Environmental Consideration in Mechanisation of
Construction Projects.
BY:
AKSHAY R MANOHAR
M.Tech(Construction Technology) CIVIL ENGINEERING DEPT. NMAMIT-NITTE.
Environmental Guidelines for Major
Construction Sites
• Construction practices that fail to control pollution can
cause damage to waterways and wetlands, kill fish,
upset aquatic ecological systems and wildlife
communities, and result in contamination of land and
groundwater.
• The risk to the environment is particularly high when
work is done near coastal areas, streams and creeks, or
along a river valley.
• When construction occurs near built-up areas, poor
practices may result in air and noise pollution which
may cause annoyance and affect the health of
neighbouring communities.
CONTENTS:
1. Purpose and application
2. Pre-construction planning and design
3. Environmental management plan
4. Land disturbance
5. Noise and vibration
6. Waste minimisation
7. Contaminated material and wastes
8. Other environmental issues
9. Inspections, monitoring and audits
1.Purpose and application
• minimising environmental impact-cost benefit
• guidelines for undertaking risk assessment
and management
• Assessment - impact of construction activities
on the environment.
• suggested best practice environmental
measures to meet the performance objectives
based on available experience.
• The Guidelines are not universal.
2. Pre-construction planning and
design
• Integrating environment protection at
planning stage ensures minimal pollution.
• more cost-effective than establishing controls
• Risk assessment :Probability, frequency, time
frame.
• Risk assessment: endangered flora and fauna,
aquatic plant and animals, ground water
recharge areas....
3. ENVIRONMENTAL MANAGEMENT
PLAN
• Objective: to minimize adverse impact of construction activities on the
environment.
• The environmental management system establishes quality systems to
ensure consistently high environment outcomes for the project as a
whole. British Standard 7750, which has gained wide international
acceptance, or the soon to be adopted ISO 14000 series should be used.
• A large construction area is divided into many.
• Work scheduling
• Land disturbance
• Storm water management
• Special operational precautions and Contingency plans
• Rehabilitation
• Maintenance, inspections and surveillance
• Ongoing risk assessment and management
• Updating the plan
4. LAND DISTURBANCE
• Objective: To minimise the quantity of soil lost
during construction due to land-clearing.
• Schedule well while Design stage.
• Control measures: a separate division
required.
• Keep vehicles on specified path...
• Rehabilitate: Grow some grass.
STORMWATER MANAGEMENT
• Objective: To minimise the generation of
contaminated storm water.
• Minimise the quantity of entering.
• Establish intercept drains.
• Reduce water velocity.
• Study-History of soil, rainfall.
DE-WATERING WORK SITES
• Objective: To ensure that de-watering
operations do not result in turbid water
entering natural waterways.
• Treat contaminated water pumped into the a
natural waterway to remove sediment if the
turbidity exceeds 30 NTU.
• Supervise and Monitor.
DUST CONTROL
• Objective: To ensure there is no health risk or
loss of amenity due to emission of dust to the
environment.
• Dust prevention strategy: at the project
planning stage.
• dust suppression measures: water sprying
and intall wind fences...
MANAGEMENT OF STOCKPILES.
• Objective: To manage soil stockpiles so that
dust and sediment in run-off are minimised.
• Don’t go for too much stock.
• Maintain dust & flood free environment.
• Stabilise stocks if they are stored for longer.
5. NOISE AND VIBRATION
• Objective: To ensure nuisance from noise and vibration
does not occur.
• Study it and minimize it.
• Fit and maintain appropriate mufflers on earth-moving
and other vehicles on the site.
• Enclose noisy equipment
• Provide noise attenuation screens, where appropriate.
• Maintain timings and respect ur neighbours.
• Plan for no traffic.
6. WASTE MINIMISATION
• Objective: To minimise the waste load
discharged to the environment.
• Study it and minimize it.
• Prioritise them and neutralize it.
• Have some target and maintain it.
7. CONTAMINATED MATERIAL AND
WASTES
• Objective: To ensure that all contaminated
material uncovered on a construction site are
excavated and disposed of in an environmentally
responsible manner.
• Excavate material in a manner which avoids off-
site environmental problems.
• Seal contaminated material to ensure that there
is no off-site effect now or in the future.
• Transport odorous wastes in covered vehicles
• Dispose of contaminated material in a licensed
landfill.
8 OTHER ENVIRONMENTAL ISSUES
• AIR QUALITY:
• Objective: To ensure there is no health risk or
loss of amenity due to emission of exhaust
gases to the environment.
• Well serviced emission controlled, smoke
shouldn’t visible >10 sec.
8. OTHER ENVIRONMENTAL ISSUES
COTINUE………
• LITTER:
• Objective: To ensure that all litter is disposed
of in a responsible manner, and is not released
into the environment.
• Maintain a high quality of housekeeping.
• Provide bins for construction workers and
staff at locations where they consume food.
• Conduct ongoing awareness with staff of the
need to avoid littering.
8. OTHER ENVIRONMENTAL ISSUES
COTINUE………
• STORING FUELS AND CHEMICALS:
• Objective: To ensure that fuel and chemical
storage is safe, and that any materials that
escape do not cause environmental damage.
• Minimise fuels and chemicals stored on- site.
• Install bunds and take other precautions to
reduce the risk of spills.
• Implement a contingency plan to handle spills.
8. OTHER ENVIRONMENTAL ISSUES
COTINUE………
• KEEPING ROADS CLEAN:
• Objective: To ensure that roads are kept clean of
soil.
• Ensure that the roads are swept at least once a
day on uncontrolled road crossings when
construction vehicles are travelling off the site.
• Install litter traps lined with filter cloth in all side-
entry pits .
• Cover all loads of soil being taken off site for
disposal.
8 OTHER ENVIRONMENTAL ISSUES
COTINUE………
• Protecting infrastructure:
• In built-up areas, care needs to be taken in
working near existing infrastructure services
such as drainage and sewerage pipes.
• Appropriate machinery must be used within
concrete channels to avoid damage to
structures.
8. OTHER ENVIRONMENTAL ISSUES
COTINUE………
• Concrete batching plants:
• Sometimes very large construction projects
will establish on-site concrete batching plants.
• Plants need to be designed in accordance with
EPA guidelines13.
• Constructing a plant which is designed to have
a throughput of greater than 100 tonnes per
week will need an EPA works approval.
•
INSPECTIONS, MONITORING AND
AUDITING
• Objective: Conduct checks on significant environmental risks to
ensure that they are adequately managed and control systems are
operating effectively.
• • Establish a baseline monitoring program before construction
commences.
• • Prepare an inspection, monitoring and auditing program,
designed to match the environmental risks.
• • Ensure that remedial action is taken promptly when monitoring,,
inspections or audit results reveal a problem in environment
management.
• • Ensure that all monitoring is conducted by a NATA registered
laboratory, either directly, or under supervision.
• • Arrange for regular independent audits of environmental
performance and the environmental management system
THANK YOU

More Related Content

What's hot

civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionAshwiniChaudhari13
 
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENT
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENTEFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENT
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENTSona Rawat
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety ManagementGAURAV. H .TANDON
 
Construction management
Construction managementConstruction management
Construction managementUsama Khalid
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering fieldswetha110
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisationCharul Sharma
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...A Makwana
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 

What's hot (20)

civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENT
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENTEFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENT
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENT
 
Pavement ppt
Pavement pptPavement ppt
Pavement ppt
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
 
Construction management
Construction managementConstruction management
Construction management
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering field
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisation
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety management
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Study of MORT_&_H
Study of MORT_&_HStudy of MORT_&_H
Study of MORT_&_H
 
Earthwork and excavation
Earthwork  and  excavationEarthwork  and  excavation
Earthwork and excavation
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
construction project planing
 construction project planing construction project planing
construction project planing
 

Viewers also liked

Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projectsbuckje123
 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Blake, Cassels & Graydon LLP
 
Environmental Concerns in Construction Projects- KSPCB Simha
Environmental Concerns in Construction Projects-   KSPCB SimhaEnvironmental Concerns in Construction Projects-   KSPCB Simha
Environmental Concerns in Construction Projects- KSPCB SimhaADDA
 
Macro Environmental impact on Construction industry
Macro Environmental impact on Construction industryMacro Environmental impact on Construction industry
Macro Environmental impact on Construction industryNadeesha273
 
Green building construction for sustainable future
Green building construction for sustainable futureGreen building construction for sustainable future
Green building construction for sustainable futureAlexander Decker
 
Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...Poonam Sankhe
 
Environmental problems and solutions
Environmental problems and solutionsEnvironmental problems and solutions
Environmental problems and solutionsLogos Academy
 
Environmental Awareness Presentation
Environmental Awareness PresentationEnvironmental Awareness Presentation
Environmental Awareness Presentationrfelters
 
Powerpoint on environmental issues
Powerpoint on environmental issuesPowerpoint on environmental issues
Powerpoint on environmental issuesMonika Uppal
 
Construction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environmentConstruction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environmentCaryl Jane Veriña
 
The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...MacDarragh Fitzpatrick
 
Environmental Consideration
Environmental Consideration Environmental Consideration
Environmental Consideration haroldtaylor1113
 
Environmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment DecisionsEnvironmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment DecisionsEric Fornell
 
Environmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwinedEnvironmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwinedWendy Mah
 
Xmas dust presentation
Xmas dust presentationXmas dust presentation
Xmas dust presentationMCSAROY
 

Viewers also liked (20)

Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projects
 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011
 
Environmental Concerns in Construction Projects- KSPCB Simha
Environmental Concerns in Construction Projects-   KSPCB SimhaEnvironmental Concerns in Construction Projects-   KSPCB Simha
Environmental Concerns in Construction Projects- KSPCB Simha
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
Macro Environmental impact on Construction industry
Macro Environmental impact on Construction industryMacro Environmental impact on Construction industry
Macro Environmental impact on Construction industry
 
Green building construction for sustainable future
Green building construction for sustainable futureGreen building construction for sustainable future
Green building construction for sustainable future
 
Sustainable Development
Sustainable DevelopmentSustainable Development
Sustainable Development
 
Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...
 
Environmental problems and solutions
Environmental problems and solutionsEnvironmental problems and solutions
Environmental problems and solutions
 
Environmental Awareness Presentation
Environmental Awareness PresentationEnvironmental Awareness Presentation
Environmental Awareness Presentation
 
Powerpoint on environmental issues
Powerpoint on environmental issuesPowerpoint on environmental issues
Powerpoint on environmental issues
 
Save Environment PPT
Save Environment PPTSave Environment PPT
Save Environment PPT
 
Construction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environmentConstruction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environment
 
The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...
 
Environmental Consideration
Environmental Consideration Environmental Consideration
Environmental Consideration
 
Record of Environmental Consideration for the PCAPP Demilitarization Activi...
Record of Environmental Consideration for the PCAPP Demilitarization Activi...Record of Environmental Consideration for the PCAPP Demilitarization Activi...
Record of Environmental Consideration for the PCAPP Demilitarization Activi...
 
Environmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment DecisionsEnvironmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment Decisions
 
Environmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwinedEnvironmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwined
 
Env training ppt rev01
Env training ppt rev01Env training ppt rev01
Env training ppt rev01
 
Xmas dust presentation
Xmas dust presentationXmas dust presentation
Xmas dust presentation
 

Similar to Environmental Considerations in Construction

Impact of desalination plant
Impact of desalination plantImpact of desalination plant
Impact of desalination plantLincy Jancy
 
Active landfill
Active landfillActive landfill
Active landfillMOHIT JAIN
 
CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptxFARSANA26
 
Secure landfilling.pptx
Secure landfilling.pptxSecure landfilling.pptx
Secure landfilling.pptxDrSr6
 
EPSC Module 2 Unit 1
EPSC Module 2 Unit 1EPSC Module 2 Unit 1
EPSC Module 2 Unit 1ejve22
 
EIA of offshore drilling and dredging
EIA of  offshore drilling and dredgingEIA of  offshore drilling and dredging
EIA of offshore drilling and dredgingbivin ebenezer
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operationarushe143
 
17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materialsNoshad Ahmed Wahocho
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016Travis Both
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into LandSaleh Sayem
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxssuser65cc68
 
Mitigational measures for Mines
Mitigational measures for MinesMitigational measures for Mines
Mitigational measures for MinesSachin Kumar Sinha
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projectsAnchal Garg
 
NSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.pptNSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.pptlala resie
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1Theodore McNeal
 
Road development projects.
Road development projects.Road development projects.
Road development projects.Abhishek Rajput
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tankkalyanmaji
 

Similar to Environmental Considerations in Construction (20)

Impact of desalination plant
Impact of desalination plantImpact of desalination plant
Impact of desalination plant
 
Active landfill
Active landfillActive landfill
Active landfill
 
Iee
IeeIee
Iee
 
CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
 
Secure landfilling.pptx
Secure landfilling.pptxSecure landfilling.pptx
Secure landfilling.pptx
 
EPSC Module 2 Unit 1
EPSC Module 2 Unit 1EPSC Module 2 Unit 1
EPSC Module 2 Unit 1
 
EIA of offshore drilling and dredging
EIA of  offshore drilling and dredgingEIA of  offshore drilling and dredging
EIA of offshore drilling and dredging
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operation
 
17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into Land
 
Green building
Green buildingGreen building
Green building
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
 
Mitigational measures for Mines
Mitigational measures for MinesMitigational measures for Mines
Mitigational measures for Mines
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
NSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.pptNSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.ppt
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
Natural gas
Natural gasNatural gas
Natural gas
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
 

Recently uploaded

Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxafzalulhoda98
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAaimanhadi215
 
Research.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddResearch.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddMadisonHenderson5
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRavikumar Vaniya
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesMonica Sydney
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...Envirotac Inc.
 
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...Sareena Khatun
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...BrixsonLajara
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetkajal
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Open Access Research Paper
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionGlenn Rambach
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理zubnm
 

Recently uploaded (20)

Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
 
Research.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddResearch.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfdddddddddddddddddddddddddddddddddddd
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
Deforestation
DeforestationDeforestation
Deforestation
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
 
IFLA ENSULIB Webinar Series #12: Sustainability - Bringing Nature and Communi...
IFLA ENSULIB Webinar Series #12: Sustainability - Bringing Nature and Communi...IFLA ENSULIB Webinar Series #12: Sustainability - Bringing Nature and Communi...
IFLA ENSULIB Webinar Series #12: Sustainability - Bringing Nature and Communi...
 
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 

Environmental Considerations in Construction

  • 1. Environmental Consideration in Mechanisation of Construction Projects. BY: AKSHAY R MANOHAR M.Tech(Construction Technology) CIVIL ENGINEERING DEPT. NMAMIT-NITTE.
  • 2. Environmental Guidelines for Major Construction Sites • Construction practices that fail to control pollution can cause damage to waterways and wetlands, kill fish, upset aquatic ecological systems and wildlife communities, and result in contamination of land and groundwater. • The risk to the environment is particularly high when work is done near coastal areas, streams and creeks, or along a river valley. • When construction occurs near built-up areas, poor practices may result in air and noise pollution which may cause annoyance and affect the health of neighbouring communities.
  • 3. CONTENTS: 1. Purpose and application 2. Pre-construction planning and design 3. Environmental management plan 4. Land disturbance 5. Noise and vibration 6. Waste minimisation 7. Contaminated material and wastes 8. Other environmental issues 9. Inspections, monitoring and audits
  • 4. 1.Purpose and application • minimising environmental impact-cost benefit • guidelines for undertaking risk assessment and management • Assessment - impact of construction activities on the environment. • suggested best practice environmental measures to meet the performance objectives based on available experience. • The Guidelines are not universal.
  • 5. 2. Pre-construction planning and design • Integrating environment protection at planning stage ensures minimal pollution. • more cost-effective than establishing controls • Risk assessment :Probability, frequency, time frame. • Risk assessment: endangered flora and fauna, aquatic plant and animals, ground water recharge areas....
  • 6. 3. ENVIRONMENTAL MANAGEMENT PLAN • Objective: to minimize adverse impact of construction activities on the environment. • The environmental management system establishes quality systems to ensure consistently high environment outcomes for the project as a whole. British Standard 7750, which has gained wide international acceptance, or the soon to be adopted ISO 14000 series should be used. • A large construction area is divided into many. • Work scheduling • Land disturbance • Storm water management • Special operational precautions and Contingency plans • Rehabilitation • Maintenance, inspections and surveillance • Ongoing risk assessment and management • Updating the plan
  • 7. 4. LAND DISTURBANCE • Objective: To minimise the quantity of soil lost during construction due to land-clearing. • Schedule well while Design stage. • Control measures: a separate division required. • Keep vehicles on specified path... • Rehabilitate: Grow some grass.
  • 8. STORMWATER MANAGEMENT • Objective: To minimise the generation of contaminated storm water. • Minimise the quantity of entering. • Establish intercept drains. • Reduce water velocity. • Study-History of soil, rainfall.
  • 9. DE-WATERING WORK SITES • Objective: To ensure that de-watering operations do not result in turbid water entering natural waterways. • Treat contaminated water pumped into the a natural waterway to remove sediment if the turbidity exceeds 30 NTU. • Supervise and Monitor.
  • 10. DUST CONTROL • Objective: To ensure there is no health risk or loss of amenity due to emission of dust to the environment. • Dust prevention strategy: at the project planning stage. • dust suppression measures: water sprying and intall wind fences...
  • 11. MANAGEMENT OF STOCKPILES. • Objective: To manage soil stockpiles so that dust and sediment in run-off are minimised. • Don’t go for too much stock. • Maintain dust & flood free environment. • Stabilise stocks if they are stored for longer.
  • 12. 5. NOISE AND VIBRATION • Objective: To ensure nuisance from noise and vibration does not occur. • Study it and minimize it. • Fit and maintain appropriate mufflers on earth-moving and other vehicles on the site. • Enclose noisy equipment • Provide noise attenuation screens, where appropriate. • Maintain timings and respect ur neighbours. • Plan for no traffic.
  • 13. 6. WASTE MINIMISATION • Objective: To minimise the waste load discharged to the environment. • Study it and minimize it. • Prioritise them and neutralize it. • Have some target and maintain it.
  • 14. 7. CONTAMINATED MATERIAL AND WASTES • Objective: To ensure that all contaminated material uncovered on a construction site are excavated and disposed of in an environmentally responsible manner. • Excavate material in a manner which avoids off- site environmental problems. • Seal contaminated material to ensure that there is no off-site effect now or in the future. • Transport odorous wastes in covered vehicles • Dispose of contaminated material in a licensed landfill.
  • 15. 8 OTHER ENVIRONMENTAL ISSUES • AIR QUALITY: • Objective: To ensure there is no health risk or loss of amenity due to emission of exhaust gases to the environment. • Well serviced emission controlled, smoke shouldn’t visible >10 sec.
  • 16. 8. OTHER ENVIRONMENTAL ISSUES COTINUE……… • LITTER: • Objective: To ensure that all litter is disposed of in a responsible manner, and is not released into the environment. • Maintain a high quality of housekeeping. • Provide bins for construction workers and staff at locations where they consume food. • Conduct ongoing awareness with staff of the need to avoid littering.
  • 17. 8. OTHER ENVIRONMENTAL ISSUES COTINUE……… • STORING FUELS AND CHEMICALS: • Objective: To ensure that fuel and chemical storage is safe, and that any materials that escape do not cause environmental damage. • Minimise fuels and chemicals stored on- site. • Install bunds and take other precautions to reduce the risk of spills. • Implement a contingency plan to handle spills.
  • 18. 8. OTHER ENVIRONMENTAL ISSUES COTINUE……… • KEEPING ROADS CLEAN: • Objective: To ensure that roads are kept clean of soil. • Ensure that the roads are swept at least once a day on uncontrolled road crossings when construction vehicles are travelling off the site. • Install litter traps lined with filter cloth in all side- entry pits . • Cover all loads of soil being taken off site for disposal.
  • 19. 8 OTHER ENVIRONMENTAL ISSUES COTINUE……… • Protecting infrastructure: • In built-up areas, care needs to be taken in working near existing infrastructure services such as drainage and sewerage pipes. • Appropriate machinery must be used within concrete channels to avoid damage to structures.
  • 20. 8. OTHER ENVIRONMENTAL ISSUES COTINUE……… • Concrete batching plants: • Sometimes very large construction projects will establish on-site concrete batching plants. • Plants need to be designed in accordance with EPA guidelines13. • Constructing a plant which is designed to have a throughput of greater than 100 tonnes per week will need an EPA works approval. •
  • 21. INSPECTIONS, MONITORING AND AUDITING • Objective: Conduct checks on significant environmental risks to ensure that they are adequately managed and control systems are operating effectively. • • Establish a baseline monitoring program before construction commences. • • Prepare an inspection, monitoring and auditing program, designed to match the environmental risks. • • Ensure that remedial action is taken promptly when monitoring,, inspections or audit results reveal a problem in environment management. • • Ensure that all monitoring is conducted by a NATA registered laboratory, either directly, or under supervision. • • Arrange for regular independent audits of environmental performance and the environmental management system