SILVERBIRD TV
BROADCAST
TECHNOLOGY
Satellite TV Station Management
• The overall objective of the project is to establish a new efficient, reliable and economic Satellite TV
Broadcast Station having the capability to deliver 24x7 worldwide Live broadcast with Digital content to
unlimited viewers simultaneously.
• The solution will be designed with world class broadcast technology as one time cost to the Stockholder
with provision for including additional TV channels in future with a cost effective manner.
• Global Standard Technology will be implemented with automatic backup and by-pass work-flow to
overcome signal and power failure at production, transmission, reception, distribution and monitoring.
• The Ultimate Aim of the project is to establish cost-effective world-class broadcast set-up and maintain the
standard procedure to meet the requirement of viewers and commercial advertisers.
Objectives
The Need
• To fulfil customer’s demand and challenging to the competitors in the market, the quality of production
and transmission should be improved with a user-friendly Digital broadcast setup.
• To Achieve highest TRP and fulfil Commercial needs with more advertisers, Broadcast standard should
be improved by using Stable & Efficient Equipment.
• To Ensure 24X7 Live Production and Transmission without Failure, the equipment should be integrated
and managed properly.
• For guaranteed Stability, Reliability, and Error-Free broadcast, the equipment should be selected
properly and designed with backup and by-pass platform.
Architecture
Department
• Live Studios
• Production Control Room
• Master Control Room (MCR)
• Central Apparatus Room (CAR)
• Ingest, Monitoring and Observer
• RF Transmission and Distribution
• Edit and Graphics
• Information Technology
Department
• Maintenance, Repairing and Testing
• Technical Support Management
• Electrical and AC
• Quality Control and Branding
• News Desk, Assignment and Editorial
• Commercial Content Management
• All Other Department
Live Studio
• There should be Two Live Studios Studio-1 and Studio-2 connected with PCR-1 and PCR-2 with
sound-proof technology.
• Studio-1 should be managed with at least four (4 Nos.) of wide-angle Professional Cameras with
CCU and RCP.
• Studio-2 should contain three (3 Nos.) Professional cameras with CCU and RCP.
• One real set and one green Chroma set must be designed with Studio-1. Studio 2 should be
designed with one video wall setup and one Chroma set.
• Mic and Camera cross interconnection provision should be there with both studios.
• Cam-1 in each studio must be employed with Broadcast Standard Teleprompter.
Studio Over View
.
Studio Architecture
Production Control Room
• There should be Two Live PCR; PCR-1 and PCR-2 connected with the studios.
• Standard 2ME live Production switcher and 32/24 channel Sound Mixer should be connected with
both the PCR with provision of interconnection and by-pass technology.
• 2 port standard play-out, PCR Automation, Graphics System, Standard TP, VTR, Router Panel,
Hybrid, Talk Back System, Multi-Viewer with other adequate equipment should be fixed with proper
mounting facility.
• Switcher frame and other rack-mount equipment should be fixed with standard rack.
• Power DB and MDU must be fixed with standard MCB and proper Grounding for power management.
• Schematic Diagram and Cable numbering should be maintained properly for AV and Networking
equipment.
Production Control Room
Production Control Room
Master Control Room
• MCR should be managed with Standard Automation Technology.
• 2 port standard play-out, Embedded MCR Switcher Graphics System, VTR, Router Panel, Talk
Back System, Multi-Viewer with other adequate equipment should be fixed with proper mounting
facility.
• Schematic Diagram and Cable numbering should be maintained properly for AV and Networking
equipment.
• Provision should be made for Addition of New Satellite TV Channels.
• SOP Must be followed for MCR Operation.
• Operation, By-Pass and Change-Over related training should be provided to the MCR Operation
Staffs.
Master Control Room
MCR Architecture
Central Apparatus Room (CAR)
• All the Broadcast Terminal Equipment, Processing and Distribution Equipment should be
Centrally managed with standard broadcast 42U Rack in CAR.
• Play-out Servers, Transmission Equipment, Encoders, Decoders, External Feeds, SNG Signals,
Should be managed with separate Broadcast Standard Rack.
• Separate UPS should be deployed with parallel Backup for CAR.
• Air Condition, Fire Safety equipment with Access Control facility must be in place.
• Equipment should be powered with standard MDU/PDU with IEC to IEC standard connector and
Separate MCB should connected with each MDU.
• SOP must be followed for CAR Operation and Maintenance.
CAR(Central Apparatus Room)
Ingest, Monitoring and Observer
• 4 port standard Ingest, VTR, Router Panel, Talk Back System, Multi-Viewer with other adequate
equipment should be fixed with proper mounting facility.
• DTH and VSAT feed recording provision should be made with both HD/SD standard broadcast
Equipment
• Schematic Diagram and Cable numbering should be maintained properly for AV and Networking
equipment.
• Separate Monitoring should be done for Both Up-Link and Down-Link Audio video quality
measurement
• Observer/ Down-Link Recording System should be employed with 90 days continuous Storage
• Library should be maintained with sufficient storage (NAS/SAN) for Archiving.
RF Transmission and Distribution
• TX and RX Equipment should be placed with separate Broadcast rack at CAR.
• C-Band Satellite Frequency with Same satellite must be Employed for All OB and Channel Up-
Link.
• Fiber Optic should be used for Distribution of signals for different Location.
• If the Teleport for Satellite Up-Link is managed/leased at different location, fiber and microwave
with guaranteed backup channel must be integrated.
• For Distribution to MSO and DTH operator, C-Band satellite down link must be used as a back-up
of Fiber.
• Terrestrial Broadcast may be used as second backup for MSO/DTH Operators.
RF Transmission and Distribution
Edit and Graphics
• Adobe-Premier CC or Apple FCP edit setup should be designed with at-least 8 Licensed desk.
• SOP must be followed while copy editing to maintain the Standard.
• Dedicated Path for Import and Export should be employed with NAS/SAN.
• Space for Raw footage and Final footage with Date wise Folder and Content Sub-Folder with
specific time slot should be maintained.
• Graphics Design Desk with at least 4 Designer License should be integrated with WASP-3D or
VIZRT.
• Two Graphics Scrolling Client should be integrated for each PCR and two for MCR for Logo,
Ticker, Back-Drop and Look and Feel Design.
Edit and Graphics
• Electrical Power Distribution Includes the Raw power, DG and UPS which should be managed in such a way
to provide 24x7 un-interrupted power supply through the channel.
• Three-Phase raw power as per the overall load
• Main DG with auto changeover mechanism having the capacity of 40% more than the actual load.
• Separate UPS for PCR-1 with Studio 1 and PCR-2 with Studio 2 having at least 60 minute power backup.
• Separate UPS for MCR and Ingest having at least 60 minute power backup.
• Separate UPS for CAR (Central Apparatus Room) with 60 minute power backup
Electrical & AC
Electrical & AC
• Separate UPS for Observer, Editorial Monitoring and General PC Usage
• Backup UPS with similar AH Capacity should be connected parallel with all the divisional UPS.
• There should be only 1 Grounding for entire Electricity distribution.
• AC should be centralized managed with main and backup chamber with adequate inlet and outlet to
provide sufficient cooling & adequate ventilation.
• No humming noise should be released from AC Outlet/Chamber.
Information Technology
• Centralized IT server room with LAN, NAS/SAN, FTP, Internet Streaming, Lease Line Connectivity
should be managed for Entire Channel Network.
• IT Server room should be placed near to the CAR in order to maintain proper integration between
Broadcast and IT Equipment.
• Separate Switch should be maintained for specific department/Division network equipment.
• NAS/SAN with Sufficient Storage with Backup and Library Archiving System should be maintained as per
Standard Procedure.
• Password Protection with Internet Access and NAS/SAN is must for security reasons.
All Other Department
• Quality Control and Branding department should be there to manage On-Air Signal quality at TX and
RX with all the locations as well as customer end.
• All the activities with respective department should be managed according to
customer/viewer/Commercial point of view.
• Input and Output content with look and feel and on-air presentation should be managed as per SOP.
• News and Assignment Desk should strictly follow the standard guide lines for Script Writing, Voice-
Over, News Content management, Air-Time management and Video Footage.
• Makeup and Costume should be managed strictly according to the On-Air Standard.
• Sales/ Marketing Guidelines must be followed strictly with weekly target base. 100% Market target
should be achieved at any cost.
All Other Department
• TRP (Television Rating Point) should be achieved aggressively with every program broadcasted.
• Commercial content Scheduling must be managed properly with each program and should not
be failed to be aired.
• Transmission Report must be maintained without fail. All the Transmission Eros should be
highlighted in the report sheet with reason.
• Audit and Research department should send their report to the Management on daily basis on
commercial and revenue point.
Prepared By:
Mr. Pravat Mohapatra
Broadcast Project and Operation
Thank You
The End

More Related Content

What's hot

Senior Management : Program-Project Management / Service Delivery / Field ...
Senior Management  :  Program-Project  Management / Service Delivery / Field ...Senior Management  :  Program-Project  Management / Service Delivery / Field ...
Senior Management : Program-Project Management / Service Delivery / Field ...
Pramod Heddurshetti
 
PLC Based Annunciation System
PLC Based Annunciation SystemPLC Based Annunciation System
PLC Based Annunciation System
Fasih Ahmed
 

What's hot (6)

Summer Training At Doordarshan
Summer Training At Doordarshan Summer Training At Doordarshan
Summer Training At Doordarshan
 
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
 
Wastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performanceWastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performance
 
Senior Management : Program-Project Management / Service Delivery / Field ...
Senior Management  :  Program-Project  Management / Service Delivery / Field ...Senior Management  :  Program-Project  Management / Service Delivery / Field ...
Senior Management : Program-Project Management / Service Delivery / Field ...
 
CV--EL
CV--ELCV--EL
CV--EL
 
PLC Based Annunciation System
PLC Based Annunciation SystemPLC Based Annunciation System
PLC Based Annunciation System
 

Viewers also liked

Viewers also liked (7)

Network block diagram
Network block diagramNetwork block diagram
Network block diagram
 
ОТ РЕГИОНАЛЬНОГО РЫНКА К ФЕДЕРАЛЬНОМУ. КАК СТАТЬ ПЕРВЫМ
ОТ РЕГИОНАЛЬНОГО РЫНКА К ФЕДЕРАЛЬНОМУ. КАК СТАТЬ ПЕРВЫМОТ РЕГИОНАЛЬНОГО РЫНКА К ФЕДЕРАЛЬНОМУ. КАК СТАТЬ ПЕРВЫМ
ОТ РЕГИОНАЛЬНОГО РЫНКА К ФЕДЕРАЛЬНОМУ. КАК СТАТЬ ПЕРВЫМ
 
Tizen.Net with Xamarin
Tizen.Net with XamarinTizen.Net with Xamarin
Tizen.Net with Xamarin
 
Catálogo Joyas de Acero 2017 - Colombia - Precios por mayor
Catálogo Joyas de Acero 2017 - Colombia - Precios por mayorCatálogo Joyas de Acero 2017 - Colombia - Precios por mayor
Catálogo Joyas de Acero 2017 - Colombia - Precios por mayor
 
Visual Studio Mobile Center
Visual Studio Mobile CenterVisual Studio Mobile Center
Visual Studio Mobile Center
 
ПримБиз - итоги 2015 года
ПримБиз - итоги 2015 годаПримБиз - итоги 2015 года
ПримБиз - итоги 2015 года
 
Broadcast TV Station Concept
Broadcast TV Station ConceptBroadcast TV Station Concept
Broadcast TV Station Concept
 

Similar to Tv d epartment system

BSmithResume2017
BSmithResume2017BSmithResume2017
BSmithResume2017
Barry Smith
 
Cloud RAN for Mobile Networks_Final
Cloud RAN for Mobile Networks_FinalCloud RAN for Mobile Networks_Final
Cloud RAN for Mobile Networks_Final
Sumedh Deshpande
 

Similar to Tv d epartment system (20)

VAV Controls_NEP 2017_Rev1.pptx
VAV Controls_NEP 2017_Rev1.pptxVAV Controls_NEP 2017_Rev1.pptx
VAV Controls_NEP 2017_Rev1.pptx
 
Video
VideoVideo
Video
 
DCS
DCSDCS
DCS
 
Dynya news report
Dynya news reportDynya news report
Dynya news report
 
Presentation of ISKRA ODM
Presentation of ISKRA ODMPresentation of ISKRA ODM
Presentation of ISKRA ODM
 
digital tv DTMB
digital tv DTMBdigital tv DTMB
digital tv DTMB
 
BSmithResume2017
BSmithResume2017BSmithResume2017
BSmithResume2017
 
D. Medina's CV (01)
D. Medina's CV (01)D. Medina's CV (01)
D. Medina's CV (01)
 
Analect Pcm series
Analect Pcm seriesAnalect Pcm series
Analect Pcm series
 
Broadcast-Solutions.pdf
Broadcast-Solutions.pdfBroadcast-Solutions.pdf
Broadcast-Solutions.pdf
 
Karim El boury cv mcr
Karim El boury cv mcrKarim El boury cv mcr
Karim El boury cv mcr
 
Karim el boury cv mcr
Karim el boury cv mcrKarim el boury cv mcr
Karim el boury cv mcr
 
Karim el boury cv mcr
Karim el boury cv mcrKarim el boury cv mcr
Karim el boury cv mcr
 
Broadcast day-2007-comtech
Broadcast day-2007-comtechBroadcast day-2007-comtech
Broadcast day-2007-comtech
 
Comtech sspi vsat_day_2009
Comtech sspi vsat_day_2009Comtech sspi vsat_day_2009
Comtech sspi vsat_day_2009
 
Kumaran Murugesan CV
Kumaran Murugesan CVKumaran Murugesan CV
Kumaran Murugesan CV
 
Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1
 
0.5m inspection conveyor user manual
0.5m inspection conveyor user manual0.5m inspection conveyor user manual
0.5m inspection conveyor user manual
 
Cloud RAN for Mobile Networks_Final
Cloud RAN for Mobile Networks_FinalCloud RAN for Mobile Networks_Final
Cloud RAN for Mobile Networks_Final
 
Duotech's F-16 Briefing During the 2015 F-16 TCG WWR
Duotech's F-16 Briefing During the 2015 F-16 TCG WWRDuotech's F-16 Briefing During the 2015 F-16 TCG WWR
Duotech's F-16 Briefing During the 2015 F-16 TCG WWR
 

Recently uploaded

Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di SurabayaObat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
CaitlinCummins3
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
ogawka
 
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di DepokObat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
drm1699
 
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di MalangObat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 

Recently uploaded (20)

What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di SurabayaObat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA Firms
 
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di DepokObat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
 
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di MalangObat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
 

Tv d epartment system

  • 2. • The overall objective of the project is to establish a new efficient, reliable and economic Satellite TV Broadcast Station having the capability to deliver 24x7 worldwide Live broadcast with Digital content to unlimited viewers simultaneously. • The solution will be designed with world class broadcast technology as one time cost to the Stockholder with provision for including additional TV channels in future with a cost effective manner. • Global Standard Technology will be implemented with automatic backup and by-pass work-flow to overcome signal and power failure at production, transmission, reception, distribution and monitoring. • The Ultimate Aim of the project is to establish cost-effective world-class broadcast set-up and maintain the standard procedure to meet the requirement of viewers and commercial advertisers. Objectives
  • 3. The Need • To fulfil customer’s demand and challenging to the competitors in the market, the quality of production and transmission should be improved with a user-friendly Digital broadcast setup. • To Achieve highest TRP and fulfil Commercial needs with more advertisers, Broadcast standard should be improved by using Stable & Efficient Equipment. • To Ensure 24X7 Live Production and Transmission without Failure, the equipment should be integrated and managed properly. • For guaranteed Stability, Reliability, and Error-Free broadcast, the equipment should be selected properly and designed with backup and by-pass platform.
  • 5. Department • Live Studios • Production Control Room • Master Control Room (MCR) • Central Apparatus Room (CAR) • Ingest, Monitoring and Observer • RF Transmission and Distribution • Edit and Graphics • Information Technology
  • 6. Department • Maintenance, Repairing and Testing • Technical Support Management • Electrical and AC • Quality Control and Branding • News Desk, Assignment and Editorial • Commercial Content Management • All Other Department
  • 7. Live Studio • There should be Two Live Studios Studio-1 and Studio-2 connected with PCR-1 and PCR-2 with sound-proof technology. • Studio-1 should be managed with at least four (4 Nos.) of wide-angle Professional Cameras with CCU and RCP. • Studio-2 should contain three (3 Nos.) Professional cameras with CCU and RCP. • One real set and one green Chroma set must be designed with Studio-1. Studio 2 should be designed with one video wall setup and one Chroma set. • Mic and Camera cross interconnection provision should be there with both studios. • Cam-1 in each studio must be employed with Broadcast Standard Teleprompter.
  • 10. Production Control Room • There should be Two Live PCR; PCR-1 and PCR-2 connected with the studios. • Standard 2ME live Production switcher and 32/24 channel Sound Mixer should be connected with both the PCR with provision of interconnection and by-pass technology. • 2 port standard play-out, PCR Automation, Graphics System, Standard TP, VTR, Router Panel, Hybrid, Talk Back System, Multi-Viewer with other adequate equipment should be fixed with proper mounting facility. • Switcher frame and other rack-mount equipment should be fixed with standard rack. • Power DB and MDU must be fixed with standard MCB and proper Grounding for power management. • Schematic Diagram and Cable numbering should be maintained properly for AV and Networking equipment.
  • 13. Master Control Room • MCR should be managed with Standard Automation Technology. • 2 port standard play-out, Embedded MCR Switcher Graphics System, VTR, Router Panel, Talk Back System, Multi-Viewer with other adequate equipment should be fixed with proper mounting facility. • Schematic Diagram and Cable numbering should be maintained properly for AV and Networking equipment. • Provision should be made for Addition of New Satellite TV Channels. • SOP Must be followed for MCR Operation. • Operation, By-Pass and Change-Over related training should be provided to the MCR Operation Staffs.
  • 16. Central Apparatus Room (CAR) • All the Broadcast Terminal Equipment, Processing and Distribution Equipment should be Centrally managed with standard broadcast 42U Rack in CAR. • Play-out Servers, Transmission Equipment, Encoders, Decoders, External Feeds, SNG Signals, Should be managed with separate Broadcast Standard Rack. • Separate UPS should be deployed with parallel Backup for CAR. • Air Condition, Fire Safety equipment with Access Control facility must be in place. • Equipment should be powered with standard MDU/PDU with IEC to IEC standard connector and Separate MCB should connected with each MDU. • SOP must be followed for CAR Operation and Maintenance.
  • 18. Ingest, Monitoring and Observer • 4 port standard Ingest, VTR, Router Panel, Talk Back System, Multi-Viewer with other adequate equipment should be fixed with proper mounting facility. • DTH and VSAT feed recording provision should be made with both HD/SD standard broadcast Equipment • Schematic Diagram and Cable numbering should be maintained properly for AV and Networking equipment. • Separate Monitoring should be done for Both Up-Link and Down-Link Audio video quality measurement • Observer/ Down-Link Recording System should be employed with 90 days continuous Storage • Library should be maintained with sufficient storage (NAS/SAN) for Archiving.
  • 19. RF Transmission and Distribution • TX and RX Equipment should be placed with separate Broadcast rack at CAR. • C-Band Satellite Frequency with Same satellite must be Employed for All OB and Channel Up- Link. • Fiber Optic should be used for Distribution of signals for different Location. • If the Teleport for Satellite Up-Link is managed/leased at different location, fiber and microwave with guaranteed backup channel must be integrated. • For Distribution to MSO and DTH operator, C-Band satellite down link must be used as a back-up of Fiber. • Terrestrial Broadcast may be used as second backup for MSO/DTH Operators.
  • 20. RF Transmission and Distribution
  • 21. Edit and Graphics • Adobe-Premier CC or Apple FCP edit setup should be designed with at-least 8 Licensed desk. • SOP must be followed while copy editing to maintain the Standard. • Dedicated Path for Import and Export should be employed with NAS/SAN. • Space for Raw footage and Final footage with Date wise Folder and Content Sub-Folder with specific time slot should be maintained. • Graphics Design Desk with at least 4 Designer License should be integrated with WASP-3D or VIZRT. • Two Graphics Scrolling Client should be integrated for each PCR and two for MCR for Logo, Ticker, Back-Drop and Look and Feel Design.
  • 23. • Electrical Power Distribution Includes the Raw power, DG and UPS which should be managed in such a way to provide 24x7 un-interrupted power supply through the channel. • Three-Phase raw power as per the overall load • Main DG with auto changeover mechanism having the capacity of 40% more than the actual load. • Separate UPS for PCR-1 with Studio 1 and PCR-2 with Studio 2 having at least 60 minute power backup. • Separate UPS for MCR and Ingest having at least 60 minute power backup. • Separate UPS for CAR (Central Apparatus Room) with 60 minute power backup Electrical & AC
  • 24. Electrical & AC • Separate UPS for Observer, Editorial Monitoring and General PC Usage • Backup UPS with similar AH Capacity should be connected parallel with all the divisional UPS. • There should be only 1 Grounding for entire Electricity distribution. • AC should be centralized managed with main and backup chamber with adequate inlet and outlet to provide sufficient cooling & adequate ventilation. • No humming noise should be released from AC Outlet/Chamber.
  • 25. Information Technology • Centralized IT server room with LAN, NAS/SAN, FTP, Internet Streaming, Lease Line Connectivity should be managed for Entire Channel Network. • IT Server room should be placed near to the CAR in order to maintain proper integration between Broadcast and IT Equipment. • Separate Switch should be maintained for specific department/Division network equipment. • NAS/SAN with Sufficient Storage with Backup and Library Archiving System should be maintained as per Standard Procedure. • Password Protection with Internet Access and NAS/SAN is must for security reasons.
  • 26. All Other Department • Quality Control and Branding department should be there to manage On-Air Signal quality at TX and RX with all the locations as well as customer end. • All the activities with respective department should be managed according to customer/viewer/Commercial point of view. • Input and Output content with look and feel and on-air presentation should be managed as per SOP. • News and Assignment Desk should strictly follow the standard guide lines for Script Writing, Voice- Over, News Content management, Air-Time management and Video Footage. • Makeup and Costume should be managed strictly according to the On-Air Standard. • Sales/ Marketing Guidelines must be followed strictly with weekly target base. 100% Market target should be achieved at any cost.
  • 27. All Other Department • TRP (Television Rating Point) should be achieved aggressively with every program broadcasted. • Commercial content Scheduling must be managed properly with each program and should not be failed to be aired. • Transmission Report must be maintained without fail. All the Transmission Eros should be highlighted in the report sheet with reason. • Audit and Research department should send their report to the Management on daily basis on commercial and revenue point.
  • 28. Prepared By: Mr. Pravat Mohapatra Broadcast Project and Operation Thank You The End