SlideShare a Scribd company logo
1 of 8
Download to read offline
CURRICULUM VITAE
Permanent address:
Lot 5470, Lorong Mahmud,
Kampong Padang, Jalan Sg Lembig
25200 Kuantan, Pahang
Tel (hp): 017-2911189
Email: zuraidi.ismail@yahoo.com
PERSONAL DETAILS
Name : Mohamad Zuraidi bin Ismail
I/C No. : 790408-06-5035
Date of Birth : 08-April-1979
Place of Birth : Temerloh, Pahang
Marital Status : Married
Nationality: Malaysian
Race : Malay
Religion : Muslim
Language Proficiency : Bahasa Malaysia (Malay Language) & English
Education : Secondary School – SPM 1996
Sek Men Tg. Panglima Perang Tg. Muhammad,
Kuantan, Pahang
Professionals Qualification : 1. CONFINED SPACE ENTRY
PROGRAM
(Code of practice 2001) Reg. No. 0184
2. ROTALIGN PRO LASER ALIGNMENT. September 2004
3. NIOSH PETRONAS SAFETY PASSPORT
(Reg No. W3791A.) August 2004
4. PAIN MANAGEMENT PROGRAM. November 2006
5. OFFSHORE SAFETY TRANING C/W ABS
(Cert No. 4616) November 2015
6. NIOSH OSFAM SAFETY PASPORT
(Reg. No. ARF 1188) October 200
7. MANUAL AND HYDRAULIC TORQUE
(By Hydratight) K0026 June 2012
Terms and Condition
Availability to work : Available
Rate quotation : Rm 10k
EPF / SOSCO : Available
Insurance / medical : Available
Annual leave : Available
OT/Weekend/Public : Upon OT
WORKING EXPERIENCES:
Employer : 1. HYDRATIGHT
Joo Koon Circle,
Singapore.
Designation : Joint Integrity Inspector
Duration : July 2014 until June 2016
Project : WHEATSTONE LNG ISBL MODULE PROJECT
Client : BECHTEL
Job Description – duties and responsibilities in order of priority:
• Work scope management.
• Informate advantage.
• QA/QC joint inspection and tagging.
• Process engineering drawing.
• Technical foundations.
• Excel joint break register.
• Attend daily and weekly progress meeting.
• Produce flange management and bolting report
Employer : 2. ANTSCOM PTE LTD
Sim Lim Tower,
Singapore.
Designation : Flange Management, Bolting and Leak Test Technician
Duration : June 2013 until July 2014
Project : 1. BEKOK C RESTORATION PROJECT.
2. GEMUSUT-KAKAP SEMI FPS PROJECT.
Client : ENERMECH PTE LTD.
HALLIBURTON PROCESS & PIPELINE SERVICES (HPPS)
Job Description – duties and responsibilities in order of priority:
• Prepare relative facilities.
• Preparation permits to work (PTW).
• Do flange inspections before spools assembling.
• Perform torqueing to all flange connections.
• Preparation equipment for N2He leak test.
• Joint inspection and walk about with client.
• Perform N2He leak test by systems.
• Attend daily and weekly progress meeting.
• Produce flange management and bolting report
Employer : 3. KENCANA PETROLEUM SDN. BHD. (KENCANA TORSCO)
Lumut Port Industrial Park,
Kampung Acheh, Perak.
Designation : MECHANICAL / PRODUCTION SUPERVISOR
FLANGE MANAGEMENT COORDINATOR
Duration : May 2011 until 30 April 2013
Project : 1. EPCC OF SEPAT EARLY PRODUCTION SYSTEM
(SEPS).
2. GEMUSUT-KAKAP SEMI FPS ENVELOPE BARGE.
3. E&C OF GORGON PROJECT / BARROW ISLAND LNG JETTY PAR.
4. EPC OF FIRST COMMERCIAL PRODUCTION (FCP) – GARRAF
FIELD DEVELOPMENT PROJECT.
Client : PETROFAC E&C SDN BHD.
PETRONAS CARIGALI SDN BHD.
DOCKWISE OCEAN DYNAMICS LLC.
SLC SAIPEM LEIGHTON CONSORTIUM.
WEATHERFORD OIL TOOL MIDDLE EAST LTD.
Job Description – duties and responsibilities in order of priority:
• Prepared relate facilities.
• Preparation all document and drawing
• Preparation permits to work (PTW) for hot work and lifting activity.
• Monitor manpower from sub-contractor.
• Update daily progress report.
• Preparation JHA and Procedure for lifting and installation.
• Joint inspection and walk about with client.
• Perform flange management and torqueing.
• Attend daily and weekly progress meeting.
• Preparation for preservation equipment at module.
• Lead for mechanical installation. (vessel, pump, turbine etc)
• Lead for high pressure testing. (Hydrotest, nitrogen & helium)
Employer : 4. MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD. (MMHE)
Pasir Gudang Industrial Park,
Pasir Gudang, Johor.
Designation : MECHANICAL / STRUCTURAL SUPERVISOR (PMT)
PROJECT MANAGEMENT TEAM
Duration : May 2010 until May 2011
Project : EPC OF KINABALU-NAG GAS PROCESSING
PLATFORM-B (KNPG-B)
Client : PETRONAS CARIGALI SDN BHD
Job Description – duties and responsibilities in order of priority:
1. Prepared relate facilities.
• Preparation all document and drawing
• Preparation permits to work (PTW) for hot work and lifting activity.
• Monitor manpower from sub-contractor.
• Update daily progress report.
• Preparation JHA and Procedure for lifting and installation.
• Joint inspection with client for receiving item
• Attend daily and weekly progress meeting.
• Preparation for preservation equipment at module.
• Monitor sub-contractor for leak test work ( Hydrotest & Reinstatement)
• Monitor manpower for close punch list.
Employer : 5. OILFAB SDN BHD
Pulau Indah Industrial Park,
Pulau Indah, Selangor.
Designation : YARD FACILITIES COORDINATOR
COMMISIONING SUPERVISOR
MECHANICAL SUPERVISOR
Duration : May 2008 until December 2009
Project : EPCC OF FIVE (5) WELLHEAD PLATFORMS FOR
JDA BLOCK B-17 (MDA, MDB, MDC, MDD, JKA)
TANGGA BARAT & KUMANG CLUSTER DEVELOPMENT
PROJECT PHASE 1
Client : CARIGALI PTTEPI ORERATING COMPANY
(CPOC)
PETRONAS CARIGALI SDN BHD
Job Description – duties and responsibilities in order of priority:
• Prepared relate facilities for project in yard.
• Team leader for T&C activity’s (Hydro testing, Flushing, Alignment, Reinstatement, valve testing &
etc)
• Preparation all document and license for new tender and project.
• Preparation to renew all permit and license.
• Joint inspection with DOSH and BOMBA for license renewal.
• Preparation all yard procedure for new project used.
• Communicate with engineering department for load out preparation, load out layout, barge layout,
sea fastening support drawing and sea fastening layout.
• Submit load out application to Lembaga Perlabuhan, customs, and Jabatan Laut for loud out permit
approver.
• Meeting with client for specific date and time for load out activity.
• Preparation all relates equipment for load out activities.
• Submit application form to Jabatan Kimia for barge gases test.
• Communicate with rigging department for long side activities.
• Preparation PTW for load out activities.
• Arrange contractor for load out and sea fastenings activities.
• Hand over to installation contractor for barge sail way.
• Sign of custody transfer and hand over work.
Employer : 6. RAMUNIA FABRICATORS SDN BHD
437, Teluk Ramunia, Pengerang
81620 JOHOR
Designation : MECHANICAL TECHNICIAN-(Millwright) (May 07– June 07)
MECHANCAL SUPERVISOR (PMT) - (July 07 – Nov 07)
HUC CONTRUCTION SUPERVISOR- (Dec 07 – May 08)
Duration : May 2007 until May 2008 (PROJECT END)
Project : BLOCK PM323 DEVEPLOMENT EAST BELUMUT-
A PLATFORM
Client : NEWFIELD PENINSULA MALAYSIA INC.
Job Description – duties and responsibilities in order of priority:
• Prepared relate facilities.
• Preparation all document and drawing
• Preparation permits to work (PTW) for hot work and lifting activity.
• Monitor manpower from sub-contractor.
• Update daily progress report.
• Preparation JHA and procedure for lifting and installation.
• Joint inspection with client for receiving item
• Attend weekly progress meeting.
• Preparation for preservation equipment at module.
• Monitor manpower for close punch list.
• Preparation, installation, alignments, final inspection and pre commissioning.
• Prepared paper work for HUC
• Monitor manpower supply for LQ habitable, Tender Rig requirement and Huc-up activities.
• Team leader for offshore testing and commissioning work.
Employer : 7. SAAG OILAND GAS SDN BHD
Kemaman Supply Base
Designation : SENIOR MECHANICAL TECHNICIAN (Millwright) (Offshore & Onshore)
Duration : October 2002 until February 2007
Project : SERVICES, REPAIR, FABRICATIONS AND
MAINTENANCE
Client : PCSB, PGB, VCMSB, POLYACTLINE, OPTIMAL,
EMEPMI, MTBESB, W.R GREACE etc
Job Description – duties and responsibilities in order of priority:
• Make site inspection and troubleshooting.
• Collect data as an original condition of equipment.
• Prepared inspection report and submit to client for service approver.
• Preparation tools and consumable for start service and repair work.
• Dismantle and remove damage equipment at site and bring back to workshop.
• Dismantle equipment part by part for repair work
• Identify damage part for replacement follow as OEM spec.
• Replace damage part and start assemble equipment.
• To conduct leak test (Hydrotest, nitrogen), testing and pre-commissioning.
• Final inspection (end flout, tough, clearance etc.)
• Sent back equipment to site and start installation work.
• Couple and alignment between equipment and motor.
• Final inspection and test run. Make vibration analysis and collect final installation data.
• Prepared repair and installation report for company warranty purpose.
Project involves
• Offshore service, maintenances and upgrading work
• Service and overhaul gas compressor (Bekok, Bunga Kertas, Dulang Platform)
• Service and overhaul sea water lift pump. (Resak, Bekok, seligi Platform)
• Replace and refurbish pump mechanical seal. (Bekok, Tapis, Seligi, Dulang, Resak Platform)
• Repair multistage fire water pump. (Seligi, Angsi, Tapis, Bekok Platform)
• Repair valve actuator and PSV. (Bekok, Tapis, Resak, Seligi, Dulang,Gutong Angsi Platform)
• Solar turbine engine change. (Bekok, Gutong, Resak Pletform)
• Laser alignments job (Bekok, Tapis, Resak, Bunga Kertas, Seligi, Dulang, Gutong, Angsi Platform)
• Repair centrifugal pump c/w mechanical seal (Resak, bekok, Angsi Platform)
• Preventive maintenance for mechanical static and rotating equipment. (Tapis, Resak, Bekok, Seligi,
Dulang, Bunga Kertas, Angsi, Gutong Platform)
• MTBE (M) Sdn. Bhd.
• Preventive maintenance contract
• Major shutdown 2006
• W.R. Greece Gebeng.
• Preventive maintenance of fire water systems
• Petronas Penapisan Terengganu Sdn Bhd
• Preventive maintenance contract for condensate transfer pump.
• Preventive maintenance for mechanical static and rotating equipment,
• Gas Possessing Plant (GPP2, 3 and 4)
• Purchasing, installation and commissioning 6 units CPC pump.
• Preventive maintenance rotating equipment.
• VCM (M) Sdn Bhd.
• Major shutdown 2006
• Service and maintenance submersible pump.
• Service and repair chemical injection skid
• Stesen Janakuasa Elektrik Sultan Ismail
• Service and repair pumps for turbine cooling water systems.
8. LEIGHTON CONSTRUCTION SDN BHD
ASST SUPERVISOR ERECTION
SEPTEMBER 2000 UNTIL JULY 2002
TEACHING HOUSING CASTING PROJECT
9. UBF ENGINEERING SDN BHD
TEAM COMMISSIONING, MECHANICAL
MARCH 2000 UNTIL JULY 2000
KR2 AROMATIC PROJECT, KERTEH
PRE ALIGHMENT AND TEST RUN ROTATING EQUIPMENT
10. TEPAT TEKNIK SDN BHD
ASST SUPERVISOR MECHANICAL
NOV 1998 UNTIL MARCH 2000
KR2 AROMATIC PROJECT, KERTEH
INSTALLATION ROTATING AND STATIC EQUIPMENTS
11. KVEANER PROCESS SYSTEMS ASIA PACIFIC
SDN BHD
BLASTING PAINTING SUPERVISOR
JUNE 1997 UNTIL AUG. 1998
MASSA FUEL DEVEPLOPMENT PROJECT
BLASTING PAINTING WORK
Other skill:
• Ability to work well with colleagues.
• Have ability to delegate effectively.
• Good communication skills.
• Computer literate in Microsoft Word and Excel.
• Enjoy reading, jungle tracking and outdoor activities.
REFERENCE: Mr. Ramli Bin Muda
General Manager (Project Management)
SAAG CONSOLIDATED (M) BERHAD
SAAG OIL AND GAS SDN BHD
DATARAN PRIMA, JLN. PJU 1/41
47301 PETALING JAYA, SELANGOR.
Hp: 019-9345636
Mr. Azmanuddin Bin Ahmad
Turbo Machinery Specialist
Technical Services Department (PTS)
PETRONAS CARIGALI SDN BHD, KERTEH
Hp: 609-8540722
Mr. Mazlam Bin Yusoff
Mechanical Supervisor (PMT)
PROJECT F13E (SC) DR-A TOP SIDE
RAMUNIA FABRICATORS SDN BHD
Hp: 013-7194537
Mr. Mohd Dzyhan Bin Abd Majid
Deputy Project Manager
PROJECT PM323 DEVELOPMENT
EAST BELUMUT-A PLATFORM
RAMUNIA FABRICATORS SDN BHD
Hp-019-7772184
Mr. Haffizul Rizal Abd Halim
Lead Mechanical / Piping Engineer
EPCC OF FOUR (4) WELLHEAD PLATFORMS FOR JDA
BLOCK B-17 PROJECT
OILFAB SDN BHD
Hp- 012-3565655
Mr. Surukumaren
Construction Manager
EPC OF KINABALU-NAG GAS PROCESSING PLATFORM-B
(KNPG-B)
MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD. (MMHE)
Hp- 012-7251303
Mr. Kok Yan Loy
Asst Production Manager
KENCANA PETROLEUM SDN BHD (TORSCO)
Hp- 016-4211663
Mr. Kevin Jures
Joint Integrity Project Manager
HYDRATIGHT
Hp- 012-4698422

More Related Content

What's hot (20)

Najam Cv
Najam CvNajam Cv
Najam Cv
 
CV_ak_2015EN
CV_ak_2015ENCV_ak_2015EN
CV_ak_2015EN
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
cv hashim.NOV2016
cv hashim.NOV2016cv hashim.NOV2016
cv hashim.NOV2016
 
CV_Y S RATHORE UPDATED
CV_Y S RATHORE UPDATEDCV_Y S RATHORE UPDATED
CV_Y S RATHORE UPDATED
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
CV Novo
CV NovoCV Novo
CV Novo
 
CV TemplateREV [1]
CV TemplateREV [1]CV TemplateREV [1]
CV TemplateREV [1]
 
wsa
wsawsa
wsa
 
wsa
wsawsa
wsa
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 

Viewers also liked

UL Certification
UL CertificationUL Certification
UL CertificationEmma YU
 
Kids karate in Palm Beach Gardens
Kids karate in Palm Beach GardensKids karate in Palm Beach Gardens
Kids karate in Palm Beach GardensJupitermartialarts
 
Palm beach gardens kids karate classes
Palm beach gardens kids karate classesPalm beach gardens kids karate classes
Palm beach gardens kids karate classesJupitermartialarts
 
4º básico a semana 10 de noviembre al 14 de noviembre
4º básico a  semana  10 de noviembre al 14 de noviembre4º básico a  semana  10 de noviembre al 14 de noviembre
4º básico a semana 10 de noviembre al 14 de noviembreColegio Camilo Henríquez
 
Acad wrtg for_pg_study_sem1_2016
Acad wrtg for_pg_study_sem1_2016Acad wrtg for_pg_study_sem1_2016
Acad wrtg for_pg_study_sem1_2016cmalthus
 
led Ceiling light UL certifications
led Ceiling light UL certificationsled Ceiling light UL certifications
led Ceiling light UL certificationsEmma YU
 
Calling his mother with bad names
Calling his mother with bad namesCalling his mother with bad names
Calling his mother with bad namesFAHIM AKTHAR ULLAL
 
Apresentação de Resultados 3T15
	Apresentação de Resultados 3T15	Apresentação de Resultados 3T15
Apresentação de Resultados 3T15DirecionalRI
 
Методические рекомендации
Методические рекомендацииМетодические рекомендации
Методические рекомендацииNMCPO
 
Guía de Filosofia capitulos 12, 13, 14 y 18
Guía de Filosofia capitulos 12, 13, 14 y 18Guía de Filosofia capitulos 12, 13, 14 y 18
Guía de Filosofia capitulos 12, 13, 14 y 18jamilethv
 
NCAGT Professional Development Superhero
NCAGT Professional Development SuperheroNCAGT Professional Development Superhero
NCAGT Professional Development SuperheroBrian Housand
 
Creative Outlets Pitt PAGE 2012
Creative Outlets Pitt PAGE 2012Creative Outlets Pitt PAGE 2012
Creative Outlets Pitt PAGE 2012Brian Housand
 
Subscribed 2014 Keynote - The Subscription Experience by Zuora
Subscribed 2014 Keynote - The Subscription Experience by ZuoraSubscribed 2014 Keynote - The Subscription Experience by Zuora
Subscribed 2014 Keynote - The Subscription Experience by ZuoraZuora, Inc.
 

Viewers also liked (20)

Bean2 bar
Bean2 barBean2 bar
Bean2 bar
 
my documents1
my documents1my documents1
my documents1
 
UL Certification
UL CertificationUL Certification
UL Certification
 
Kids karate in Palm Beach Gardens
Kids karate in Palm Beach GardensKids karate in Palm Beach Gardens
Kids karate in Palm Beach Gardens
 
Palm beach gardens kids karate classes
Palm beach gardens kids karate classesPalm beach gardens kids karate classes
Palm beach gardens kids karate classes
 
4º básico a semana 10 de noviembre al 14 de noviembre
4º básico a  semana  10 de noviembre al 14 de noviembre4º básico a  semana  10 de noviembre al 14 de noviembre
4º básico a semana 10 de noviembre al 14 de noviembre
 
Acad wrtg for_pg_study_sem1_2016
Acad wrtg for_pg_study_sem1_2016Acad wrtg for_pg_study_sem1_2016
Acad wrtg for_pg_study_sem1_2016
 
led Ceiling light UL certifications
led Ceiling light UL certificationsled Ceiling light UL certifications
led Ceiling light UL certifications
 
Calling his mother with bad names
Calling his mother with bad namesCalling his mother with bad names
Calling his mother with bad names
 
Apresentação de Resultados 3T15
	Apresentação de Resultados 3T15	Apresentação de Resultados 3T15
Apresentação de Resultados 3T15
 
Jornada 4
Jornada 4Jornada 4
Jornada 4
 
Karate schools in jupiter
Karate schools in jupiterKarate schools in jupiter
Karate schools in jupiter
 
L188 Gloire à Dieu
L188 Gloire à DieuL188 Gloire à Dieu
L188 Gloire à Dieu
 
Dinamica de grupos
Dinamica de gruposDinamica de grupos
Dinamica de grupos
 
Методические рекомендации
Методические рекомендацииМетодические рекомендации
Методические рекомендации
 
Guía de Filosofia capitulos 12, 13, 14 y 18
Guía de Filosofia capitulos 12, 13, 14 y 18Guía de Filosofia capitulos 12, 13, 14 y 18
Guía de Filosofia capitulos 12, 13, 14 y 18
 
NCAGT Professional Development Superhero
NCAGT Professional Development SuperheroNCAGT Professional Development Superhero
NCAGT Professional Development Superhero
 
A NEW HOPE CAG 2012
A NEW HOPE CAG 2012A NEW HOPE CAG 2012
A NEW HOPE CAG 2012
 
Creative Outlets Pitt PAGE 2012
Creative Outlets Pitt PAGE 2012Creative Outlets Pitt PAGE 2012
Creative Outlets Pitt PAGE 2012
 
Subscribed 2014 Keynote - The Subscription Experience by Zuora
Subscribed 2014 Keynote - The Subscription Experience by ZuoraSubscribed 2014 Keynote - The Subscription Experience by Zuora
Subscribed 2014 Keynote - The Subscription Experience by Zuora
 

Similar to CV Mechanical Engineer Oil Gas (20)

Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
jayaprakash
jayaprakashjayaprakash
jayaprakash
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
L. SELVA MOHAN (CV)
L. SELVA  MOHAN (CV)L. SELVA  MOHAN (CV)
L. SELVA MOHAN (CV)
 
ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUME
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction Superintendent
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
CV Herwandi
CV HerwandiCV Herwandi
CV Herwandi
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
CV-Balamurugan.
CV-Balamurugan.CV-Balamurugan.
CV-Balamurugan.
 
Resume
ResumeResume
Resume
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 

CV Mechanical Engineer Oil Gas

  • 1. CURRICULUM VITAE Permanent address: Lot 5470, Lorong Mahmud, Kampong Padang, Jalan Sg Lembig 25200 Kuantan, Pahang Tel (hp): 017-2911189 Email: zuraidi.ismail@yahoo.com PERSONAL DETAILS Name : Mohamad Zuraidi bin Ismail I/C No. : 790408-06-5035 Date of Birth : 08-April-1979 Place of Birth : Temerloh, Pahang Marital Status : Married Nationality: Malaysian Race : Malay Religion : Muslim Language Proficiency : Bahasa Malaysia (Malay Language) & English Education : Secondary School – SPM 1996 Sek Men Tg. Panglima Perang Tg. Muhammad, Kuantan, Pahang Professionals Qualification : 1. CONFINED SPACE ENTRY PROGRAM (Code of practice 2001) Reg. No. 0184 2. ROTALIGN PRO LASER ALIGNMENT. September 2004 3. NIOSH PETRONAS SAFETY PASSPORT (Reg No. W3791A.) August 2004 4. PAIN MANAGEMENT PROGRAM. November 2006 5. OFFSHORE SAFETY TRANING C/W ABS (Cert No. 4616) November 2015 6. NIOSH OSFAM SAFETY PASPORT (Reg. No. ARF 1188) October 200 7. MANUAL AND HYDRAULIC TORQUE (By Hydratight) K0026 June 2012 Terms and Condition Availability to work : Available Rate quotation : Rm 10k EPF / SOSCO : Available Insurance / medical : Available Annual leave : Available OT/Weekend/Public : Upon OT
  • 2. WORKING EXPERIENCES: Employer : 1. HYDRATIGHT Joo Koon Circle, Singapore. Designation : Joint Integrity Inspector Duration : July 2014 until June 2016 Project : WHEATSTONE LNG ISBL MODULE PROJECT Client : BECHTEL Job Description – duties and responsibilities in order of priority: • Work scope management. • Informate advantage. • QA/QC joint inspection and tagging. • Process engineering drawing. • Technical foundations. • Excel joint break register. • Attend daily and weekly progress meeting. • Produce flange management and bolting report Employer : 2. ANTSCOM PTE LTD Sim Lim Tower, Singapore. Designation : Flange Management, Bolting and Leak Test Technician Duration : June 2013 until July 2014 Project : 1. BEKOK C RESTORATION PROJECT. 2. GEMUSUT-KAKAP SEMI FPS PROJECT. Client : ENERMECH PTE LTD. HALLIBURTON PROCESS & PIPELINE SERVICES (HPPS) Job Description – duties and responsibilities in order of priority: • Prepare relative facilities. • Preparation permits to work (PTW). • Do flange inspections before spools assembling. • Perform torqueing to all flange connections. • Preparation equipment for N2He leak test. • Joint inspection and walk about with client. • Perform N2He leak test by systems. • Attend daily and weekly progress meeting.
  • 3. • Produce flange management and bolting report Employer : 3. KENCANA PETROLEUM SDN. BHD. (KENCANA TORSCO) Lumut Port Industrial Park, Kampung Acheh, Perak. Designation : MECHANICAL / PRODUCTION SUPERVISOR FLANGE MANAGEMENT COORDINATOR Duration : May 2011 until 30 April 2013 Project : 1. EPCC OF SEPAT EARLY PRODUCTION SYSTEM (SEPS). 2. GEMUSUT-KAKAP SEMI FPS ENVELOPE BARGE. 3. E&C OF GORGON PROJECT / BARROW ISLAND LNG JETTY PAR. 4. EPC OF FIRST COMMERCIAL PRODUCTION (FCP) – GARRAF FIELD DEVELOPMENT PROJECT. Client : PETROFAC E&C SDN BHD. PETRONAS CARIGALI SDN BHD. DOCKWISE OCEAN DYNAMICS LLC. SLC SAIPEM LEIGHTON CONSORTIUM. WEATHERFORD OIL TOOL MIDDLE EAST LTD. Job Description – duties and responsibilities in order of priority: • Prepared relate facilities. • Preparation all document and drawing • Preparation permits to work (PTW) for hot work and lifting activity. • Monitor manpower from sub-contractor. • Update daily progress report. • Preparation JHA and Procedure for lifting and installation. • Joint inspection and walk about with client. • Perform flange management and torqueing. • Attend daily and weekly progress meeting. • Preparation for preservation equipment at module. • Lead for mechanical installation. (vessel, pump, turbine etc) • Lead for high pressure testing. (Hydrotest, nitrogen & helium) Employer : 4. MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD. (MMHE) Pasir Gudang Industrial Park, Pasir Gudang, Johor. Designation : MECHANICAL / STRUCTURAL SUPERVISOR (PMT) PROJECT MANAGEMENT TEAM Duration : May 2010 until May 2011 Project : EPC OF KINABALU-NAG GAS PROCESSING PLATFORM-B (KNPG-B) Client : PETRONAS CARIGALI SDN BHD
  • 4. Job Description – duties and responsibilities in order of priority: 1. Prepared relate facilities. • Preparation all document and drawing • Preparation permits to work (PTW) for hot work and lifting activity. • Monitor manpower from sub-contractor. • Update daily progress report. • Preparation JHA and Procedure for lifting and installation. • Joint inspection with client for receiving item • Attend daily and weekly progress meeting. • Preparation for preservation equipment at module. • Monitor sub-contractor for leak test work ( Hydrotest & Reinstatement) • Monitor manpower for close punch list. Employer : 5. OILFAB SDN BHD Pulau Indah Industrial Park, Pulau Indah, Selangor. Designation : YARD FACILITIES COORDINATOR COMMISIONING SUPERVISOR MECHANICAL SUPERVISOR Duration : May 2008 until December 2009 Project : EPCC OF FIVE (5) WELLHEAD PLATFORMS FOR JDA BLOCK B-17 (MDA, MDB, MDC, MDD, JKA) TANGGA BARAT & KUMANG CLUSTER DEVELOPMENT PROJECT PHASE 1 Client : CARIGALI PTTEPI ORERATING COMPANY (CPOC) PETRONAS CARIGALI SDN BHD Job Description – duties and responsibilities in order of priority: • Prepared relate facilities for project in yard. • Team leader for T&C activity’s (Hydro testing, Flushing, Alignment, Reinstatement, valve testing & etc) • Preparation all document and license for new tender and project. • Preparation to renew all permit and license. • Joint inspection with DOSH and BOMBA for license renewal. • Preparation all yard procedure for new project used. • Communicate with engineering department for load out preparation, load out layout, barge layout, sea fastening support drawing and sea fastening layout. • Submit load out application to Lembaga Perlabuhan, customs, and Jabatan Laut for loud out permit approver. • Meeting with client for specific date and time for load out activity. • Preparation all relates equipment for load out activities. • Submit application form to Jabatan Kimia for barge gases test. • Communicate with rigging department for long side activities. • Preparation PTW for load out activities. • Arrange contractor for load out and sea fastenings activities. • Hand over to installation contractor for barge sail way. • Sign of custody transfer and hand over work.
  • 5. Employer : 6. RAMUNIA FABRICATORS SDN BHD 437, Teluk Ramunia, Pengerang 81620 JOHOR Designation : MECHANICAL TECHNICIAN-(Millwright) (May 07– June 07) MECHANCAL SUPERVISOR (PMT) - (July 07 – Nov 07) HUC CONTRUCTION SUPERVISOR- (Dec 07 – May 08) Duration : May 2007 until May 2008 (PROJECT END) Project : BLOCK PM323 DEVEPLOMENT EAST BELUMUT- A PLATFORM Client : NEWFIELD PENINSULA MALAYSIA INC. Job Description – duties and responsibilities in order of priority: • Prepared relate facilities. • Preparation all document and drawing • Preparation permits to work (PTW) for hot work and lifting activity. • Monitor manpower from sub-contractor. • Update daily progress report. • Preparation JHA and procedure for lifting and installation. • Joint inspection with client for receiving item • Attend weekly progress meeting. • Preparation for preservation equipment at module. • Monitor manpower for close punch list. • Preparation, installation, alignments, final inspection and pre commissioning. • Prepared paper work for HUC • Monitor manpower supply for LQ habitable, Tender Rig requirement and Huc-up activities. • Team leader for offshore testing and commissioning work. Employer : 7. SAAG OILAND GAS SDN BHD Kemaman Supply Base Designation : SENIOR MECHANICAL TECHNICIAN (Millwright) (Offshore & Onshore) Duration : October 2002 until February 2007 Project : SERVICES, REPAIR, FABRICATIONS AND MAINTENANCE Client : PCSB, PGB, VCMSB, POLYACTLINE, OPTIMAL, EMEPMI, MTBESB, W.R GREACE etc Job Description – duties and responsibilities in order of priority: • Make site inspection and troubleshooting. • Collect data as an original condition of equipment. • Prepared inspection report and submit to client for service approver. • Preparation tools and consumable for start service and repair work. • Dismantle and remove damage equipment at site and bring back to workshop. • Dismantle equipment part by part for repair work • Identify damage part for replacement follow as OEM spec. • Replace damage part and start assemble equipment.
  • 6. • To conduct leak test (Hydrotest, nitrogen), testing and pre-commissioning. • Final inspection (end flout, tough, clearance etc.) • Sent back equipment to site and start installation work. • Couple and alignment between equipment and motor. • Final inspection and test run. Make vibration analysis and collect final installation data. • Prepared repair and installation report for company warranty purpose. Project involves • Offshore service, maintenances and upgrading work • Service and overhaul gas compressor (Bekok, Bunga Kertas, Dulang Platform) • Service and overhaul sea water lift pump. (Resak, Bekok, seligi Platform) • Replace and refurbish pump mechanical seal. (Bekok, Tapis, Seligi, Dulang, Resak Platform) • Repair multistage fire water pump. (Seligi, Angsi, Tapis, Bekok Platform) • Repair valve actuator and PSV. (Bekok, Tapis, Resak, Seligi, Dulang,Gutong Angsi Platform) • Solar turbine engine change. (Bekok, Gutong, Resak Pletform) • Laser alignments job (Bekok, Tapis, Resak, Bunga Kertas, Seligi, Dulang, Gutong, Angsi Platform) • Repair centrifugal pump c/w mechanical seal (Resak, bekok, Angsi Platform) • Preventive maintenance for mechanical static and rotating equipment. (Tapis, Resak, Bekok, Seligi, Dulang, Bunga Kertas, Angsi, Gutong Platform) • MTBE (M) Sdn. Bhd. • Preventive maintenance contract • Major shutdown 2006 • W.R. Greece Gebeng. • Preventive maintenance of fire water systems • Petronas Penapisan Terengganu Sdn Bhd • Preventive maintenance contract for condensate transfer pump. • Preventive maintenance for mechanical static and rotating equipment, • Gas Possessing Plant (GPP2, 3 and 4) • Purchasing, installation and commissioning 6 units CPC pump. • Preventive maintenance rotating equipment. • VCM (M) Sdn Bhd. • Major shutdown 2006 • Service and maintenance submersible pump. • Service and repair chemical injection skid • Stesen Janakuasa Elektrik Sultan Ismail • Service and repair pumps for turbine cooling water systems. 8. LEIGHTON CONSTRUCTION SDN BHD ASST SUPERVISOR ERECTION SEPTEMBER 2000 UNTIL JULY 2002 TEACHING HOUSING CASTING PROJECT 9. UBF ENGINEERING SDN BHD TEAM COMMISSIONING, MECHANICAL MARCH 2000 UNTIL JULY 2000 KR2 AROMATIC PROJECT, KERTEH PRE ALIGHMENT AND TEST RUN ROTATING EQUIPMENT
  • 7. 10. TEPAT TEKNIK SDN BHD ASST SUPERVISOR MECHANICAL NOV 1998 UNTIL MARCH 2000 KR2 AROMATIC PROJECT, KERTEH INSTALLATION ROTATING AND STATIC EQUIPMENTS 11. KVEANER PROCESS SYSTEMS ASIA PACIFIC SDN BHD BLASTING PAINTING SUPERVISOR JUNE 1997 UNTIL AUG. 1998 MASSA FUEL DEVEPLOPMENT PROJECT BLASTING PAINTING WORK Other skill: • Ability to work well with colleagues. • Have ability to delegate effectively. • Good communication skills. • Computer literate in Microsoft Word and Excel. • Enjoy reading, jungle tracking and outdoor activities. REFERENCE: Mr. Ramli Bin Muda General Manager (Project Management) SAAG CONSOLIDATED (M) BERHAD SAAG OIL AND GAS SDN BHD DATARAN PRIMA, JLN. PJU 1/41 47301 PETALING JAYA, SELANGOR. Hp: 019-9345636 Mr. Azmanuddin Bin Ahmad Turbo Machinery Specialist Technical Services Department (PTS) PETRONAS CARIGALI SDN BHD, KERTEH Hp: 609-8540722 Mr. Mazlam Bin Yusoff
  • 8. Mechanical Supervisor (PMT) PROJECT F13E (SC) DR-A TOP SIDE RAMUNIA FABRICATORS SDN BHD Hp: 013-7194537 Mr. Mohd Dzyhan Bin Abd Majid Deputy Project Manager PROJECT PM323 DEVELOPMENT EAST BELUMUT-A PLATFORM RAMUNIA FABRICATORS SDN BHD Hp-019-7772184 Mr. Haffizul Rizal Abd Halim Lead Mechanical / Piping Engineer EPCC OF FOUR (4) WELLHEAD PLATFORMS FOR JDA BLOCK B-17 PROJECT OILFAB SDN BHD Hp- 012-3565655 Mr. Surukumaren Construction Manager EPC OF KINABALU-NAG GAS PROCESSING PLATFORM-B (KNPG-B) MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD. (MMHE) Hp- 012-7251303 Mr. Kok Yan Loy Asst Production Manager KENCANA PETROLEUM SDN BHD (TORSCO) Hp- 016-4211663 Mr. Kevin Jures Joint Integrity Project Manager HYDRATIGHT Hp- 012-4698422