                      PROJECT REPORT FORMAT

        All Students should strictly follow the following standards for preparation of
Project Report.

        Sr.No               Specifications                          Details
        1       Number of copies of project report       3 ( Three)
        2       Binding                                  Black color hard binding
        3       Embossing                                Golden Color
        4       Page size                                A4
        5       Page color                               White
        6       Left Margin                              1.5 inch
        7       Other Margins ( Top, Bottom, Right)      1 inch
        8       Headings Font                            Times New Roman
        9       Headings Fond Size                       14, bold, uppercase
        10      Subheadings Font                         Times New Roman
        11      Subheadings Font Size                    12, bold, uppercase
        12      Text Body Font                           Times New Roman
        13      Text Body Font Size                      12, normal, lower case
        14      Header                                   As suitable (No Company
                                                         Logos allowed)
        15      Footer                                   Page Numbers at centre
        16      Total number of pages                    Approx. in between 55 to
                                                         95


FRONT PAGE

   Golden embossing on black background hard bound copy.
   For this page you can use any professional font of any relative size to make it more
   attractive. This page should include the following points.

   1.    Project title
   2.    Name of the company
   3.    Submitted to
   4.    Submitted by
   5.    Batch
   6.    College name and address.
                                                                                         1
For example :

                                         A
                                  PROJECT REPORT
                                        ON


    “MARKET SURVEY AND ANALYSIS OF CUSTOMER FEEDBACK FOR
           NEWLY LAUNCHED FOUR WHEELER – SWIFT”


                                       FOR
                                MARUTI UDYOG LTD.


                                   SUBMITTED TO

                                UNIVERSITY OF PUNE

          IN PARTIAL FULFILLMENT OF TWO YEARS FULL TIME
         MASTERS DEGREE IN BUSINESS ADMINISTRATION (MBA)


                                   SUBMITTED BY

                                   PIYUSH PATIL
                                 (BATCH – 2009-2011)

                                         KJEI’s

              TRINITY COLLEGE OF ENGINEERING & RESEARCH
                                     (MBA Prog),

                              OR
         TRINITY INSTITUTE OF MANAGEMENT RESEARCH.



INSIDE 1ST PAGE

   This page will be nothing but the complete copy of front page as it is. Only instead of
   golden color you have to use any other color or combination of different colors.




                                                                                        2
COMPANY CERTIFICATE

   This certificate must be printed on company’s original letter head. It should include
   the following points
     1. Name of the student
     2. Project title
     3. Duration of project ( minimum 50 working days)
     4. Location
     5. Authority sign and company seal.

For example:


                        BANK OF MAHARASHTRA



            PIMPRI BRANCH, PUNE., 27272765, FAX – (020)27272766,


    Ref.No.                                                      Date:

                     TO WHOMSOEVER IT MAY CONCERN

    This is to certify that Mr. Omkar Patwardhan a MBA Student of
    TRINITYCOLLEGE OF ENGINEERING & RESEARCH , Pune has undergone
    training and completed a project on “Evaluation of Credit Risk Rating
    Framework”
    In Pune region.

    He has carried out this project for Bank of Maharashtra from 15/05/2010 to
      / /2010.

    In the span of project duration his candidature was found to be very sincere &
    hardworking.


    We wish him a bright future.


                                              Seal
    (sign)
    Mr, R.K.Tripathi
    Branch Manager
    Bank of Maharashtra.




                                                                                           3
COLLEGE CERTIFICATE:

      This certificate will be issued by the college later on when you rejoin college in IIIrd
      Semester (one copy to each student will be given). You have to make at least 2 Xerox
      of it for other 2 copies of project report.


ACKNOWLEDGEMENT:

This page will include vote of thanks in following Chronology

      1.   Company project guide
      2.   Director (TIMR) or Principal (TCOER)
      3.   College project guide
      4.   Other staff & friends ( if any)

INDEX:


SR.
                                        TOPIC                                 PAGE NO.
No.
1.         Executive Summary
2.         Objectives & Scope of the project
3.         Company Profile
4.         Product Profile ( As Applicable)
5.         Theoretical Background
6.         Research Methodology
7.         Data Analysis & Interpretation
8.         Limitations of the Project
 9.        Conclusion & Suggestions
10.        Bibliography




                 “UP TO THIS PAGE DON’T PUT PAGE NUMBERS”.




                                                                                            4
EXECUTIVE SUMMARY: (One page only)

   This should include Introduction & objectives of the project, reasons for selection of
   company, selection of project, and research design of the project (i.e. procedure you
   have used to carry out the project). Also you have to mention brief conclusions of the
   project. (One paragraph on each chapter)


OBJECTIVES & SCOPE OF THE PROJECT:

    1. Objectives of the project
    2. Scope: in terms of practical implication of the project. (Not only in terms
       geographical scope.)


COMPANY PROFILE: This should include

   1. Complete name & Address of the company
   2.Mission statement, vision, slogan, logo if any.
   3. Historical developments of the company
   4.Achievements and financial result of the company if any.
   5.Organizational chart
   6. List of competitors
   7.Branches & offices
   8.Building photographs (if any).


PRODUCT PROFILE: this should include

   Details of the products with different ranges of the products & photographs of the
   products (if any)


THEREOTICAL BACKGROUND: It should include

   Application of different relative concepts of the concern subjects topic & their
   correlation with respect to your project like:

For Marketing:

   Market segmentation, Target Marketing, PLC, New product development, marketing
   planning, classification of markets, market competition, promotional mix,
   Distribution channels, services marketing, sales promotion schemes, supply chain
   management, customer relationship management, Business ethics, consumer
   behaviour, law of demand & supply, AIDA model etc.




                                                                                        5
For Finance:

   Ratio analysis, risk management, legal aspects ,funds flow statements, country risks
   analysis, investment decisions, capital budgeting, cost analysis, analysis of financial
   position of company, TDS, International finance, balance sheet, Portfolio
   management, import –export procedures and tax implications etc.


For HR:

   Training & development, Recruitment & selection process, performance appraisal
   system, motivational tools, manpower planning, labour laws, grievance handling
   procedures, Interview techniques, etc.


RESEARCH METHODOLOGY: It should include

   1. Definition of Research
   2. Types of research in brief and the category of research applicable to your project.
   3. Different methods of data collection in short and justification for the method
       adopted by you.
   4. Sources of primary data & secondary data you have used for your project.
   5. Sample size for your project.
   6. Method of data analysis you have used for your project.



DATA ANALYSIS & INTERPRETATION:

   This is the major & most important part of the project. It should contain the analysis
   of all those questions asked to the respondents through the questionnaire. Use
   appropriate bar charts/ pie charts/ graphs/ table/ line diagram/ frequency curve etc.

   For Example:

                          Satisfaction level of the customers


      Sr.No. Level of Satisfaction      No. of Customers          Percentage
        1          Satisfied                   130                    65
        2      Highly Satisfied                 30                    15
        3        Dissatisfied                   20                    10
        4     Highly Dissatisfied               10                     5
        5       No Response                     10                     5




                                                                                        6
Level of Satisfaction of Customers(%)
                               70




             No.of Customers
                               60
                               50
                               40
                               30
                               20
                               10
                               0
                                    satisfied   Highly Satisfied Dissatisfied      Highly      No response
                                                                                dissatisfied

                                                           Satisfaction Level



Finding & Interpretation:

65% of customers are satisfied with the product due to best quality of the product.
--------------------------------
--------------------------------
--------------------------------
It has been observed that 5% customers are non respondent as they were busy with the
other works.

Data Analysis (for Finance):

Do the data analyses as shown above, only you have to choose appropriate methods for
analysis like ratio analysis, cash flow, comparative analysis, operating cycle study etc.

LIMITATIONS OF THE PROJECT:
  No project is ideal. In reality the researcher always come across different problems
  which acts as limitations of the project such as –
     1.Biased reply of the respondents
     2.Non availability of data or other relevant information
     3.Time constraints
     4. Budget constraints
     5.Company’s policy that not to disclose confidential data. Etc.

CONCLUSION AND RECOMMENDATION

While concluding student should take care that his conclusion is matching with the title
of the project and objectives set in the project. Student has to give different suggestions to
the company which will act as solution to all those problems researcher has identified
with product or services or methods applied.




                                                                                                             7
BIBLIOGRAPHY: (This will be the last page of the project)

It includes – references, books and research journals used, web sites, newspapers etc.

For example:

For Books:            C.R.Kothari, Research Methodology, Methods & Techniques,
                      New Age International Publisher, edition II, 2004.
For Research Journal: Mridula S Mishra and Umakant Dash, “Importance of Retail
                      Service Attributes: A study on Indian consumers”, Page No.7-
                      20, The ICFAIAN journal of Management Research, Vol.VII,
                      NO. 2, February 2008.
For Website:          Write the name of authentic website or official website of an
                      organization not the search engine like google or rediffmail
                      search.




ABBREVIATIONS

Try to avoid using any abbreviations, but if you have used any technical and standard
abbreviations then please mention their full form over here.

ANNEXURE:

It includes one copy of blank questionnaire, pamphlets, catalogue, photographs, price list
etc.




Important Note: The student should carry all his/her project related rough work,
data sheet, filled questionnaires to the institute ( internal project guide) as soon the
project training is over. The Student must keep all the project related material on
the day of the Final VIVA, external may ask the same as a proof.

You are advised to maintain a notebook of activities that you do each day.

You are not allowed to put the logo of the company on any of the page of the Report.




All the Best!!!



                                                                                         8

More Related Content

What's hot

Summer internship project report
Summer internship project reportSummer internship project report
Summer internship project reportManish Singh
 
HR Policies - Reliance Industries Ltd
HR Policies - Reliance Industries LtdHR Policies - Reliance Industries Ltd
HR Policies - Reliance Industries LtdObadia Lalthazuala
 
internship report document (3)
internship report document (3)internship report document (3)
internship report document (3)Raghda Al Saif
 
PTCL Six Weeks Internship report
PTCL Six Weeks Internship reportPTCL Six Weeks Internship report
PTCL Six Weeks Internship reportArshad_Iqbal096
 
Summer Internship Project report- Customer Satisfaction Analysis: Reliance S...
Summer Internship Project report-  Customer Satisfaction Analysis: Reliance S...Summer Internship Project report-  Customer Satisfaction Analysis: Reliance S...
Summer Internship Project report- Customer Satisfaction Analysis: Reliance S...Shubham Dasgupta
 
Project Report on Comparative Study Philips LED With Other Competitive Brands
Project Report on Comparative Study Philips LED With Other Competitive BrandsProject Report on Comparative Study Philips LED With Other Competitive Brands
Project Report on Comparative Study Philips LED With Other Competitive BrandsKapil Shelke
 
Infosys Case Study, Organizational Structure- Infosys
Infosys Case Study, Organizational Structure- InfosysInfosys Case Study, Organizational Structure- Infosys
Infosys Case Study, Organizational Structure- InfosysMidhu S V Unnithan
 
MBA Summer Internship Project Report
MBA Summer Internship Project ReportMBA Summer Internship Project Report
MBA Summer Internship Project Reportprateek tyagi
 
M.com Project Orientation, University of Mumbai
M.com Project Orientation, University of MumbaiM.com Project Orientation, University of Mumbai
M.com Project Orientation, University of MumbaiDr. Parveen Kaur Nagpal
 
Impact of Advertisements on Investors at HDFC Standard Life Insurance
Impact of Advertisements on Investors at HDFC Standard Life InsuranceImpact of Advertisements on Investors at HDFC Standard Life Insurance
Impact of Advertisements on Investors at HDFC Standard Life InsuranceProjects Kart
 
Recruitment and Selection Summer Internship Project Report
Recruitment and Selection Summer Internship Project ReportRecruitment and Selection Summer Internship Project Report
Recruitment and Selection Summer Internship Project ReportRahul Maheshwari
 
M&m (repaired)
M&m (repaired)M&m (repaired)
M&m (repaired)ashchanda
 
Blackbook Vijay mirgule
Blackbook Vijay mirguleBlackbook Vijay mirgule
Blackbook Vijay mirguleVijay Mirgule
 

What's hot (20)

My SIP Report
My SIP ReportMy SIP Report
My SIP Report
 
Summer internship project report
Summer internship project reportSummer internship project report
Summer internship project report
 
HR Policies - Reliance Industries Ltd
HR Policies - Reliance Industries LtdHR Policies - Reliance Industries Ltd
HR Policies - Reliance Industries Ltd
 
PROJECT ON AIRTEL
PROJECT ON AIRTELPROJECT ON AIRTEL
PROJECT ON AIRTEL
 
internship report document (3)
internship report document (3)internship report document (3)
internship report document (3)
 
PTCL Six Weeks Internship report
PTCL Six Weeks Internship reportPTCL Six Weeks Internship report
PTCL Six Weeks Internship report
 
PPT on Reliance-jio
PPT on  Reliance-jio PPT on  Reliance-jio
PPT on Reliance-jio
 
rjil_V2
rjil_V2rjil_V2
rjil_V2
 
Wipro
WiproWipro
Wipro
 
Summer Internship Project report- Customer Satisfaction Analysis: Reliance S...
Summer Internship Project report-  Customer Satisfaction Analysis: Reliance S...Summer Internship Project report-  Customer Satisfaction Analysis: Reliance S...
Summer Internship Project report- Customer Satisfaction Analysis: Reliance S...
 
Airtel
AirtelAirtel
Airtel
 
Summer internship Presentation
Summer internship PresentationSummer internship Presentation
Summer internship Presentation
 
Project Report on Comparative Study Philips LED With Other Competitive Brands
Project Report on Comparative Study Philips LED With Other Competitive BrandsProject Report on Comparative Study Philips LED With Other Competitive Brands
Project Report on Comparative Study Philips LED With Other Competitive Brands
 
Infosys Case Study, Organizational Structure- Infosys
Infosys Case Study, Organizational Structure- InfosysInfosys Case Study, Organizational Structure- Infosys
Infosys Case Study, Organizational Structure- Infosys
 
MBA Summer Internship Project Report
MBA Summer Internship Project ReportMBA Summer Internship Project Report
MBA Summer Internship Project Report
 
M.com Project Orientation, University of Mumbai
M.com Project Orientation, University of MumbaiM.com Project Orientation, University of Mumbai
M.com Project Orientation, University of Mumbai
 
Impact of Advertisements on Investors at HDFC Standard Life Insurance
Impact of Advertisements on Investors at HDFC Standard Life InsuranceImpact of Advertisements on Investors at HDFC Standard Life Insurance
Impact of Advertisements on Investors at HDFC Standard Life Insurance
 
Recruitment and Selection Summer Internship Project Report
Recruitment and Selection Summer Internship Project ReportRecruitment and Selection Summer Internship Project Report
Recruitment and Selection Summer Internship Project Report
 
M&m (repaired)
M&m (repaired)M&m (repaired)
M&m (repaired)
 
Blackbook Vijay mirgule
Blackbook Vijay mirguleBlackbook Vijay mirgule
Blackbook Vijay mirgule
 

Similar to Project report format

Summer training guidelines
Summer training guidelinesSummer training guidelines
Summer training guidelinestjoshi000
 
New product development on antivirus
New product development on antivirusNew product development on antivirus
New product development on antivirusPT Bipin Bhardwaj
 
project-report-formatbyvishal-120118002351-phpapp01.pdf
project-report-formatbyvishal-120118002351-phpapp01.pdfproject-report-formatbyvishal-120118002351-phpapp01.pdf
project-report-formatbyvishal-120118002351-phpapp01.pdfroystoncdsouza7
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial AnalysisKai Yun Pang
 
Guidelines for mentorship project report
Guidelines for mentorship project reportGuidelines for mentorship project report
Guidelines for mentorship project reportLKCH
 
Guidelines for mentorship project report
Guidelines for mentorship project reportGuidelines for mentorship project report
Guidelines for mentorship project reportLKCH
 
Summer training guidelines ppt
Summer training guidelines pptSummer training guidelines ppt
Summer training guidelines pptGurjar Patel
 
Project Plans Each student will submit two project plan.docx
Project Plans  Each student will submit two project plan.docxProject Plans  Each student will submit two project plan.docx
Project Plans Each student will submit two project plan.docxwkyra78
 
Fm august 2018 group assignment brief
Fm august 2018 group assignment briefFm august 2018 group assignment brief
Fm august 2018 group assignment briefashleyyeap
 
Prepared by Ms. Dalal Bamufleh .docx
Prepared by Ms. Dalal Bamufleh                           .docxPrepared by Ms. Dalal Bamufleh                           .docx
Prepared by Ms. Dalal Bamufleh .docxChantellPantoja184
 
Dr Robert Phaal - Technology roadmapping: a case study
Dr Robert Phaal - Technology roadmapping: a case studyDr Robert Phaal - Technology roadmapping: a case study
Dr Robert Phaal - Technology roadmapping: a case studyJIC
 
Pitch Deck Sample Nidhi prayash scheme 2024
Pitch Deck Sample Nidhi prayash scheme 2024Pitch Deck Sample Nidhi prayash scheme 2024
Pitch Deck Sample Nidhi prayash scheme 2024BhushanMeshram5
 
6 weeks trg_report_format
6 weeks trg_report_format6 weeks trg_report_format
6 weeks trg_report_formatAshwani Gupta
 
Олена Петращук - When should you say “no” to your clients for starting develo...
Олена Петращук - When should you say “no” to your clients for starting develo...Олена Петращук - When should you say “no” to your clients for starting develo...
Олена Петращук - When should you say “no” to your clients for starting develo...Lviv Startup Club
 
Project report-format by vishal
Project report-format by vishalProject report-format by vishal
Project report-format by vishalvishal18900
 
A report on Statistical Questionnaire
A report on Statistical QuestionnaireA report on Statistical Questionnaire
A report on Statistical QuestionnairePranab Ghosh
 
HMD project.docx
HMD project.docxHMD project.docx
HMD project.docxbkbk37
 
Project Guidance and Project flow for UG & PG candidates
Project Guidance and Project flow for UG & PG candidatesProject Guidance and Project flow for UG & PG candidates
Project Guidance and Project flow for UG & PG candidatespradeep kumar
 
Table of Contents .docx
Table of Contents                                          .docxTable of Contents                                          .docx
Table of Contents .docxmattinsonjanel
 

Similar to Project report format (20)

Summer training guidelines
Summer training guidelinesSummer training guidelines
Summer training guidelines
 
New product development on antivirus
New product development on antivirusNew product development on antivirus
New product development on antivirus
 
project-report-formatbyvishal-120118002351-phpapp01.pdf
project-report-formatbyvishal-120118002351-phpapp01.pdfproject-report-formatbyvishal-120118002351-phpapp01.pdf
project-report-formatbyvishal-120118002351-phpapp01.pdf
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 
Guidelines for mentorship project report
Guidelines for mentorship project reportGuidelines for mentorship project report
Guidelines for mentorship project report
 
Guidelines for mentorship project report
Guidelines for mentorship project reportGuidelines for mentorship project report
Guidelines for mentorship project report
 
Summer training guidelines ppt
Summer training guidelines pptSummer training guidelines ppt
Summer training guidelines ppt
 
Project Plans Each student will submit two project plan.docx
Project Plans  Each student will submit two project plan.docxProject Plans  Each student will submit two project plan.docx
Project Plans Each student will submit two project plan.docx
 
Fm august 2018 group assignment brief
Fm august 2018 group assignment briefFm august 2018 group assignment brief
Fm august 2018 group assignment brief
 
Prepared by Ms. Dalal Bamufleh .docx
Prepared by Ms. Dalal Bamufleh                           .docxPrepared by Ms. Dalal Bamufleh                           .docx
Prepared by Ms. Dalal Bamufleh .docx
 
Dr Robert Phaal - Technology roadmapping: a case study
Dr Robert Phaal - Technology roadmapping: a case studyDr Robert Phaal - Technology roadmapping: a case study
Dr Robert Phaal - Technology roadmapping: a case study
 
Pitch Deck Sample Nidhi prayash scheme 2024
Pitch Deck Sample Nidhi prayash scheme 2024Pitch Deck Sample Nidhi prayash scheme 2024
Pitch Deck Sample Nidhi prayash scheme 2024
 
Chp 6
Chp 6Chp 6
Chp 6
 
6 weeks trg_report_format
6 weeks trg_report_format6 weeks trg_report_format
6 weeks trg_report_format
 
Олена Петращук - When should you say “no” to your clients for starting develo...
Олена Петращук - When should you say “no” to your clients for starting develo...Олена Петращук - When should you say “no” to your clients for starting develo...
Олена Петращук - When should you say “no” to your clients for starting develo...
 
Project report-format by vishal
Project report-format by vishalProject report-format by vishal
Project report-format by vishal
 
A report on Statistical Questionnaire
A report on Statistical QuestionnaireA report on Statistical Questionnaire
A report on Statistical Questionnaire
 
HMD project.docx
HMD project.docxHMD project.docx
HMD project.docx
 
Project Guidance and Project flow for UG & PG candidates
Project Guidance and Project flow for UG & PG candidatesProject Guidance and Project flow for UG & PG candidates
Project Guidance and Project flow for UG & PG candidates
 
Table of Contents .docx
Table of Contents                                          .docxTable of Contents                                          .docx
Table of Contents .docx
 

Recently uploaded

ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...FIDO Alliance
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfFIDO Alliance
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessUXDXConf
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfFIDO Alliance
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentationyogeshlabana357357
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FIDO Alliance
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPTiSEO AI
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe中 央社
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIES VE
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101vincent683379
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024Stephanie Beckett
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandIES VE
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastUXDXConf
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftshyamraj55
 
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxJennifer Lim
 
PLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsPLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsStefano
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireExakis Nelite
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfUK Journal
 
Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge
 

Recently uploaded (20)

ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & Ireland
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at Comcast
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
 
PLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsPLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. Startups
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024
 

Project report format

  • 1. K J EDUCATIONAL INSTITUTE’S TIMR / TCOER Approved by AICTE, Government of Maharashtra & Affiliated to University of Pune. PROJECT REPORT FORMAT All Students should strictly follow the following standards for preparation of Project Report. Sr.No Specifications Details 1 Number of copies of project report 3 ( Three) 2 Binding Black color hard binding 3 Embossing Golden Color 4 Page size A4 5 Page color White 6 Left Margin 1.5 inch 7 Other Margins ( Top, Bottom, Right) 1 inch 8 Headings Font Times New Roman 9 Headings Fond Size 14, bold, uppercase 10 Subheadings Font Times New Roman 11 Subheadings Font Size 12, bold, uppercase 12 Text Body Font Times New Roman 13 Text Body Font Size 12, normal, lower case 14 Header As suitable (No Company Logos allowed) 15 Footer Page Numbers at centre 16 Total number of pages Approx. in between 55 to 95 FRONT PAGE Golden embossing on black background hard bound copy. For this page you can use any professional font of any relative size to make it more attractive. This page should include the following points. 1. Project title 2. Name of the company 3. Submitted to 4. Submitted by 5. Batch 6. College name and address. 1
  • 2. For example : A PROJECT REPORT ON “MARKET SURVEY AND ANALYSIS OF CUSTOMER FEEDBACK FOR NEWLY LAUNCHED FOUR WHEELER – SWIFT” FOR MARUTI UDYOG LTD. SUBMITTED TO UNIVERSITY OF PUNE IN PARTIAL FULFILLMENT OF TWO YEARS FULL TIME MASTERS DEGREE IN BUSINESS ADMINISTRATION (MBA) SUBMITTED BY PIYUSH PATIL (BATCH – 2009-2011) KJEI’s TRINITY COLLEGE OF ENGINEERING & RESEARCH (MBA Prog), OR TRINITY INSTITUTE OF MANAGEMENT RESEARCH. INSIDE 1ST PAGE This page will be nothing but the complete copy of front page as it is. Only instead of golden color you have to use any other color or combination of different colors. 2
  • 3. COMPANY CERTIFICATE This certificate must be printed on company’s original letter head. It should include the following points 1. Name of the student 2. Project title 3. Duration of project ( minimum 50 working days) 4. Location 5. Authority sign and company seal. For example: BANK OF MAHARASHTRA PIMPRI BRANCH, PUNE., 27272765, FAX – (020)27272766, Ref.No. Date: TO WHOMSOEVER IT MAY CONCERN This is to certify that Mr. Omkar Patwardhan a MBA Student of TRINITYCOLLEGE OF ENGINEERING & RESEARCH , Pune has undergone training and completed a project on “Evaluation of Credit Risk Rating Framework” In Pune region. He has carried out this project for Bank of Maharashtra from 15/05/2010 to / /2010. In the span of project duration his candidature was found to be very sincere & hardworking. We wish him a bright future. Seal (sign) Mr, R.K.Tripathi Branch Manager Bank of Maharashtra. 3
  • 4. COLLEGE CERTIFICATE: This certificate will be issued by the college later on when you rejoin college in IIIrd Semester (one copy to each student will be given). You have to make at least 2 Xerox of it for other 2 copies of project report. ACKNOWLEDGEMENT: This page will include vote of thanks in following Chronology 1. Company project guide 2. Director (TIMR) or Principal (TCOER) 3. College project guide 4. Other staff & friends ( if any) INDEX: SR. TOPIC PAGE NO. No. 1. Executive Summary 2. Objectives & Scope of the project 3. Company Profile 4. Product Profile ( As Applicable) 5. Theoretical Background 6. Research Methodology 7. Data Analysis & Interpretation 8. Limitations of the Project 9. Conclusion & Suggestions 10. Bibliography “UP TO THIS PAGE DON’T PUT PAGE NUMBERS”. 4
  • 5. EXECUTIVE SUMMARY: (One page only) This should include Introduction & objectives of the project, reasons for selection of company, selection of project, and research design of the project (i.e. procedure you have used to carry out the project). Also you have to mention brief conclusions of the project. (One paragraph on each chapter) OBJECTIVES & SCOPE OF THE PROJECT: 1. Objectives of the project 2. Scope: in terms of practical implication of the project. (Not only in terms geographical scope.) COMPANY PROFILE: This should include 1. Complete name & Address of the company 2.Mission statement, vision, slogan, logo if any. 3. Historical developments of the company 4.Achievements and financial result of the company if any. 5.Organizational chart 6. List of competitors 7.Branches & offices 8.Building photographs (if any). PRODUCT PROFILE: this should include Details of the products with different ranges of the products & photographs of the products (if any) THEREOTICAL BACKGROUND: It should include Application of different relative concepts of the concern subjects topic & their correlation with respect to your project like: For Marketing: Market segmentation, Target Marketing, PLC, New product development, marketing planning, classification of markets, market competition, promotional mix, Distribution channels, services marketing, sales promotion schemes, supply chain management, customer relationship management, Business ethics, consumer behaviour, law of demand & supply, AIDA model etc. 5
  • 6. For Finance: Ratio analysis, risk management, legal aspects ,funds flow statements, country risks analysis, investment decisions, capital budgeting, cost analysis, analysis of financial position of company, TDS, International finance, balance sheet, Portfolio management, import –export procedures and tax implications etc. For HR: Training & development, Recruitment & selection process, performance appraisal system, motivational tools, manpower planning, labour laws, grievance handling procedures, Interview techniques, etc. RESEARCH METHODOLOGY: It should include 1. Definition of Research 2. Types of research in brief and the category of research applicable to your project. 3. Different methods of data collection in short and justification for the method adopted by you. 4. Sources of primary data & secondary data you have used for your project. 5. Sample size for your project. 6. Method of data analysis you have used for your project. DATA ANALYSIS & INTERPRETATION: This is the major & most important part of the project. It should contain the analysis of all those questions asked to the respondents through the questionnaire. Use appropriate bar charts/ pie charts/ graphs/ table/ line diagram/ frequency curve etc. For Example: Satisfaction level of the customers Sr.No. Level of Satisfaction No. of Customers Percentage 1 Satisfied 130 65 2 Highly Satisfied 30 15 3 Dissatisfied 20 10 4 Highly Dissatisfied 10 5 5 No Response 10 5 6
  • 7. Level of Satisfaction of Customers(%) 70 No.of Customers 60 50 40 30 20 10 0 satisfied Highly Satisfied Dissatisfied Highly No response dissatisfied Satisfaction Level Finding & Interpretation: 65% of customers are satisfied with the product due to best quality of the product. -------------------------------- -------------------------------- -------------------------------- It has been observed that 5% customers are non respondent as they were busy with the other works. Data Analysis (for Finance): Do the data analyses as shown above, only you have to choose appropriate methods for analysis like ratio analysis, cash flow, comparative analysis, operating cycle study etc. LIMITATIONS OF THE PROJECT: No project is ideal. In reality the researcher always come across different problems which acts as limitations of the project such as – 1.Biased reply of the respondents 2.Non availability of data or other relevant information 3.Time constraints 4. Budget constraints 5.Company’s policy that not to disclose confidential data. Etc. CONCLUSION AND RECOMMENDATION While concluding student should take care that his conclusion is matching with the title of the project and objectives set in the project. Student has to give different suggestions to the company which will act as solution to all those problems researcher has identified with product or services or methods applied. 7
  • 8. BIBLIOGRAPHY: (This will be the last page of the project) It includes – references, books and research journals used, web sites, newspapers etc. For example: For Books: C.R.Kothari, Research Methodology, Methods & Techniques, New Age International Publisher, edition II, 2004. For Research Journal: Mridula S Mishra and Umakant Dash, “Importance of Retail Service Attributes: A study on Indian consumers”, Page No.7- 20, The ICFAIAN journal of Management Research, Vol.VII, NO. 2, February 2008. For Website: Write the name of authentic website or official website of an organization not the search engine like google or rediffmail search. ABBREVIATIONS Try to avoid using any abbreviations, but if you have used any technical and standard abbreviations then please mention their full form over here. ANNEXURE: It includes one copy of blank questionnaire, pamphlets, catalogue, photographs, price list etc. Important Note: The student should carry all his/her project related rough work, data sheet, filled questionnaires to the institute ( internal project guide) as soon the project training is over. The Student must keep all the project related material on the day of the Final VIVA, external may ask the same as a proof. You are advised to maintain a notebook of activities that you do each day. You are not allowed to put the logo of the company on any of the page of the Report. All the Best!!! 8