HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Objective
Know the flow of radio
network planning
Grasp the key parts of the stages
of radio network planning
Make the radio network planning
be more standard and controllable
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Building up Mobile Network
Network
Planning
Project Execution
Network Optimization
Network Objective
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Introduction to Radio NetworkPlanning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Attention:
• Before the project is started,
be acquainted with related
information
• Confirm the information with
the users for several times
• Pay attention to VIPs
• Related information from the marketRelated information from the market
• Project documents output before theProject documents output before the
network planning is soldnetwork planning is sold
• Information about destination areaInformation about destination area
• Object of network constructionObject of network construction
• Plan of network scale and stagePlan of network scale and stage
constructionconstruction
• Available sites and frequencies toAvailable sites and frequencies to
the carriersthe carriers
• Digital mapDigital map
• MapInfo mapMapInfo map
• VIP user surveyVIP user survey
Collects detailed information about the network planning
to meet the requirements of network estimation and emulation
input. It prepares for satisfactory planning result.
Collects detailed information about the network planning
to meet the requirements of network estimation and emulation
input. It prepares for satisfactory planning result.
001 Information Collection Confirmation/Analysis
Output
Network Planning Information
Collection CHECKLIST
• Recent optimization report
• Carrier’s network
configuration information
• Carrier’s drive test
analysis
• Carrier’s network traffic
analysis
• User complaint analysis
• Related guide
For expansion, move or change,
the collected information includes
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Output
• Link budget result
• Works out the iterative
result based on the capacity
and coverage
• Network estimation
report
002 radio Network Estimation
Through the estimation, to perform a quantitative analysis
and know the construction scale. Thus, the construction period
and cost budget can be worked out.
• Scenario division and transmit
model confirmation
• Quality of the capacity of
scenarios’ coverage
• Traffic model and service model
• Other related parameters
• Estimation tool software
• Related guide
Monitors the Following:
Network input parameters, estimation RND documents and the result of the estimation.
The network estimation report needs to be reviewed.
Attention:
• When the parameters cannot be typed, refer to the
company planning principle to provide values for the
carrier to confirm
• For improper parameters, communicate with and
guide the carrier on site. Besides, notify the customer
service center and market of the regional office. The
result need to be reviewed.
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
CW Test and Model Rectification (Optional)
The transmit model is the basis of the cell planning. Whether the
model is correct affects the planning and affects whether the needs of the
users can be met in an economic and proper investment.
• Scenario division and
classification confirmation
• Selecting typical test points
• Testing instrument and
related software
• Related guide
•Adjusting Report of
Transmit ModelOutput
Attention:
• For years’ development,
the company has a complete
model library. It is
recommended to obtain the
model from the model
library.
• For the needs of the market
or customers, you can test the
typical area based on the
actual reconnaissance. Then,
rectify the model based on
the test result.
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of Radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Network base station topology
• Network estimation result
• Available site resources
• Electronic map
• Local administrative map (Paper)
• Related guide
003 Map Assistant Planning and Original Site
Selection
Select and plan the area on the map based on the available site
resources of the carrier, destination coverage need, the carrier’s network
analysis and network estimation result.
Attention:
• Set the theoretic site
as the center and R/8
as the semidiameter to
search. Besides, there
are some restriction
on the height.
• It is recommended
to mark the to-be
reconnoitered on the
paper map.
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of Radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
004 Reconnoitering Base Station
Collect network planning information and environment
description to confirm whether the site meet the requirements
• Topology and map
of network base
stations
• Reconnaissance tool
• Related guide
Monitoring point:
• The following needed to be reviewed: project parameter table,
base station topology, device setting, antenna feeder
• Check some base station reconnaissance
• Project parameter table
• Radio on site reconnaissance
report (xxx base station)
• On site reconnaissance table
• Base station reconnaissance memo
Attention:
• For proper sites, confirm the
project parameters; for improper sites,
give the replacing suggestion and
verify the emulation
• For sites cannot be reconnoitered
caused by customers, sign the
reconnaissance memo
• For sites have the same addresses,
guarantee the independence
• Factors of on site reconnaissance
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of Radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Testing Electromagnetic Background (Optional)
To make sure that the electromagnetic background of the selected
site is available, you need to test on site by using electromagnetic
interference device. Generally, the network planning reconnaissance
personnel test it.
• Test instruments
and fittings
• Related guide
•EM Interference Test Table
•EM Background Test ReportOutput
Attention:
• For experiment network
of large scale, you can
select and test sites based
on the actual work volume.
• The downlink band of
the area needs to be tested.
You need to arrange the
vehicles to test the road.
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of Radio Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
005 System Emulation
Based on the previous information, you need to emulate the
system of the reconnoitered site. The emulation is a process to adjust
the planning configuration to meet the needs of the customers.
• Project parameter table
• Transmit model
• Parameters needed in emulation
• Emulation software
• Digital map
• Related guide
XXX Project Network Emulation ReportXXX Project Network Emulation Report
Attention:
• When the theoretical site do not
meet the requirements, you need to
determine whether to select a new
site.
• When the emulation does not meet
the needs of the customer.
Reconnoiter and emulate the system
again to achieve the goal and export
the network emulation report.
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of Radio Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
XXX Project Network
Preplanning Report
W Network Pre-planning Scheme
and Report Review Self-Checking
Input
• Template of the network
pre-planning report
• Input information of
the network planning
• Network estimation report
• Reconnaissance report of
the base station
• Output information of
the system emulation
006 Pre-Planning of Radio Network
Based on the previous collected information, network
estimation, site selection, and system emulation to summarize
the network pre-planning.
Attention:
• The pre-planning report after
review needs to be submit to the
market of the regional office for
improvement. Then, it can be
submitted to the customer.
• When exporting the emulation
result, submitting the result in the
report template as soon as possible
to promote the progress of the
project.
The following needs to be monitored:
Pre-planning result and pre-planning report review
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of Radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Cell Parameter Design Report
or Network Design Report
Output
007 Designing Cell Parameter
Set the base stations and cells exported from the
preplanning into a connected network to guide the
later project
• Network pre-planning report
• Project parameter table
• Table of network planning
information collection
• Default parameter
comparison table
• For GSM, Important Parameter
Comparison Table of
Dual Band Network
• Related guide
Attention:
• The cell naming rule and coding rule, frequency
range, multiplexing mode and code planning rule
• For the GSM network, focus on the cooperation of
the dual band data
• For the network supports both 2G and 3G, focus on
the cooperation of mutual operation of different
system parameters
The cell parameters include the following:
LAC/RAC RNC area, neighborhood tables, frequency/scramble,
power division, switchover and permitted parameters
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of Radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
008 Processing Office Data
Send the parameter designing data of the network
planning cell to the data center. Combine the designing data
with the project parameters to generate DBF data
Cell Parameter Design
Report or Network Planning
Design Report
• DBF file or the script file
that can be loaded
Attention:
• The generated DBF
file or the script file that
can be loaded must be
consistent with the
network planning
parameters
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Overview of Radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
009 Radio Network Planning
Based on the integrated network planning report and the cell parameter
design, write the Network Planning Report. Submit the report to the regional
office of the technical support for users to exchange and report ideas.
• Radio Network Pre-Planning Report
• Cell Parameter planning Report or Radio
Network Planning Report • Radio Network Planning Report
• Network Planning Scheme
• Radio Network Planning
Communication Report
Attention:
• The planning rule of all
parameters must be embodied in the
Planning Scheme for the
convenience of other person and
guide the later network
optimization.
The following needs to be monitored:
Review the report of the radio network planning
and planning scheme
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Retrospect of Radio Network Planning Flow
HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential
Case Analysis
A carrier bided for setting up a new radio network. Our company received
the bidding on Sep.24, and asked to on Oct.2. The market personnel sent the
to a network planning pre-sales engineer on Sep.29 and required them to
complete the pre-planning and post-planning of the network based on the
bidding. The pre-sales engineer found out that the traffic model condition and
network quality requirements are not clear. Besides, the on-site market
personnel cannot provide the correct information about the local geographical
environment, economy, population, mobile market, customer and market
strategy. The pre-sales engineer finished the base station estimation and
network planning construction suggestions on Oct.2. The engineer made the
estimation of 45 base stations in the first period and 80 base stations in the
second period for the market to quote. The market personnel denied the
estimation and thought that the estimations do not accord with the actual
situation because the number of the base stations are too many, the pressure
of the service is heavy and the customers do not accept the estimation.
Besides, the estimation does not adapt to the economy development of the
country and the actual situation of the customers is not taken into account.
The technical suggestions had not embody the network planning scheme.
谢谢
www.huawei.com

More Related Content

What's hot

Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18frankjoh
 
Finding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareFinding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareMuhammad Waqas Akram
 
Sagar Kuchekar_LTE_RF_Optimization Engineer
Sagar Kuchekar_LTE_RF_Optimization EngineerSagar Kuchekar_LTE_RF_Optimization Engineer
Sagar Kuchekar_LTE_RF_Optimization EngineerSagar Kuchekar
 
2 g planning-optimization-part-5
2 g planning-optimization-part-52 g planning-optimization-part-5
2 g planning-optimization-part-5Rizwan Javed
 
Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Ketut Widya
 
Munendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra singh jadon
 
Rf Optimization Tools Development111
Rf Optimization Tools Development111Rf Optimization Tools Development111
Rf Optimization Tools Development111Zk87
 
Resume_Ray_OConnell_2015_1
Resume_Ray_OConnell_2015_1Resume_Ray_OConnell_2015_1
Resume_Ray_OConnell_2015_1Ray O'Connell
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?TTI Telecom
 
I nop brochure_2017
I nop brochure_2017I nop brochure_2017
I nop brochure_2017frankjoh
 
Rf Planning And Optimization
Rf Planning And OptimizationRf Planning And Optimization
Rf Planning And OptimizationUmmaarraa Raa
 
60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]picaraza9
 
Wcdma radio network planning part 1
Wcdma radio network planning   part 1Wcdma radio network planning   part 1
Wcdma radio network planning part 1Aneesh Thomas
 

What's hot (20)

Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18
 
Mobile CDS LTE Simulation Demo
Mobile CDS LTE Simulation Demo Mobile CDS LTE Simulation Demo
Mobile CDS LTE Simulation Demo
 
Finding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareFinding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization software
 
Sagar Kuchekar_LTE_RF_Optimization Engineer
Sagar Kuchekar_LTE_RF_Optimization EngineerSagar Kuchekar_LTE_RF_Optimization Engineer
Sagar Kuchekar_LTE_RF_Optimization Engineer
 
2 g planning-optimization-part-5
2 g planning-optimization-part-52 g planning-optimization-part-5
2 g planning-optimization-part-5
 
Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5
 
Munendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE Optimization
 
5G peek
5G peek5G peek
5G peek
 
Rf Optimization Tools Development111
Rf Optimization Tools Development111Rf Optimization Tools Development111
Rf Optimization Tools Development111
 
LTE RF Planning Tool - Atoll
LTE RF Planning Tool - AtollLTE RF Planning Tool - Atoll
LTE RF Planning Tool - Atoll
 
IBS Training
IBS TrainingIBS Training
IBS Training
 
HOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORK
HOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORKHOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORK
HOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORK
 
Resume_Ray_OConnell_2015_1
Resume_Ray_OConnell_2015_1Resume_Ray_OConnell_2015_1
Resume_Ray_OConnell_2015_1
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?
 
I nop brochure_2017
I nop brochure_2017I nop brochure_2017
I nop brochure_2017
 
Rf Planning And Optimization
Rf Planning And OptimizationRf Planning And Optimization
Rf Planning And Optimization
 
Wcdma RNO RF optimization
Wcdma RNO RF optimizationWcdma RNO RF optimization
Wcdma RNO RF optimization
 
60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 
Wcdma radio network planning part 1
Wcdma radio network planning   part 1Wcdma radio network planning   part 1
Wcdma radio network planning part 1
 

Viewers also liked

Feature adaptive configuration of traffic channel power offset for hsupa perf...
Feature adaptive configuration of traffic channel power offset for hsupa perf...Feature adaptive configuration of traffic channel power offset for hsupa perf...
Feature adaptive configuration of traffic channel power offset for hsupa perf...Ketut Widya
 
Gsma data-demand-explained-june-2015
Gsma data-demand-explained-june-2015Gsma data-demand-explained-june-2015
Gsma data-demand-explained-june-2015Ketut Widya
 
Adaptive configuration of traffic channel power offset for hsupa
Adaptive configuration of traffic channel power offset for hsupaAdaptive configuration of traffic channel power offset for hsupa
Adaptive configuration of traffic channel power offset for hsupaKetut Widya
 
The Mobile Economy Asia Pasific 2016
The Mobile Economy Asia Pasific 2016The Mobile Economy Asia Pasific 2016
The Mobile Economy Asia Pasific 2016Ketut Widya
 
03 tinjauan industri(1)
03 tinjauan industri(1)03 tinjauan industri(1)
03 tinjauan industri(1)Ketut Widya
 
Og 001 overview of wireless network planning and optimization issue1.0
Og 001 overview of wireless network planning and optimization issue1.0Og 001 overview of wireless network planning and optimization issue1.0
Og 001 overview of wireless network planning and optimization issue1.0Ketut Widya
 
Cisco vni global-mobile-data-traffic-forecast-update
Cisco vni global-mobile-data-traffic-forecast-updateCisco vni global-mobile-data-traffic-forecast-update
Cisco vni global-mobile-data-traffic-forecast-updateKetut Widya
 
RNC Pilot PO Optimization
RNC Pilot PO OptimizationRNC Pilot PO Optimization
RNC Pilot PO OptimizationKetut Widya
 
Hsdpa over iur several rnc report
Hsdpa over iur several rnc reportHsdpa over iur several rnc report
Hsdpa over iur several rnc reportKetut Widya
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System StructureAtif Mahmood
 
Huawei parameter strategy v1.4 1st dec
Huawei parameter strategy v1.4  1st decHuawei parameter strategy v1.4  1st dec
Huawei parameter strategy v1.4 1st decKetut Widya
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopnavaidkhan
 
Global Intelligence Alliance
Global Intelligence AllianceGlobal Intelligence Alliance
Global Intelligence AllianceLie Luo
 
1 g 2g_3g_4g_tutorial
1 g 2g_3g_4g_tutorial1 g 2g_3g_4g_tutorial
1 g 2g_3g_4g_tutorialPreeti Lamba
 
7.Cne040608010038 Bts3812 E系统概述 Issue 1.0
7.Cne040608010038 Bts3812 E系统概述 Issue 1.07.Cne040608010038 Bts3812 E系统概述 Issue 1.0
7.Cne040608010038 Bts3812 E系统概述 Issue 1.0Atif Mahmood
 
GIS Applied to Mobile Technology
GIS Applied to Mobile TechnologyGIS Applied to Mobile Technology
GIS Applied to Mobile TechnologyEsri
 
How To Solve Lab D Oml By Ex Alarm
How To Solve Lab D Oml By Ex AlarmHow To Solve Lab D Oml By Ex Alarm
How To Solve Lab D Oml By Ex AlarmAtif Mahmood
 

Viewers also liked (20)

Feature adaptive configuration of traffic channel power offset for hsupa perf...
Feature adaptive configuration of traffic channel power offset for hsupa perf...Feature adaptive configuration of traffic channel power offset for hsupa perf...
Feature adaptive configuration of traffic channel power offset for hsupa perf...
 
Gsma data-demand-explained-june-2015
Gsma data-demand-explained-june-2015Gsma data-demand-explained-june-2015
Gsma data-demand-explained-june-2015
 
Adaptive configuration of traffic channel power offset for hsupa
Adaptive configuration of traffic channel power offset for hsupaAdaptive configuration of traffic channel power offset for hsupa
Adaptive configuration of traffic channel power offset for hsupa
 
Bappenas
BappenasBappenas
Bappenas
 
The Mobile Economy Asia Pasific 2016
The Mobile Economy Asia Pasific 2016The Mobile Economy Asia Pasific 2016
The Mobile Economy Asia Pasific 2016
 
03 tinjauan industri(1)
03 tinjauan industri(1)03 tinjauan industri(1)
03 tinjauan industri(1)
 
Og 001 overview of wireless network planning and optimization issue1.0
Og 001 overview of wireless network planning and optimization issue1.0Og 001 overview of wireless network planning and optimization issue1.0
Og 001 overview of wireless network planning and optimization issue1.0
 
Cisco vni global-mobile-data-traffic-forecast-update
Cisco vni global-mobile-data-traffic-forecast-updateCisco vni global-mobile-data-traffic-forecast-update
Cisco vni global-mobile-data-traffic-forecast-update
 
RNC Pilot PO Optimization
RNC Pilot PO OptimizationRNC Pilot PO Optimization
RNC Pilot PO Optimization
 
Hsdpa over iur several rnc report
Hsdpa over iur several rnc reportHsdpa over iur several rnc report
Hsdpa over iur several rnc report
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System Structure
 
Huawei parameter strategy v1.4 1st dec
Huawei parameter strategy v1.4  1st decHuawei parameter strategy v1.4  1st dec
Huawei parameter strategy v1.4 1st dec
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shop
 
Mobile Telephone & Communication Evidence
Mobile Telephone & Communication EvidenceMobile Telephone & Communication Evidence
Mobile Telephone & Communication Evidence
 
Global Intelligence Alliance
Global Intelligence AllianceGlobal Intelligence Alliance
Global Intelligence Alliance
 
1 g 2g_3g_4g_tutorial
1 g 2g_3g_4g_tutorial1 g 2g_3g_4g_tutorial
1 g 2g_3g_4g_tutorial
 
Throughput analysis wcdma planet
Throughput analysis wcdma planetThroughput analysis wcdma planet
Throughput analysis wcdma planet
 
7.Cne040608010038 Bts3812 E系统概述 Issue 1.0
7.Cne040608010038 Bts3812 E系统概述 Issue 1.07.Cne040608010038 Bts3812 E系统概述 Issue 1.0
7.Cne040608010038 Bts3812 E系统概述 Issue 1.0
 
GIS Applied to Mobile Technology
GIS Applied to Mobile TechnologyGIS Applied to Mobile Technology
GIS Applied to Mobile Technology
 
How To Solve Lab D Oml By Ex Alarm
How To Solve Lab D Oml By Ex AlarmHow To Solve Lab D Oml By Ex Alarm
How To Solve Lab D Oml By Ex Alarm
 

Similar to Og 002 service flow of radio network planning issue1.1

Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Mashaal322
 
Cloud RAN for Mobile Networks_Final
Cloud RAN for Mobile Networks_FinalCloud RAN for Mobile Networks_Final
Cloud RAN for Mobile Networks_FinalSumedh Deshpande
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Joseph Melanson
 
Wifi Documentation Presentation
Wifi Documentation PresentationWifi Documentation Presentation
Wifi Documentation PresentationSwitchPitch
 
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-DatacenterCV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-Datacenterneeladri kumar
 
Ehab Atta Optimizer
Ehab Atta OptimizerEhab Atta Optimizer
Ehab Atta OptimizerEhab Atta
 
Tracking Area LTE.pptx
Tracking Area LTE.pptxTracking Area LTE.pptx
Tracking Area LTE.pptxAmjadMsouker
 
C-RAN, Cloud RAN Training | Tonex Training
C-RAN, Cloud RAN Training | Tonex TrainingC-RAN, Cloud RAN Training | Tonex Training
C-RAN, Cloud RAN Training | Tonex TrainingBryan Len
 
NetMate General Brochure (PDF)
NetMate General Brochure (PDF)NetMate General Brochure (PDF)
NetMate General Brochure (PDF)Ian Easson
 
Evolution of Telecommunication
Evolution of Telecommunication Evolution of Telecommunication
Evolution of Telecommunication AbhishekBhat36
 
PME 2021 Design & Quote.pptx
PME 2021 Design & Quote.pptxPME 2021 Design & Quote.pptx
PME 2021 Design & Quote.pptxNavedKhan659845
 
Kelly Fan Resume
Kelly Fan ResumeKelly Fan Resume
Kelly Fan ResumeKelly Fan
 

Similar to Og 002 service flow of radio network planning issue1.1 (20)

Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
CV--EL
CV--ELCV--EL
CV--EL
 
Cloud RAN for Mobile Networks_Final
Cloud RAN for Mobile Networks_FinalCloud RAN for Mobile Networks_Final
Cloud RAN for Mobile Networks_Final
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013
 
PROJECT 1-anurag
PROJECT 1-anuragPROJECT 1-anurag
PROJECT 1-anurag
 
Wifi Documentation Presentation
Wifi Documentation PresentationWifi Documentation Presentation
Wifi Documentation Presentation
 
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-DatacenterCV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
 
Ehab Atta Optimizer
Ehab Atta OptimizerEhab Atta Optimizer
Ehab Atta Optimizer
 
Tracking Area LTE.pptx
Tracking Area LTE.pptxTracking Area LTE.pptx
Tracking Area LTE.pptx
 
JAGDISH Updated
JAGDISH UpdatedJAGDISH Updated
JAGDISH Updated
 
C-RAN, Cloud RAN Training | Tonex Training
C-RAN, Cloud RAN Training | Tonex TrainingC-RAN, Cloud RAN Training | Tonex Training
C-RAN, Cloud RAN Training | Tonex Training
 
NetMate General Brochure (PDF)
NetMate General Brochure (PDF)NetMate General Brochure (PDF)
NetMate General Brochure (PDF)
 
Evolution of Telecommunication
Evolution of Telecommunication Evolution of Telecommunication
Evolution of Telecommunication
 
Attique Mahmood_CV
Attique Mahmood_CVAttique Mahmood_CV
Attique Mahmood_CV
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
PME 2021 Design & Quote.pptx
PME 2021 Design & Quote.pptxPME 2021 Design & Quote.pptx
PME 2021 Design & Quote.pptx
 
Ruchi_Verma_PM
Ruchi_Verma_PMRuchi_Verma_PM
Ruchi_Verma_PM
 
Kelly Fan Resume
Kelly Fan ResumeKelly Fan Resume
Kelly Fan Resume
 

Recently uploaded

SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 

Recently uploaded (20)

SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 

Og 002 service flow of radio network planning issue1.1

  • 1. HUAWEITECHNOLOGIES CO., LTD. www.huawei.com HUAWEIConfidential Security Level: Service Flow of Radio Network Planning Radio Cases training Center ISSUE 1.1
  • 2. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Objective Know the flow of radio network planning Grasp the key parts of the stages of radio network planning Make the radio network planning be more standard and controllable
  • 3. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Building up Mobile Network Network Planning Project Execution Network Optimization Network Objective
  • 4. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Introduction to Radio NetworkPlanning Flow
  • 5. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of radio Network Planning Flow
  • 6. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Attention: • Before the project is started, be acquainted with related information • Confirm the information with the users for several times • Pay attention to VIPs • Related information from the marketRelated information from the market • Project documents output before theProject documents output before the network planning is soldnetwork planning is sold • Information about destination areaInformation about destination area • Object of network constructionObject of network construction • Plan of network scale and stagePlan of network scale and stage constructionconstruction • Available sites and frequencies toAvailable sites and frequencies to the carriersthe carriers • Digital mapDigital map • MapInfo mapMapInfo map • VIP user surveyVIP user survey Collects detailed information about the network planning to meet the requirements of network estimation and emulation input. It prepares for satisfactory planning result. Collects detailed information about the network planning to meet the requirements of network estimation and emulation input. It prepares for satisfactory planning result. 001 Information Collection Confirmation/Analysis Output Network Planning Information Collection CHECKLIST • Recent optimization report • Carrier’s network configuration information • Carrier’s drive test analysis • Carrier’s network traffic analysis • User complaint analysis • Related guide For expansion, move or change, the collected information includes
  • 7. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of radio Network Planning Flow
  • 8. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Output • Link budget result • Works out the iterative result based on the capacity and coverage • Network estimation report 002 radio Network Estimation Through the estimation, to perform a quantitative analysis and know the construction scale. Thus, the construction period and cost budget can be worked out. • Scenario division and transmit model confirmation • Quality of the capacity of scenarios’ coverage • Traffic model and service model • Other related parameters • Estimation tool software • Related guide Monitors the Following: Network input parameters, estimation RND documents and the result of the estimation. The network estimation report needs to be reviewed. Attention: • When the parameters cannot be typed, refer to the company planning principle to provide values for the carrier to confirm • For improper parameters, communicate with and guide the carrier on site. Besides, notify the customer service center and market of the regional office. The result need to be reviewed.
  • 9. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of radio Network Planning Flow
  • 10. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential CW Test and Model Rectification (Optional) The transmit model is the basis of the cell planning. Whether the model is correct affects the planning and affects whether the needs of the users can be met in an economic and proper investment. • Scenario division and classification confirmation • Selecting typical test points • Testing instrument and related software • Related guide •Adjusting Report of Transmit ModelOutput Attention: • For years’ development, the company has a complete model library. It is recommended to obtain the model from the model library. • For the needs of the market or customers, you can test the typical area based on the actual reconnaissance. Then, rectify the model based on the test result.
  • 11. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of Radio Network Planning Flow
  • 12. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Network base station topology • Network estimation result • Available site resources • Electronic map • Local administrative map (Paper) • Related guide 003 Map Assistant Planning and Original Site Selection Select and plan the area on the map based on the available site resources of the carrier, destination coverage need, the carrier’s network analysis and network estimation result. Attention: • Set the theoretic site as the center and R/8 as the semidiameter to search. Besides, there are some restriction on the height. • It is recommended to mark the to-be reconnoitered on the paper map.
  • 13. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of Radio Network Planning Flow
  • 14. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential 004 Reconnoitering Base Station Collect network planning information and environment description to confirm whether the site meet the requirements • Topology and map of network base stations • Reconnaissance tool • Related guide Monitoring point: • The following needed to be reviewed: project parameter table, base station topology, device setting, antenna feeder • Check some base station reconnaissance • Project parameter table • Radio on site reconnaissance report (xxx base station) • On site reconnaissance table • Base station reconnaissance memo Attention: • For proper sites, confirm the project parameters; for improper sites, give the replacing suggestion and verify the emulation • For sites cannot be reconnoitered caused by customers, sign the reconnaissance memo • For sites have the same addresses, guarantee the independence • Factors of on site reconnaissance
  • 15. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of Radio Network Planning Flow
  • 16. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Testing Electromagnetic Background (Optional) To make sure that the electromagnetic background of the selected site is available, you need to test on site by using electromagnetic interference device. Generally, the network planning reconnaissance personnel test it. • Test instruments and fittings • Related guide •EM Interference Test Table •EM Background Test ReportOutput Attention: • For experiment network of large scale, you can select and test sites based on the actual work volume. • The downlink band of the area needs to be tested. You need to arrange the vehicles to test the road.
  • 17. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of Radio Planning Flow
  • 18. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential 005 System Emulation Based on the previous information, you need to emulate the system of the reconnoitered site. The emulation is a process to adjust the planning configuration to meet the needs of the customers. • Project parameter table • Transmit model • Parameters needed in emulation • Emulation software • Digital map • Related guide XXX Project Network Emulation ReportXXX Project Network Emulation Report Attention: • When the theoretical site do not meet the requirements, you need to determine whether to select a new site. • When the emulation does not meet the needs of the customer. Reconnoiter and emulate the system again to achieve the goal and export the network emulation report.
  • 19. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of Radio Planning Flow
  • 20. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential XXX Project Network Preplanning Report W Network Pre-planning Scheme and Report Review Self-Checking Input • Template of the network pre-planning report • Input information of the network planning • Network estimation report • Reconnaissance report of the base station • Output information of the system emulation 006 Pre-Planning of Radio Network Based on the previous collected information, network estimation, site selection, and system emulation to summarize the network pre-planning. Attention: • The pre-planning report after review needs to be submit to the market of the regional office for improvement. Then, it can be submitted to the customer. • When exporting the emulation result, submitting the result in the report template as soon as possible to promote the progress of the project. The following needs to be monitored: Pre-planning result and pre-planning report review
  • 21. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of Radio Network Planning Flow
  • 22. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Cell Parameter Design Report or Network Design Report Output 007 Designing Cell Parameter Set the base stations and cells exported from the preplanning into a connected network to guide the later project • Network pre-planning report • Project parameter table • Table of network planning information collection • Default parameter comparison table • For GSM, Important Parameter Comparison Table of Dual Band Network • Related guide Attention: • The cell naming rule and coding rule, frequency range, multiplexing mode and code planning rule • For the GSM network, focus on the cooperation of the dual band data • For the network supports both 2G and 3G, focus on the cooperation of mutual operation of different system parameters The cell parameters include the following: LAC/RAC RNC area, neighborhood tables, frequency/scramble, power division, switchover and permitted parameters
  • 23. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of Radio Network Planning Flow
  • 24. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential 008 Processing Office Data Send the parameter designing data of the network planning cell to the data center. Combine the designing data with the project parameters to generate DBF data Cell Parameter Design Report or Network Planning Design Report • DBF file or the script file that can be loaded Attention: • The generated DBF file or the script file that can be loaded must be consistent with the network planning parameters
  • 25. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Overview of Radio Network Planning Flow
  • 26. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential 009 Radio Network Planning Based on the integrated network planning report and the cell parameter design, write the Network Planning Report. Submit the report to the regional office of the technical support for users to exchange and report ideas. • Radio Network Pre-Planning Report • Cell Parameter planning Report or Radio Network Planning Report • Radio Network Planning Report • Network Planning Scheme • Radio Network Planning Communication Report Attention: • The planning rule of all parameters must be embodied in the Planning Scheme for the convenience of other person and guide the later network optimization. The following needs to be monitored: Review the report of the radio network planning and planning scheme
  • 27. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Retrospect of Radio Network Planning Flow
  • 28. HUAWEITECHNOLOGIES CO., LTD. HUAWEIConfidential Case Analysis A carrier bided for setting up a new radio network. Our company received the bidding on Sep.24, and asked to on Oct.2. The market personnel sent the to a network planning pre-sales engineer on Sep.29 and required them to complete the pre-planning and post-planning of the network based on the bidding. The pre-sales engineer found out that the traffic model condition and network quality requirements are not clear. Besides, the on-site market personnel cannot provide the correct information about the local geographical environment, economy, population, mobile market, customer and market strategy. The pre-sales engineer finished the base station estimation and network planning construction suggestions on Oct.2. The engineer made the estimation of 45 base stations in the first period and 80 base stations in the second period for the market to quote. The market personnel denied the estimation and thought that the estimations do not accord with the actual situation because the number of the base stations are too many, the pressure of the service is heavy and the customers do not accept the estimation. Besides, the estimation does not adapt to the economy development of the country and the actual situation of the customers is not taken into account. The technical suggestions had not embody the network planning scheme.

Editor's Notes

  1. Network objective: covered area, number of users, service type and Qos of the service Network planning: based on the requirement for building up the network to determine the scale and scheme of the network. As a result, to guide the construction of the project.
  2. Input: Other related information from the market, for example, work memo, information about the pre-phase of the market Project record documents exported by the network planning pre-sales department Destination area information: area size, economy, distribution of resources and physiognomy, customer information and market information Network construction objective: meet the requirements of the service, the coverage area, coverage ratio, communication quality, capacity of network users and cell objective load Network scale and phase construction planning Information about available sites to the carriers and frequency resources information Digital map used in planning Mapinfo digital map VIP user survey For expansion, move or change of the current network, the following items need to be added to the planning phase information: Recent network optimization report Configuration information about the carrier’s network, including hardware configuration, parameter configuration, frequency power, combining and distribution mode and set-top transmit power Collection and analysis of carrier’s network test documents Statistic data of carrier’s network traffic and the analysis of the statistic data Collection and analysis of carrier’s network complaints of the users Attention: Before the project is started, get acquainted with related information form the marketing personnel, including pre-market, scale of the project and human resource needs. The collected information need to be confirmed by the customer for several times, especially destination are information, network construction objective, network scale limit and construction phase planning in case the planning result cannot meet the requirements of the customers. For VIPs, for example, the governments, offices of the president, and places where import person lives, the market personnel must specialize them or the use the information provided by customers. These places must be marked on the map and you need to pay attention to them in planning. Related guides: W-Subject Guide Information Collection -20050316-A-2.0.doc W-Digital Map Selection and Acceptance Guide-20041101-A-1.0.doc
  3. From the pre-planning proportion, through the network estimation, you can get the cell semidiameter and scale of the base station. Thus, to guide later site reconnaissance and emulation work. For the WCDMA system, a complete radio network consists the following: estimations of NodeB, RNC and transmitting link needs. For the engineers of the radio network planning, they perform the NodeB estimation and provide the result. Then, other related departments perform estimations of RNC and transmitting link needs. Confirming input parameters: Scenario division and confirmation of transmit model of all scenarios. Requirements for the coverage, capacity and quality of all the scenarios. Traffic model and service model Other related parameters, for example, penetration loss and shadow fading margin Network estimation tool software W-Subject Guide Network Evaluation-20050316-A-2.0.doc W-Operation Guide for Network Evaluation Tool-20041101-A-1.0.doc W-Simplified Operation Guide for Network Evaluation Tool-20041101-A-1.0.doc W-Radio Network Evaluation Guide-20041101-A-1.2.doc W-CE Number Evaluation Guide-20041101-A-1.0.doc W-Iub Transmitting Evaluation Guide-20041101-A-1.0.doc W-Phase Guide Network Evaluation-20050316-A-2.0.doc W-Guide for Using Link Pre-Evaluation Tool-20041101-A-1.0.doc W-Operation Flow for Network Evaluation-20041101-A-1.0.doc Output: Link budget result, including the scale of all scenarios’ sites and cells’ semidiameter. Based on the coverage and capacity needs, to work out the iterative result, including the scale of all scenarios’ sites, cells’ semidiameter and system resource needs. Network Evaluation Report Attention: Parameter input is the basis for the network estimation and planning. When the carrier does not provide the parameter input, refer to the planning principle for WCDMA radio network planning of carriers of Huawei. Analyze the network and work out proper values. Finally, give the result to the carriers for confirmation. For improper input parameters that cause improper estimation result, on site engineers must communicate with the carriers and guide the carriers. At the same time, the engineers ask for help from the technical support team. The estimation result must be reviewed by the technical support team.
  4. Related guide: W-Subject Guide Area Planning-20050316-A-2.0.doc W-Subject Guide Analyzing Adjusting Data of Transmit Model (Enterprise version)-20050316-A-2.3.doc W-Subject Guide Parameter Setting of Transmit Mode of All Environments-20050316-A-2.0.doc W-CW Operation Guide for Data Processing Tool-20041101-A-1.0.doc W-E4406A Using Guide-20041101-A-1.0.lwp W-E4436B Using Guide-20041101-A-1.0.lwp Attention: For years’ development, the company sets up a complete transmit model library. The model library can adapt to the transmitting characters of several scenarios. It is recommended to use the transmit model from the model library that fit the local area. For the needs of the market and customers, you can perform the continuous wave test on area which has typical transmitting type based on the actual reconnaissance. Then, rectify the model based on the test result.
  5. Input: Network estimation result: network scale of all scenarios and the cell semidiameters Available site resources to the carriers Mapinfo map or 3D electronic map Local administrative map (Paper) Related guide: W-Operation Guide for Converting Digital Map Vector Data to mif File-20041101-A-1.0.doc Attention: Based on experience, the theoretical site is set as the center of the Search Ring and the semidiameter is R/4. Besides, there are some requirements for the height of the standby sites. From this point, the Search Ring is three dimensional. It is recommended to mark the site to be reconnoitered on the map for the convenience of the base station.
  6. Reconnaissance factors: Basic information about the sites (contents in the project parameter table), including position (longitude and latitude), height (of the antenna or the site), angle, site type, equipment room space, antenna installation mode and position, transmitting conditions, power supply, equipment room grounding, commercial aspect (possibility of rent and cost). Environment description: includes typical environment types and distributing, average height of the buildings, trees’ distributing (species, height and density), coverage destination position and environment description (government, operators’ residence, important industry and mine areas). If it is shared sites, you need to take the following aspects into account: available resources of equipment room and platform, distances, impact and mitigation. Related guides: W-Subject Guide Base Station Network Planning Reconnaissance-20050613-A-2.1.doc Output: Engineering Parameter Table Radio survey on-site report (XXX BTS) Radio survey summary table 《XX Office XX Project XX Period WCDMA Survey Memo Template V1.0.doc Attention: For proper sites, confirm the project parameters; for improper sites, give the replacing suggestion and verify the emulation. Some sites cannot be reconnoitered because of the customers. You need to ask the market personnel to solve the problem. If the problem cannot be solved, sign the On Site Reconnaissance Memo. For sites have the same addresses with other radio devices (GSM, CDMA, PHS and microwave), select the antenna installation mode and position in reconnaissance based on specific rules to guarantee distances. On site reconnaissance factors: Basic information about the sites (contents in the project parameter table), including position (longitude and latitude), height (of the antenna or the site), angle, site type, equipment room space, antenna installation mode and position, transmitting conditions, power supply, equipment room grounding, commercial aspect (possibility of rent and cost). Environment description: includes typical environment types and distributing, average height of the buildings, trees’ distributing (species, height and density), coverage destination position and environment description (government, operators’ residence, important industry and mine areas). If it is shared sites, you need to take the following aspects into account: available resources of equipment room and platform, distances, impact and mitigation.
  7. Related guide: W-Guide for Electro Interference Test-20041101-A-2.0.doc
  8. Input: Project parameter table Transmit model Parameters needed in emulation, for example, scenario, channel type, service type, traffic model, antenna parameters and network parameters Related guide W-U-Net Emulation Operation Guide-20041101-A-1.0.doc W-U-Net Guide for Setting Emulation Parameters-20050528-A-1.1.xls Attention: When a theoretical site has several sites to be selected, you need to select proper sites. Besides, dome sites cannot meet the requirements of Search Ring or the sites (For example, the equipment room and the transmission), you need to determine whether to select a new site. If the emulation of the correct site cannot meet the needs of the customer. You need to adjust the site if necessary. After the adjusting, you need to reconnoiter and emulate the site again to achieve the meet the requirements of the customer and export the Network Emulation Report.
  9. Attention: The Radio Pre-Planning Report after reviewed by the technical support team needs to be confirmed by the market personnel in the regional office. Then, it can be submitted to the customer. The Report Template of Radio Pre-Planning Report must be embodied in the ending of each phase of the pre-planning. When the emulation result is exported, the initial report of the pre-planning must be finished to submit for review by the technical support team and promote the progress of the project. After the previous part, the scale of the local network construction, including number and configuration of the base stations is settled. Then, the Network Pre-Planning Report needs to be written. So far, the network pre-planning phase is complete. But for the commercial network, to-be used in commercial network and the experimental network cannot be used after the previous part. They need be designed based on the parameters of each cell to form the office data can be cut over and loaded. Then the Network Planning Report can be written and a complete network planning is finished. The needs of different carriers are different or some other causes, as a result, the pre-sales, pre-planning and pre-commercial (or commercial and experimental) phases are not coherent. After the pre-planning phase, a local network may have a complete planning needs after a long time. So the result of the pre-planning and whether the needs of the carrier is changed need to be confirmed by the carrier. If necessary, emulate the sites in pre-planning again. If the result of the pre-planning is proper and proved to be available, you can design the parameters of the cells and process the office data to form a complete planning of a local network.
  10. The cell parameter design includes the following: Position and routing planning RNC area planning Neighborhood tables (neighbor areas of the same frequency, neighbor areas of different frequencies and neighbor areas of different systems) Frequency planning Cell scramble planning Planning of the parameters of the cell channel power Planning of the switchover parameters Permitted parameter planning Guides: W-Operation Guide for Cell Major Scramble-20041101-A-1.0.doc W-Subject Guide Neighborhood Planning-20050316-A-2.0.doc W-Subject Guide Area Planning-20050316-A-2.0.doc W-Guide for Setting System Parameter-20041022-C-1.0.doc Attention: Negotiate with the users or the designing institute about the following items: cell naming rule and coding rule, available frequency range, frequency multiplexing mode小 (for the GSM network) and code planning rule (for both the CDMA and GSM networks), frequency planning of local network boundaries and code planning. For the GSM network, pay attention to the cooperation of the dual band network data. For the network supports both 2G and 3G, focus on the cooperation of mutual operation of different system parameters.
  11. Based on the integrated network planning report and the cell parameter design, write the Network Planning Report. Submit the report to the project team and technical support team for reviewing. After the review, communicate with the market personnel of the regional office or the area department. Then, the report can be submitted to the users. When the network planning is complete, communicate with the users and report the planning result to make sure that the users know the planning scheme of the planning. Thus, the users can cooperate with us in later project construction phase.