1. PERSONAL
INFORMATION
• Identity Card No : 31-013674
• Nationality : Brunei Permanent Resident
• Age : 48
• Race : Chinese
• Religion : Islam
• Contact No : 673-3-341966 (H) or H/P# 8177310
• Home Address: Lot 09281 (LTS 2988), Simpang 50-34-6, Jalan Kompleks Sukan Mumong,
Kuala Belait, Brunei Darussalam
• E-mail Address: mohdhashim383@gmail.com
PERSONAL REFERENCES
BSP- AEC /12 – DK Kasumawati Pg Hj Ahmad (Contract Holder)
McDermott Project Manager – Ragesh Kumar Lingam
(email – Rklingam@mcdermott.com)
McDermott HR Manager – Jennifer Nyanggau (email – Jnyanggau@mcdermott.com)
ACADEMIC
QUALIFICATIONS
1. Joint Malaysian Certificate of Education and GCE ‘O’ Level Certificate
2. Diploma in General Mechanical Engineering - Option in Welding
From International Correspondence Schools, USA.
3
3. British Gas Painting Inspector Grade 2 (Expired)
4. Diploma in Purchasing and Materials Handling From Stonebridge Associated
College, UK - Registration No# e18427
5. NCFE Level 4 Purchasing and Materials Handling Award UK
Certificate No# 1277326 and Candidate No# 100210972
6. Recognition of Achievement Level 5 in Project Management From
Institute of Supply Chain Management (IoSCM), UK.
Cv hashim Page 1 of 6 NOV 2016
Curriculum Vitae Of
Mohammad Hashim Bin
Abdullah
2. MEMBERSHIP BODY
1. Professional member (PSCM) for Institute of Supply Chain Management, UK
Certificate No#04834
2. Member of APICS Professional Supply Chain Association – APICS ID# 2025183
TRAINING COURSES ATTENDED
1 Incident Investigation Course conducted by MEGAMAS TRAINING CENTRE
dated 23rd and 24th November 2009.
2 Competent Worksite Supervisor IMS 5 Refresher conducted by MEGAMAS
TRAINING CENTRE, Brunei dated 5th December 2013.
3 Supervising HSE conducted by MEGAMAS TRAINING CENTRE, Brunei
Dated 2nd & 3rd December 2009
4 SENIOR FIRST AID conducted by St. John Ambulance Australia at
MEGAMAS TRAINING CENTRE, BRUNEI dated 5th & 6th March 2003.
5 HSE FAMILIARISATION FOR SSS / TAS conducted by MEGAMAS
TRAINING CENTRE dated 29th January 2002.
6 MANAGING HAZARDS AT WORKPLACE conducted by MEGAMAS
TRAINING CENTRE dated 25th January 2001.
7 PERMIT TO WORK - WORKSITE SUPERVISORS conducted by
MEGAMAS TRAINING CENTRE dated 25th
& 26th
March 2003.
8 Lifting Equipment Instruction Presentation conducted by Bureau Veritas at Kuala
Belait, Brunei dated 25th
July 1992.
9 Workplace Supervisors On - Job Training Skills conducted by WS Atkins
International Ltd. at Kuala Belait, Brunei dated 3rd
December 1992.
10 Team Work that Works Seminar conducted by Adinin Training and
Development Centre at Kuala Belait, Brunei dated 27th
February 1993.
11 Rigging & Slinging Course conducted by Adinin Training and Development
Centre, Brunei dated 1st
& 2nd
April 1996.
12 Safe Driving Awareness conducted by Adinin Training and Development Centre
Brunei dated 18th
May 1996.
13 Safety Seminar for Swagelok materials conducted by Bruwell Valve & Fitting
Sdn. Bhd. Dated 18th September 1995.
14 Team Leader / Group Leader Course conducted by Gemba Research – Kaizen
Institute at Singapore dated 8th December 2011.
15 Worksite Hazard Management – Champion Training Course conducted by Brunei
Shell Petroleum BSP-MPN at Kuala Belait dated 13th and 14th September 2013.
Cv hashim Page 2 of 6 NOV 2016
3. COMPUTER KNOWLEDGE
1. Window Vista / Window 7 Microsoft Excel
2. Window Vista / Window 7 Microsoft Words
WORK EXPERIENCE
JANUARY 2015 TO PRESENT
POSITION : SENIOR MATERIALS COORDINATOR
FOR J.RAY MCDERMOTT BRUNEI BRANCH
Work Involved: 1) To receive and monitor BSP supplied materials for Umbilical, MOL and
CPID Pipeline Projects under contract holder AEC/1.
2) To load out BSP, Vendor and local supplied materials as per instruction of
Operation Engineers and Field Engineers.
3) Report to Procurement / Subcontract Manager for materials movement and
Coordination.
4) Liaise with Logistic Coordinator for transport materials to warehouse
Storage and load out materials via Muara / KB Port, Miri Shin Yang
Shipyard and Labuan Shipyard to Offshore vessels.
5) To update materials record into SPMAT system.
6) Liaise with Procurement Buyer for materials receiving to support offshore
Operation. Receive materials/equipments from local suppliers for offshore.
7) Coordinate with MOC transport provider for materials transfer / movement
Including supply riggers and warehousing storage and load out activities.
8) To attend internal operation meeting with Installation Manager, Project
Engineers, Operation and Field Engineers with regards to materials
movement and load out activities.
9) To control/monitor rental storage area for BSP Supplied materials, Import
and Export materials from Vendors Singapore, Batam, Malaysia, Dubai, UK
and USA.
10) Monitor materials/logistic costs and budget as per management decision.
11) Involve materials/logistics management for R3640 - Piling Equipments and
R3649 - Transportation and Installation of PID1979 and PID1893 Pipelines.
MARCH 2009 TO JANUARY 2015
POSITION : WORKSHOP FABRICATION SUPERVISOR
FOR SWIBER OFFSHORE CONSTRUCTION PTE. LTD.
Work Involved: 1) To in-charge and manage workshop for fabrication of steel structural and
Piping works for Swiber Project Management Team under Offshore
Transportation and Installations contract for Brunei Shell - MPN/11 and
Champion Water Flood Flexi-pipeline project.
2) To control and supervise the pipe fitters and welders for fabrication
of Riser clamps, Stub clamps, support frames, towheads, pullheads,
launchers, receivers, hang off sleeves and riser pipes.
3) To assess the work competency of the workers.
4) To liaise with Project Engineers for fabrication drawings and materials.
Cv hashim Page 3 of 6 NOV 2016
4. 5) To assign work tasks to the workers and conduct welder test.
6) To conduct toolbox talks and cascade HSE information to workers.
7) To ensure proper tools and equipments being used with proper
certification and inspection.
8) To ensure the safety of the workers at work.
9) Responsible for the output and quality of the job.
10) To maintain good housekeeping at workshop.
11) To ensure the plans and procedures are being followed.
12) To report any deficiencies / problems to Project Manager/Director.
13) To monitor daily fabrication progress and work planning.
14) To report unsafe acts and incidents at workplace.
15) To carry out welding works for vessel at jetty as and when required.
16) To raise SAP purchase requisition to Procurement Department to
purchase materials for workshop fabrication and engineering use.
17) To coordinate with QA/QC department for welding inspection of the
prefabricated materials.
18) To liaise with Human Resource department for worker’s problems.
19) To prepare and check timecards for workers and submit to account
department for payment of salary.
20) To coordinate with Materials Coordinator/ Expeditor and BSP Project
Materials Controllers for materials issue including load out materials to
offshore.
21) To accompany BSP HSE audit as and when required at worksite.
22) To assist pipeline launching at Telesai Rentis Yard.
JANUARY 2004 to DECEMBER 2008
POSITION : SENIOR MATERIALS HANDLING SUPERVISOR
For Syarikat Kejuruteraan Sistematik SDN. BHD. (SKS)
Work Involved: 1) To monitor and control the overall onshore materials handling operations
for SKSWood Sdn Bhd under Brunei Shell Petroleum - SCO/54 contract.
2) To control and give work instructions to 40 workforce under various
categories for materials handling operations.
3) To attend materials meetings for campaign works with SCO/2 &
SKSWood Campaign Engineers, Materials Coordinator , SCO/2
Campaign Materials Schedulers, BSP Project Engineers , WEST & EAST
Shutdown Managers and SCM/3 Procurement Staffs
4) To attend bi-weekly Operations / HSE meeting with Yard Superintendent
and Operations Supervisors and Foremen at Marine Construction Yard.
5) To control materials handling budgets.
6) To conduct daily toolbox briefing for HSE issues to Materials Handling
Personnels and organised internal meeting for daily operational works.
7) To track , update and monitor materials movement based on SAP system
against campaign projects and work order numbers.
8) To look for available surplus materials to complete urgent fabrication
works
9) To monitor load out offshore materials and assemblies including E&I as
per Campaign Engineer’s load out instruction and coordinate with
SKSWood Offshore Coordinator, Materials Coordinator and Workboat
Barge Superintendents with regards to materials load out.
10) To update / inform the Materials Coordinator and Campaign Engineers for
the fabrication status including painting prior to load out.
11) To make verification for materials received to Materials Schedulers and
Campaign Engineers if not in compliance with materials order / take-off
Cv hashim Page 4 of 6 NOV 2016
5. 12) To arrange overtime work for workers to prepare materials load out and
loading materials to vessel and cargo barge at MCY jetty.
13) To monitor backload materials from offshore whether the projects deferred
or materials become surplus and return to BSP- STL as per CE instruction.
14) To monitor barang boxes movement for load out and maintenance of boxes
for certification before use
15) To control the materials equipments like Hiab trucks, shovel, forklift for
materials handling at warehouses and field operations.
16) To liaise with STL & SCM Staffs with regards to materials collection,
delivery, vendors and local purchase materials procurement.
AUGUST 1999 to DECEMBER 2003 POSITION: PAINTING INSPECTOR CUM
SUPERVISOR
For Syarikat Kejuruteraan Sistematik SDN. BHD. (SKS)
Work Involved: 1) To monitor the quality control of the SKS Blasting and
Painting Shop as per BSP Painting Specification.
2) To site inspection for wrapping weld joints for underground PE
Coated pipelines and witness holiday testing,
3) To conduct qualification trade test for Blasters & Painters as per
BSP procedures.
4) To report Non Conformance to Senior Supervisor, Project Manager
and QA/QC Coordinator.
5) To site inspection for touch-up painting works.
6) To inspect greasing and tape wrapping for flange to flange joints for
wellhead areas.
7) To monitor quality control for blasting and painting of tanks and
conduct pinhole holiday testing on internal tank.
8) To witness adhesion test (dolly test) on test panels carried out by
Paint Representative.
BSP Painting Project Involved:
1) DN 600 Relief Valve Discharge Line – From October 2002 to February 2003
2) Land Well Tie-in Contract – From August 2002 to April 2003
3) DN 700 East HP Gas Expansion Pipeline – From May 2002 to December 2003
4) Seria Gaslift Replacement Network – From April to October 2002.
5) Oil and Gas Discovery Centre – From December 2001 to June 2002
6) Seria Crude Oil Terminal Drainage Segregation Phase 2 – From Sept.2001 to
Jan. 2003
7) BLNG Tank 4201 Restoration – From April to July 2001.
8) OGP Package 2 – Fabrication of Pipe Racks, Pipe Bridges, underground pipeline,
Piping works and Compressor Building 1/2/3 – From August 2000 to July 2001.
9) OGP package 3 – Fabrication of DN 1016 Slug Catcher and Pipe Supports –
From December 2000 to July 2001.
10) Asam Paya Development Pipeline – From April to August 2000.
11) West Wet Gas Project (BLNG) - From December 1999 to April 2000.
12) Maintenance of Tanks and Pipeworks Contract – From January 1999 to
December 2000.
Cv hashim Page 5 of 6 NOV 2016
6. NOVEMBER 1990 TO JULY 1999 POSITION : MATERIAL COORDINATOR
For Adinin Works & Engineering Sdn. Bhd.
Work Involved : 1) To responsible for overall operation of engineering materials under BSP
contract - Service Campaign Operation (SCO) at Marine Construction Yard.
2) To study the fabrication work order given by BSP for onshore yard fabrication.
3) To control and supervise materialmen for monitoring project materials.
4) To prepare Material Status Report to Planning Engineer and Yard Manager.
5) Coordination with BSP Project Engineers, Fabrication Supervisors and BSP
Material Supervisors.
6) To assist Senior Welding Inspector for material traceability for conducting Welder
Qualification Test.
7) Reporting for any special materials used for fabrication and welding to Project
Engineer and Senior Welding Inspector.
8) Coordination with Blasting and Painting Foreman and Painting Inspector for
painting pre-fabrication materials to BSP Painting Specification.
9) Involved material control for major BSP CPFC-7 Project and PERAGAM
Development Facilities Project which consists of construction of four legged
Jackets, decks, piles, boatlandings structure and pipeline. To coordinate with
QA/QC department for material inspection and prepare material inspection
reports.To monitor procurement activity report for material delivery for construction
of major projects.
10) To assist material control for BSP AMPA-30 Development Facilities Project
under main contractor - Hyundai Heavy Industries.
11) Assigned to BSP-SCO/3 warehouse for controlling fabrication loose materials for
Onshore yard fabrication and monitoring the storage of completed pre-fabrication
spools and structures prior to load-out to offshore as per BSP’s instruction.
To provide material status to BSP Construction Engineers for fabrication.
DECEMBER 1989 TO OCTOBER 1990 POSITION : MATERIALMAN / STOREKEEPER
For Adinin Works & Engineering Sdn. Bhd.
Work Involved : To check and segregate BSP incoming materials from Supplies Department (SSU)
based on material issue voucher (MIV) and deliver to material storage prior to issuing for shop
fabrication. Experienced BSP engineering materials for steelworks fabrication and construction.
Reporting to Material Coordinator.
Work Involved : Responsible for receiving and recording consumable items such as electrodes, clear
glass, electrode holders, paint products and etc., engineering tools and welding equipments used for
fabrication. To record issuance of consumable items, tools and equipments to Fabrication / Painting
Supervisors. To update material stock cards and make ordering material request to Yard Manager.
To check timecards for the yard personnels as per timesheet submitted by Supervisors and prepare
daily manpower list to Senior Supervisor and Yard Manager.
Cv hashim Page 6 of 6 NOV 2016
7. NOVEMBER 1990 TO JULY 1999 POSITION : MATERIAL COORDINATOR
For Adinin Works & Engineering Sdn. Bhd.
Work Involved : 1) To responsible for overall operation of engineering materials under BSP
contract - Service Campaign Operation (SCO) at Marine Construction Yard.
2) To study the fabrication work order given by BSP for onshore yard fabrication.
3) To control and supervise materialmen for monitoring project materials.
4) To prepare Material Status Report to Planning Engineer and Yard Manager.
5) Coordination with BSP Project Engineers, Fabrication Supervisors and BSP
Material Supervisors.
6) To assist Senior Welding Inspector for material traceability for conducting Welder
Qualification Test.
7) Reporting for any special materials used for fabrication and welding to Project
Engineer and Senior Welding Inspector.
8) Coordination with Blasting and Painting Foreman and Painting Inspector for
painting pre-fabrication materials to BSP Painting Specification.
9) Involved material control for major BSP CPFC-7 Project and PERAGAM
Development Facilities Project which consists of construction of four legged
Jackets, decks, piles, boatlandings structure and pipeline. To coordinate with
QA/QC department for material inspection and prepare material inspection
reports.To monitor procurement activity report for material delivery for construction
of major projects.
10) To assist material control for BSP AMPA-30 Development Facilities Project
under main contractor - Hyundai Heavy Industries.
11) Assigned to BSP-SCO/3 warehouse for controlling fabrication loose materials for
Onshore yard fabrication and monitoring the storage of completed pre-fabrication
spools and structures prior to load-out to offshore as per BSP’s instruction.
To provide material status to BSP Construction Engineers for fabrication.
DECEMBER 1989 TO OCTOBER 1990 POSITION : MATERIALMAN / STOREKEEPER
For Adinin Works & Engineering Sdn. Bhd.
Work Involved : To check and segregate BSP incoming materials from Supplies Department (SSU)
based on material issue voucher (MIV) and deliver to material storage prior to issuing for shop
fabrication. Experienced BSP engineering materials for steelworks fabrication and construction.
Reporting to Material Coordinator.
Work Involved : Responsible for receiving and recording consumable items such as electrodes, clear
glass, electrode holders, paint products and etc., engineering tools and welding equipments used for
fabrication. To record issuance of consumable items, tools and equipments to Fabrication / Painting
Supervisors. To update material stock cards and make ordering material request to Yard Manager.
To check timecards for the yard personnels as per timesheet submitted by Supervisors and prepare
daily manpower list to Senior Supervisor and Yard Manager.
Cv hashim Page 6 of 6 NOV 2016