Aras Innovator PLM Deployment Methodology

  1. 1. BEDIFFERENT ACE 2012 I NTERNATI O NALCopyright © 2012 Aras. All Rights Reserved.
  2. 2. ACE 2012 INTERNATIONAL Aras Innovator Deployment Methodology Strategies for SuccessCopyright © 2012 Aras. All Rights Reserved.
  3. 3. Agenda  Methodology Overview  Getting Organized  Resources  Getting Started  Breaking down a project  Some Tips  How things get sideways  Final thoughtsCopyright © 2012 Aras. All Rights Reserved. Slide 3
  4. 4. The Aras Methodology  Iterative design not a waterfall approach  Based on principles from IBM’s Rational Unified Process  Incorporates Agile development principles  Designed to use the “Small Win” approach  Take a well defined problem(s) and implement with less risk and a higher degree of confidence  Implement a series of Production releases that comprise the complete solution  Each release provides value to the business  Scope each release to be completed in 90 days or lessCopyright © 2012 Aras. All Rights Reserved. Slide 4
  5. 5. A little about the process Designed to be an iterative approach to solution development Well defined but not a concrete prescriptive process Provides an adaptable implementation process framework  Intended to be tailored by selecting the elements that meet your needs Based on Best Practices of software development  Develop Iteratively, risk is the primary iteration driver  Manage Requirements and scope  Continuously verify quality  Control Changes  Manage customization All this leads to improved quality and better predictabilityCopyright © 2012 Aras. All Rights Reserved. Slide 5
  6. 6. Iterative Development The Aras Approach Business value is delivered incrementally in time-boxed cross-discipline iterationsCopyright © 2012 Aras. All Rights Reserved. Slide 6
  7. 7. BREAKING DOWN YOUR PROJECT Manageable PhasesCopyright © 2012 Aras. All Rights Reserved. Slide 7
  8. 8. Inception Phase Decide what to do  Primary Objectives:  Scope the system adequately  Validate initial costing and budget estimates  Activities  Establish Business Case and high level Requirements  High level Use Cases  Project Plan and Initial Risk Assessment  Milestones:  Stakeholder concurrence on scope, cost, and risk  Initial requirements defined (not a lot of detail)  Achieve Project Plan concurrence  Plan is realistic  Business case makes senseCopyright © 2012 Aras. All Rights Reserved. Slide 8
  9. 9. Elaboration Phase Plan the details  Primary Objectives:  Improve requirements and validate  End to End skeleton  Activities  Requirements elaboration  Use Cases  Design Workshops  User validation  Milestones:  Use Cases identified and 80% complete  Requirements are understood & documented  Project Plan refined, cost & risk are managed  Detailed plans for iterations are in placeCopyright © 2012 Aras. All Rights Reserved. Slide 9
  10. 10. Construction Phase Build it  Primary Objectives:  Build the system end to end  Activities  Visual prototypes  Behavioral Prototypes  Data Migration  Unit test  Milestones:  Solution is acceptable to deploy  Project Plan refined, cost & risk are managed  Additional Iterations are plannedCopyright © 2012 Aras. All Rights Reserved. Slide 10
  11. 11. Transition Phase Deploy it  Primary Objectives:  Move the system to production  Training & fine tuning  Activities  End user training  Documentation  Full system test (production environment)  Milestones:  Solution & documentation is ready to deploy  Stakeholders are near ready to deploy  System is functional in productionCopyright © 2012 Aras. All Rights Reserved. Slide 11
  12. 12. OK, GREAT ! Now how does this apply to Aras InnovatorCopyright © 2012 Aras. All Rights Reserved. Slide 12
  13. 13. A Complete Look Disciplines Activities Phases Inception Elaboration Construction Transition Initial Parts Change Parts Change Interface T1 T2 Install Test Environment Project Startup Train Project Team Kickoff Meeting High Level Requirements Discovery workshop(s) Business Modeling SoW Project Charter & Solution Overview High Level Use Cases Requirements Workshops Requirements Requirements Document(s) Gap analysis Use Case Development Solution Design Doc Analysis & Design Functional specs for customizations Screen Mockups Visual Prototypes Import Users Configure Items Configure Forms Configure Workflows Implementation Configure Roles & Permissions Behavioral Prototypes Develop Data Migration Interface development Develop Customizations Prepare Test Plan Test Unit Test Full System Test Prepare User Docs Develop User Training Deployment Deliver User Training Build & Deploy Prod Env Production Data Migration Packaging Configuration Management Migrate Dev-QA-Prod Change Management Initial Project Plan Project Management Initial Risk Analysis Project Planning & Design Review Milestones TIMECopyright © 2012 Aras. All Rights Reserved. Slide 13
  14. 14. Implementation Best Practices  Develop iteratively  Its always best to know all the requirements up front but this is not reality  Don’t spend an inordinate amount of time upfront on requirements and design w/o user validation  Model a little, test a little & repeat  This is a big strong point or Aras Innovator  Manage Requirements  Always keep in mind the requirements set by the users  Model visually  Use diagrams and mock ups  Its what Aras Innovator does really wellCopyright © 2012 Aras. All Rights Reserved. Slide 14
  15. 15. Implementation Best Practices  Use Components  Break down large projects into manageable pieces  Item reuse is a big plus  Again, this is what Aras Innovator does really well  Verify Quality  Always make user testing a major part of the project  Control Change  Ensure changes are synchronized and verified constantly  Use a managed process for implementing iterationsCopyright © 2012 Aras. All Rights Reserved. Slide 15
  16. 16. Making Iterations work Things to think about  Work does not proceed entirely serial  This is not a waterfall approach  Work is done in a serial fashion but you don’t need to finalize a discipline before moving on to the next  Address some requirements, analyze, develop and go back  Iterations should be planned according to risk  Higher priority risks first  Near term iterations are planned in more detail  Longer term items may change in scope, etc  Doesn’t mean that longer term items are not plannedCopyright © 2012 Aras. All Rights Reserved. Slide 16
  17. 17. GETTING STARTED Who, What & HowCopyright © 2012 Aras. All Rights Reserved. Slide 17
  18. 18. Resources Who do you need Role Responsibility Project Manager • Direct Implementation resources • Manage project schedules • Track Status • Resolve conflicts and issues Business Process Owner(s) • Provide project priorities and objectives • Direct participation of resources • Resolve business process issues Subject Matter Experts • Communicate current process • Provide information details • Support user community during rollout I.T. System Support • Support site infrastructure • Extract legacy data • Provide technical expertise Technical Resources • Configure application • Develop customizations • Provide technical expertiseCopyright © 2012 Aras. All Rights Reserved. Slide 18
  19. 19. How to approach it Divide and Conquer  Divide implementation into phases  Preferably phases that provide business values and can be deployed independently  Build a plan for each phase  Choose goals for each phase and make sure you address items with importance or high risk sooner  Divide phases by related business processes  Build high level use cases for these business processes  Its OK if use cases overlap  Break down high level use cases  Detail each use case from a user perspective  These will likely be developed iterativelyCopyright © 2012 Aras. All Rights Reserved. Slide 19
  20. 20. Getting Started  Develop a Project Charter if you need funding  Lets management know what you will do and will not do  Defines a goal and an endpoint to measure success  There are plenty of examples on the web  Develop a Project Plan  Lets resources know what is expected of them  Sets the schedule for the project  Get Trained  The team needs to understand Aras Innovator  Review the standard Aras Innovator Solutions  Required for effective gap analysisCopyright © 2012 Aras. All Rights Reserved. Slide 20
  21. 21. Getting It Done Elaboration - The Key Points Make sure you achieve concurrence on requirements  This provides mutual understanding and prevents individual interpretations of the project Document use cases and requirements  These will be used to provide context to the team  Will be leveraged later in the project for other activities Validate this with Subject Matter Experts & End Users  Do NOT underestimate the IMPORTANCE of thisCopyright © 2012 Aras. All Rights Reserved. Slide 21
  22. 22. Getting It Done Construction - The Key Points  Visual Prototypes  This is just building things in Aras Innovator  Used to solicit user feedback  May cause you to revisit use cases and specifications  Should not include automation  Don’t worry about getting it 100% right  Behavioral Prototype  Adds automation to the Visual Prototype  Will likely cause you to revisit use cases and specifications  Will introduce changes to the Visual prototype  Includes building interfaces and integrationsCopyright © 2012 Aras. All Rights Reserved. Slide 22
  23. 23. Getting It Done Transition – The Key Points  Test Plans  These are based on use cases  Testing and Validation  Unit testing is important for managing iterations  Conference Room Pilots are good for user validation  Full system test  Training  Don’t under estimate the time it takes to develop materials or train end users  Production Cutover  Plan, Plan, Plan, - There WILL be external influencesCopyright © 2012 Aras. All Rights Reserved. Slide 23
  24. 24. How Things Get Sideways  Lack of understanding of requirements or agreement on requirements with end users  Lack of understanding of the standard out-of-the-box Aras Innovator solutions  Lack of Training  Understanding the impact of change  Biting off too much at one time!Copyright © 2012 Aras. All Rights Reserved. Slide 24
  25. 25. Our Recommendations  Training is a MUST  Engage Aras or a partner for jump start activities  Project phasing & planning  Requirements review  Architectural guidance  Leverage experience to recommend best practices or how approached in similar scenarios  Use case development  Initial architectural design review  Periodic reviews and questions  Solve a real problem and move on to the nextCopyright © 2012 Aras. All Rights Reserved. Slide 25
  26. 26. Final Thoughts Dos and Don’ts  DO  Create visual prototypes and get user validation before developing any method code  Develop accurate Use Cases and keep them up to date • They will save you time down the road !!  Look for “Small Wins” that provide business value  DON’T  Spend a significant amount of time developing specs w/o prototyping the solution  Worry about not getting 100% of the detailed requirements up front… because you can’t!Copyright © 2012 Aras. All Rights Reserved. Slide 26
  27. 27. THANK YOU Questions?Copyright © 2012 Aras. All Rights Reserved. Slide 27