DESIGN AND DETAILINGOF FLAT SLABESE SOEDARSONO HS27 FEBRUARY 2002
CONTENT 
•Introduction 
•Benefits 
•Design Considerations 
•Design Methodology 
•Analysis of Flat Slab 
•Detailing
INTRODUCTION 
What is a flat slab? 
•a reinforced concrete slab supported directly by concrete columns without the use of beams
INTRODUCTIONFlat slabFlat slab with drop panelsFlat slab with column headFlat slab with drop panel and column head
INTRODUCTION 
Uses of column heads : 
•increase shear strength of slab 
•reduce the moment in the slab by reducing the clear or effective spanFlat slab with column head
INTRODUCTION 
Uses of drop panels : 
•increase shear strength of slab 
•increase negative moment capacity of slab 
•stiffen the slab and hence reduce deflection
BENEFITS
BENEFITS 
•Flexibility in room layout 
•Saving in building height 
•Shorter construction time 
•Ease of installation of M&E services 
•Prefabricated welded mesh 
•Buildable score
Benefits . . . 
FLEXIBILITY IN ROOM LAYOUT 
•allows Architect to introduce partition walls anywhere required 
•allows owner to change the size of room layout 
•allows choice of omitting false ceiling and finish soffit of slab with skim coating
Benefits . . . 
SAVING IN BUILDING HEIGHT 
•Lower storey height will reduce building weight due to lower partitions and cladding to façade 
•approx. saves 10% in vertical members 
•reduce foundation load SlabSlabBeamBeam3.4m3.4m2.8m2.8mConventionalConventionalSlabSlab3.2m3.2m2.8m2.8mBeam-FreeBeam-Free
Benefits . . . 
SHORTER CONSTRUCTION TIME 
flat plate design will 
facilitate the use of 
big table formwork to 
increase productivity
Benefits . . . 
SINGLE SOFFIT LEVELLiving RoomLiving RoomToiletToiletShowerShowerKitchenKitchenYardYard30307575260260303030303030BalconyBalcony 
155 
FlatPlate Slab 
Single Level 
Ceiling 
• Simplified the table formwork needed
Benefits . . . 
EASE OF INSTALLATION 
OF M&E SERVICES 
•all M & E services can be mounted directly on the underside of the slab instead of bending them to avoid the beams 
•avoids hacking through beams
Benefits . . . 
PRE-FABRICATED WELDED MESH•control•Prefabricated in standard sizes•Minimised installation time•Better quality control
Benefits . . . 
BUILDABLE SCORE 
•allows standardized structural members and prefabricated sections to be integrated into the design for ease of construction 
•this process will make the structure more buildable, reduce the number of site workers and increase the productivity at site 
•more tendency to achieve a higher Buildable score
DESIGN 
CONSIDERATIONS
Design Considerations. . . . 
WALL AND COLUMN POSITION 
•Locate position of wall tomaximisethe structural stiffness for 
lateral loads 
•Facilitates the rigidity to be located to thecentreof buildingTypical floor plan of Compass the Elizabeth
Design Considerations. . . . 
OPTIMISATION OF STRUCTURAL LAYOUT PLAN 
•the sizes of vertical and structural structural members can be optimised to keep the volume of concrete for the entire superstructure inclusive of walls and lift cores to be in the region of 0.4 to 0.5 m3per square metre 
•this figure is considered to be economical and comparable to an optimum design in conventional of beam and slab systems
Design Considerations. . . . 
DEFLECTION CHECK 
•necessary to include checking of the slab deflection for all load cases both for short and long term basis 
•In general, under full service load, δ< L/250 or 40 mm whichever is smaller 
•Limit set to prevent unsightly occurrence of cracks on non-structural walls and floor finishes
Design Considerations. . . . 
CRACK CONTROL 
•advisable to perform crack width calculations based on spacing of reinforcement as detailed and the moment envelope obtained from structural analysis 
•good detailing of reinforcement will 
–restrict the crack width to within acceptable tolerances as specified in the codes and 
–reduce future maintenance cost of the building
Design Considerations. . . . 
FLOOR OPENINGS 
•No opening should encroach upon a column head or drop 
•Sufficient reinforcement must be provided to take care of stress concentration
Design Considerations. . . . 
PUNCHING SHEAR 
•always a critical consideration in flat plate design around the columns 
•instead of using thicker section, shear reinforcement in the form of shear heads, shear studs or stirrup cages may be embedded in the slab to enhance shear capacity at the edges of walls and columns
Design Considerations. . . . 
PUNCHING SHEARShear StudsShear Studs
Design Considerations. . . . 
CONSTRUCTION LOADS 
•critical for fast track project where removal of forms at early strength is required 
•possible to achieve 70% of specified concrete cube strength within a day or two by using high strength concrete 
•alternatively use 2 sets of forms
Design Considerations. . . . 
LATERAL STABILITY 
•buildings with flat plate design is generally less rigid 
•lateral stiffness depends largely on the configuration of lift core position, layout of walls and columns 
•frame action is normally insufficient to resist lateral loads in high rise buildings, it needs to act in tendam with walls and lift cores to achieve the required stiffness
Design Considerations. . . . 
LATERAL STABILITY 
MULTIPLE FUNCTION PERIMETER BEAMS•adds lateral rigidity•reduce slab deflection
DESIGN 
METHODOLOGY
Design methodology .. . 
METHODS OF DESIGN 
•the finite element analysis 
•the simplified method 
•the equivalent frame method
Design methodology .. . 
FINITE ELEMENT METHOD 
•Based upon the division of complicated structures into smaller and simpler pieces (elements) whose behaviour can be formulated. 
•E.g of software includes SAFE, ADAPT, etc 
•results includes 
–moment and shear envelopes 
–contour of structural deformation
Structural Analysis .. .
Structural Analysis .. .
Structural Analysis .. .
Structural Analysis .. .
Structural Analysis .. .
Design methodology .. . 
SIMPLIFIED METHOD 
Table 3.19 may be used provided•Live load > 1.25 Dead load•Live load (excluding partitions) > 5KN/m2•there are at least 3 rows of panels of approximately equal span in direction considered•lateral stability is independent of slab column connections
Design methodology .. .. 
SIMPLIFIED METHOD 
Table 3.19: BM and SF coefficients for flat slab or 3 or more equal spansOuter SupportColumnWallNear centreof 1st spanFirst interiorspanCentre ofinteriorspanInteriorspanMoment-0.04Fl*0.086Fl0.083Fl*-0.063Fl0.071Fl-0.055FlShear0.45F0.4F-0.6F-0.5FTotalcolumnmoments0.04Fl--0.022Fl-0.022Fl* the design moments in the edge panel may have to be adjusted according to 3.7.4.3F is the total design ultimate load on the strip of slab between adjacent columns considered(1.4gk + 1.6 qk) lis the effective span
Design methodology .. . 
EQUIVALENT FRAME METHOD 
•most commonly used method 
•the flat slab structure is divided longitudinally and transversely into frames consisting of columns and strips of slabs with : 
–stiffness of members based on concrete alone 
–for vertical loading, full width of the slab is used to evaluate stiffness 
–effect of drop panel may be neglected if dimension < lx/3
Design methodology .. . 
EQUIVALENT FRAME METHOD 
Plan of floor slab 
Step 1 : define line of support in X & Y directions
Design methodology .. . 
EQUIVALENT FRAME METHOD910109.20.8DESIGN STRIP IN PROTOTYPE91010.610.50.8STRAIGHTENED DESIGN STRIPDESIGN STRIP IN ELEVATION 
Step 2 : define design strips in X & Y directions
ANALYSIS OF 
FLAT SLAB
Analysis of flat slab.. 
COLUMN HEADlholh maxlcdh(i)lh= lh, maxlholh maxlcdh(ii)lh= lhoEffective dimension of a head , where lho = actual dimension, lh max= lc+ 2(dh-40) lh (mm)= lesser of lho orlh max
Analysis of flat slab.. 
COLUMN HEADlholh maxlcdh(iv)lh= lholholh maxlcdh40(iii)lh= lh, maxFor circular column or column head, effective diameter ,hc= 4 x area/Îż< 0.25 lx
Analysis of flat slab.. 
DIVISION OF PANELS 
The panels are divided into ‘column strips’ and middle strips’ in both direction. 
(a)Slab Without Dropslx/4 Column strip Column striplx/4lx/4lx/4middle strip (ly-lx/2) middlestrip lx (shorter span) ly (longer span)
Analysis of flat slab.. 
lx Dropmiddle strip (ly-drop size) lx/4Column strip = drop sizemiddlestriply (longer span) note : ignore drop if dimension is less than lx/3 Drop (b)Slab With Drops
Analysis of flat slab.. 
MOMENT DIVISIONApportionment between columnand middle strip expressed as % of the total negative designmomentColumn stripMiddle stripNegative75%25% Positive55%45% •Note : For slab with drops where the width of the middle strip exceeds L/2, the distribution of moment in the middle strip should be increased in proportion to its increased width and the momentresisted by the column strip should be adjusted accordingly.
Analysis of flat slab.. 
MOMENT DIVISION -EXAMPLE 
6000 
6000 
6000 
6000 
6000 
5000 
Layout of building 
7000 
5000 
A floor slab in a building where stability is provided by shear walls in one direction (N-S). The slab is without drops and is supported internally and on the external long sides by square columns . The imposed loading on the floor is 5 KN/m2and an allowance of 2.5KN/m2for finishes, etc. fcu = 40 KN/m2, fy = 460KN/m2
Analysis of flat slab.. 
MOMENT DIVISION -EXAMPLE250030002500 
6000 
6000600060005000700025001500275040001250 
3500 
3000 
3500 
Division of panels into strips in x and y direction
Analysis of flat slab.. 
MOMENT DIVISION -EXAMPLE 
6000250035003000300025003500 
60003520020036920020035 
Column strip 
exterior support = 0.75*35 on 2.5m strip = 10.5Knm 
centre of 1st span= 0.55*200 on 2.5 strip = 44KNm 
1st interior support = 0.75*200 on 3m strip = 50KNm 
centre of interior span = 0.55 *369 on 3m strip = 67.7KNm 
Middle strip 
exterior support = 0.25*35 on 2.5m strip = 3.5KNm 
centre of 1st span= 0.45*200 on 2.5 strip = 36KNm 
1st interior support = 0.25*200 on 3m strip = 16.7KNm 
centre of interior span = 0.45 *369 on 3m strip = 55.4KNm
Analysis of flat slab.. 
DESIGN FOR BENDING 
INTERNAL PANELS 
•columns and middle strips should be designed to withstand design moments from analysis
Analysis of flat slab.. 
DESIGN FOR BENDING 
EDGE PANELS•apportionment of moment exactly the same as internal columns•max. design moment transferable between slab and edge column by a column strip of breadth beis < 0.5 design moment (EFM) < 0.7 design moment (FEM) Otherwise structural arrangements shall be changed. Mt, max= 0.15 bed2fcu
Analysis of flat slab.. 
PUNCHING SHEAR 
1.CalculateVeff =kVt at column perimeter (approx. equal span) 
Vt = SF transferred from slab 
k = 1.15 for internal column, 1.25 corner columns and edge columns where M acts parallel to free edge and 1.4 for edge columns where M acts at right angle to free edge 
2.Determine vmax= Veff /uodwhere uo is the length of column perimeter 
Check vma < 0.8fcu or 5 N/mm2 
3.Determine v=(Veff -V/ud)where uis the length of perimeter A and V is the column load and checkv< vc 
4.Repeat step 3 for perimeter B and CColumn perimeterPerimeter APerimeter B3d23d4Column perimeterPerimeter APerimeter BPerimeter C3d23d43d4)lx/3
Analysis of flat slab.. 
DEFLECTION 
(i) use normal span/effective depth ratio if drop width >1/3 span each way; otherwise(ii) to apply 0.9modification factor for flat slab, orwhere drop panel width < L/31.0otherwiseSpan/depth ratioCantilever7Simply supported20Continuous26
Holes in areas bounded by the column stripsmay be formedproviding : •greatest dimension < 0.4 span lengthand•total positive and negative moments are redistributed between the remaining structure to meet the changed conditionsOPENINGSAnalysis Analysis of flat slab.. ly (longer span) lx (shorter span)
OPENINGSAnalysis Analysis of flat slab.. Holes in areas common to two column stripsmay be formed providing : •that their aggregate their length or width does not exceed one-tenth of the width of the column strip; •that the reduced sections are capable of resisting with the moments; and•that the perimeter for calculating the design shear stress is reduced if appropriately (longer span) lx (shorter span)
OPENINGSAnalysis Analysis of flat slab.. ly (longer span) lx (shorter span) 
Holes in areas common to the column strip and the middle stripmay 
be formed providing : 
•that in aggregate their length or width does not exceed one-quarter of the width of the column strip and 
•that the reduced sections are capable of resisting the design moments
OPENINGSAnalysis Analysis of flat slab.. 
For all other cases of openings, it should be framed on 
all sides with beams to carry the loads to the columns.
DETAILING OF 
FLAT SLAB
Detailing of flat slab .. . 
TYPE OF REINFORCEMENT 
F-mesh-A mesh formed by main wire with cross wire 
at a fixed spacing of 800 mm 
mesh - #Main wire-hard drawn ribbed wire with diameter and 
spacing as per design 
wire - #Cross wire-hard drawn smooth wire as holding wire 
wire - H8-800mm c/c for main wire diameter > 10mm 
H7-800mm c/c for main wire diameter of 10mm 
and below
Detailing of flat slab .. . 
TYPE OF REINFORCEMENT Main WireHolding WireF-Mesh 2Holding Wire (800mm c/c) Main WireF-Mesh 1
TensionLap = 45 dia. Holding WireMain Wire
Holding WireMain WireMainWirePlan View of Mesh LayoutPlan Layout
F -MeshMain WireCross Wire
F -MeshMain WireCross Wire
Detailing of flat slab .. . 
REINFORCEMENT 
FOR INTERNAL PANELS 
•Reinforcement are arranged in 2 directions parallel to each span; and 
•2/3 of the reinforcement required to resist negative moment in the column strip must be placed in the centre half of the strip 
•for slab with drops, the top reinforcement should be placed evenly across the column strip
STANDARD LAPPING OF MESH 
(FOR FLAT SLAB)
TYPICAL DETAIL SHOWING RECESS AT SLAB SOFFIT FOR SERVICES
TYPICAL SECTION AT STAIRCASE
DETAILS OF INSPECTION CHAMBER 
AT APRON
DETAILS OF INSPECTION CHAMBER AT APRON
DETAILS OF INSPECTION CHAMBER AT APRON
DETAILS OF INSPECTION CHAMBER AT APRON
DETAILS OF INSPECTION CHAMBER AT PLAY AREA
1ST STOREY (DWELLING UNIT) SLAB DETAILS OF HOUSEHOLD SHELTER
TYPICAL DETAILS OF 125X250 RC CHANNEL FOR GAS PIPE ENTRY
TYPICAL SECTION 
THRU’ COVERED HOUSEDRAIN (PRECAST)

More Related Content

What's hot

Advance structural system. pptx
Advance structural system. pptxAdvance structural system. pptx
Advance structural system. pptxShivani Nandgowle
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)Waseem Akbar
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildingsAnas Adel
 
Space frames
Space framesSpace frames
Space framesBnv Aditya
 
Shear wall ppt
Shear wall ppt Shear wall ppt
Shear wall ppt Akash Pandey
 
Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
Earthquake Resistance planning
Earthquake Resistance planningEarthquake Resistance planning
Earthquake Resistance planningSumanta Das
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 
slab concrete
slab concreteslab concrete
slab concretesrwsh ahmad
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdfZeinab Awada
 
PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE524001
 
TYPE OF STEEL TRUSS
TYPE OF STEEL TRUSSTYPE OF STEEL TRUSS
TYPE OF STEEL TRUSSBhavishyaPahwa1
 

What's hot (20)

Foundations
FoundationsFoundations
Foundations
 
flat Slab
flat Slabflat Slab
flat Slab
 
R.C.C. STAIRS
R.C.C. STAIRSR.C.C. STAIRS
R.C.C. STAIRS
 
Advance structural system. pptx
Advance structural system. pptxAdvance structural system. pptx
Advance structural system. pptx
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Space frames
Space framesSpace frames
Space frames
 
Shear wall ppt
Shear wall ppt Shear wall ppt
Shear wall ppt
 
Structural System in High Rise building
Structural System in High Rise buildingStructural System in High Rise building
Structural System in High Rise building
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Earthquake Resistance planning
Earthquake Resistance planningEarthquake Resistance planning
Earthquake Resistance planning
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
slab concrete
slab concreteslab concrete
slab concrete
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
 
Shell structure
Shell structureShell structure
Shell structure
 
CONSTRUCTION OF DOMES
CONSTRUCTION OF DOMESCONSTRUCTION OF DOMES
CONSTRUCTION OF DOMES
 
PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE
 
TYPE OF STEEL TRUSS
TYPE OF STEEL TRUSSTYPE OF STEEL TRUSS
TYPE OF STEEL TRUSS
 
Steel structures
Steel structuresSteel structures
Steel structures
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 

Viewers also liked

Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle SlabAkshay Gawade
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systemsMuftah Aljoat
 
Punching Shears 1.1
Punching Shears 1.1Punching Shears 1.1
Punching Shears 1.1Milan Stanic
 
Flat slab and it's importance
Flat slab and it's importanceFlat slab and it's importance
Flat slab and it's importanceGEOMIND
 
Climate Responsive Architecture Finalpdf
Climate Responsive Architecture FinalpdfClimate Responsive Architecture Finalpdf
Climate Responsive Architecture FinalpdfAnkita Kolamkar
 
Two way slab by Rashedul kabir
Two way slab by Rashedul kabirTwo way slab by Rashedul kabir
Two way slab by Rashedul kabirbadhanxy
 
Two way slab
Two way slabTwo way slab
Two way slabillpa
 
Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frameSatish Kambaliya
 
Foot bridge presentation
Foot bridge presentationFoot bridge presentation
Foot bridge presentationTausif Kauswala
 
introduction of intze tank
introduction of intze tankintroduction of intze tank
introduction of intze tankjenish patel
 
Chapter 1 introduction of building construction
Chapter 1 introduction of building constructionChapter 1 introduction of building construction
Chapter 1 introduction of building constructionKHUSHBU SHAH
 
Retaining wall - design of reinforced concrete structure
Retaining wall - design of reinforced concrete structureRetaining wall - design of reinforced concrete structure
Retaining wall - design of reinforced concrete structureKavin Raval
 
Counterfort Retaining Wall
Counterfort Retaining WallCounterfort Retaining Wall
Counterfort Retaining WallKaizer Dave
 

Viewers also liked (20)

DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
235562808 coffered-slab
235562808 coffered-slab235562808 coffered-slab
235562808 coffered-slab
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
Punching Shears 1.1
Punching Shears 1.1Punching Shears 1.1
Punching Shears 1.1
 
Flat slab and it's importance
Flat slab and it's importanceFlat slab and it's importance
Flat slab and it's importance
 
Climate Responsive Architecture Finalpdf
Climate Responsive Architecture FinalpdfClimate Responsive Architecture Finalpdf
Climate Responsive Architecture Finalpdf
 
Two way slab by Rashedul kabir
Two way slab by Rashedul kabirTwo way slab by Rashedul kabir
Two way slab by Rashedul kabir
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frame
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Foot bridge presentation
Foot bridge presentationFoot bridge presentation
Foot bridge presentation
 
introduction of intze tank
introduction of intze tankintroduction of intze tank
introduction of intze tank
 
Ppv ppt
Ppv pptPpv ppt
Ppv ppt
 
Chapter 1 introduction of building construction
Chapter 1 introduction of building constructionChapter 1 introduction of building construction
Chapter 1 introduction of building construction
 
Retaining wall - design of reinforced concrete structure
Retaining wall - design of reinforced concrete structureRetaining wall - design of reinforced concrete structure
Retaining wall - design of reinforced concrete structure
 
Hollow core slabs
Hollow core slabsHollow core slabs
Hollow core slabs
 
Hollow Floor Slab
Hollow Floor SlabHollow Floor Slab
Hollow Floor Slab
 
Counterfort Retaining Wall
Counterfort Retaining WallCounterfort Retaining Wall
Counterfort Retaining Wall
 

Similar to Flat slab design

presentation on flat plate
 presentation on flat plate presentation on flat plate
presentation on flat platesharifulaust
 
shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )sharifulaust
 
Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code Sandeep Yadav
 
MULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGMULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGManoj Navneeth
 
PRESENTATION 3 - Copy.pptx
PRESENTATION 3 - Copy.pptxPRESENTATION 3 - Copy.pptx
PRESENTATION 3 - Copy.pptxkuba9
 
Medium span rcc flooring systems
Medium span rcc flooring systemsMedium span rcc flooring systems
Medium span rcc flooring systemsRishikesh Kalal
 
INTERNSHIP (5).pptx
 INTERNSHIP (5).pptx INTERNSHIP (5).pptx
INTERNSHIP (5).pptxkartik395517
 
Analysis and Design of G+3 building with flat slab using STAAD PRO V8i M F-1....
Analysis and Design of G+3 building with flat slab using STAAD PRO V8i M F-1....Analysis and Design of G+3 building with flat slab using STAAD PRO V8i M F-1....
Analysis and Design of G+3 building with flat slab using STAAD PRO V8i M F-1....ManoharManu993491
 
Shear wall design - muros de corte Etabs
Shear wall design - muros de corte EtabsShear wall design - muros de corte Etabs
Shear wall design - muros de corte Etabscastigadordekill
 
Design of concrete Structure 2
Design of concrete Structure 2Design of concrete Structure 2
Design of concrete Structure 2SHARIQUE AHMAD
 
Analysisanddesignofamulti storey staad pro.
Analysisanddesignofamulti storey staad pro.Analysisanddesignofamulti storey staad pro.
Analysisanddesignofamulti storey staad pro.CADmantra Technologies
 
UMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxUMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxPraveendubey82
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Bhishma Bhatti
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabDivineGraceFernando
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsDP NITHIN
 
Analysis and Design of G+3 shopping complex
Analysis and Design of G+3 shopping complexAnalysis and Design of G+3 shopping complex
Analysis and Design of G+3 shopping complexDhananjay Singh
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
ADCS Full ppt-Lec 1-5 - Copy.pptx
ADCS Full ppt-Lec 1-5 - Copy.pptxADCS Full ppt-Lec 1-5 - Copy.pptx
ADCS Full ppt-Lec 1-5 - Copy.pptxfdpnitkce19
 
Flat_slab.pptx
Flat_slab.pptxFlat_slab.pptx
Flat_slab.pptxssuserdd13b81
 

Similar to Flat slab design (20)

presentation on flat plate
 presentation on flat plate presentation on flat plate
presentation on flat plate
 
shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )
 
Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code
 
MULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGMULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKING
 
PRESENTATION 3 - Copy.pptx
PRESENTATION 3 - Copy.pptxPRESENTATION 3 - Copy.pptx
PRESENTATION 3 - Copy.pptx
 
Medium span rcc flooring systems
Medium span rcc flooring systemsMedium span rcc flooring systems
Medium span rcc flooring systems
 
INTERNSHIP (5).pptx
 INTERNSHIP (5).pptx INTERNSHIP (5).pptx
INTERNSHIP (5).pptx
 
Analysis and Design of G+3 building with flat slab using STAAD PRO V8i M F-1....
Analysis and Design of G+3 building with flat slab using STAAD PRO V8i M F-1....Analysis and Design of G+3 building with flat slab using STAAD PRO V8i M F-1....
Analysis and Design of G+3 building with flat slab using STAAD PRO V8i M F-1....
 
Shear wall design - muros de corte Etabs
Shear wall design - muros de corte EtabsShear wall design - muros de corte Etabs
Shear wall design - muros de corte Etabs
 
Design of concrete Structure 2
Design of concrete Structure 2Design of concrete Structure 2
Design of concrete Structure 2
 
Analysisanddesignofamulti storey staad pro.
Analysisanddesignofamulti storey staad pro.Analysisanddesignofamulti storey staad pro.
Analysisanddesignofamulti storey staad pro.
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
UMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxUMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptx
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slab
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
 
Analysis and Design of G+3 shopping complex
Analysis and Design of G+3 shopping complexAnalysis and Design of G+3 shopping complex
Analysis and Design of G+3 shopping complex
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
ADCS Full ppt-Lec 1-5 - Copy.pptx
ADCS Full ppt-Lec 1-5 - Copy.pptxADCS Full ppt-Lec 1-5 - Copy.pptx
ADCS Full ppt-Lec 1-5 - Copy.pptx
 
Flat_slab.pptx
Flat_slab.pptxFlat_slab.pptx
Flat_slab.pptx
 

Recently uploaded

INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerAnamika Sarkar
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 

Flat slab design

  • 1. DESIGN AND DETAILINGOF FLAT SLABESE SOEDARSONO HS27 FEBRUARY 2002
  • 2. CONTENT •Introduction •Benefits •Design Considerations •Design Methodology •Analysis of Flat Slab •Detailing
  • 3. INTRODUCTION What is a flat slab? •a reinforced concrete slab supported directly by concrete columns without the use of beams
  • 4. INTRODUCTIONFlat slabFlat slab with drop panelsFlat slab with column headFlat slab with drop panel and column head
  • 5. INTRODUCTION Uses of column heads : •increase shear strength of slab •reduce the moment in the slab by reducing the clear or effective spanFlat slab with column head
  • 6. INTRODUCTION Uses of drop panels : •increase shear strength of slab •increase negative moment capacity of slab •stiffen the slab and hence reduce deflection
  • 8. BENEFITS •Flexibility in room layout •Saving in building height •Shorter construction time •Ease of installation of M&E services •Prefabricated welded mesh •Buildable score
  • 9. Benefits . . . FLEXIBILITY IN ROOM LAYOUT •allows Architect to introduce partition walls anywhere required •allows owner to change the size of room layout •allows choice of omitting false ceiling and finish soffit of slab with skim coating
  • 10. Benefits . . . SAVING IN BUILDING HEIGHT •Lower storey height will reduce building weight due to lower partitions and cladding to façade •approx. saves 10% in vertical members •reduce foundation load SlabSlabBeamBeam3.4m3.4m2.8m2.8mConventionalConventionalSlabSlab3.2m3.2m2.8m2.8mBeam-FreeBeam-Free
  • 11. Benefits . . . SHORTER CONSTRUCTION TIME flat plate design will facilitate the use of big table formwork to increase productivity
  • 12. Benefits . . . SINGLE SOFFIT LEVELLiving RoomLiving RoomToiletToiletShowerShowerKitchenKitchenYardYard30307575260260303030303030BalconyBalcony 155 FlatPlate Slab Single Level Ceiling • Simplified the table formwork needed
  • 13. Benefits . . . EASE OF INSTALLATION OF M&E SERVICES •all M & E services can be mounted directly on the underside of the slab instead of bending them to avoid the beams •avoids hacking through beams
  • 14. Benefits . . . PRE-FABRICATED WELDED MESH•control•Prefabricated in standard sizes•Minimised installation time•Better quality control
  • 15. Benefits . . . BUILDABLE SCORE •allows standardized structural members and prefabricated sections to be integrated into the design for ease of construction •this process will make the structure more buildable, reduce the number of site workers and increase the productivity at site •more tendency to achieve a higher Buildable score
  • 17. Design Considerations. . . . WALL AND COLUMN POSITION •Locate position of wall tomaximisethe structural stiffness for lateral loads •Facilitates the rigidity to be located to thecentreof buildingTypical floor plan of Compass the Elizabeth
  • 18. Design Considerations. . . . OPTIMISATION OF STRUCTURAL LAYOUT PLAN •the sizes of vertical and structural structural members can be optimised to keep the volume of concrete for the entire superstructure inclusive of walls and lift cores to be in the region of 0.4 to 0.5 m3per square metre •this figure is considered to be economical and comparable to an optimum design in conventional of beam and slab systems
  • 19. Design Considerations. . . . DEFLECTION CHECK •necessary to include checking of the slab deflection for all load cases both for short and long term basis •In general, under full service load, δ< L/250 or 40 mm whichever is smaller •Limit set to prevent unsightly occurrence of cracks on non-structural walls and floor finishes
  • 20. Design Considerations. . . . CRACK CONTROL •advisable to perform crack width calculations based on spacing of reinforcement as detailed and the moment envelope obtained from structural analysis •good detailing of reinforcement will –restrict the crack width to within acceptable tolerances as specified in the codes and –reduce future maintenance cost of the building
  • 21. Design Considerations. . . . FLOOR OPENINGS •No opening should encroach upon a column head or drop •Sufficient reinforcement must be provided to take care of stress concentration
  • 22. Design Considerations. . . . PUNCHING SHEAR •always a critical consideration in flat plate design around the columns •instead of using thicker section, shear reinforcement in the form of shear heads, shear studs or stirrup cages may be embedded in the slab to enhance shear capacity at the edges of walls and columns
  • 23. Design Considerations. . . . PUNCHING SHEARShear StudsShear Studs
  • 24. Design Considerations. . . . CONSTRUCTION LOADS •critical for fast track project where removal of forms at early strength is required •possible to achieve 70% of specified concrete cube strength within a day or two by using high strength concrete •alternatively use 2 sets of forms
  • 25. Design Considerations. . . . LATERAL STABILITY •buildings with flat plate design is generally less rigid •lateral stiffness depends largely on the configuration of lift core position, layout of walls and columns •frame action is normally insufficient to resist lateral loads in high rise buildings, it needs to act in tendam with walls and lift cores to achieve the required stiffness
  • 26. Design Considerations. . . . LATERAL STABILITY MULTIPLE FUNCTION PERIMETER BEAMS•adds lateral rigidity•reduce slab deflection
  • 28. Design methodology .. . METHODS OF DESIGN •the finite element analysis •the simplified method •the equivalent frame method
  • 29. Design methodology .. . FINITE ELEMENT METHOD •Based upon the division of complicated structures into smaller and simpler pieces (elements) whose behaviour can be formulated. •E.g of software includes SAFE, ADAPT, etc •results includes –moment and shear envelopes –contour of structural deformation
  • 35. Design methodology .. . SIMPLIFIED METHOD Table 3.19 may be used provided•Live load > 1.25 Dead load•Live load (excluding partitions) > 5KN/m2•there are at least 3 rows of panels of approximately equal span in direction considered•lateral stability is independent of slab column connections
  • 36. Design methodology .. .. SIMPLIFIED METHOD Table 3.19: BM and SF coefficients for flat slab or 3 or more equal spansOuter SupportColumnWallNear centreof 1st spanFirst interiorspanCentre ofinteriorspanInteriorspanMoment-0.04Fl*0.086Fl0.083Fl*-0.063Fl0.071Fl-0.055FlShear0.45F0.4F-0.6F-0.5FTotalcolumnmoments0.04Fl--0.022Fl-0.022Fl* the design moments in the edge panel may have to be adjusted according to 3.7.4.3F is the total design ultimate load on the strip of slab between adjacent columns considered(1.4gk + 1.6 qk) lis the effective span
  • 37. Design methodology .. . EQUIVALENT FRAME METHOD •most commonly used method •the flat slab structure is divided longitudinally and transversely into frames consisting of columns and strips of slabs with : –stiffness of members based on concrete alone –for vertical loading, full width of the slab is used to evaluate stiffness –effect of drop panel may be neglected if dimension < lx/3
  • 38. Design methodology .. . EQUIVALENT FRAME METHOD Plan of floor slab Step 1 : define line of support in X & Y directions
  • 39. Design methodology .. . EQUIVALENT FRAME METHOD910109.20.8DESIGN STRIP IN PROTOTYPE91010.610.50.8STRAIGHTENED DESIGN STRIPDESIGN STRIP IN ELEVATION Step 2 : define design strips in X & Y directions
  • 41. Analysis of flat slab.. COLUMN HEADlholh maxlcdh(i)lh= lh, maxlholh maxlcdh(ii)lh= lhoEffective dimension of a head , where lho = actual dimension, lh max= lc+ 2(dh-40) lh (mm)= lesser of lho orlh max
  • 42. Analysis of flat slab.. COLUMN HEADlholh maxlcdh(iv)lh= lholholh maxlcdh40(iii)lh= lh, maxFor circular column or column head, effective diameter ,hc= 4 x area/Îż< 0.25 lx
  • 43. Analysis of flat slab.. DIVISION OF PANELS The panels are divided into ‘column strips’ and middle strips’ in both direction. (a)Slab Without Dropslx/4 Column strip Column striplx/4lx/4lx/4middle strip (ly-lx/2) middlestrip lx (shorter span) ly (longer span)
  • 44. Analysis of flat slab.. lx Dropmiddle strip (ly-drop size) lx/4Column strip = drop sizemiddlestriply (longer span) note : ignore drop if dimension is less than lx/3 Drop (b)Slab With Drops
  • 45. Analysis of flat slab.. MOMENT DIVISIONApportionment between columnand middle strip expressed as % of the total negative designmomentColumn stripMiddle stripNegative75%25% Positive55%45% •Note : For slab with drops where the width of the middle strip exceeds L/2, the distribution of moment in the middle strip should be increased in proportion to its increased width and the momentresisted by the column strip should be adjusted accordingly.
  • 46. Analysis of flat slab.. MOMENT DIVISION -EXAMPLE 6000 6000 6000 6000 6000 5000 Layout of building 7000 5000 A floor slab in a building where stability is provided by shear walls in one direction (N-S). The slab is without drops and is supported internally and on the external long sides by square columns . The imposed loading on the floor is 5 KN/m2and an allowance of 2.5KN/m2for finishes, etc. fcu = 40 KN/m2, fy = 460KN/m2
  • 47. Analysis of flat slab.. MOMENT DIVISION -EXAMPLE250030002500 6000 6000600060005000700025001500275040001250 3500 3000 3500 Division of panels into strips in x and y direction
  • 48. Analysis of flat slab.. MOMENT DIVISION -EXAMPLE 6000250035003000300025003500 60003520020036920020035 Column strip exterior support = 0.75*35 on 2.5m strip = 10.5Knm centre of 1st span= 0.55*200 on 2.5 strip = 44KNm 1st interior support = 0.75*200 on 3m strip = 50KNm centre of interior span = 0.55 *369 on 3m strip = 67.7KNm Middle strip exterior support = 0.25*35 on 2.5m strip = 3.5KNm centre of 1st span= 0.45*200 on 2.5 strip = 36KNm 1st interior support = 0.25*200 on 3m strip = 16.7KNm centre of interior span = 0.45 *369 on 3m strip = 55.4KNm
  • 49. Analysis of flat slab.. DESIGN FOR BENDING INTERNAL PANELS •columns and middle strips should be designed to withstand design moments from analysis
  • 50. Analysis of flat slab.. DESIGN FOR BENDING EDGE PANELS•apportionment of moment exactly the same as internal columns•max. design moment transferable between slab and edge column by a column strip of breadth beis < 0.5 design moment (EFM) < 0.7 design moment (FEM) Otherwise structural arrangements shall be changed. Mt, max= 0.15 bed2fcu
  • 51. Analysis of flat slab.. PUNCHING SHEAR 1.CalculateVeff =kVt at column perimeter (approx. equal span) Vt = SF transferred from slab k = 1.15 for internal column, 1.25 corner columns and edge columns where M acts parallel to free edge and 1.4 for edge columns where M acts at right angle to free edge 2.Determine vmax= Veff /uodwhere uo is the length of column perimeter Check vma < 0.8fcu or 5 N/mm2 3.Determine v=(Veff -V/ud)where uis the length of perimeter A and V is the column load and checkv< vc 4.Repeat step 3 for perimeter B and CColumn perimeterPerimeter APerimeter B3d23d4Column perimeterPerimeter APerimeter BPerimeter C3d23d43d4)lx/3
  • 52. Analysis of flat slab.. DEFLECTION (i) use normal span/effective depth ratio if drop width >1/3 span each way; otherwise(ii) to apply 0.9modification factor for flat slab, orwhere drop panel width < L/31.0otherwiseSpan/depth ratioCantilever7Simply supported20Continuous26
  • 53. Holes in areas bounded by the column stripsmay be formedproviding : •greatest dimension < 0.4 span lengthand•total positive and negative moments are redistributed between the remaining structure to meet the changed conditionsOPENINGSAnalysis Analysis of flat slab.. ly (longer span) lx (shorter span)
  • 54. OPENINGSAnalysis Analysis of flat slab.. Holes in areas common to two column stripsmay be formed providing : •that their aggregate their length or width does not exceed one-tenth of the width of the column strip; •that the reduced sections are capable of resisting with the moments; and•that the perimeter for calculating the design shear stress is reduced if appropriately (longer span) lx (shorter span)
  • 55. OPENINGSAnalysis Analysis of flat slab.. ly (longer span) lx (shorter span) Holes in areas common to the column strip and the middle stripmay be formed providing : •that in aggregate their length or width does not exceed one-quarter of the width of the column strip and •that the reduced sections are capable of resisting the design moments
  • 56. OPENINGSAnalysis Analysis of flat slab.. For all other cases of openings, it should be framed on all sides with beams to carry the loads to the columns.
  • 58. Detailing of flat slab .. . TYPE OF REINFORCEMENT F-mesh-A mesh formed by main wire with cross wire at a fixed spacing of 800 mm mesh - #Main wire-hard drawn ribbed wire with diameter and spacing as per design wire - #Cross wire-hard drawn smooth wire as holding wire wire - H8-800mm c/c for main wire diameter > 10mm H7-800mm c/c for main wire diameter of 10mm and below
  • 59. Detailing of flat slab .. . TYPE OF REINFORCEMENT Main WireHolding WireF-Mesh 2Holding Wire (800mm c/c) Main WireF-Mesh 1
  • 60.
  • 61. TensionLap = 45 dia. Holding WireMain Wire
  • 62. Holding WireMain WireMainWirePlan View of Mesh LayoutPlan Layout
  • 65. Detailing of flat slab .. . REINFORCEMENT FOR INTERNAL PANELS •Reinforcement are arranged in 2 directions parallel to each span; and •2/3 of the reinforcement required to resist negative moment in the column strip must be placed in the centre half of the strip •for slab with drops, the top reinforcement should be placed evenly across the column strip
  • 66. STANDARD LAPPING OF MESH (FOR FLAT SLAB)
  • 67. TYPICAL DETAIL SHOWING RECESS AT SLAB SOFFIT FOR SERVICES
  • 68. TYPICAL SECTION AT STAIRCASE
  • 69. DETAILS OF INSPECTION CHAMBER AT APRON
  • 70. DETAILS OF INSPECTION CHAMBER AT APRON
  • 71. DETAILS OF INSPECTION CHAMBER AT APRON
  • 72. DETAILS OF INSPECTION CHAMBER AT APRON
  • 73. DETAILS OF INSPECTION CHAMBER AT PLAY AREA
  • 74. 1ST STOREY (DWELLING UNIT) SLAB DETAILS OF HOUSEHOLD SHELTER
  • 75. TYPICAL DETAILS OF 125X250 RC CHANNEL FOR GAS PIPE ENTRY
  • 76. TYPICAL SECTION THRU’ COVERED HOUSEDRAIN (PRECAST)