Stepping Quickly Through the   PACT Processes for Training/ Learning/ Knowledge Management 3 levels of  Predictable  ISD Instructional Systems Design ©2007 EPPIC Inc.
3 levels of  Predictable  ISD  in   terms of costs, schedules and quality ©2007 EPPIC Inc.
©2007 EPPIC Inc.
3 levels of ISD  and   common   Analysis  philosophies, tools and templates and   common   Project Planning  & Management  philosophies, tools and templates Easier to learn, master  and coach Easier to plan, monitor  and manage ©2007 EPPIC Inc.
PACT ©2007 EPPIC Inc.
 
CAD  Key Outputs ©2007 EPPIC Inc.
CAD Phase 1 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],©2007 EPPIC Inc.
CAD Phase 2 In Curriculum Architecture Design Phase 2: Analysis, target audience data is gathered and preparations and logistics for the Analysis Team meeting are coordinated.  During the Analysis Team meeting, the team generates the Performance Model and the Knowledge/Skill Matrix data.  After the Analysis Team meeting, existing T&D is assessed to see how that training addresses needs identified in the Performance Model and Knowledge/Skill Matrix.  All of the analysis activities are documented in an Analysis Report. The project manager and analyst present the report to the Project Steering Team during the Phase 2 gate review meeting. During the gate review meeting, the Project Steering Team verifies and approves the findings, or changes them as necessary.  ©2007 EPPIC Inc.
CAD Phase 3 In Curriculum Architecture Design Phase 3: Design, the project manager and designer begin by preparing for the CAD design efforts. Then a Design Team meeting is conducted.  In the Design Team meeting, all of the potential modules of the architecture are identified, classified, and numbered.  The team combines these modules into T&D Events and constructs T&D Paths for learners― sequences of events appropriate for target audiences. The results are compiled in a Design Document and formally presented to the Project Steering Team, which reviews these at the gate review meeting.  ©2007 EPPIC Inc.
CAD Phase 4 In Curriculum Architecture Design Phase 4: Implementation Planning, an Implementation Planning Team is formed.  This team prioritizes the  gap  T&D Events and Modules. Modules of highest priority will be developed using the Modular Curriculum Development PACT Process or some other ISD process.  In parallel, development cost heuristics are developed and applied to forecast the cost implications of implementing the CAD’s top priorities.  The final priorities and cost implications are then presented to the Project Steering Team for review and reaction. In some projects, the Project Steering Team performs the Implementation Planning Team’s “prioritization of gaps” function during the Phase 3 gate review and during Phase 4 is asked to “macroplan” their development/acquisition.  ©2007 EPPIC Inc.
1:Many -- CAD:MCD/IAD
 
MCD Phase 1 ,[object Object],[object Object],[object Object],[object Object],[object Object],©2007 EPPIC Inc.
MCD Phase 2 During Phase 2: Analysis, target audience data is gathered and preparations and logistics for the Analysis Team meeting are coordinated.  If the Modular Curriculum Development project follows a Curriculum Architecture Design project, the CAD data is validated and an Analysis Team meeting is conducted to generate more detail for the Performance Model and Knowledge/Skill Matrices.  After the Analysis Team meeting, all relevant existing training is assessed to see if it fits the training needs documented in the Performance Model and Knowledge/Skill Matrices. This data is then documented in an Analysis Report, which is presented during the Project Steering Team gate review meeting for Phase 2. The analysis data must be approved in that meeting before the Design Phase begins.  ©2007 EPPIC Inc.
MCD Phase 3 During the third phase of Modular Curriculum Development, Design, modules are designed at a level appropriate to the project’s scope. With the Design Team’s assistance, Event and Module Maps are produced. These maps are visually sequenced versions of the specs.  The Event and Module Maps are further refined into Lesson Specs and Maps, and then into Activity Specs (the last level of design detail).  All Phase 3 outputs are encapsulated in a Design Document and a presentation. The design and presentation are reviewed by the Project Steering Team during the gate review meeting following this phase.  ©2007 EPPIC Inc.
MCD Phase 4 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],©2007 EPPIC Inc.
MCD Phase 5 Phase 5 of the Modular Curriculum Development effort is the Pilot Test. Instructors, facilitators, and administrators prepare materials and themselves to conduct the pilot test. As part of the preparation, the learning experience is described to managers of pilot participants. The managers are also informed of any postpilot activities that must be completed to ensure successful transfer of knowledge and skills to the actual job. During the pilot-test session, written and verbal evaluations are collected and debriefings are conducted. After the session, the feedback is assessed and revision recommendations are generated for consideration by the Project Steering Team. The Project Steering Team may accept, modify, or reject the revision recommendations. The final results constitute the revision specifications used in the final phase of a Modular Curriculum Development project: Revision & Release.  ©2007 EPPIC Inc.
MCD Phase 6 The sixth phase of a Modular Curriculum Development project is Revision & Release.  The revision specifications approved by the Project Steering Team in Phase 5 determine the final updates required of all of the materials.  After revision, master materials are stored for duplication, assembly, and deployment.  ©2007 EPPIC Inc.
Collaborating Work Teams  work for the  Project Steering Team ©2007 EPPIC Inc.
Beneficial Results of the PACT Processes PACT brings “enough control” to the processes of  ISD – Instructional Systems Design ©2007 EPPIC Inc.
PACT begins with the  end in mind  regarding  the organization of  performance-based content: Information  & Instruction enabling the  process workflow
Analysis Data Drives Content Information & Instruction for the Workflow
©2007 EPPIC Inc.
 
 
 
 
Geary A. Rummler  from the Performance Design Lab says, “If you want to ground your fantasy of a ‘corporate university’ with the reality of a sound ‘engineering’ approach to instructional systems that will provide results, you should learn about the PACT Processes. If you are the leader of, or a serious participant in, the design and implementation of a large-scale corporate curriculum, then this book is for you. This system could be the difference between achieving bottom-line results with your training or being just another ‘little red school house.’ ” Miki Lane,  senior partner at MVM The Communications Group says, “ lean- ISD  takes all of the theory, books, courses, and pseudo job aids that are currently on the market about Instructional Systems Design and blows them out of the water. Previous ‘systems’ approach books showed a lot of big boxes and diagrams, which were supposed to help the reader become proficient in the design process. Here is a book that actually includes all of the information that fell through the cracks of other ISD training materials and shows you the way to actually get from one step to another. Guy adds all of the caveats and tips he has learned in more than 20 years of ISD practice and sprinkles them as job aids and stories throughout the book. However, the most critical part of the book for me was that Guy included the project and people management elements of ISD in the book. Too often, ISD models and materials forget that we are working with real people in getting the work done. This book helps explain and illustrate best practices in ensuring success in ISD projects.” Book cover design by Geary A. Rummler Recipient : ISPI 2002 Award of Excellence for  Outstanding Instructional Communications
Guy W Wallace Certified Performance Technologist President, EPPIC Inc. Author of the  PACT Processes Author of other books, chapters and numerous articles Contact: [email_address]   www.eppic.biz   Some of Guy’s books, newsletters and external columns
Guy’s short and full professional biographies, covering over 250 client projects  for 44 Fortune 500 firms and many others  from 1982 until today  can be reviewed and downloaded  as a PDF from the EPPIC web site at:  www.eppic.biz
Guy’s Client Listings – 1982 to 2008 2000—Today Abbott Laboratories ,  AMS ,  Eli Lilly , Fireman’s Fund Insurance,  General Motors ,  GTE , Johnson Controls, NASCO, NAVAIR,  NAVSEA , Norfolk Naval Shipyard,  Siemens Building Technologies , and  Verizon .   1990—1999 Abbott Laboratories ,  ALCOA ,  ALCOA Labs , Alyeska Pipeline Services Company,  American Management  Systems ,  Amoco ,  AT&T Network Systems ,  Bandag ,  Bank of America ,  Baxter , Bellcore-Tech, British Petroleum-America,  Burroughs ,  CCH , Data General, Detroit Ball Bearing, Digital Equipment Company, Discover Card,  Dow Chemical , EDS,  Eli Lilly ,  Ford ,  General Dynamics ,  General Motors , H&R Block,  HP ,  Illinois Bell , Imperial Bondware,  MCC Powers ,  NCR ,  Novacor ,  Occidental Petroleum Labs , Spartan Stores, Sphinx Pharmaceuticals, Square D Company, and Valuemetrics.   1982—1989 ALCOA ,  ALCOA Labs ,  Ameritech ,  Amoco , Arthur Anderson,  AT&T Communications , AT&T Microelectronics,  AT&T Network Systems ,  Baxter ,  Burroughs , Channel Gas Industries/Tenneco,  Dow Chemical ,  Exxon ,  Ford ,  General Dynamics ,  HP ,  Illinois Bell ,  MCC Powers , Motorola, Multigraphics, NASA,  Northern Telecom ,Northern Trust Bank, and Westinghouse Defense Electronics.   Project Overviews for each project are available at  www.eppic.biz   in “About EPPIC” and in Guy’s Professional Bio pdf   Clients listed in “ Blue ” = multiple project customer

More Related Content

What's hot

The Synergistic Nature of PI Objectives
The Synergistic Nature of PI ObjectivesThe Synergistic Nature of PI Objectives
The Synergistic Nature of PI ObjectivesCharlene Cuenca
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management SampleRavi Nakulan
 
Prince2 resources e book 2
Prince2 resources e book 2Prince2 resources e book 2
Prince2 resources e book 2Knowledge Train
 
PMP assessment exam 1.1
PMP assessment exam 1.1PMP assessment exam 1.1
PMP assessment exam 1.1Daniel Hucks
 
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Tareq Al-Behairi,PMP,PMI-ACP
 
175 PMP Sample Questions
175 PMP Sample Questions175 PMP Sample Questions
175 PMP Sample Questionszohaibqadir
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project ManagementMike Cottmeyer
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewInvensis Learning
 
Top 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsTop 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsMark Corker
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management frameworkstefanhenry
 
How do I get a PMP Certification in 2021?
How do I get a PMP Certification in 2021?How do I get a PMP Certification in 2021?
How do I get a PMP Certification in 2021?Sprintzeal
 
Agile project management
Agile project management Agile project management
Agile project management Bimba Pawar
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringGlen Alleman
 
Smsvn pmp training_slides_chapter_9
Smsvn pmp training_slides_chapter_9Smsvn pmp training_slides_chapter_9
Smsvn pmp training_slides_chapter_9Nam Trung
 
Scrum In Action - Algiers Tech Meetup
Scrum In Action - Algiers Tech MeetupScrum In Action - Algiers Tech Meetup
Scrum In Action - Algiers Tech MeetupHacen Dadda
 
Meetup#2 SAFe Patrick & Maxence
Meetup#2 SAFe Patrick & MaxenceMeetup#2 SAFe Patrick & Maxence
Meetup#2 SAFe Patrick & MaxenceAlexandre Boutin
 
Project Management Cookbook Part 3 (ARA) Feb16
Project Management Cookbook Part 3 (ARA) Feb16Project Management Cookbook Part 3 (ARA) Feb16
Project Management Cookbook Part 3 (ARA) Feb16Tony Alvarez
 

What's hot (20)

The Synergistic Nature of PI Objectives
The Synergistic Nature of PI ObjectivesThe Synergistic Nature of PI Objectives
The Synergistic Nature of PI Objectives
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
 
Prince2 resources e book 2
Prince2 resources e book 2Prince2 resources e book 2
Prince2 resources e book 2
 
PMP assessment exam 1.1
PMP assessment exam 1.1PMP assessment exam 1.1
PMP assessment exam 1.1
 
Pmp study-notes
Pmp study-notesPmp study-notes
Pmp study-notes
 
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
 
175 PMP Sample Questions
175 PMP Sample Questions175 PMP Sample Questions
175 PMP Sample Questions
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course Preview
 
Top 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsTop 10 Microsoft Project Problems
Top 10 Microsoft Project Problems
 
PMP® Sample Questions 3
PMP® Sample Questions 3PMP® Sample Questions 3
PMP® Sample Questions 3
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management framework
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
How do I get a PMP Certification in 2021?
How do I get a PMP Certification in 2021?How do I get a PMP Certification in 2021?
How do I get a PMP Certification in 2021?
 
Agile project management
Agile project management Agile project management
Agile project management
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
Smsvn pmp training_slides_chapter_9
Smsvn pmp training_slides_chapter_9Smsvn pmp training_slides_chapter_9
Smsvn pmp training_slides_chapter_9
 
Scrum In Action - Algiers Tech Meetup
Scrum In Action - Algiers Tech MeetupScrum In Action - Algiers Tech Meetup
Scrum In Action - Algiers Tech Meetup
 
Meetup#2 SAFe Patrick & Maxence
Meetup#2 SAFe Patrick & MaxenceMeetup#2 SAFe Patrick & Maxence
Meetup#2 SAFe Patrick & Maxence
 
Project Management Cookbook Part 3 (ARA) Feb16
Project Management Cookbook Part 3 (ARA) Feb16Project Management Cookbook Part 3 (ARA) Feb16
Project Management Cookbook Part 3 (ARA) Feb16
 

Similar to The Pact Processes - Overview

Project Management in digital content production process
Project Management  in digital content production processProject Management  in digital content production process
Project Management in digital content production processmkparente
 
ADDIE- An Instructional Systems Design Model
ADDIE- An Instructional Systems Design ModelADDIE- An Instructional Systems Design Model
ADDIE- An Instructional Systems Design Modeleshikachattopadhyay
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overviewhouserdah
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsRaja Bavani
 
The Design Document Blueprint
The Design Document Blueprint The Design Document Blueprint
The Design Document Blueprint jenniferomalley
 
The Design Document Blueprint
The Design Document Blueprint The Design Document Blueprint
The Design Document Blueprint jenniferomalley
 
Instructional Design
Instructional DesignInstructional Design
Instructional DesignRiva Warid
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure ReportCheryl Burcham
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementsmumbahelp
 
Project management part 1
Project management part 1Project management part 1
Project management part 1hkbhadraa
 
ADDIE-Model-For-Instructional-Design_Caparo.pptx
ADDIE-Model-For-Instructional-Design_Caparo.pptxADDIE-Model-For-Instructional-Design_Caparo.pptx
ADDIE-Model-For-Instructional-Design_Caparo.pptxREYIBANEZ
 
Info461ProjectCharterEskridgeAs08
Info461ProjectCharterEskridgeAs08Info461ProjectCharterEskridgeAs08
Info461ProjectCharterEskridgeAs08Greg Eskridge
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodologyray biztech
 
Unified process,agile process,process assesment ppt
Unified process,agile process,process assesment pptUnified process,agile process,process assesment ppt
Unified process,agile process,process assesment pptShweta Ghate
 

Similar to The Pact Processes - Overview (20)

Project Management in digital content production process
Project Management  in digital content production processProject Management  in digital content production process
Project Management in digital content production process
 
ADDIE- An Instructional Systems Design Model
ADDIE- An Instructional Systems Design ModelADDIE- An Instructional Systems Design Model
ADDIE- An Instructional Systems Design Model
 
Day 2 scope
Day 2 scopeDay 2 scope
Day 2 scope
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile Projects
 
Systematic Innovation
Systematic InnovationSystematic Innovation
Systematic Innovation
 
The Design Document Blueprint
The Design Document Blueprint The Design Document Blueprint
The Design Document Blueprint
 
The Design Document Blueprint
The Design Document Blueprint The Design Document Blueprint
The Design Document Blueprint
 
Instructional Design
Instructional DesignInstructional Design
Instructional Design
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
 
Software project management
Software project managementSoftware project management
Software project management
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Project management part 1
Project management part 1Project management part 1
Project management part 1
 
ADDIE-Model-For-Instructional-Design_Caparo.pptx
ADDIE-Model-For-Instructional-Design_Caparo.pptxADDIE-Model-For-Instructional-Design_Caparo.pptx
ADDIE-Model-For-Instructional-Design_Caparo.pptx
 
Project Charter
Project CharterProject Charter
Project Charter
 
Info461ProjectCharterEskridgeAs08
Info461ProjectCharterEskridgeAs08Info461ProjectCharterEskridgeAs08
Info461ProjectCharterEskridgeAs08
 
PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
 
Unified process,agile process,process assesment ppt
Unified process,agile process,process assesment pptUnified process,agile process,process assesment ppt
Unified process,agile process,process assesment ppt
 

More from EPPIC Inc.

Curriculum Architecture Design - November 2010
Curriculum Architecture Design - November 2010Curriculum Architecture Design - November 2010
Curriculum Architecture Design - November 2010EPPIC Inc.
 
Enterprise Process Performance Improvement - November 2010
Enterprise Process Performance Improvement - November 2010Enterprise Process Performance Improvement - November 2010
Enterprise Process Performance Improvement - November 2010EPPIC Inc.
 
The Customer Is KING - Not
The Customer Is KING - NotThe Customer Is KING - Not
The Customer Is KING - NotEPPIC Inc.
 
Performance-based Employee Qualification/ Certification Systems and Performan...
Performance-based Employee Qualification/ Certification Systems and Performan...Performance-based Employee Qualification/ Certification Systems and Performan...
Performance-based Employee Qualification/ Certification Systems and Performan...EPPIC Inc.
 
Using HPT To Improve Your Enterprise Processes
Using HPT To Improve Your Enterprise ProcessesUsing HPT To Improve Your Enterprise Processes
Using HPT To Improve Your Enterprise ProcessesEPPIC Inc.
 
EPPI Review Presentation
EPPI Review PresentationEPPI Review Presentation
EPPI Review PresentationEPPIC Inc.
 
Establishing Areas of Performance
Establishing Areas of PerformanceEstablishing Areas of Performance
Establishing Areas of PerformanceEPPIC Inc.
 
T&D Systems View Assessment Workshop
T&D Systems View Assessment WorkshopT&D Systems View Assessment Workshop
T&D Systems View Assessment WorkshopEPPIC Inc.
 
Analysis for EPPI
Analysis for EPPIAnalysis for EPPI
Analysis for EPPIEPPIC Inc.
 
Project Project Planning & Management for ISD and HPT Efforts
Project Project Planning & Management for ISD and HPT EffortsProject Project Planning & Management for ISD and HPT Efforts
Project Project Planning & Management for ISD and HPT EffortsEPPIC Inc.
 
Push Pull KMS - Knowledge Management Systems
Push Pull KMS - Knowledge Management SystemsPush Pull KMS - Knowledge Management Systems
Push Pull KMS - Knowledge Management SystemsEPPIC Inc.
 
Performance Modeling
Performance ModelingPerformance Modeling
Performance ModelingEPPIC Inc.
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & ManagementEPPIC Inc.
 
Performance-based Curriculum Architecture Design
Performance-based Curriculum Architecture DesignPerformance-based Curriculum Architecture Design
Performance-based Curriculum Architecture DesignEPPIC Inc.
 
Modeling Mastery Performance
Modeling Mastery PerformanceModeling Mastery Performance
Modeling Mastery PerformanceEPPIC Inc.
 
Changing Human Performance to Improve Business Processes
Changing Human Performance to Improve Business ProcessesChanging Human Performance to Improve Business Processes
Changing Human Performance to Improve Business ProcessesEPPIC Inc.
 

More from EPPIC Inc. (16)

Curriculum Architecture Design - November 2010
Curriculum Architecture Design - November 2010Curriculum Architecture Design - November 2010
Curriculum Architecture Design - November 2010
 
Enterprise Process Performance Improvement - November 2010
Enterprise Process Performance Improvement - November 2010Enterprise Process Performance Improvement - November 2010
Enterprise Process Performance Improvement - November 2010
 
The Customer Is KING - Not
The Customer Is KING - NotThe Customer Is KING - Not
The Customer Is KING - Not
 
Performance-based Employee Qualification/ Certification Systems and Performan...
Performance-based Employee Qualification/ Certification Systems and Performan...Performance-based Employee Qualification/ Certification Systems and Performan...
Performance-based Employee Qualification/ Certification Systems and Performan...
 
Using HPT To Improve Your Enterprise Processes
Using HPT To Improve Your Enterprise ProcessesUsing HPT To Improve Your Enterprise Processes
Using HPT To Improve Your Enterprise Processes
 
EPPI Review Presentation
EPPI Review PresentationEPPI Review Presentation
EPPI Review Presentation
 
Establishing Areas of Performance
Establishing Areas of PerformanceEstablishing Areas of Performance
Establishing Areas of Performance
 
T&D Systems View Assessment Workshop
T&D Systems View Assessment WorkshopT&D Systems View Assessment Workshop
T&D Systems View Assessment Workshop
 
Analysis for EPPI
Analysis for EPPIAnalysis for EPPI
Analysis for EPPI
 
Project Project Planning & Management for ISD and HPT Efforts
Project Project Planning & Management for ISD and HPT EffortsProject Project Planning & Management for ISD and HPT Efforts
Project Project Planning & Management for ISD and HPT Efforts
 
Push Pull KMS - Knowledge Management Systems
Push Pull KMS - Knowledge Management SystemsPush Pull KMS - Knowledge Management Systems
Push Pull KMS - Knowledge Management Systems
 
Performance Modeling
Performance ModelingPerformance Modeling
Performance Modeling
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Performance-based Curriculum Architecture Design
Performance-based Curriculum Architecture DesignPerformance-based Curriculum Architecture Design
Performance-based Curriculum Architecture Design
 
Modeling Mastery Performance
Modeling Mastery PerformanceModeling Mastery Performance
Modeling Mastery Performance
 
Changing Human Performance to Improve Business Processes
Changing Human Performance to Improve Business ProcessesChanging Human Performance to Improve Business Processes
Changing Human Performance to Improve Business Processes
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIShubhangi Sonawane
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxNikitaBankoti2
 

Recently uploaded (20)

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 

The Pact Processes - Overview

  • 1. Stepping Quickly Through the PACT Processes for Training/ Learning/ Knowledge Management 3 levels of Predictable ISD Instructional Systems Design ©2007 EPPIC Inc.
  • 2. 3 levels of Predictable ISD in terms of costs, schedules and quality ©2007 EPPIC Inc.
  • 4. 3 levels of ISD and common Analysis philosophies, tools and templates and common Project Planning & Management philosophies, tools and templates Easier to learn, master and coach Easier to plan, monitor and manage ©2007 EPPIC Inc.
  • 6.  
  • 7. CAD Key Outputs ©2007 EPPIC Inc.
  • 8.
  • 9. CAD Phase 2 In Curriculum Architecture Design Phase 2: Analysis, target audience data is gathered and preparations and logistics for the Analysis Team meeting are coordinated. During the Analysis Team meeting, the team generates the Performance Model and the Knowledge/Skill Matrix data. After the Analysis Team meeting, existing T&D is assessed to see how that training addresses needs identified in the Performance Model and Knowledge/Skill Matrix. All of the analysis activities are documented in an Analysis Report. The project manager and analyst present the report to the Project Steering Team during the Phase 2 gate review meeting. During the gate review meeting, the Project Steering Team verifies and approves the findings, or changes them as necessary. ©2007 EPPIC Inc.
  • 10. CAD Phase 3 In Curriculum Architecture Design Phase 3: Design, the project manager and designer begin by preparing for the CAD design efforts. Then a Design Team meeting is conducted. In the Design Team meeting, all of the potential modules of the architecture are identified, classified, and numbered. The team combines these modules into T&D Events and constructs T&D Paths for learners― sequences of events appropriate for target audiences. The results are compiled in a Design Document and formally presented to the Project Steering Team, which reviews these at the gate review meeting. ©2007 EPPIC Inc.
  • 11. CAD Phase 4 In Curriculum Architecture Design Phase 4: Implementation Planning, an Implementation Planning Team is formed. This team prioritizes the gap T&D Events and Modules. Modules of highest priority will be developed using the Modular Curriculum Development PACT Process or some other ISD process. In parallel, development cost heuristics are developed and applied to forecast the cost implications of implementing the CAD’s top priorities. The final priorities and cost implications are then presented to the Project Steering Team for review and reaction. In some projects, the Project Steering Team performs the Implementation Planning Team’s “prioritization of gaps” function during the Phase 3 gate review and during Phase 4 is asked to “macroplan” their development/acquisition. ©2007 EPPIC Inc.
  • 13.  
  • 14.
  • 15. MCD Phase 2 During Phase 2: Analysis, target audience data is gathered and preparations and logistics for the Analysis Team meeting are coordinated. If the Modular Curriculum Development project follows a Curriculum Architecture Design project, the CAD data is validated and an Analysis Team meeting is conducted to generate more detail for the Performance Model and Knowledge/Skill Matrices. After the Analysis Team meeting, all relevant existing training is assessed to see if it fits the training needs documented in the Performance Model and Knowledge/Skill Matrices. This data is then documented in an Analysis Report, which is presented during the Project Steering Team gate review meeting for Phase 2. The analysis data must be approved in that meeting before the Design Phase begins. ©2007 EPPIC Inc.
  • 16. MCD Phase 3 During the third phase of Modular Curriculum Development, Design, modules are designed at a level appropriate to the project’s scope. With the Design Team’s assistance, Event and Module Maps are produced. These maps are visually sequenced versions of the specs. The Event and Module Maps are further refined into Lesson Specs and Maps, and then into Activity Specs (the last level of design detail). All Phase 3 outputs are encapsulated in a Design Document and a presentation. The design and presentation are reviewed by the Project Steering Team during the gate review meeting following this phase. ©2007 EPPIC Inc.
  • 17.
  • 18. MCD Phase 5 Phase 5 of the Modular Curriculum Development effort is the Pilot Test. Instructors, facilitators, and administrators prepare materials and themselves to conduct the pilot test. As part of the preparation, the learning experience is described to managers of pilot participants. The managers are also informed of any postpilot activities that must be completed to ensure successful transfer of knowledge and skills to the actual job. During the pilot-test session, written and verbal evaluations are collected and debriefings are conducted. After the session, the feedback is assessed and revision recommendations are generated for consideration by the Project Steering Team. The Project Steering Team may accept, modify, or reject the revision recommendations. The final results constitute the revision specifications used in the final phase of a Modular Curriculum Development project: Revision & Release. ©2007 EPPIC Inc.
  • 19. MCD Phase 6 The sixth phase of a Modular Curriculum Development project is Revision & Release. The revision specifications approved by the Project Steering Team in Phase 5 determine the final updates required of all of the materials. After revision, master materials are stored for duplication, assembly, and deployment. ©2007 EPPIC Inc.
  • 20. Collaborating Work Teams work for the Project Steering Team ©2007 EPPIC Inc.
  • 21. Beneficial Results of the PACT Processes PACT brings “enough control” to the processes of ISD – Instructional Systems Design ©2007 EPPIC Inc.
  • 22. PACT begins with the end in mind regarding the organization of performance-based content: Information & Instruction enabling the process workflow
  • 23. Analysis Data Drives Content Information & Instruction for the Workflow
  • 25.  
  • 26.  
  • 27.  
  • 28.  
  • 29. Geary A. Rummler from the Performance Design Lab says, “If you want to ground your fantasy of a ‘corporate university’ with the reality of a sound ‘engineering’ approach to instructional systems that will provide results, you should learn about the PACT Processes. If you are the leader of, or a serious participant in, the design and implementation of a large-scale corporate curriculum, then this book is for you. This system could be the difference between achieving bottom-line results with your training or being just another ‘little red school house.’ ” Miki Lane, senior partner at MVM The Communications Group says, “ lean- ISD takes all of the theory, books, courses, and pseudo job aids that are currently on the market about Instructional Systems Design and blows them out of the water. Previous ‘systems’ approach books showed a lot of big boxes and diagrams, which were supposed to help the reader become proficient in the design process. Here is a book that actually includes all of the information that fell through the cracks of other ISD training materials and shows you the way to actually get from one step to another. Guy adds all of the caveats and tips he has learned in more than 20 years of ISD practice and sprinkles them as job aids and stories throughout the book. However, the most critical part of the book for me was that Guy included the project and people management elements of ISD in the book. Too often, ISD models and materials forget that we are working with real people in getting the work done. This book helps explain and illustrate best practices in ensuring success in ISD projects.” Book cover design by Geary A. Rummler Recipient : ISPI 2002 Award of Excellence for Outstanding Instructional Communications
  • 30. Guy W Wallace Certified Performance Technologist President, EPPIC Inc. Author of the PACT Processes Author of other books, chapters and numerous articles Contact: [email_address] www.eppic.biz Some of Guy’s books, newsletters and external columns
  • 31. Guy’s short and full professional biographies, covering over 250 client projects for 44 Fortune 500 firms and many others from 1982 until today can be reviewed and downloaded as a PDF from the EPPIC web site at: www.eppic.biz
  • 32. Guy’s Client Listings – 1982 to 2008 2000—Today Abbott Laboratories , AMS , Eli Lilly , Fireman’s Fund Insurance, General Motors , GTE , Johnson Controls, NASCO, NAVAIR, NAVSEA , Norfolk Naval Shipyard, Siemens Building Technologies , and Verizon .   1990—1999 Abbott Laboratories , ALCOA , ALCOA Labs , Alyeska Pipeline Services Company, American Management Systems , Amoco , AT&T Network Systems , Bandag , Bank of America , Baxter , Bellcore-Tech, British Petroleum-America, Burroughs , CCH , Data General, Detroit Ball Bearing, Digital Equipment Company, Discover Card, Dow Chemical , EDS, Eli Lilly , Ford , General Dynamics , General Motors , H&R Block, HP , Illinois Bell , Imperial Bondware, MCC Powers , NCR , Novacor , Occidental Petroleum Labs , Spartan Stores, Sphinx Pharmaceuticals, Square D Company, and Valuemetrics.   1982—1989 ALCOA , ALCOA Labs , Ameritech , Amoco , Arthur Anderson, AT&T Communications , AT&T Microelectronics, AT&T Network Systems , Baxter , Burroughs , Channel Gas Industries/Tenneco, Dow Chemical , Exxon , Ford , General Dynamics , HP , Illinois Bell , MCC Powers , Motorola, Multigraphics, NASA, Northern Telecom ,Northern Trust Bank, and Westinghouse Defense Electronics.   Project Overviews for each project are available at www.eppic.biz in “About EPPIC” and in Guy’s Professional Bio pdf   Clients listed in “ Blue ” = multiple project customer