Agenda
1. Translink Portfolio and P30 Strategy – B Harkin
2. P3O Information Management System – M Bradley
Translink Portfolio
• Translink is a Non-Departmental Public Body (NDPB) comprising
Northern Ireland Railways, Ulsterbus and Citybus (Metro) responsible
for providing public transport services in N Ireland
• Department for Infrastructure (DfI) sponsor
• Organisation manages a diverse portfolio of Bus and Rail Fleet,
Infrastructure, Property and Business Systems
• Current capital portfolio comprises 350+ projects (BAU and
Enhancement programmes) with annual budget of ~£240m
Translink PMO
• 2008 - Project Control Office - Infrastructure Division
• Project Management Procedures (Achieving Excellence in Construction)
• Performance Management Framework (Project Stages / Base Line)
• 2014 – Virtual PMO (all Divisions)
• Holistic Planning / Standardised Performance Management
• Step change in capital investment / governance identified
• 2016 – P3O Strategy
• Adopted best practice P3O governance model to support effective planning
and delivery of portfolio and optimised return on investment
• 2018 – Portfolio Management Office (Consolidated)
• P3O Information Management System (2019)
P3O Strategy / Themes
• P3O Organisational Governance / Management Structure
• Best practice P3O Procedures (Portfolio, Programme, Project)
• Integrated P3O planning and performance management framework
• Focus on Programme Management – Business Change
• Focus on Value / Benefits Management (strategic alignment)
• Competency Management Framework
• Lessons Learned - continuous improvement
• P30 Information Management System / Portal (fit for purpose)
P3O Model
DoF COE
Stakeholders
Programmes
Projects
Delivery
Planning &
Assurance
Delivery
DfI
Executive
Committee
Investment
Decision
Finance
Operations
Asset
Owners
HR
ICT
Interest
Groups
Portfolio
Progress
Report
Portfolio
Office
Objective – Informed Decision Making; Optimised Return on Investment;
Effective Governance
MOU
P3O Structure / Levels
Portfolio
Bus Fleet &
Engineering
Track
Structures
S&T
Safety
Projects
Sub-Category Tags / Project Activities
Rail Fleet &
Engineering
Business
Systems
Property
Network
Development
Network
Engineering
Transport Hub
Electrification
Network
Capacity
Passenger
Facilities
Carbon
Reduction
Park & Ride
Low/Zero
Emission Fleet
Engineering
New Trains
Engineering
Ticketing
ICT
Portfolio Office Functions
Planning Delivery Assurance (COE)
Strategic Alignment
Scenario / Forward Planning
Project Prioritisation
Financial Planning
Benefits
Risks / Opportunities
Dependencies
Change
Resource Planning
Project Start Up / Closure
R&V Workshops
Business Case
Key Document Review
Delivery Strategy
Risks
Change
Information Management
Procedures & Templates
• Portfolio
• Programme
• Project
Training
Gateway / Internal Peer Reviews
Post Project Evaluation
Lessons Learned
Programme/Project Board
P3O Reporting Cycle
Portfolio
Project
Programme
Start Up /
Initiation
Business Case
Identification /
Definition
Business Case
Strategy,
Prioritisation,
Base Line Plan
Lessons
Learned
Change
Portfolio
KPIs
Change
Program
me KPIs
Change
Lessons
Learned
Lessons
Learned
Risks /
Issues
Cost/
Schedule
Cost /
Schedule
Cost /
Schedule
Project
KPIs
Escalation
Benefits
Risks /
Issues
Benefits
Risks /
Issues
Benefits
Performance Reporting
Planning
Information Management System - Requirements
• Cloud based, Enterprise Management System, Remote Working
• Capacity – 800+ projects; 150+ users
• PMO Home Page (portal)
• Vertically integrated P3O Planning (escalation)
• Cost loaded Project Schedules – Financial Planning
• Integrated Project Management tools e.g. Risk, Benefits, Change Register
• Document management capability
• Source data information reporting- single truth;
• Bespoke analysis / reporting (established management framework)
P3O IM Model
Project
Online
SharePoint
Online
Project Schedules
• Project Stages
• Key Milestones
• Tagged Activities
• Resources
• Costs
Project Registers
• Risks Register
• Issues Log
• Change Register
• Benefits Plan
• Lessons Learned
• Highlight Report
Power BI
P3O
Reporting
Users
Project Static Data
Document
Libraries
Project Centre
PMO
Demonstration of P3O IM System
• P3O Portal
• Project Online System
• Power Bi Reporting
P3O Portal
Project Online Homepage
Project Site
Power Bi – Portfolio Dashboard
Power Bi – Forward Planning
Power Bi – Project KPIs
Power Bi – Risk Register
Power Bi – Highlight Report
Power Bi – Benefits Realisation
Power Bi – Lessons Learnt
P3O IM Model Refresh
P3O
Reporting
Power BI
Users
PMO
Power
Apps
Microsoft
Project
Microsoft
Dataverse
- Streamlined User Interface
- Project Management Tools
- Document Management
- Cost Loaded Schedules
- Project Performance
Tracking
- Automated Document
Sign-off
- Data Storage
- Design Flexibility
P3O System Refresh
• Flexibility of Design (Templates) – Microsoft Dataverse
• Improved User Interface – Power Apps
• Automated document sign off - Workflow
• Additional Programme Management Capability
• Increased Capacity / Speed
• Improved document management

More Related Content

What's hot

P3O quick guide
P3O quick guideP3O quick guide
P3O quick guide
Maven
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
TURKI , PMP
 
P3O - The Value Adding PMO - from Strategy to Projects
P3O - The Value Adding PMO - from Strategy to ProjectsP3O - The Value Adding PMO - from Strategy to Projects
P3O - The Value Adding PMO - from Strategy to Projects
Tony Vynckier
 
ePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiePMO Workshop - Ali Kaabi
ePMO Workshop - Ali Kaabi
Ali Kaabi
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
jimmcdonaldpmp
 

What's hot (20)

AXELOS - MSP® - Managing Successful Programmes - Foundation
AXELOS - MSP® - Managing Successful Programmes - FoundationAXELOS - MSP® - Managing Successful Programmes - Foundation
AXELOS - MSP® - Managing Successful Programmes - Foundation
 
Pmo
PmoPmo
Pmo
 
The PMO VALUE RING Workshop
The PMO VALUE RING WorkshopThe PMO VALUE RING Workshop
The PMO VALUE RING Workshop
 
P3O quick guide
P3O quick guideP3O quick guide
P3O quick guide
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
P3O - The Value Adding PMO - from Strategy to Projects
P3O - The Value Adding PMO - from Strategy to ProjectsP3O - The Value Adding PMO - from Strategy to Projects
P3O - The Value Adding PMO - from Strategy to Projects
 
ePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiePMO Workshop - Ali Kaabi
ePMO Workshop - Ali Kaabi
 
Pmo Why?
Pmo Why?Pmo Why?
Pmo Why?
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive Dashboard
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
AXELOS - MoP® - Management of Portfolios - Foundation
AXELOS - MoP® - Management of Portfolios - FoundationAXELOS - MoP® - Management of Portfolios - Foundation
AXELOS - MoP® - Management of Portfolios - Foundation
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMO
 
Pmipmo
PmipmoPmipmo
Pmipmo
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
P3O In 7 Slides
P3O In 7 SlidesP3O In 7 Slides
P3O In 7 Slides
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
 

Similar to P30 information management system webinar

20070829 PPM afdelingsmøde
20070829 PPM afdelingsmøde20070829 PPM afdelingsmøde
20070829 PPM afdelingsmøde
Kim Holm
 
Nikhil Kulkarni Portfolio Presentation
Nikhil Kulkarni Portfolio PresentationNikhil Kulkarni Portfolio Presentation
Nikhil Kulkarni Portfolio Presentation
Nikhil Kulkarni
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration Project
David Niles
 
OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016
Tomi Ogunjobi
 
Anthony Scarfo Curriculum Vitae
Anthony Scarfo   Curriculum VitaeAnthony Scarfo   Curriculum Vitae
Anthony Scarfo Curriculum Vitae
anthonyscarfo
 

Similar to P30 information management system webinar (20)

Joydeep PMO Executive resume
Joydeep PMO Executive resumeJoydeep PMO Executive resume
Joydeep PMO Executive resume
 
Connected Planning Using EPM Cloud at Opus Group
Connected Planning Using EPM Cloud at Opus GroupConnected Planning Using EPM Cloud at Opus Group
Connected Planning Using EPM Cloud at Opus Group
 
Andrew Buck Cv11
Andrew Buck Cv11Andrew Buck Cv11
Andrew Buck Cv11
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
20070829 PPM afdelingsmøde
20070829 PPM afdelingsmøde20070829 PPM afdelingsmøde
20070829 PPM afdelingsmøde
 
PW cv1602 03
PW cv1602 03PW cv1602 03
PW cv1602 03
 
Nikhil Kulkarni Portfolio Presentation
Nikhil Kulkarni Portfolio PresentationNikhil Kulkarni Portfolio Presentation
Nikhil Kulkarni Portfolio Presentation
 
Lean pmo – Delivering success globally public
Lean pmo – Delivering success globally publicLean pmo – Delivering success globally public
Lean pmo – Delivering success globally public
 
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary LtdPROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration Project
 
From 0 to PMO – The Encirc Journey - Encirc | FuturePMO 2023
From 0 to PMO – The Encirc Journey - Encirc | FuturePMO 2023From 0 to PMO – The Encirc Journey - Encirc | FuturePMO 2023
From 0 to PMO – The Encirc Journey - Encirc | FuturePMO 2023
 
OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016
 
Leading practices in Project Planning
Leading practices in Project PlanningLeading practices in Project Planning
Leading practices in Project Planning
 
PMO and project server 2013
PMO and project server 2013PMO and project server 2013
PMO and project server 2013
 
The PMO in practice
The PMO in practiceThe PMO in practice
The PMO in practice
 
Skeleton for EPMO roll out for large enterprises
Skeleton for EPMO roll out for large enterprises Skeleton for EPMO roll out for large enterprises
Skeleton for EPMO roll out for large enterprises
 
1010 cd overview light
1010 cd overview light1010 cd overview light
1010 cd overview light
 
Best practices for reconciling Architecture roadmaps across domains
Best practices for reconciling Architecture roadmaps across domainsBest practices for reconciling Architecture roadmaps across domains
Best practices for reconciling Architecture roadmaps across domains
 
Anthony Scarfo Curriculum Vitae
Anthony Scarfo   Curriculum VitaeAnthony Scarfo   Curriculum Vitae
Anthony Scarfo Curriculum Vitae
 
Kjf11a1 Chron
Kjf11a1 ChronKjf11a1 Chron
Kjf11a1 Chron
 

More from Association for Project Management

Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Association for Project Management
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
Association for Project Management
 

More from Association for Project Management (20)

Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 

Recently uploaded

Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
AnaAcapella
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 

Recently uploaded (20)

Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use Cases
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdfUGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 

P30 information management system webinar

  • 1. Translink P3O Information Management System APM Webinar 10 March 2022
  • 2. Agenda 1. Translink Portfolio and P30 Strategy – B Harkin 2. P3O Information Management System – M Bradley
  • 3. Translink Portfolio • Translink is a Non-Departmental Public Body (NDPB) comprising Northern Ireland Railways, Ulsterbus and Citybus (Metro) responsible for providing public transport services in N Ireland • Department for Infrastructure (DfI) sponsor • Organisation manages a diverse portfolio of Bus and Rail Fleet, Infrastructure, Property and Business Systems • Current capital portfolio comprises 350+ projects (BAU and Enhancement programmes) with annual budget of ~£240m
  • 4. Translink PMO • 2008 - Project Control Office - Infrastructure Division • Project Management Procedures (Achieving Excellence in Construction) • Performance Management Framework (Project Stages / Base Line) • 2014 – Virtual PMO (all Divisions) • Holistic Planning / Standardised Performance Management • Step change in capital investment / governance identified • 2016 – P3O Strategy • Adopted best practice P3O governance model to support effective planning and delivery of portfolio and optimised return on investment • 2018 – Portfolio Management Office (Consolidated) • P3O Information Management System (2019)
  • 5. P3O Strategy / Themes • P3O Organisational Governance / Management Structure • Best practice P3O Procedures (Portfolio, Programme, Project) • Integrated P3O planning and performance management framework • Focus on Programme Management – Business Change • Focus on Value / Benefits Management (strategic alignment) • Competency Management Framework • Lessons Learned - continuous improvement • P30 Information Management System / Portal (fit for purpose)
  • 6. P3O Model DoF COE Stakeholders Programmes Projects Delivery Planning & Assurance Delivery DfI Executive Committee Investment Decision Finance Operations Asset Owners HR ICT Interest Groups Portfolio Progress Report Portfolio Office Objective – Informed Decision Making; Optimised Return on Investment; Effective Governance MOU
  • 7. P3O Structure / Levels Portfolio Bus Fleet & Engineering Track Structures S&T Safety Projects Sub-Category Tags / Project Activities Rail Fleet & Engineering Business Systems Property Network Development Network Engineering Transport Hub Electrification Network Capacity Passenger Facilities Carbon Reduction Park & Ride Low/Zero Emission Fleet Engineering New Trains Engineering Ticketing ICT
  • 8. Portfolio Office Functions Planning Delivery Assurance (COE) Strategic Alignment Scenario / Forward Planning Project Prioritisation Financial Planning Benefits Risks / Opportunities Dependencies Change Resource Planning Project Start Up / Closure R&V Workshops Business Case Key Document Review Delivery Strategy Risks Change Information Management Procedures & Templates • Portfolio • Programme • Project Training Gateway / Internal Peer Reviews Post Project Evaluation Lessons Learned Programme/Project Board
  • 9. P3O Reporting Cycle Portfolio Project Programme Start Up / Initiation Business Case Identification / Definition Business Case Strategy, Prioritisation, Base Line Plan Lessons Learned Change Portfolio KPIs Change Program me KPIs Change Lessons Learned Lessons Learned Risks / Issues Cost/ Schedule Cost / Schedule Cost / Schedule Project KPIs Escalation Benefits Risks / Issues Benefits Risks / Issues Benefits Performance Reporting Planning
  • 10. Information Management System - Requirements • Cloud based, Enterprise Management System, Remote Working • Capacity – 800+ projects; 150+ users • PMO Home Page (portal) • Vertically integrated P3O Planning (escalation) • Cost loaded Project Schedules – Financial Planning • Integrated Project Management tools e.g. Risk, Benefits, Change Register • Document management capability • Source data information reporting- single truth; • Bespoke analysis / reporting (established management framework)
  • 11. P3O IM Model Project Online SharePoint Online Project Schedules • Project Stages • Key Milestones • Tagged Activities • Resources • Costs Project Registers • Risks Register • Issues Log • Change Register • Benefits Plan • Lessons Learned • Highlight Report Power BI P3O Reporting Users Project Static Data Document Libraries Project Centre PMO
  • 12. Demonstration of P3O IM System • P3O Portal • Project Online System • Power Bi Reporting
  • 16. Power Bi – Portfolio Dashboard
  • 17. Power Bi – Forward Planning
  • 18. Power Bi – Project KPIs
  • 19. Power Bi – Risk Register
  • 20. Power Bi – Highlight Report
  • 21. Power Bi – Benefits Realisation
  • 22. Power Bi – Lessons Learnt
  • 23. P3O IM Model Refresh P3O Reporting Power BI Users PMO Power Apps Microsoft Project Microsoft Dataverse - Streamlined User Interface - Project Management Tools - Document Management - Cost Loaded Schedules - Project Performance Tracking - Automated Document Sign-off - Data Storage - Design Flexibility
  • 24. P3O System Refresh • Flexibility of Design (Templates) – Microsoft Dataverse • Improved User Interface – Power Apps • Automated document sign off - Workflow • Additional Programme Management Capability • Increased Capacity / Speed • Improved document management