SCHOOL OF ARCHITECTURE, BUILDING &
DESIGN (SABD)
INT60105 INTERNSHIP TRAINING & REPORT
INTERNSHIP REPORT
NAME: CHONG YI HUI
STUDENT ID: 0324404
TUTOR: DR. TAMIL SALVI
COMPANY NAME: y’ SHIN ARCHITECT
INTERNSHIP DURATION: 8TH JANUARY 2018 - 23RD FEBRUARY
2018

 INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
TABLE OF CONTENT
CONTENT PAGE NO.
1.0 INTRODUCTION

- 1.1 PROLOGUE
 3
2.0 PROJECTS

- 2.1 COCONUT ICECREAM STAND, HERBALINE BOTANIC, SELANGOR

- 2.2 NILAI REV 7, NEGERI SEMBILAN

- 2.3 KINGDOM, SEMENYIH, SELANGOR

- 2.4 HOMECITY, KAJANG, SELANGOR

- 2.5 HERBALINE SQUARE, IPOH, PERAK

- 2.6 VISTA OUG, KUALA LUMPUR

- 2.7 MAX HOUSE, SELANGOR

- 2.8 NALANDA, SELANGOR

- Conclusion
4-5

6

7-8

9-12

13-18

19-24

25-26

27

28
3.0 LOGSHEETS 29-36
4.0 TESTIMONIAL LETTER 37


3
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
1.0 INTRODUCTION

1.1 PROLOGUE

First of all, I would like to extend my sincerest thanks and gratitude to Y’ SHIN
ARCHITECT for accepting me as an intern to carry out my internship with them during
this short period. However, I am able to gain a lot of knowledge in such a short time in
regards to the professional practice in an actual architectural firm. Thus, I would like to
personally thank my supervisor Ms. Chang Ye Shin who is also the director of the firm,
along with the rest of the staff and colleagues for their guidance throughout the course
of my internship as well as giving some tips on how to become a better architect. I
would also like to thank my lecturer Dr. Tamil Salvi for her care and guidance throughout
the entire internship.


4
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
2.0 PROJECTS

2.1 HERBALINE BOTANIC, MELAKA

The first project that I was involved in during my internship period, I started off with a
small scale project in the form of a ice-cream stand for the Herbaline Botanic in
Selangor. The client for this project is Mr. C. K. Low. The ice-cream stand is a single
floor stall of 8 square meters with inspiration taken from the concept of the whole site
which is like an island as the buildings are designed in a clustering form. As the ice-
cream stand stands alone as a lone building, louvers are added to act as a shading
device. The roof design is a butterfly roof with rainwater down pipes on both side.
Butterfly roof is proposed as the ice-cream stand can be accessed by customers on
both sides. This prevents heavy water flow from the roof to disrupt customers. These
features makes the stand more user friendly.

I was tasked to produce a new design of the ice-cream stand from an already existing
SketchUp file as reference to get an idea of what the design should or should not be
like. By having a reference, it is also easier for me to develop a new design for the ice-
cream stand. While carrying out this task, I was given advices from Ms. Shin about the
design of the ice-cream stand as well as the importance of incorporating structural
details into the 3D and AutoCAD drawings as it will help other professionals to
understand the drawings/idea more. This definitely improved my knowledge about
structural details in buildings for future use. 

In the 6th week of my internship, I was given the task to check the whole SketchUp file
of the Herbaline Botanic project and place the ice-cream stand into the completed
SketchUp file. I also followed a colleague, Ms. Shamini, to send the tender drawings to
the authorities. Here, I learned the process in producing tender documents and the
guidelines that we have to follow.


5
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 1.0 Perspective view of 3D SketchUp of ice-cream stand
Image 1.1 Perspective view of 3D SketchUp of Herbaline Botanic, Selangor


6
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
2.2 NILAI REV 7, NILAI, NEGERI SEMBILAN

The next project I am involved with is the Nilai Rev 7 condominium project located in
Negeri Sembilan. For this project, the client requested for different colour schemes for
the condominium. As the 3D SketchUp for this condominium is already completed, my
task was to come out with different colour scheme to better suit the condominium.
Other than that, I also did the renderings for the condominium as per requested by the
client for a presentation the next week. For this project, I learnt how to render using
SketchUp V-ray renderer as normally I would have used 3Ds Max as my renderer but the
office does not have it. Now, I acquired the skills to render with different softwares as it
is more versatile in the real world.
Image 2.0 Colour Scheme Option 1 for Nilai Rev 7
Image 2.1 Colour Scheme Option 2 for Nilai Rev 7


7
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
2.3 KINGDOM, SEMENYIH, SELANGOR

Located in Semenyih, the project’s client is Nirvana Group. The budget of the project was not
disclosed as this project is still just in conceptual phase. My director, Ms. Shin briefed me on the
project. This project is given the name “KINGDOM” and is about 500 acre land. My task for this
project is to propose a layout of the masterplan consisting of infrastructure, landscape,
commercial area, sales gallery and etc. I am to create a presentation for the client meeting on
2nd February 2018. As this is the beginning of the conceptual design stage, over a span of three
weeks was spent coming up with a number of layouts were produced and discussed with the
director, with several changes made to each new proposal. This definitely helps me as a future
architect, as it opens my eyes on designing for the people, rather than just trying to leave a
design statement. As this is a large scale project, functionality is as important as having the
aesthetics to a particular masterplan layout. In the duration of this project, I also enhanced my
photoshop skills as it was needed for better aesthetics on selling the concept of the project.

SITE ANALYSIS
-SITE IS SITUATED ON HILLY AREA
-TOTAL ACRE OF SITE IS 584.51 ACRES
HILLY AREA
LESS SLOPE AREA
10FT GREEN BUFFER
STREAM
FUTURE HIGHWAY
10FT GREEN BUFFER
ALONG SITE
JLNSG
LA
LA
NG
LESSSLOPE
AREA
STREAM
FUTURE NEW HIGHWAY FROM NORTH
HILL 1
HILL 2
HILL 3
HILL 4
HILL 5
HILL 6
HILL 7
STRE
AM
STRE
AM
PROPOSED MASTER PLAN
-ASSOCIATED WITH 2 TIERS OF SECURITY AT THE EACH ENTRANCE
-EACH ZONE HAS THEIR INDIVIDUAL CLUBHOUSE
LOOKOUT TOWER
CANOPY RESTAURANT
OTHER FACILITIES
66FT GREEN BUFFER
10FT GREEN BUFFER
ENTRANCE
STREAM
ROAD
MAIN GATEWAY ENTRANCE
GATEWAY ENTRANCE 2
MAIN RING ROAD
LOOKOUT TOWER
STREAM
10FT GREEN BUFFER
ROAD
JLN SG LALANG
66FT GREEN BUFFER
CAN
OPY
RESTAU
RA
NT
SALES
GALLERY
CONTAINER
F&B
OTHER
FACILITIES
CENTRAL PARK
LAKE
ZONE 1
ZONE 3
ZONE 2
ZONE 4
ZONE 5
ZONE 6
CLUB
HOUSE
WATERFRON
T
RESTA
UR
AN
T
MAIN ENTRANCE
ENTRANCES
MAIN GATEWAY
ENTRANCE
GATEWAY ENTRANCE 2
MAIN RING ROAD
-PROPOSED LOCATION IN MASTERPLAN
https://youtu.be/XT7bOhKOiPU
ECO SANCTUARY, SELANGOR
-TALL MODERN & GRAND LANDMARK AS A SYMBOL OF HOME
-CELEBRATED WITH A LINE OF LUSH GREENERIES TO RELAX THE MIND
MAIN ENTRANCE GUARDHOUSE
GUARDHOUSE
GUARDHOUSE
MAIN RING ROAD
-PROPOSED LOCATION IN MASTERPLAN
ECOWORLD MAJESTIC, SEMENYIH
-ASSOCIATED WITH 2 TIERS OF SECURITY AT THE ENTRANCE
-GREETED BY WELCOMING GUARDS SENDS A FRIENDLY MESSAGE TO COMMUNITY
GUARDHOUSE ENTRANCE ROAD
ECO ARDENCE, SETIA ALAM
-2 WAY ROAD PARADED WITH TREES TO SHOWCASE THE NATURAL BEAUTY
-AND TAKE IN THE GREAT BEAUTY OF NATURE
FENCE
MAIN RING ROAD
FENCE SURROUNDING
WHOLE PERIMETER
-PROPOSED LOCATION IN MASTERPLAN
FENCE FOR EACH ZONE
ECOWORLD HORIZON, PENANG
-ELEGANT CAST IRON GRAND FENCING PLATED WITH OWN LOGO FOR GRANDEUR FEEL
-ANTI CLIMB FENCING
FENCE & LOGO LOOKOUT POINT FOR EACH ZONE
MAIN RING ROAD
-PROPOSED LOCATION IN MASTERPLAN
LOOKOUT POINT
-EACH 1 ACRE IS PROVIDED WITH AN INDIVIDUAL SECURITY BOOTH AND CCTV SURVEILLANCE
FOR BETTER SECURITY
INDIVIDUAL SECURITY BOOTH
1 ACRE LAND
SECURITY HOUSE
MAIN RING ROAD


8
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
-SIDE BY SIDE & SEPARATED BY GREENS IN BETWEEN
-SAFER FOR PEDESTRIANS AS THERE ARE DEDICATED PATHS FOR THEM
DESA PARK CITY
VEHICLE, BICYCLE & PEDESTRIAN LANE LAKE
LAKE
-PROPOSED LOCATION IN MASTERPLAN
-OTHER THAN ENJOYING THE VIEW, PEOPLE CAN HAVE A STOLL OR JOG WITH THEIR PETS
-THEY CAN ALSO ENJOY A RELAXING PICNIC WITH FAMILY MEMBERS BY THE LAKE
RECREATION BY THE LAKE PARK
PARK
-PROPOSED LOCATION IN MASTERPLAN
-BY THE LAKE, SURROUNDED BY LUSH NATURE & POCKET PARKS
CENTRAL PARK
-SURROUNDING THE CENTRAL PARK, WILL BE OTHER SMALLER POCKET PARKS FOR COMMUNITY TO ENJOY
-TO DISTRIBUTE THE PEOPLE IN THE AREA
POCKET PARKS CLUBHOUSE
CLUBHOUSE
-PROPOSED LOCATION IN MASTERPLAN
CLUBHOUSE-EXTERIOR
-HIGH END CLUBHOUSE FITTED WITH SIMILAR QUALITY FACILITIES IN A PEACEFUL SETTING
-DRIVE WAY & DROP OFF CONNECTED TO CLUBHOUSE FOR EASY ACCESS
ECO SANCTUARY, SELANGOR
-RELAX & IMMERSE IN THE CLASSY INTERIOR OF THE CLUBHOUSE OVERLOOKING THE OUTSIDE LANDSCAPE
CLUBHOUSE-INTERIOR COMMUNITY HALL
COMMUNITY
HALL
-PROPOSED LOCATION IN MASTERPLAN
-A PLACE WHERE COMMUNITY GATHER, EXCHANGE IDEAS & COMMUNICATE FREELY AS A WHOLE
TO IMPROVE THE AREA
COMMUNITY HALL COMMERCIAL AREA
COMMERCIAL
AREA
-PROPOSED LOCATION IN MASTERPLAN
-EASILY ACCESSED BY PUBLIC & VEHICULAR TRANSPORTATION
-FLEXIBLE DESIGN CONCEPT FOR RETAIL AND F&B OUTLETS TO CONVERT TO PERMANENT BUILDINGS LATER ON
ECO ARDENCE, SETIA ALAMECO ARDENCE, SETIA ALAM
TEMPORARY COMMERCIAL CONTAINER SPACES SALES GALLERY
SALES GALLERY
-PROPOSED LOCATION IN MASTERPLAN
Image 3.0 Presentation for KINGDOM, Semenyih
* The presentation is not the full presentation as by now it belongs to y’ SHIN Architect


9
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
2.4 HOMECITY, KAJANG, SELANGOR

In the 4th week of my internship, I was given the task to CAD the floor plans according to their
units and also render floor plans for Homecity project located in Kajang. Homecity is terrace
linked housing. There are 3 different types of terraces which are the low-cost, middle cost and
high cost terraces. After finishing the floor plans, I also took part in submitting the drawings with
Sunny (colleague). While carrying out the tasks, I learnt that there is no final design until
construction as there will still be things to change in the design. I also gained knowledge about
the fire protection system in buildings and as the architect it is our responsibility to remind the
client about the safety in a building although it may exceed the cost.


10
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 4.0 CAD drawing for Homecity, Kajang


11
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 4.1 Rendered floor plan for Homecity, Kajang (Type-A)


12Image 4.2 Rendered floor plan for Homecity, Kajang (Type-B)
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404


13
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
2.5 HERBALINE SQUARE, IPOH, PERAK

Herbaline Square is a five storey building located in Ipoh. The client is Mr. C. K. Low. I
was tasked to produce a 3D drawing of the building based on the AutoCAD drawings
done by Ms. Shamini. A site visit was conducted at the site on Sunday, 4th February
2018. This site visit was to oversee the construction of the building in progress,
particularly the interior of the buildings where there were changes based on the client
and the interior designer. Furthermore, I was able to observe different professionals
coordinating with each other working on the same project, rather than just observing
from the architect’s perspective. We went floor by floor to oversee what changes that
can be made to enhance the aesthetic value of the building as a whole. As the building
was halfway into construction, changes to the building still can be made depending on
the structure of the building and cost the client are willing to give. Being a real project
that is under construction, it is crucial that all parties understands and agrees between
one professional with another and ensure all safety protocols are abided to prevent
potential malfunctions to the building.
Image 5.0 Ground floor plan


14
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 5.1 Mezzanine floor plan DN50mmDN50mmDN50mmDN50mm
Image 5.2 First floor plan


15
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 5.3 Second floor plan
Image 5.4 Third floor plan


16
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 5.5 Roof plan
Image 5.6 Left & front elevation


17
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 5.7 Right & back elevation
Image 5.8 X & Y section


18
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 5.9 - 5.11 Scenes from 3D SketchUp


19
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
2.6 VISTA OUG, KUALA LUMPUR

The next project I am involved with is the Vista OUG located in Kuala Lumpur. This
project is a condominium which consists of a 5 level parking lot, 3 blocks of 25 storey
condominium with 1800 units and facilities such as gym, kindergarten and convenient
store. The client is Vistarene Development Sdn. Bhd. My task for this project is to render
the floor plans for the condominium and landscape. I was also given the task to design
the landscape of the linear park located in the site. From this task, I was able to further
familiarise myself with the photoshop commands to work faster and efficient. I also
learnt how to incorporate the linear park with the condominium in order for the design to
be more green and also creates a buffer zone for the tenants to experience nature.
Image 6.0 Map of proposed site


20
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404


21
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404


22
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404


23
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404


24
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 6.1 - 6.5 Rendered floor plans


25
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
2.7 MAX HOUSE, TAMAN TASIK SEMENYIH, SELANGOR

Located in Taman Tasik Semenyih, Selongor, Max House is an existing house for client
Mr. Max. For this project, my task was to redraw the layout of the house using AutoCAD.
Reference was given in the form of pictures of the manual drawings of the house when it
was first constructed in 1986. Therefor, the owner, Mr. Max requested for the digital
layout of the building. At the end of this project, I was able to further develop my
AutoCAD skills and also take details in line weights and plotting styles.

Image 7.0 - 7.4 Photos of original drawings


26
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
Image 7.5 Ground floor plan and roof plan
Image 7.6 Right, front, left and back elevation


27
INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404
2.8 NALANDA, SELANGOR

On my last day as an intern, I was given the opportunity to tag along for a site visit at
Nalanda, Seri Kembangan. From the time spent on-site, I was able to learn a lot more
about the operations at a construction site while also gaining more knowledge on the
construction process of a particular project. Furthermore, I am able to observe multiple
professionals coordinating with one another to ensure the building is constructed as
intended by the architect. Upon observing how my director, Ar. Shin coordinates with
contractor, engineers and client, I realised that an architect has to know a lot more on
the process of a project before, during and after its construction to be able to manage it
in an efficient and effective manner, as the architect is considered the mastermind in the
grand scheme of any architectural project.
Image 8.0 & 8.1 Ar. Shin explaining about the works on site


28
CONCLUSION 

To conclude this report, I would like to once again thank everyone that was involved in
helping me accomplish my internship at y’ SHIN ARCHITECT, from my colleagues to my
director. I would like to thank Dr. Salvi once again for her coordination with me
throughout the internship period. I have also gained invaluable knowledge and skills in
the office that the studio could never give. I have not only experienced the operations of
a professional architectural firm, but I have also become more sensitive in regards to
designing not just to give aesthetics but also for functionality, ease of access to the
public and following the by-laws. I have started to dive into the world of architecture,
proper master planning and designing thanks to all my colleagues guiding me
throughout this period. In my opinion, going through this internship is a must for all
students to prepare them for the real world rather than just start working after
graduation without proper experience. Most importantly, I was able to observe each
stage of an architectural project, from the beginning of its design to its contract
documentation stage. These are experiences that are simply unobtainable while in
university. 

INT60105
INTERNSHIP TRAINING & REPORT
NAME : CHONG YI HUI
STUDENT ID : 0324404


29
LOGSHEET
(WEEK 1 TO WEEK 7)
&
TESTIMONIAL LETTER






ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404

More Related Content

What's hot

New Projects in Kandivali East - Godrej Tranquil
New Projects in Kandivali East - Godrej TranquilNew Projects in Kandivali East - Godrej Tranquil
New Projects in Kandivali East - Godrej TranquilPoojaShetty87
 
Club House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTSClub House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTSsupratikrath
 
Landscape Design Research Report
Landscape Design Research ReportLandscape Design Research Report
Landscape Design Research ReportKate O'Hara
 
Ici final group
Ici final groupIci final group
Ici final groupKailyn Lee
 
Exhibition Center of Beijing Poly Future Metropolitan / BIAD
Exhibition Center of Beijing Poly Future Metropolitan / BIADExhibition Center of Beijing Poly Future Metropolitan / BIAD
Exhibition Center of Beijing Poly Future Metropolitan / BIADAMIT ANAND
 
Portfolio Arddy Berylian
Portfolio Arddy BerylianPortfolio Arddy Berylian
Portfolio Arddy BerylianArddy Bokslag
 
Ici final project
Ici final projectIci final project
Ici final projectAdeleLu
 
The centrum club case study
The centrum club case studyThe centrum club case study
The centrum club case studymeenalgajbhiye
 
Builders in Bangalore | Real Estate Developers in Bangalore
Builders in Bangalore | Real Estate Developers in BangaloreBuilders in Bangalore | Real Estate Developers in Bangalore
Builders in Bangalore | Real Estate Developers in Bangaloreabhishekraiuniverse
 
ANASTASIA uli_Portfolio
ANASTASIA uli_PortfolioANASTASIA uli_Portfolio
ANASTASIA uli_PortfolioAnastasia Uli
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural PortfolioHammad Haroon
 
Ruaa Abdulahad Portfolio
Ruaa Abdulahad PortfolioRuaa Abdulahad Portfolio
Ruaa Abdulahad PortfolioRuaa Abdulahad
 
cover letter,portfolio,resume-ANNA
cover letter,portfolio,resume-ANNAcover letter,portfolio,resume-ANNA
cover letter,portfolio,resume-ANNASHENGER DAI
 
Portfolio 2019 part 1/2
Portfolio 2019 part 1/2Portfolio 2019 part 1/2
Portfolio 2019 part 1/2DannyHin
 
The Gallery House, West Bengal
The Gallery House, West BengalThe Gallery House, West Bengal
The Gallery House, West Bengalbhavikagoyal2
 
5 Things to Know About Provident Park Square
5 Things to Know About Provident Park Square5 Things to Know About Provident Park Square
5 Things to Know About Provident Park SquareDream Earth
 
AYSE SARIMUSTAFA_PORTFOLIO
AYSE SARIMUSTAFA_PORTFOLIOAYSE SARIMUSTAFA_PORTFOLIO
AYSE SARIMUSTAFA_PORTFOLIOAyseSarimustafa
 

What's hot (20)

New Projects in Kandivali East - Godrej Tranquil
New Projects in Kandivali East - Godrej TranquilNew Projects in Kandivali East - Godrej Tranquil
New Projects in Kandivali East - Godrej Tranquil
 
Club House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTSClub House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTS
 
Landscape Design Research Report
Landscape Design Research ReportLandscape Design Research Report
Landscape Design Research Report
 
Icip3 project brief
Icip3 project briefIcip3 project brief
Icip3 project brief
 
Ici final group
Ici final groupIci final group
Ici final group
 
Exhibition Center of Beijing Poly Future Metropolitan / BIAD
Exhibition Center of Beijing Poly Future Metropolitan / BIADExhibition Center of Beijing Poly Future Metropolitan / BIAD
Exhibition Center of Beijing Poly Future Metropolitan / BIAD
 
Portfolio Arddy Berylian
Portfolio Arddy BerylianPortfolio Arddy Berylian
Portfolio Arddy Berylian
 
Portfolio
PortfolioPortfolio
Portfolio
 
Ici final project
Ici final projectIci final project
Ici final project
 
The centrum club case study
The centrum club case studyThe centrum club case study
The centrum club case study
 
Builders in Bangalore | Real Estate Developers in Bangalore
Builders in Bangalore | Real Estate Developers in BangaloreBuilders in Bangalore | Real Estate Developers in Bangalore
Builders in Bangalore | Real Estate Developers in Bangalore
 
ANASTASIA uli_Portfolio
ANASTASIA uli_PortfolioANASTASIA uli_Portfolio
ANASTASIA uli_Portfolio
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
Ruaa Abdulahad Portfolio
Ruaa Abdulahad PortfolioRuaa Abdulahad Portfolio
Ruaa Abdulahad Portfolio
 
cover letter,portfolio,resume-ANNA
cover letter,portfolio,resume-ANNAcover letter,portfolio,resume-ANNA
cover letter,portfolio,resume-ANNA
 
Portfolio 2019 part 1/2
Portfolio 2019 part 1/2Portfolio 2019 part 1/2
Portfolio 2019 part 1/2
 
The Gallery House, West Bengal
The Gallery House, West BengalThe Gallery House, West Bengal
The Gallery House, West Bengal
 
5 Things to Know About Provident Park Square
5 Things to Know About Provident Park Square5 Things to Know About Provident Park Square
5 Things to Know About Provident Park Square
 
Presentasi bellevue place mt haryono 081282050117
Presentasi bellevue place mt haryono 081282050117Presentasi bellevue place mt haryono 081282050117
Presentasi bellevue place mt haryono 081282050117
 
AYSE SARIMUSTAFA_PORTFOLIO
AYSE SARIMUSTAFA_PORTFOLIOAYSE SARIMUSTAFA_PORTFOLIO
AYSE SARIMUSTAFA_PORTFOLIO
 

Similar to ARC2625 REPORT FILE ChongYiHui0324404

ICI Final Project Proposal
ICI Final Project ProposalICI Final Project Proposal
ICI Final Project ProposalJunXiang97
 
Project Management Games and Recreation Documentation Report
Project Management Games and Recreation Documentation ReportProject Management Games and Recreation Documentation Report
Project Management Games and Recreation Documentation ReportKohSungJie
 
Ici final project
Ici   final projectIci   final project
Ici final projectJoeylau97
 
Ici - final project
Ici - final projectIci - final project
Ici - final projectleejanett3
 
WatsonMArch Portfolio
WatsonMArch PortfolioWatsonMArch Portfolio
WatsonMArch PortfolioReva Watson
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Jannah Jailani
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan ReportFarah Sham
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2Clement Seong
 
Gouttaman ananda selvan portfolio
Gouttaman ananda selvan   portfolioGouttaman ananda selvan   portfolio
Gouttaman ananda selvan portfolioArGold Gouttaman
 
PORTFOLIO - PRANAV SHAUCHE
PORTFOLIO - PRANAV SHAUCHEPORTFOLIO - PRANAV SHAUCHE
PORTFOLIO - PRANAV SHAUCHEPranav Shauche
 
Ici project brief
Ici project briefIci project brief
Ici project briefjerryycc
 
Architecture Portfolio Ahmed Quwaider 004.pdf
Architecture Portfolio Ahmed Quwaider 004.pdfArchitecture Portfolio Ahmed Quwaider 004.pdf
Architecture Portfolio Ahmed Quwaider 004.pdfAhmedQuwaider
 

Similar to ARC2625 REPORT FILE ChongYiHui0324404 (20)

ICI Final Project Proposal
ICI Final Project ProposalICI Final Project Proposal
ICI Final Project Proposal
 
Project Management Games and Recreation Documentation Report
Project Management Games and Recreation Documentation ReportProject Management Games and Recreation Documentation Report
Project Management Games and Recreation Documentation Report
 
pa 4.pptx
pa 4.pptxpa 4.pptx
pa 4.pptx
 
Ici final project
Ici   final projectIci   final project
Ici final project
 
Ici - final project
Ici - final projectIci - final project
Ici - final project
 
ARC 2615
ARC 2615ARC 2615
ARC 2615
 
WatsonMArch Portfolio
WatsonMArch PortfolioWatsonMArch Portfolio
WatsonMArch Portfolio
 
Jithin Portfolio
Jithin PortfolioJithin Portfolio
Jithin Portfolio
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
Project
Project Project
Project
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan Report
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2
 
portfolio
portfolioportfolio
portfolio
 
Portfolio 2019
Portfolio 2019 Portfolio 2019
Portfolio 2019
 
Gouttaman ananda selvan portfolio
Gouttaman ananda selvan   portfolioGouttaman ananda selvan   portfolio
Gouttaman ananda selvan portfolio
 
PortfolioWeb1
PortfolioWeb1PortfolioWeb1
PortfolioWeb1
 
PORTFOLIO - PRANAV SHAUCHE
PORTFOLIO - PRANAV SHAUCHEPORTFOLIO - PRANAV SHAUCHE
PORTFOLIO - PRANAV SHAUCHE
 
Ici project brief
Ici project briefIci project brief
Ici project brief
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
Architecture Portfolio Ahmed Quwaider 004.pdf
Architecture Portfolio Ahmed Quwaider 004.pdfArchitecture Portfolio Ahmed Quwaider 004.pdf
Architecture Portfolio Ahmed Quwaider 004.pdf
 

More from Chong Yi Hui

BSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdfBSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdfChong Yi Hui
 
Comparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdfComparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdfChong Yi Hui
 
THEORIES_YIHUI.pdf
THEORIES_YIHUI.pdfTHEORIES_YIHUI.pdf
THEORIES_YIHUI.pdfChong Yi Hui
 
Slides for bscience ii
Slides for bscience iiSlides for bscience ii
Slides for bscience iiChong Yi Hui
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 reportChong Yi Hui
 
Building technology report
Building technology reportBuilding technology report
Building technology reportChong Yi Hui
 
Building construction report
Building construction reportBuilding construction report
Building construction reportChong Yi Hui
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalizedChong Yi Hui
 
Social psychology project ii(comic)
Social psychology project ii(comic)Social psychology project ii(comic)
Social psychology project ii(comic)Chong Yi Hui
 
Account assignment report finale(1)
Account assignment report finale(1)Account assignment report finale(1)
Account assignment report finale(1)Chong Yi Hui
 

More from Chong Yi Hui (20)

btechcompiled.pdf
btechcompiled.pdfbtechcompiled.pdf
btechcompiled.pdf
 
BSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdfBSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdf
 
Comparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdfComparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdf
 
THEORIES_YIHUI.pdf
THEORIES_YIHUI.pdfTHEORIES_YIHUI.pdf
THEORIES_YIHUI.pdf
 
Yihui's pm final
Yihui's pm finalYihui's pm final
Yihui's pm final
 
Pm final
Pm finalPm final
Pm final
 
Btechii-project2
Btechii-project2Btechii-project2
Btechii-project2
 
Btechii
BtechiiBtechii
Btechii
 
Studio report
Studio reportStudio report
Studio report
 
Slides for bscience ii
Slides for bscience iiSlides for bscience ii
Slides for bscience ii
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Final report
Final reportFinal report
Final report
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalized
 
Statitics
StatiticsStatitics
Statitics
 
English report
English report English report
English report
 
Social psychology project ii(comic)
Social psychology project ii(comic)Social psychology project ii(comic)
Social psychology project ii(comic)
 
Account assignment report finale(1)
Account assignment report finale(1)Account assignment report finale(1)
Account assignment report finale(1)
 
Epc
EpcEpc
Epc
 

Recently uploaded

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 

Recently uploaded (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 

ARC2625 REPORT FILE ChongYiHui0324404

  • 1. 
 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN (SABD) INT60105 INTERNSHIP TRAINING & REPORT INTERNSHIP REPORT NAME: CHONG YI HUI STUDENT ID: 0324404 TUTOR: DR. TAMIL SALVI COMPANY NAME: y’ SHIN ARCHITECT INTERNSHIP DURATION: 8TH JANUARY 2018 - 23RD FEBRUARY 2018
  • 2. 
 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 TABLE OF CONTENT CONTENT PAGE NO. 1.0 INTRODUCTION - 1.1 PROLOGUE 3 2.0 PROJECTS - 2.1 COCONUT ICECREAM STAND, HERBALINE BOTANIC, SELANGOR - 2.2 NILAI REV 7, NEGERI SEMBILAN - 2.3 KINGDOM, SEMENYIH, SELANGOR - 2.4 HOMECITY, KAJANG, SELANGOR - 2.5 HERBALINE SQUARE, IPOH, PERAK - 2.6 VISTA OUG, KUALA LUMPUR - 2.7 MAX HOUSE, SELANGOR - 2.8 NALANDA, SELANGOR - Conclusion 4-5 6 7-8 9-12 13-18 19-24 25-26 27 28 3.0 LOGSHEETS 29-36 4.0 TESTIMONIAL LETTER 37
  • 3. 
 3 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 1.0 INTRODUCTION 1.1 PROLOGUE First of all, I would like to extend my sincerest thanks and gratitude to Y’ SHIN ARCHITECT for accepting me as an intern to carry out my internship with them during this short period. However, I am able to gain a lot of knowledge in such a short time in regards to the professional practice in an actual architectural firm. Thus, I would like to personally thank my supervisor Ms. Chang Ye Shin who is also the director of the firm, along with the rest of the staff and colleagues for their guidance throughout the course of my internship as well as giving some tips on how to become a better architect. I would also like to thank my lecturer Dr. Tamil Salvi for her care and guidance throughout the entire internship.
  • 4. 
 4 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 2.0 PROJECTS 2.1 HERBALINE BOTANIC, MELAKA The first project that I was involved in during my internship period, I started off with a small scale project in the form of a ice-cream stand for the Herbaline Botanic in Selangor. The client for this project is Mr. C. K. Low. The ice-cream stand is a single floor stall of 8 square meters with inspiration taken from the concept of the whole site which is like an island as the buildings are designed in a clustering form. As the ice- cream stand stands alone as a lone building, louvers are added to act as a shading device. The roof design is a butterfly roof with rainwater down pipes on both side. Butterfly roof is proposed as the ice-cream stand can be accessed by customers on both sides. This prevents heavy water flow from the roof to disrupt customers. These features makes the stand more user friendly. I was tasked to produce a new design of the ice-cream stand from an already existing SketchUp file as reference to get an idea of what the design should or should not be like. By having a reference, it is also easier for me to develop a new design for the ice- cream stand. While carrying out this task, I was given advices from Ms. Shin about the design of the ice-cream stand as well as the importance of incorporating structural details into the 3D and AutoCAD drawings as it will help other professionals to understand the drawings/idea more. This definitely improved my knowledge about structural details in buildings for future use. In the 6th week of my internship, I was given the task to check the whole SketchUp file of the Herbaline Botanic project and place the ice-cream stand into the completed SketchUp file. I also followed a colleague, Ms. Shamini, to send the tender drawings to the authorities. Here, I learned the process in producing tender documents and the guidelines that we have to follow.
  • 5. 
 5 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 1.0 Perspective view of 3D SketchUp of ice-cream stand Image 1.1 Perspective view of 3D SketchUp of Herbaline Botanic, Selangor
  • 6. 
 6 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 2.2 NILAI REV 7, NILAI, NEGERI SEMBILAN The next project I am involved with is the Nilai Rev 7 condominium project located in Negeri Sembilan. For this project, the client requested for different colour schemes for the condominium. As the 3D SketchUp for this condominium is already completed, my task was to come out with different colour scheme to better suit the condominium. Other than that, I also did the renderings for the condominium as per requested by the client for a presentation the next week. For this project, I learnt how to render using SketchUp V-ray renderer as normally I would have used 3Ds Max as my renderer but the office does not have it. Now, I acquired the skills to render with different softwares as it is more versatile in the real world. Image 2.0 Colour Scheme Option 1 for Nilai Rev 7 Image 2.1 Colour Scheme Option 2 for Nilai Rev 7
  • 7. 
 7 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 2.3 KINGDOM, SEMENYIH, SELANGOR Located in Semenyih, the project’s client is Nirvana Group. The budget of the project was not disclosed as this project is still just in conceptual phase. My director, Ms. Shin briefed me on the project. This project is given the name “KINGDOM” and is about 500 acre land. My task for this project is to propose a layout of the masterplan consisting of infrastructure, landscape, commercial area, sales gallery and etc. I am to create a presentation for the client meeting on 2nd February 2018. As this is the beginning of the conceptual design stage, over a span of three weeks was spent coming up with a number of layouts were produced and discussed with the director, with several changes made to each new proposal. This definitely helps me as a future architect, as it opens my eyes on designing for the people, rather than just trying to leave a design statement. As this is a large scale project, functionality is as important as having the aesthetics to a particular masterplan layout. In the duration of this project, I also enhanced my photoshop skills as it was needed for better aesthetics on selling the concept of the project. SITE ANALYSIS -SITE IS SITUATED ON HILLY AREA -TOTAL ACRE OF SITE IS 584.51 ACRES HILLY AREA LESS SLOPE AREA 10FT GREEN BUFFER STREAM FUTURE HIGHWAY 10FT GREEN BUFFER ALONG SITE JLNSG LA LA NG LESSSLOPE AREA STREAM FUTURE NEW HIGHWAY FROM NORTH HILL 1 HILL 2 HILL 3 HILL 4 HILL 5 HILL 6 HILL 7 STRE AM STRE AM PROPOSED MASTER PLAN -ASSOCIATED WITH 2 TIERS OF SECURITY AT THE EACH ENTRANCE -EACH ZONE HAS THEIR INDIVIDUAL CLUBHOUSE LOOKOUT TOWER CANOPY RESTAURANT OTHER FACILITIES 66FT GREEN BUFFER 10FT GREEN BUFFER ENTRANCE STREAM ROAD MAIN GATEWAY ENTRANCE GATEWAY ENTRANCE 2 MAIN RING ROAD LOOKOUT TOWER STREAM 10FT GREEN BUFFER ROAD JLN SG LALANG 66FT GREEN BUFFER CAN OPY RESTAU RA NT SALES GALLERY CONTAINER F&B OTHER FACILITIES CENTRAL PARK LAKE ZONE 1 ZONE 3 ZONE 2 ZONE 4 ZONE 5 ZONE 6 CLUB HOUSE WATERFRON T RESTA UR AN T MAIN ENTRANCE ENTRANCES MAIN GATEWAY ENTRANCE GATEWAY ENTRANCE 2 MAIN RING ROAD -PROPOSED LOCATION IN MASTERPLAN https://youtu.be/XT7bOhKOiPU ECO SANCTUARY, SELANGOR -TALL MODERN & GRAND LANDMARK AS A SYMBOL OF HOME -CELEBRATED WITH A LINE OF LUSH GREENERIES TO RELAX THE MIND MAIN ENTRANCE GUARDHOUSE GUARDHOUSE GUARDHOUSE MAIN RING ROAD -PROPOSED LOCATION IN MASTERPLAN ECOWORLD MAJESTIC, SEMENYIH -ASSOCIATED WITH 2 TIERS OF SECURITY AT THE ENTRANCE -GREETED BY WELCOMING GUARDS SENDS A FRIENDLY MESSAGE TO COMMUNITY GUARDHOUSE ENTRANCE ROAD ECO ARDENCE, SETIA ALAM -2 WAY ROAD PARADED WITH TREES TO SHOWCASE THE NATURAL BEAUTY -AND TAKE IN THE GREAT BEAUTY OF NATURE FENCE MAIN RING ROAD FENCE SURROUNDING WHOLE PERIMETER -PROPOSED LOCATION IN MASTERPLAN FENCE FOR EACH ZONE ECOWORLD HORIZON, PENANG -ELEGANT CAST IRON GRAND FENCING PLATED WITH OWN LOGO FOR GRANDEUR FEEL -ANTI CLIMB FENCING FENCE & LOGO LOOKOUT POINT FOR EACH ZONE MAIN RING ROAD -PROPOSED LOCATION IN MASTERPLAN LOOKOUT POINT -EACH 1 ACRE IS PROVIDED WITH AN INDIVIDUAL SECURITY BOOTH AND CCTV SURVEILLANCE FOR BETTER SECURITY INDIVIDUAL SECURITY BOOTH 1 ACRE LAND SECURITY HOUSE MAIN RING ROAD
  • 8. 
 8 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 -SIDE BY SIDE & SEPARATED BY GREENS IN BETWEEN -SAFER FOR PEDESTRIANS AS THERE ARE DEDICATED PATHS FOR THEM DESA PARK CITY VEHICLE, BICYCLE & PEDESTRIAN LANE LAKE LAKE -PROPOSED LOCATION IN MASTERPLAN -OTHER THAN ENJOYING THE VIEW, PEOPLE CAN HAVE A STOLL OR JOG WITH THEIR PETS -THEY CAN ALSO ENJOY A RELAXING PICNIC WITH FAMILY MEMBERS BY THE LAKE RECREATION BY THE LAKE PARK PARK -PROPOSED LOCATION IN MASTERPLAN -BY THE LAKE, SURROUNDED BY LUSH NATURE & POCKET PARKS CENTRAL PARK -SURROUNDING THE CENTRAL PARK, WILL BE OTHER SMALLER POCKET PARKS FOR COMMUNITY TO ENJOY -TO DISTRIBUTE THE PEOPLE IN THE AREA POCKET PARKS CLUBHOUSE CLUBHOUSE -PROPOSED LOCATION IN MASTERPLAN CLUBHOUSE-EXTERIOR -HIGH END CLUBHOUSE FITTED WITH SIMILAR QUALITY FACILITIES IN A PEACEFUL SETTING -DRIVE WAY & DROP OFF CONNECTED TO CLUBHOUSE FOR EASY ACCESS ECO SANCTUARY, SELANGOR -RELAX & IMMERSE IN THE CLASSY INTERIOR OF THE CLUBHOUSE OVERLOOKING THE OUTSIDE LANDSCAPE CLUBHOUSE-INTERIOR COMMUNITY HALL COMMUNITY HALL -PROPOSED LOCATION IN MASTERPLAN -A PLACE WHERE COMMUNITY GATHER, EXCHANGE IDEAS & COMMUNICATE FREELY AS A WHOLE TO IMPROVE THE AREA COMMUNITY HALL COMMERCIAL AREA COMMERCIAL AREA -PROPOSED LOCATION IN MASTERPLAN -EASILY ACCESSED BY PUBLIC & VEHICULAR TRANSPORTATION -FLEXIBLE DESIGN CONCEPT FOR RETAIL AND F&B OUTLETS TO CONVERT TO PERMANENT BUILDINGS LATER ON ECO ARDENCE, SETIA ALAMECO ARDENCE, SETIA ALAM TEMPORARY COMMERCIAL CONTAINER SPACES SALES GALLERY SALES GALLERY -PROPOSED LOCATION IN MASTERPLAN Image 3.0 Presentation for KINGDOM, Semenyih * The presentation is not the full presentation as by now it belongs to y’ SHIN Architect
  • 9. 
 9 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 2.4 HOMECITY, KAJANG, SELANGOR In the 4th week of my internship, I was given the task to CAD the floor plans according to their units and also render floor plans for Homecity project located in Kajang. Homecity is terrace linked housing. There are 3 different types of terraces which are the low-cost, middle cost and high cost terraces. After finishing the floor plans, I also took part in submitting the drawings with Sunny (colleague). While carrying out the tasks, I learnt that there is no final design until construction as there will still be things to change in the design. I also gained knowledge about the fire protection system in buildings and as the architect it is our responsibility to remind the client about the safety in a building although it may exceed the cost.
  • 10. 
 10 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 4.0 CAD drawing for Homecity, Kajang
  • 11. 
 11 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 4.1 Rendered floor plan for Homecity, Kajang (Type-A)
  • 12. 
 12Image 4.2 Rendered floor plan for Homecity, Kajang (Type-B) INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404
  • 13. 
 13 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 2.5 HERBALINE SQUARE, IPOH, PERAK Herbaline Square is a five storey building located in Ipoh. The client is Mr. C. K. Low. I was tasked to produce a 3D drawing of the building based on the AutoCAD drawings done by Ms. Shamini. A site visit was conducted at the site on Sunday, 4th February 2018. This site visit was to oversee the construction of the building in progress, particularly the interior of the buildings where there were changes based on the client and the interior designer. Furthermore, I was able to observe different professionals coordinating with each other working on the same project, rather than just observing from the architect’s perspective. We went floor by floor to oversee what changes that can be made to enhance the aesthetic value of the building as a whole. As the building was halfway into construction, changes to the building still can be made depending on the structure of the building and cost the client are willing to give. Being a real project that is under construction, it is crucial that all parties understands and agrees between one professional with another and ensure all safety protocols are abided to prevent potential malfunctions to the building. Image 5.0 Ground floor plan
  • 14. 
 14 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 5.1 Mezzanine floor plan DN50mmDN50mmDN50mmDN50mm Image 5.2 First floor plan
  • 15. 
 15 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 5.3 Second floor plan Image 5.4 Third floor plan
  • 16. 
 16 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 5.5 Roof plan Image 5.6 Left & front elevation
  • 17. 
 17 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 5.7 Right & back elevation Image 5.8 X & Y section
  • 18. 
 18 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 5.9 - 5.11 Scenes from 3D SketchUp
  • 19. 
 19 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 2.6 VISTA OUG, KUALA LUMPUR The next project I am involved with is the Vista OUG located in Kuala Lumpur. This project is a condominium which consists of a 5 level parking lot, 3 blocks of 25 storey condominium with 1800 units and facilities such as gym, kindergarten and convenient store. The client is Vistarene Development Sdn. Bhd. My task for this project is to render the floor plans for the condominium and landscape. I was also given the task to design the landscape of the linear park located in the site. From this task, I was able to further familiarise myself with the photoshop commands to work faster and efficient. I also learnt how to incorporate the linear park with the condominium in order for the design to be more green and also creates a buffer zone for the tenants to experience nature. Image 6.0 Map of proposed site
  • 20. 
 20 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404
  • 21. 
 21 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404
  • 22. 
 22 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404
  • 23. 
 23 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404
  • 24. 
 24 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 6.1 - 6.5 Rendered floor plans
  • 25. 
 25 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 2.7 MAX HOUSE, TAMAN TASIK SEMENYIH, SELANGOR Located in Taman Tasik Semenyih, Selongor, Max House is an existing house for client Mr. Max. For this project, my task was to redraw the layout of the house using AutoCAD. Reference was given in the form of pictures of the manual drawings of the house when it was first constructed in 1986. Therefor, the owner, Mr. Max requested for the digital layout of the building. At the end of this project, I was able to further develop my AutoCAD skills and also take details in line weights and plotting styles. Image 7.0 - 7.4 Photos of original drawings
  • 26. 
 26 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 Image 7.5 Ground floor plan and roof plan Image 7.6 Right, front, left and back elevation
  • 27. 
 27 INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404 2.8 NALANDA, SELANGOR On my last day as an intern, I was given the opportunity to tag along for a site visit at Nalanda, Seri Kembangan. From the time spent on-site, I was able to learn a lot more about the operations at a construction site while also gaining more knowledge on the construction process of a particular project. Furthermore, I am able to observe multiple professionals coordinating with one another to ensure the building is constructed as intended by the architect. Upon observing how my director, Ar. Shin coordinates with contractor, engineers and client, I realised that an architect has to know a lot more on the process of a project before, during and after its construction to be able to manage it in an efficient and effective manner, as the architect is considered the mastermind in the grand scheme of any architectural project. Image 8.0 & 8.1 Ar. Shin explaining about the works on site
  • 28. 
 28 CONCLUSION To conclude this report, I would like to once again thank everyone that was involved in helping me accomplish my internship at y’ SHIN ARCHITECT, from my colleagues to my director. I would like to thank Dr. Salvi once again for her coordination with me throughout the internship period. I have also gained invaluable knowledge and skills in the office that the studio could never give. I have not only experienced the operations of a professional architectural firm, but I have also become more sensitive in regards to designing not just to give aesthetics but also for functionality, ease of access to the public and following the by-laws. I have started to dive into the world of architecture, proper master planning and designing thanks to all my colleagues guiding me throughout this period. In my opinion, going through this internship is a must for all students to prepare them for the real world rather than just start working after graduation without proper experience. Most importantly, I was able to observe each stage of an architectural project, from the beginning of its design to its contract documentation stage. These are experiences that are simply unobtainable while in university. INT60105 INTERNSHIP TRAINING & REPORT NAME : CHONG YI HUI STUDENT ID : 0324404
  • 29. 
 29 LOGSHEET (WEEK 1 TO WEEK 7) & TESTIMONIAL LETTER
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.