© 2016 Aras aras.com
Aras Vision & Roadmap
Rob McAveney
Chief Architect
© 2016 Aras aras.com
QP
PM
PE
RM
CE
Just Two Years Ago…
© 2013 Aras aras.com
Configuration
Traceability
Visual
Collaboration
Phase-Gate /
Workflow
Reporting &
Analytics
Access
Control
ERP
CAD
Concept Design Development Launch Manufacture Support
QP
PM
PE
RM
CE
Since then…
© 2013 Aras aras.com
Configuration
Traceability
Visual
Collaboration
Phase-Gate /
Workflow
Reporting &
Analytics
Access
Control
ERP
RMRM
TD
PM
CECE
PE
QP
CAD
Concept Design Development Launch Manufacture Support
QP
PM
PE
RM
CE
And in just a few months…
© 2013 Aras aras.com
Configuration
Traceability
Visual
Collaboration
Phase-Gate /
Workflow
Reporting &
Analytics
Access
Control
ERP
RMRM
TD
MPP
QMS
PM
CECE
PE
QP
CAD
Concept Design Development Launch Manufacture Support
AS SERVICED
C
F
D
H
J
K
O
L
G
T
SN #97
SN #44
A SN #6
Q SN #71
R
S
AS DELIVERED
C
F
D
H
J
K
O
L
G
T
SN #89
SN #44
R
S
Q
A SN #6
SN #71
AS BUILT
C
F
D
I
J
K
O
L
G
T
SN #89
SN #44
Q
R
S
SN #53
AA SN #6
AS PLANNED
P1
C
F
D
P2
IH
J
K
O
L
G
T
Q
R
S
A
AS ORDERED
B
C
F
D
G
IH
J
K
O
L
Q
R
S
A
AS DESIGNED
B
C
FE
D
G
IH
K
M
O
L
J
Q
R
S
A
LOGICAL
L2
L7
L3
L8
L5
L6
L4
L9
L10
L11
L1
FUNCTIONAL
F2
F8
F6
F4
F11
F10
F12
F9
F5
F7
F3
F13
F15
F14
F16
F1
REQUIRED
R2
R7
R3
R8
R5
R6
R4
R9
R10
R11
R14
R13
R1
R12
Another View
© 2016 Aras aras.com
Concept Design Development Launch Manufacture Support
AS PLANNED
P1
C
F
D
P2
IH
J
K
O
L
G
T
Q
R
S
A
AS ORDERED
B
C
F
D
G
IH
J
K
O
L
Q
R
S
A
AS DESIGNED
B
C
FE
D
G
IH
K
M
O
L
J
Q
R
S
A
AS DELIVERED
C
F
D
H
J
K
O
L
G
T
SN #89
SN #44
R
S
Q
A SN #6
SN #71
AS SERVICED
C
F
D
H
J
K
O
L
G
T
SN #97
SN #44
A SN #6
Q SN #71
R
S
FUNCTIONAL
F2
F8
F6
F4
F11
F10
F12
F9
F5
F7
F3
F13
F15
F14
F16
F1
LOGICAL
L2
L7
L3
L8
L5
L6
L4
L9
L10
L11
L1
REQUIRED
R2
R7
R3
R8
R5
R6
R4
R9
R10
R11
R14
R13
R1
R12
AS BUILT
C
F
D
I
J
K
O
L
G
T
SN #89
SN #44
Q
R
S
SN #53
AA SN #6
Filling the Gaps
© 2016 Aras aras.com
Concept Design Development Launch Manufacture Support
MBSE
PVC
MES
MRO
System Modeling
Model Based Systems Engineering
© 2016 Aras aras.com
LOGICAL
L2
L7
L3
L8
L5
L6
L4
L9
L10
L11
L1
FUNCTIONAL
F2
F8
F6
F4
F11
F10
F12
F9
F5
F7
F3
F13
F15
F14
F16
F1
Variant Product Configuration
© 2016 Aras aras.com
AS ORDERED
B
C
F
D
G
IH
J
K
O
L
Q
R
S
A
Browser
Option A
Option B
Option C
Color
Manufacturing Execution
© 2016 Aras aras.com
AS DELIVERED
C
F
D
H
J
K
O
L
G
T
SN #89
SN #44
R
S
Q
A SN #6
SN #71
AS BUILT
C
F
D
I
J
K
O
L
G
T
SN #89
SN #44
Q
R
S
SN #53
AA SN #6
TRAVELER
Maintenance, Repair & Overhaul
© 2016 Aras aras.com
Rear Fan Replacement
5. Remove the old fan unit
6. Insert the new fan unit. Record the serial number: D4218220
7. Insert two (2) 6-32 x ¼” PPSS Screws. Torque to a
minimum of 20 lb-ft. Actual torque: 24 lb-ft
AS SERVICED
C
F
D
H
J
K
O
L
G
T
SN #97
SN #44
A SN #6
Q SN #71
R
S
AS PLANNED
P1
C
F
D
P2
IH
J
K
O
L
G
T
Q
R
S
A
AS ORDERED
B
C
F
D
G
IH
J
K
O
L
Q
R
S
A
AS DESIGNED
B
C
FE
D
G
IH
K
M
O
L
J
Q
R
S
A
AS DELIVERED
C
F
D
H
J
K
O
L
G
T
SN #89
SN #44
R
S
Q
A SN #6
SN #71
AS SERVICED
C
F
D
H
J
K
O
L
G
T
SN #97
SN #44
A SN #6
Q SN #71
R
S
FUNCTIONAL
F2
F8
F6
F4
F11
F10
F12
F9
F5
F7
F3
F13
F15
F14
F16
F1
LOGICAL
L2
L7
L3
L8
L5
L6
L4
L9
L10
L11
L1
REQUIRED
R2
R7
R3
R8
R5
R6
R4
R9
R10
R11
R14
R13
R1
R12
AS BUILT
C
F
D
I
J
K
O
L
G
T
SN #89
SN #44
Q
R
S
SN #53
AA SN #6
The Goal: Full Lifecycle Traceability
© 2016 Aras aras.com
Concept Design Development Launch Manufacture Support
© 2016 Aras aras.com
Configuration
Traceability
Visual
Collaboration
Phase-Gate /
Workflow
Reporting &
Analytics
Access
Control
PLATFORM Services
Web Service
Publish
Branch and Merge UI Toolkit
Web Service Publish
© 2016 Aras aras.com
Web Service - REST/OData – Supplier A
Part
Supplier = “A”
Part Number
Description
Part BOM
Quanitity
PUBLISH SUPPLIER A
PLM
D.9D.8C.7C.6B.5B.4B.3
Branch & Merge
© 2016 Aras aras.com
A.1 A.2
Current state of PLM market
Branch & Merge
© 2016 Aras aras.com
Where Aras is headed
Branch & Merge
© 2016 Aras aras.com
ECO 1
Where Aras is headed
Branch & Merge
© 2016 Aras aras.com
ECO 1
ECO 2
Where Aras is headed
Branch & Merge
© 2016 Aras aras.com
ECO 1
ECO 2
Where Aras is headed
ECO 3
Branch & Merge
© 2016 Aras aras.com
ECO 1
ECO 2
Where Aras is headed
ECO 3
Branch & Merge
© 2016 Aras aras.com
ECO 1
ECO 2
Where Aras is headed
User Interface Toolkit
© 2016 Aras aras.com
Control Library
T
O
C
Search Grid
Form
Tab Bar
Relationships Grid
Dashboard Menu
Status Bar
Dialog
Structure
Browser
2D /3D
Viewer
Ribbon
Toolbar
User Interface Toolkit
© 2016 Aras aras.com
BrowserControl Library
Ribbon
Form
Tab Bar
Relationships Grid
T
O
C
Search Grid
Form
Tab Bar
Relationships Grid
Dashboard Menu
Status Bar
Dialog
Structure
Browser
2D /3D
Viewer
Ribbon
Toolbar
User Interface Toolkit
© 2016 Aras aras.com
BrowserControl Library
Ribbon
Form
Tab Bar
Relationships Grid
CAD Tool
Search
Grid
Toolbar
T
O
C
Search Grid
Form
Tab Bar
Relationships Grid
Dashboard Menu
Status Bar
Dialog
Structure
Browser
2D /3D
Viewer
Ribbon
Toolbar
User Interface Toolkit
© 2016 Aras aras.com
BrowserControl Library
Ribbon
Form
Tab Bar
Relationships Grid
Structure
Browser
Toolbar
Form
CAD Tool
Search
Grid
Toolbar
Dashboard
Ribbon
T
O
C
Search Grid
Form
Tab Bar
Relationships Grid
Dashboard Menu
Status Bar
Dialog
Structure
Browser
2D /3D
Viewer
Ribbon
Toolbar
User Interface Toolkit
© 2016 Aras aras.com
Windows App
BrowserControl Library
Ribbon
Form
Tab Bar
Relationships Grid
Structure
Browser
Toolbar
Form
Search Grid
2D /3D Viewer
CAD Tool
Search
Grid
Toolbar
Dashboard
Ribbon
T
O
C
Search Grid
Form
Tab Bar
Relationships Grid
Dashboard Menu
Status Bar
Dialog
Structure
Browser
2D /3D
Viewer
Ribbon
Toolbar
© 2016 Aras aras.com
introducing
Mobile Apps
© 2016 Aras aras.com
8:37 am
aras DISCUSSIONS
Enter a comment…
David…
2 min ago
Please check for
cooling obstructio…
Nancy
Anderson
3 days ago
Thermal testing is
complete, we’re
running 5-6 deg C
over the limit. Can
you please take a…
David…
1 day ago
OK, I will start an
ECO for a…
Terry…
3 days ago
These numbers
look a little off…
Web Services
© 2016 Aras aras.com
Connectors
© 2016 Aras aras.com
Community Solutions
© 2016 Aras aras.com
© 2016 Aras aras.com

Aras Vision and Roadmap 2016

  • 1.
    © 2016 Arasaras.com
  • 2.
    Aras Vision &Roadmap Rob McAveney Chief Architect © 2016 Aras aras.com
  • 3.
    QP PM PE RM CE Just Two YearsAgo… © 2013 Aras aras.com Configuration Traceability Visual Collaboration Phase-Gate / Workflow Reporting & Analytics Access Control ERP CAD Concept Design Development Launch Manufacture Support
  • 4.
    QP PM PE RM CE Since then… © 2013Aras aras.com Configuration Traceability Visual Collaboration Phase-Gate / Workflow Reporting & Analytics Access Control ERP RMRM TD PM CECE PE QP CAD Concept Design Development Launch Manufacture Support
  • 5.
    QP PM PE RM CE And in justa few months… © 2013 Aras aras.com Configuration Traceability Visual Collaboration Phase-Gate / Workflow Reporting & Analytics Access Control ERP RMRM TD MPP QMS PM CECE PE QP CAD Concept Design Development Launch Manufacture Support
  • 6.
    AS SERVICED C F D H J K O L G T SN #97 SN#44 A SN #6 Q SN #71 R S AS DELIVERED C F D H J K O L G T SN #89 SN #44 R S Q A SN #6 SN #71 AS BUILT C F D I J K O L G T SN #89 SN #44 Q R S SN #53 AA SN #6 AS PLANNED P1 C F D P2 IH J K O L G T Q R S A AS ORDERED B C F D G IH J K O L Q R S A AS DESIGNED B C FE D G IH K M O L J Q R S A LOGICAL L2 L7 L3 L8 L5 L6 L4 L9 L10 L11 L1 FUNCTIONAL F2 F8 F6 F4 F11 F10 F12 F9 F5 F7 F3 F13 F15 F14 F16 F1 REQUIRED R2 R7 R3 R8 R5 R6 R4 R9 R10 R11 R14 R13 R1 R12 Another View © 2016 Aras aras.com Concept Design Development Launch Manufacture Support
  • 7.
    AS PLANNED P1 C F D P2 IH J K O L G T Q R S A AS ORDERED B C F D G IH J K O L Q R S A ASDESIGNED B C FE D G IH K M O L J Q R S A AS DELIVERED C F D H J K O L G T SN #89 SN #44 R S Q A SN #6 SN #71 AS SERVICED C F D H J K O L G T SN #97 SN #44 A SN #6 Q SN #71 R S FUNCTIONAL F2 F8 F6 F4 F11 F10 F12 F9 F5 F7 F3 F13 F15 F14 F16 F1 LOGICAL L2 L7 L3 L8 L5 L6 L4 L9 L10 L11 L1 REQUIRED R2 R7 R3 R8 R5 R6 R4 R9 R10 R11 R14 R13 R1 R12 AS BUILT C F D I J K O L G T SN #89 SN #44 Q R S SN #53 AA SN #6 Filling the Gaps © 2016 Aras aras.com Concept Design Development Launch Manufacture Support MBSE PVC MES MRO
  • 8.
    System Modeling Model BasedSystems Engineering © 2016 Aras aras.com LOGICAL L2 L7 L3 L8 L5 L6 L4 L9 L10 L11 L1 FUNCTIONAL F2 F8 F6 F4 F11 F10 F12 F9 F5 F7 F3 F13 F15 F14 F16 F1
  • 9.
    Variant Product Configuration ©2016 Aras aras.com AS ORDERED B C F D G IH J K O L Q R S A Browser Option A Option B Option C Color
  • 10.
    Manufacturing Execution © 2016Aras aras.com AS DELIVERED C F D H J K O L G T SN #89 SN #44 R S Q A SN #6 SN #71 AS BUILT C F D I J K O L G T SN #89 SN #44 Q R S SN #53 AA SN #6 TRAVELER
  • 11.
    Maintenance, Repair &Overhaul © 2016 Aras aras.com Rear Fan Replacement 5. Remove the old fan unit 6. Insert the new fan unit. Record the serial number: D4218220 7. Insert two (2) 6-32 x ¼” PPSS Screws. Torque to a minimum of 20 lb-ft. Actual torque: 24 lb-ft AS SERVICED C F D H J K O L G T SN #97 SN #44 A SN #6 Q SN #71 R S
  • 12.
    AS PLANNED P1 C F D P2 IH J K O L G T Q R S A AS ORDERED B C F D G IH J K O L Q R S A ASDESIGNED B C FE D G IH K M O L J Q R S A AS DELIVERED C F D H J K O L G T SN #89 SN #44 R S Q A SN #6 SN #71 AS SERVICED C F D H J K O L G T SN #97 SN #44 A SN #6 Q SN #71 R S FUNCTIONAL F2 F8 F6 F4 F11 F10 F12 F9 F5 F7 F3 F13 F15 F14 F16 F1 LOGICAL L2 L7 L3 L8 L5 L6 L4 L9 L10 L11 L1 REQUIRED R2 R7 R3 R8 R5 R6 R4 R9 R10 R11 R14 R13 R1 R12 AS BUILT C F D I J K O L G T SN #89 SN #44 Q R S SN #53 AA SN #6 The Goal: Full Lifecycle Traceability © 2016 Aras aras.com Concept Design Development Launch Manufacture Support
  • 13.
    © 2016 Arasaras.com Configuration Traceability Visual Collaboration Phase-Gate / Workflow Reporting & Analytics Access Control PLATFORM Services Web Service Publish Branch and Merge UI Toolkit
  • 14.
    Web Service Publish ©2016 Aras aras.com Web Service - REST/OData – Supplier A Part Supplier = “A” Part Number Description Part BOM Quanitity PUBLISH SUPPLIER A PLM
  • 15.
    D.9D.8C.7C.6B.5B.4B.3 Branch & Merge ©2016 Aras aras.com A.1 A.2 Current state of PLM market
  • 16.
    Branch & Merge ©2016 Aras aras.com Where Aras is headed
  • 17.
    Branch & Merge ©2016 Aras aras.com ECO 1 Where Aras is headed
  • 18.
    Branch & Merge ©2016 Aras aras.com ECO 1 ECO 2 Where Aras is headed
  • 19.
    Branch & Merge ©2016 Aras aras.com ECO 1 ECO 2 Where Aras is headed
  • 20.
    ECO 3 Branch &Merge © 2016 Aras aras.com ECO 1 ECO 2 Where Aras is headed
  • 21.
    ECO 3 Branch &Merge © 2016 Aras aras.com ECO 1 ECO 2 Where Aras is headed
  • 22.
    User Interface Toolkit ©2016 Aras aras.com Control Library T O C Search Grid Form Tab Bar Relationships Grid Dashboard Menu Status Bar Dialog Structure Browser 2D /3D Viewer Ribbon Toolbar
  • 23.
    User Interface Toolkit ©2016 Aras aras.com BrowserControl Library Ribbon Form Tab Bar Relationships Grid T O C Search Grid Form Tab Bar Relationships Grid Dashboard Menu Status Bar Dialog Structure Browser 2D /3D Viewer Ribbon Toolbar
  • 24.
    User Interface Toolkit ©2016 Aras aras.com BrowserControl Library Ribbon Form Tab Bar Relationships Grid CAD Tool Search Grid Toolbar T O C Search Grid Form Tab Bar Relationships Grid Dashboard Menu Status Bar Dialog Structure Browser 2D /3D Viewer Ribbon Toolbar
  • 25.
    User Interface Toolkit ©2016 Aras aras.com BrowserControl Library Ribbon Form Tab Bar Relationships Grid Structure Browser Toolbar Form CAD Tool Search Grid Toolbar Dashboard Ribbon T O C Search Grid Form Tab Bar Relationships Grid Dashboard Menu Status Bar Dialog Structure Browser 2D /3D Viewer Ribbon Toolbar
  • 26.
    User Interface Toolkit ©2016 Aras aras.com Windows App BrowserControl Library Ribbon Form Tab Bar Relationships Grid Structure Browser Toolbar Form Search Grid 2D /3D Viewer CAD Tool Search Grid Toolbar Dashboard Ribbon T O C Search Grid Form Tab Bar Relationships Grid Dashboard Menu Status Bar Dialog Structure Browser 2D /3D Viewer Ribbon Toolbar
  • 27.
    © 2016 Arasaras.com introducing
  • 28.
    Mobile Apps © 2016Aras aras.com 8:37 am aras DISCUSSIONS Enter a comment… David… 2 min ago Please check for cooling obstructio… Nancy Anderson 3 days ago Thermal testing is complete, we’re running 5-6 deg C over the limit. Can you please take a… David… 1 day ago OK, I will start an ECO for a… Terry… 3 days ago These numbers look a little off…
  • 29.
    Web Services © 2016Aras aras.com
  • 30.
  • 31.
  • 32.
    © 2016 Arasaras.com