SlideShare a Scribd company logo
1 of 33
Download to read offline
TRAVERSE SURVEY(CONTD…)
Lecture - 3
Fore and Back Bearing:
• Every line has two bearings, one observed at each
end of the line. The bearing of the line which is the
direction of the progress of survey is called fore or
forward bearing (F.B), while its bearing in the
opposite direction is known as back or reverse
bearing (B.B).
• It may be noted that the fore and back bearings of
a line differ exactly by 180o. In the whole circle
bearing system, the back bearing of a line may be
obtained from the fore bearing by using the
following relation:
• Back Bearing = Fore Bearing ± 180o
Fore and Back Bearing
• When the fore bearing is less than 180o, then use
plus sign, and if it exceeds 180o, use minus sign.
• In the quadrantal bearing system, the fore and
back bearings are numerically equal but with
opposite letters. For example, if the fore bearing
of a line is N 40o 25’ E, then the back bearing of a
line is S40o25’W.
To find Back Bearing from Fore Bearing
• Qn: Fore bearing of Line PQ is 38o15’, find Back bearing.
Back Bearing =218o15’
38o15’
P
Q
To find Back Bearing from Fore Bearing
• Qn: Fore bearing of Line RS is 210o15’ find the back
bearing.
210o15’
Back Bearing =30o30’
R
S
Conversion of FB to BB:
• WCB System
• Quadrantal Bearing System
• Examples
• Problems in Book
Local Attraction, Dip and Magnetic
Declination:
• The magnetic needle is deflected from its normal
position when it is under the influence of external
attractive forces (called the sources of local
attraction). Such a disturbing influence in known as
local attraction. The term is also used to denote the
amount of deviation of the needle from its normal
position.
• If the needle is perfectly balanced before
magnetization, it remains in horizontal position. But it
will not remain in the same position after it is
magnetized, on account of the magnetic influence of
the earth. It will be inclined downwards the pole.
• The inclination of the needle with the horizontal is
known as dip of the needle. The amount of dip is
not constant, but varies in different parts of the
earth. It is 0o at the equator and 90o at the
magnetic poles.
• The magnetic meridian at a place does not
coincide with the true meridian at that place
except in few places.
• The horizontal angle which the magnetic
meridian makes with the true meridian is known
as magnetic declination or simply declination.
Local Attraction, Dip and Magnetic
Declination:
When the bearings are given in WCB
When given bearings of the two lines are RB
1. When both the lines lie in the same quadrant
2. When both the lines are on the same side of
different poles
3. When the lines are on different sides of different
poles.
4. When the lines are lying on different side of same
pole.
• Examples
Calculation of Angles from Bearings:
• Bearings observed in the field with the help of magnetic
compass are called observed bearings of that line.
• If we measure the angle between this line and another
line at this point of intersection, the bearings of second
line can be calculated, which is called the calculated
bearing of second line.
Calculated Bearing:
Problem:
• A,B,C,D and E are five survey stations of an closed
traverse. Following are the interior angles :
• ∟A = 78o 10' 40''
• ∟B = 165o 30' 20''
• ∟C = 85o 10' 20''
• ∟D = 120o 45' 20''
• ∟E = 90o 18' 20''
• If the observed bearing of AB is 110o 20' 40'', then
compute the bearings of remaining sides?
Solution
• Since observed bearing of AB is 110o 20' 40'' and we have
to find bearings of:
BC, CD, DE, & EA.
• Bearing of BC = Bearing of BA + angle ABC
= B.B of BA + angle ABC
= F.B of AB ± 180o + angle ABC
= 110o 20' 40'' + 180o + 165o 30' 20''
= 455o 51' > 360o
= 95o 51' (i.e. 455o 51' – 360o )
• Bearing of CD = Bearing of CB + angle BCD
= B.B of CB + angle BCD
= F.B of BC ± 180o + angle BCD
= 95o 51' + 180o + 85o 10' 20''
= 361o 1' 20'' > 360o
= 1o 1' 20'' (i.e. 361o 1' 20'' – 360o)
• Bearing of DE = Bearing of DC + angle CDE
= B.B of DC + angle CDE
= F.B of CD ± 180o + angle CDE
= 1o 1' 20'' + 180o + 120o 45' 20''
= 301o 46' 40''
Solution
• Bearing of EA = Bearing of ED + angle DEA
= B.B of ED + angle DEA
= F.B of DE ± 180o + angle DEA
= 301o 46' 40'' – 180o + 90o 18' 20''
= 212o 5' 0''
Solution
Latitude
• It is a projection of a line parallel to the meridian”
OR
• “Latitude of a line is the length of its projection along the
meridian”
AB' is the latitude of AB.
Lat. (ab) = Lcosθ
Departure
• “Departure of a line is the length of its projection along a
line perpendicular to meridian”
AB'' is the departure of AB.
Dep. (ab) = Lsinθ
• Calculate the latitude & departure from the following
observations?
Problem:
LINE LENGTH (L) BEARINGS (θ) BEARINGS IN
‘W.C.B’
LATITUDE
‘Lcos θ’
DEPARTURE
‘Lsin θ’
AB 522.1 N 43o 50' E 43o 50'
BC 560.0 N 35o 20' E 35o 20'
CD 385.0 N 75o 30' W 284o 30'
DA 360.0 S 60o 30' W 240o 30'
LINE LENGTH (L) BEARINGS (θ) BEARINGS IN
‘W.C.B’
LATITUDE
‘Lcos θ’
DEPARTURE
‘Lsin θ’
AB 522.1 N 43o 50' E 43o 50' --do-- --do--
BC 560.0 N 35o 20' E 35o 20' --do-- --do--
CD 385.0 N 75o 30' W 284o 30' --do-- --do--
DA 360.0 S 60o 30' W 240o 30' --do-- --do--
Solution
CLOSING ERROR OR ERROR OF
ENCLOSURE:
• When there is a gap between the starting point of the first
line and the finishing point of last line. This gap is called
the “error of enclosure”.
• Following data was calculated in connection with a closed
traverse PQRS.
Problem:
LINE LENGTH (L) BEARINGS (θ)
PQ 782 140o12'
QR 1980 36o24'
RS 378 338o48'
SP ? ?
Calculate the missing length & bearing of SP?
LINE LENGTH (L) BEARINGS (θ) LATITUDE
‘Lcos θ’
DEPARTURE
‘Lsin θ’
PQ 782 140o12' -600.797 500.565
QR 1980 36o24' 1593.689 1174.969
RS 378 338o48' 352.418 -136.694
SP ? ? Lat.(sp) Dep.(sp)
Σ = 1345.31 +
Lat.(sp)
Σ = 1538.84 +
Dep.(sp)
Solution
Now;
Lat. (sp) = -1345.31
& Dep. (sp) = -1538.84
• Since we know that:
•
Length of SP = √ (Σ Lat.)2 + (Σ Dep.)2
OR Length of SP = √ (Lat.(sp))2 + (Dep.(sp))2
• Thus on substituting the vales in the above equation, we
get;
• Length of SP = 2043.988
• Also;
θ = tan-1 (Σ dep. / Σ Lat.) = tan-1 (1538.84 / 1345.31)
* S θ W = 48o50'20''
Solution
• In W.C.B, we have
• θ = 180o + 48o50'20''
• θ = --do--
• *NOTE:
• Why we have written “S θ W” and not only “θ”, because
value of SP-Latitude is negative and we know that south
& west directions are taken as negative.
Solution
AREA OF A CLOSED TRAVERSE BY (D.M.D)
METHOD:
• “D.M.D” stands for “Double Meridian Distance”
• Area = ∑ (longitude × latitude)
• 2 × Area = 2 × ∑ (Longitude × Latitude).
= ∑ (2 × Longitude × Latitude).
= ∑ (2 × M.D × latitude).
= ∑ (D.M.D × latitude).
• Area = ½ ∑ (D.M.D × latitude).
Longitude:
• Longitude (or meridian distance) of a line is the
perpendicular distance from a convenient meridian to the
center of the line.
• The most convenient meridian for any particular close
traverse is the North-South line passing through the most
westerly station of the traverse.
• In closed traverse ABCDA, A'1 and B'1 are the mid points of sides
AB & BC respectively.
• A1 and B1 are the foots of perpendicular from A'1 and B'1 on the
Meridian.
• Meridian distance or longitude of AB = A1A'1 = ½ (departure of
AB).
• D.M.D of AB = Departure of AB
• (M.D) Longitude of BC = B1B'1 = A1A'1 + A'1B' +B'B''1
= M.D of AB + ½ Departure of AB +
½ Departure of BC.
AREA OF A CLOSED TRAVERSE BY (D.M.D)
METHOD:
• DMD of BC = DMD of AB + Dep. of AB + Dep. of BC
• Similarly, we can prove that:
• DMD of CD = DMD of BC + Dep. of BC + Dep. of CD
• So;
• In general we have:
• DMD of nth line = DMD of (n-1) th line + Dep. of (n-1) th line + Dep. of
nth line.
• DMD of last line is equal to the departure of that line but with the
opposite sign.
• Area = ½ ∑ (DMD × latitude).
AREA OF A CLOSED TRAVERSE BY (D.M.D)
METHOD:
Line Latitude Departure DMD DMD ×
Latitude
AB -375.98 362.2 362.2 -136179.956
BC 456.82 323.87 1048.27 478870.70
CD 96.40 -372.74 999.4 963421.16
DA -177.27 -313.33 313.33 -55544.0091
Problem:
Solution:
Following are the latitudes and departures of a closed
Traverse ABCDA. Calculate the area enclosed by DMD
method?
Solution
• Area = ½ ∑ (D.M.D × latitude).
= ½ (383488.8949)
• Area = 191744.4475
• *Hint:
323.87 + 362.2 + 362.2 = 1048.27
Traverse Survey Part 2/2

More Related Content

What's hot

Lecture 11 traverse computations
Lecture 11 traverse computations Lecture 11 traverse computations
Lecture 11 traverse computations Awais Ahmad
 
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. AbatayoBPA ABATAYO Land Surveying Services
 
Circular Curves - Surveying - Civil Engineering
Circular Curves - Surveying - Civil EngineeringCircular Curves - Surveying - Civil Engineering
Circular Curves - Surveying - Civil EngineeringAbhishek Jangir
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveysstudent
 
Surveying problem solving
Surveying problem solvingSurveying problem solving
Surveying problem solvingRemmy Cornelius
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Gokul Saud
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsBahzad5
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingRAHUL SINHA
 
Horizontal curves pdf
Horizontal curves pdfHorizontal curves pdf
Horizontal curves pdfKaila Turla
 
Part 5 simple curves updated
Part 5 simple curves updatedPart 5 simple curves updated
Part 5 simple curves updatedPankaj Kushwaha
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric surveyStudent
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptxSaddoAjmal
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse surveyanjali adabala
 

What's hot (20)

Lecture 11 traverse computations
Lecture 11 traverse computations Lecture 11 traverse computations
Lecture 11 traverse computations
 
Ge 105 lecture 5 (STRENGTH OF FIGURE) by: Broddett B. Abatayo
Ge 105 lecture 5 (STRENGTH OF FIGURE) by: Broddett B. AbatayoGe 105 lecture 5 (STRENGTH OF FIGURE) by: Broddett B. Abatayo
Ge 105 lecture 5 (STRENGTH OF FIGURE) by: Broddett B. Abatayo
 
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
 
Circular Curves - Surveying - Civil Engineering
Circular Curves - Surveying - Civil EngineeringCircular Curves - Surveying - Civil Engineering
Circular Curves - Surveying - Civil Engineering
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveys
 
Surveying problem solving
Surveying problem solvingSurveying problem solving
Surveying problem solving
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
GEODETIC Least Square with fx 991-es plus
GEODETIC Least Square with fx 991-es plusGEODETIC Least Square with fx 991-es plus
GEODETIC Least Square with fx 991-es plus
 
Theory of errors
Theory of errors Theory of errors
Theory of errors
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Horizontal curves pdf
Horizontal curves pdfHorizontal curves pdf
Horizontal curves pdf
 
Part 5 simple curves updated
Part 5 simple curves updatedPart 5 simple curves updated
Part 5 simple curves updated
 
Lecture 4 classification of soil
Lecture 4 classification of soilLecture 4 classification of soil
Lecture 4 classification of soil
 
Vertical Curves (Part 1)
Vertical Curves (Part 1)Vertical Curves (Part 1)
Vertical Curves (Part 1)
 
Volume
VolumeVolume
Volume
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse survey
 

Viewers also liked

Viewers also liked (20)

Traverse surveiying
Traverse surveiyingTraverse surveiying
Traverse surveiying
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Traverse Calculation
Traverse Calculation Traverse Calculation
Traverse Calculation
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Surveying
Surveying Surveying
Surveying
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveying
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - Report
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
 
Levelling
LevellingLevelling
Levelling
 
216 surveying traverse explained
216 surveying traverse explained216 surveying traverse explained
216 surveying traverse explained
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
 
Bearings
BearingsBearings
Bearings
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 

Similar to Traverse Survey Part 2/2

Traverse Computations
Traverse ComputationsTraverse Computations
Traverse ComputationsBahzad5
 
4_6041824606606592995.pptx
4_6041824606606592995.pptx4_6041824606606592995.pptx
4_6041824606606592995.pptxAbrshWubishet
 
Compass Surveying.ppt
Compass Surveying.pptCompass Surveying.ppt
Compass Surveying.pptWaseemUllah71
 
Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1Bahzad5
 
Compass survey part 2
Compass survey part 2Compass survey part 2
Compass survey part 2ArunRavi43
 
Arc length, area of a sector and segments of a circle
Arc length, area of a sector and segments of a circleArc length, area of a sector and segments of a circle
Arc length, area of a sector and segments of a circleJoey Valdriz
 
Surveying
SurveyingSurveying
Surveyingredaasd
 
Chapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptxChapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptxSaadtariq82
 
116 coriolis acceleration
116  coriolis acceleration116  coriolis acceleration
116 coriolis accelerationAravind Mohan
 
Circle 10 STB.pptx
Circle 10 STB.pptxCircle 10 STB.pptx
Circle 10 STB.pptxVinod Gupta
 
OCW Chapter 5.pptx
OCW Chapter 5.pptxOCW Chapter 5.pptx
OCW Chapter 5.pptxFelixXZ
 
Math 10 Module 6_Q2.pptx
Math 10 Module 6_Q2.pptxMath 10 Module 6_Q2.pptx
Math 10 Module 6_Q2.pptxHeiroAtamisako
 
applied modern geometry.pptx
applied modern geometry.pptxapplied modern geometry.pptx
applied modern geometry.pptxJennilynBalusdan3
 
curves needed in surveying and levelling
curves needed in surveying and levellingcurves needed in surveying and levelling
curves needed in surveying and levellingPriyankaKotoky1
 
LAY OUT CALCULATIONS (1).pptx
LAY OUT CALCULATIONS (1).pptxLAY OUT CALCULATIONS (1).pptx
LAY OUT CALCULATIONS (1).pptxAkhilVijay19
 
Theodolite surveying part2
Theodolite surveying part2Theodolite surveying part2
Theodolite surveying part2Naufil Sayyad
 

Similar to Traverse Survey Part 2/2 (20)

Traverse Computations
Traverse ComputationsTraverse Computations
Traverse Computations
 
4_6041824606606592995.pptx
4_6041824606606592995.pptx4_6041824606606592995.pptx
4_6041824606606592995.pptx
 
Compass Surveying.ppt
Compass Surveying.pptCompass Surveying.ppt
Compass Surveying.ppt
 
Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1
 
Compass survey part 2
Compass survey part 2Compass survey part 2
Compass survey part 2
 
Arc length, area of a sector and segments of a circle
Arc length, area of a sector and segments of a circleArc length, area of a sector and segments of a circle
Arc length, area of a sector and segments of a circle
 
Surveying
SurveyingSurveying
Surveying
 
Chapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptxChapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptx
 
116 coriolis acceleration
116  coriolis acceleration116  coriolis acceleration
116 coriolis acceleration
 
Circle 10 STB.pptx
Circle 10 STB.pptxCircle 10 STB.pptx
Circle 10 STB.pptx
 
OCW Chapter 5.pptx
OCW Chapter 5.pptxOCW Chapter 5.pptx
OCW Chapter 5.pptx
 
travesing.pdf
travesing.pdftravesing.pdf
travesing.pdf
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Math 10 Module 6_Q2.pptx
Math 10 Module 6_Q2.pptxMath 10 Module 6_Q2.pptx
Math 10 Module 6_Q2.pptx
 
3 circle 1
3  circle 13  circle 1
3 circle 1
 
Curves.pptx
Curves.pptxCurves.pptx
Curves.pptx
 
applied modern geometry.pptx
applied modern geometry.pptxapplied modern geometry.pptx
applied modern geometry.pptx
 
curves needed in surveying and levelling
curves needed in surveying and levellingcurves needed in surveying and levelling
curves needed in surveying and levelling
 
LAY OUT CALCULATIONS (1).pptx
LAY OUT CALCULATIONS (1).pptxLAY OUT CALCULATIONS (1).pptx
LAY OUT CALCULATIONS (1).pptx
 
Theodolite surveying part2
Theodolite surveying part2Theodolite surveying part2
Theodolite surveying part2
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

Traverse Survey Part 2/2

  • 2. Fore and Back Bearing: • Every line has two bearings, one observed at each end of the line. The bearing of the line which is the direction of the progress of survey is called fore or forward bearing (F.B), while its bearing in the opposite direction is known as back or reverse bearing (B.B). • It may be noted that the fore and back bearings of a line differ exactly by 180o. In the whole circle bearing system, the back bearing of a line may be obtained from the fore bearing by using the following relation: • Back Bearing = Fore Bearing ± 180o
  • 3. Fore and Back Bearing • When the fore bearing is less than 180o, then use plus sign, and if it exceeds 180o, use minus sign. • In the quadrantal bearing system, the fore and back bearings are numerically equal but with opposite letters. For example, if the fore bearing of a line is N 40o 25’ E, then the back bearing of a line is S40o25’W.
  • 4. To find Back Bearing from Fore Bearing • Qn: Fore bearing of Line PQ is 38o15’, find Back bearing. Back Bearing =218o15’ 38o15’ P Q
  • 5. To find Back Bearing from Fore Bearing • Qn: Fore bearing of Line RS is 210o15’ find the back bearing. 210o15’ Back Bearing =30o30’ R S
  • 6. Conversion of FB to BB: • WCB System • Quadrantal Bearing System • Examples • Problems in Book
  • 7. Local Attraction, Dip and Magnetic Declination: • The magnetic needle is deflected from its normal position when it is under the influence of external attractive forces (called the sources of local attraction). Such a disturbing influence in known as local attraction. The term is also used to denote the amount of deviation of the needle from its normal position. • If the needle is perfectly balanced before magnetization, it remains in horizontal position. But it will not remain in the same position after it is magnetized, on account of the magnetic influence of the earth. It will be inclined downwards the pole.
  • 8. • The inclination of the needle with the horizontal is known as dip of the needle. The amount of dip is not constant, but varies in different parts of the earth. It is 0o at the equator and 90o at the magnetic poles. • The magnetic meridian at a place does not coincide with the true meridian at that place except in few places. • The horizontal angle which the magnetic meridian makes with the true meridian is known as magnetic declination or simply declination. Local Attraction, Dip and Magnetic Declination:
  • 9.
  • 10. When the bearings are given in WCB When given bearings of the two lines are RB 1. When both the lines lie in the same quadrant 2. When both the lines are on the same side of different poles 3. When the lines are on different sides of different poles. 4. When the lines are lying on different side of same pole. • Examples Calculation of Angles from Bearings:
  • 11. • Bearings observed in the field with the help of magnetic compass are called observed bearings of that line. • If we measure the angle between this line and another line at this point of intersection, the bearings of second line can be calculated, which is called the calculated bearing of second line. Calculated Bearing:
  • 12. Problem: • A,B,C,D and E are five survey stations of an closed traverse. Following are the interior angles : • ∟A = 78o 10' 40'' • ∟B = 165o 30' 20'' • ∟C = 85o 10' 20'' • ∟D = 120o 45' 20'' • ∟E = 90o 18' 20'' • If the observed bearing of AB is 110o 20' 40'', then compute the bearings of remaining sides?
  • 13. Solution • Since observed bearing of AB is 110o 20' 40'' and we have to find bearings of: BC, CD, DE, & EA. • Bearing of BC = Bearing of BA + angle ABC = B.B of BA + angle ABC = F.B of AB ± 180o + angle ABC = 110o 20' 40'' + 180o + 165o 30' 20'' = 455o 51' > 360o = 95o 51' (i.e. 455o 51' – 360o )
  • 14. • Bearing of CD = Bearing of CB + angle BCD = B.B of CB + angle BCD = F.B of BC ± 180o + angle BCD = 95o 51' + 180o + 85o 10' 20'' = 361o 1' 20'' > 360o = 1o 1' 20'' (i.e. 361o 1' 20'' – 360o) • Bearing of DE = Bearing of DC + angle CDE = B.B of DC + angle CDE = F.B of CD ± 180o + angle CDE = 1o 1' 20'' + 180o + 120o 45' 20'' = 301o 46' 40'' Solution
  • 15. • Bearing of EA = Bearing of ED + angle DEA = B.B of ED + angle DEA = F.B of DE ± 180o + angle DEA = 301o 46' 40'' – 180o + 90o 18' 20'' = 212o 5' 0'' Solution
  • 16. Latitude • It is a projection of a line parallel to the meridian” OR • “Latitude of a line is the length of its projection along the meridian” AB' is the latitude of AB. Lat. (ab) = Lcosθ
  • 17. Departure • “Departure of a line is the length of its projection along a line perpendicular to meridian” AB'' is the departure of AB. Dep. (ab) = Lsinθ
  • 18.
  • 19. • Calculate the latitude & departure from the following observations? Problem: LINE LENGTH (L) BEARINGS (θ) BEARINGS IN ‘W.C.B’ LATITUDE ‘Lcos θ’ DEPARTURE ‘Lsin θ’ AB 522.1 N 43o 50' E 43o 50' BC 560.0 N 35o 20' E 35o 20' CD 385.0 N 75o 30' W 284o 30' DA 360.0 S 60o 30' W 240o 30'
  • 20. LINE LENGTH (L) BEARINGS (θ) BEARINGS IN ‘W.C.B’ LATITUDE ‘Lcos θ’ DEPARTURE ‘Lsin θ’ AB 522.1 N 43o 50' E 43o 50' --do-- --do-- BC 560.0 N 35o 20' E 35o 20' --do-- --do-- CD 385.0 N 75o 30' W 284o 30' --do-- --do-- DA 360.0 S 60o 30' W 240o 30' --do-- --do-- Solution
  • 21. CLOSING ERROR OR ERROR OF ENCLOSURE: • When there is a gap between the starting point of the first line and the finishing point of last line. This gap is called the “error of enclosure”.
  • 22. • Following data was calculated in connection with a closed traverse PQRS. Problem: LINE LENGTH (L) BEARINGS (θ) PQ 782 140o12' QR 1980 36o24' RS 378 338o48' SP ? ? Calculate the missing length & bearing of SP?
  • 23. LINE LENGTH (L) BEARINGS (θ) LATITUDE ‘Lcos θ’ DEPARTURE ‘Lsin θ’ PQ 782 140o12' -600.797 500.565 QR 1980 36o24' 1593.689 1174.969 RS 378 338o48' 352.418 -136.694 SP ? ? Lat.(sp) Dep.(sp) Σ = 1345.31 + Lat.(sp) Σ = 1538.84 + Dep.(sp) Solution Now; Lat. (sp) = -1345.31 & Dep. (sp) = -1538.84
  • 24. • Since we know that: • Length of SP = √ (Σ Lat.)2 + (Σ Dep.)2 OR Length of SP = √ (Lat.(sp))2 + (Dep.(sp))2 • Thus on substituting the vales in the above equation, we get; • Length of SP = 2043.988 • Also; θ = tan-1 (Σ dep. / Σ Lat.) = tan-1 (1538.84 / 1345.31) * S θ W = 48o50'20'' Solution
  • 25. • In W.C.B, we have • θ = 180o + 48o50'20'' • θ = --do-- • *NOTE: • Why we have written “S θ W” and not only “θ”, because value of SP-Latitude is negative and we know that south & west directions are taken as negative. Solution
  • 26. AREA OF A CLOSED TRAVERSE BY (D.M.D) METHOD: • “D.M.D” stands for “Double Meridian Distance” • Area = ∑ (longitude × latitude) • 2 × Area = 2 × ∑ (Longitude × Latitude). = ∑ (2 × Longitude × Latitude). = ∑ (2 × M.D × latitude). = ∑ (D.M.D × latitude). • Area = ½ ∑ (D.M.D × latitude).
  • 27. Longitude: • Longitude (or meridian distance) of a line is the perpendicular distance from a convenient meridian to the center of the line. • The most convenient meridian for any particular close traverse is the North-South line passing through the most westerly station of the traverse.
  • 28. • In closed traverse ABCDA, A'1 and B'1 are the mid points of sides AB & BC respectively. • A1 and B1 are the foots of perpendicular from A'1 and B'1 on the Meridian. • Meridian distance or longitude of AB = A1A'1 = ½ (departure of AB). • D.M.D of AB = Departure of AB • (M.D) Longitude of BC = B1B'1 = A1A'1 + A'1B' +B'B''1 = M.D of AB + ½ Departure of AB + ½ Departure of BC. AREA OF A CLOSED TRAVERSE BY (D.M.D) METHOD:
  • 29.
  • 30. • DMD of BC = DMD of AB + Dep. of AB + Dep. of BC • Similarly, we can prove that: • DMD of CD = DMD of BC + Dep. of BC + Dep. of CD • So; • In general we have: • DMD of nth line = DMD of (n-1) th line + Dep. of (n-1) th line + Dep. of nth line. • DMD of last line is equal to the departure of that line but with the opposite sign. • Area = ½ ∑ (DMD × latitude). AREA OF A CLOSED TRAVERSE BY (D.M.D) METHOD:
  • 31. Line Latitude Departure DMD DMD × Latitude AB -375.98 362.2 362.2 -136179.956 BC 456.82 323.87 1048.27 478870.70 CD 96.40 -372.74 999.4 963421.16 DA -177.27 -313.33 313.33 -55544.0091 Problem: Solution: Following are the latitudes and departures of a closed Traverse ABCDA. Calculate the area enclosed by DMD method?
  • 32. Solution • Area = ½ ∑ (D.M.D × latitude). = ½ (383488.8949) • Area = 191744.4475 • *Hint: 323.87 + 362.2 + 362.2 = 1048.27