic → Nature direct or indirect, cumulative, etc. → Magnitude or severity high, moderate, low → Extent local, regional, trans-boundary or global → Timing immediate/long term → Duration temporary/permanent → Uncertainty low likelihood/high probability → Reversibility reversible/irreversible → Significance* unimportant/important 21
  • 22. TOOLS FOR IMPACT ANALYSIS  checklists  matrices  networks  overlays and geographical information systems (GIS)  expert systems  professional judgement 22
  • 23. IMPACT MITIGATION  to avoid, minimise or remedy adverse impacts  to ensure that residual impacts are within acceptable levels  to enhance environmental and social benefits 23
  • 24. FRAMEWORK FOR IMPACT MITIGATION Common (desirable) Rare (undesirable) Alternative sites or technology to eliminate habitat loss Actions during design, construction and operation to minimise or eliminate habitat loss Used as a last resort to offset habitat loss Avoidance Mitigation Compensation 24
  • 25. REPORTING Different name of EIA reports  Environmental Impact Assessment Report (EIA Report)  Environmental Impact Statement (EIS)  Environmental Statement (ES)  Environmental Assessment Report (EA Report)  Environmental Effects Statement (EES) 25
  • 26. Remediation Measures in Thermal power plant Air pollution control:- For boiler stacks ESP/ Bag house Coal crusher Bag filter Coal mill Bag filter SOx control:- Use of alternative fuel Low sulphur containing fuel Lime dosing High stack NOx control:- Ammonia injection Low NOx burner Flue gas recirculation 26
  • 27. Remediation Measures in Thermal power plant Fugitive Dust control:- Covered storage yard for coal Closed unloading of coal with adequate dust suction device Closed conveyor belt for transportation of raw Fly ash management:- Ash disposal site should be lined to prevent metal contamination Construction of green barrier all around the ash pond Construction of piezometric holes Recycling of ash pond effluents New technologies practices:- Water conservation techniques:- Practices to reduce transportation impact:- Practices for soil management:- 27
  • 28. REFRENCES:- 1. CPCB 2. An India case study on Thermal power plants 3. International journal of Environmental Engineering and management 4. www.envfor.nic.in 5. www.harmo.org/confrences 6. www.environmental-experts.com 7. Dr. Amit Jain 28