Factors
1. Accessibility to site
2. Available Facilities
3. Water Table
4. Subsoil
5. Underground Services
6. Site Clearance
Accessibility to site
 Temporary road is required to
access construction site
 Carry load to site
Water Table
 Ground water level ( pump out all
the underground water )
Available facilities
 If issues is schools/shop or any
other facilities we need to be extra
careful due to the peoples might
go into the construction site.
 Public facilities such as hospital,
school and others need to be taken
under consideration before
undergo any activities for
construction (if any)
 Avoid unnecessary noise or
disruption during operational hours
Subsoil
 Sand ( excavate until a certain
depth to reach the minimum
movement of construction)
 Clay
 Gravel
 Hard rock ( high excavation cost,
good foundation, high bearing
capacity)
Underground Services
 Water pipelines ( prevent from
damage while excavating )
 Electricity Cable ( engage with
Licensed Cable Detection Workers
( LCDW) to carry out cable
detection works )
Security & Safety
Fencing
 For the safety of labourer
Hoarding
 Provide public safety
 Avoid unauthorised access
 To confined any risk during demolition, exaction or any unprecedented falling
objects
Potential hazards for workers in construction include:
 Falls (from heights)
 Trench collapse
 Scaffold collapse
 Electric shock and arc flash/arc blast
 Failure to use proper personal protective equipment
 Repetitive motion injuries.
 Training provided for safety reason
 Gloves, head protection
Types of accommodation
Construction site
container
 It can be stacked vertically or jointly
horizontally .
 Living places for the construction workers .
 Accommodate construction stuff .
 Time saving
 Convenient
 They are built of readily available materials .
 A method which is widely used in construction
site .
 Quick construction without heavy tools and
equipment .
 Save cost or the expenses in a construction .
 Low waterproof resistance.
 It is not strong enough to resist major wind
events .
Wooden huts
Gravel Road
 Consists of crushed stone ,sand & fines .
 Suitable to be used in construction side .
 Need frequent maintenance
Dirt road
 Slightly narrower than than
gravel road .
 Muddy & slippery when wet .
Temporary Roads (accessibility to site)
Scaffolding
Steel
 Common scaffold
 Durable
 Reliable
Aluminium
 Ideal for residential project
 Painting & Installing window
Fibreglass
 Prevent electrocution
 High portability
Provide space for material storage
Designate storage
 Maximise storing capability
 plant, materials, waste, flammable substances
Remove waste
 To improve site safety
Group members
 Low Wei Jian (0328646)
 Tang Lam Yu (0324966)
 Lai Eugene (0324075)
 Sow Wei Henn (0324998)

More Related Content

Viewers also liked

Online discussion assignment
Online discussion assignmentOnline discussion assignment
Online discussion assignmentLam Yu
 
Business report final
Business report finalBusiness report final
Business report finalLam Yu
 
Oral presentation august2015 (1)
Oral presentation august2015 (1)Oral presentation august2015 (1)
Oral presentation august2015 (1)Lam Yu
 
Final project business presentation EPC
Final project business presentation EPCFinal project business presentation EPC
Final project business presentation EPCLam Yu
 
Mural art assignment
Mural art assignmentMural art assignment
Mural art assignmentLam Yu
 
Drawing module outline july 2015 (1)
Drawing module outline july 2015 (1)Drawing module outline july 2015 (1)
Drawing module outline july 2015 (1)Lam Yu
 
Tutorial 3 (2)
Tutorial 3 (2)Tutorial 3 (2)
Tutorial 3 (2)Lam Yu
 
Project 1
Project 1Project 1
Project 1Lam Yu
 
Iciassignment 1b
Iciassignment 1bIciassignment 1b
Iciassignment 1bLam Yu
 
Landscape project proposal
Landscape project proposalLandscape project proposal
Landscape project proposalLam Yu
 
Tutorial 6 (1)
Tutorial 6 (1)Tutorial 6 (1)
Tutorial 6 (1)Lam Yu
 

Viewers also liked (11)

Online discussion assignment
Online discussion assignmentOnline discussion assignment
Online discussion assignment
 
Business report final
Business report finalBusiness report final
Business report final
 
Oral presentation august2015 (1)
Oral presentation august2015 (1)Oral presentation august2015 (1)
Oral presentation august2015 (1)
 
Final project business presentation EPC
Final project business presentation EPCFinal project business presentation EPC
Final project business presentation EPC
 
Mural art assignment
Mural art assignmentMural art assignment
Mural art assignment
 
Drawing module outline july 2015 (1)
Drawing module outline july 2015 (1)Drawing module outline july 2015 (1)
Drawing module outline july 2015 (1)
 
Tutorial 3 (2)
Tutorial 3 (2)Tutorial 3 (2)
Tutorial 3 (2)
 
Project 1
Project 1Project 1
Project 1
 
Iciassignment 1b
Iciassignment 1bIciassignment 1b
Iciassignment 1b
 
Landscape project proposal
Landscape project proposalLandscape project proposal
Landscape project proposal
 
Tutorial 6 (1)
Tutorial 6 (1)Tutorial 6 (1)
Tutorial 6 (1)
 

Similar to Tutorial 2 (2)

Safety in excavation
Safety in excavationSafety in excavation
Safety in excavationDukeRamirez1
 
Personal and structural safety
Personal and structural safetyPersonal and structural safety
Personal and structural safetyRavikiran Kattoli
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentationqayyum23
 
Building Construction I Project 1 Compilation
Building Construction I Project 1 CompilationBuilding Construction I Project 1 Compilation
Building Construction I Project 1 CompilationNatalie Yunxian
 
BUILDING CONSTRUCTION 1
BUILDING CONSTRUCTION 1BUILDING CONSTRUCTION 1
BUILDING CONSTRUCTION 1Alexis Wei
 
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterConstruction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterMuizz Anibire
 
Safety and envirnomental issues in mechanization
Safety and envirnomental issues in mechanizationSafety and envirnomental issues in mechanization
Safety and envirnomental issues in mechanizationsneha tiwari
 
EXPERIENCING, DOCUMENTATION AND ANALYSING CONSTRUCTION PROCESS
EXPERIENCING, DOCUMENTATION AND ANALYSING CONSTRUCTION PROCESSEXPERIENCING, DOCUMENTATION AND ANALYSING CONSTRUCTION PROCESS
EXPERIENCING, DOCUMENTATION AND ANALYSING CONSTRUCTION PROCESSJia Xin Chee
 
Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892Sumit Modi
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionMuizz Anibire
 
Protecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from SkudoProtecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from Skudoskudousa
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTemily9199
 

Similar to Tutorial 2 (2) (20)

Safety in excavation
Safety in excavationSafety in excavation
Safety in excavation
 
Personal and structural safety
Personal and structural safetyPersonal and structural safety
Personal and structural safety
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentation
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Building Construction I Project 1 Compilation
Building Construction I Project 1 CompilationBuilding Construction I Project 1 Compilation
Building Construction I Project 1 Compilation
 
BUILDING CONSTRUCTION 1
BUILDING CONSTRUCTION 1BUILDING CONSTRUCTION 1
BUILDING CONSTRUCTION 1
 
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterConstruction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over Water
 
Hazardous Work Practices in Construction
Hazardous Work Practices in ConstructionHazardous Work Practices in Construction
Hazardous Work Practices in Construction
 
Safety measures
Safety measuresSafety measures
Safety measures
 
Safety and envirnomental issues in mechanization
Safety and envirnomental issues in mechanizationSafety and envirnomental issues in mechanization
Safety and envirnomental issues in mechanization
 
EXPERIENCING, DOCUMENTATION AND ANALYSING CONSTRUCTION PROCESS
EXPERIENCING, DOCUMENTATION AND ANALYSING CONSTRUCTION PROCESSEXPERIENCING, DOCUMENTATION AND ANALYSING CONSTRUCTION PROCESS
EXPERIENCING, DOCUMENTATION AND ANALYSING CONSTRUCTION PROCESS
 
Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Construction safety PART III
Construction safety PART IIIConstruction safety PART III
Construction safety PART III
 
Report on excavation
Report on excavationReport on excavation
Report on excavation
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall Protection
 
Protecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from SkudoProtecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from Skudo
 
Site visit report
Site visit reportSite visit report
Site visit report
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT
 

More from Lam Yu

Group presentation compiled and updated 2
Group presentation compiled and updated 2Group presentation compiled and updated 2
Group presentation compiled and updated 2Lam Yu
 
Lamyu column 6 f (1)
Lamyu column 6 f (1)Lamyu column 6 f (1)
Lamyu column 6 f (1)Lam Yu
 
Lamyu column 1 e
Lamyu column 1 eLamyu column 1 e
Lamyu column 1 eLam Yu
 
Lamyu 4
Lamyu 4Lamyu 4
Lamyu 4Lam Yu
 
Lamyu 3
Lamyu 3Lamyu 3
Lamyu 3Lam Yu
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2Lam Yu
 
Lamyu 1
Lamyu 1Lamyu 1
Lamyu 1Lam Yu
 
Estimating final
Estimating  final Estimating  final
Estimating final Lam Yu
 
Estimating presentation (final)
Estimating presentation (final)Estimating presentation (final)
Estimating presentation (final)Lam Yu
 
Supply chain invidividual123123
Supply chain invidividual123123Supply chain invidividual123123
Supply chain invidividual123123Lam Yu
 
Supply chain invidividual
Supply chain invidividualSupply chain invidividual
Supply chain invidividualLam Yu
 
Ms (1)
Ms (1)Ms (1)
Ms (1)Lam Yu
 
Sc bim
Sc bimSc bim
Sc bimLam Yu
 
Bs1 (1)
Bs1 (1)Bs1 (1)
Bs1 (1)Lam Yu
 
Final ct aa slides
Final ct aa slidesFinal ct aa slides
Final ct aa slidesLam Yu
 
Smart tunnel
Smart tunnelSmart tunnel
Smart tunnelLam Yu
 
Bs finallll (1)
Bs finallll (1)Bs finallll (1)
Bs finallll (1)Lam Yu
 
Site surveying-almost-1
Site surveying-almost-1Site surveying-almost-1
Site surveying-almost-1Lam Yu
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1Lam Yu
 
Pile cap
Pile cap Pile cap
Pile cap Lam Yu
 

More from Lam Yu (20)

Group presentation compiled and updated 2
Group presentation compiled and updated 2Group presentation compiled and updated 2
Group presentation compiled and updated 2
 
Lamyu column 6 f (1)
Lamyu column 6 f (1)Lamyu column 6 f (1)
Lamyu column 6 f (1)
 
Lamyu column 1 e
Lamyu column 1 eLamyu column 1 e
Lamyu column 1 e
 
Lamyu 4
Lamyu 4Lamyu 4
Lamyu 4
 
Lamyu 3
Lamyu 3Lamyu 3
Lamyu 3
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2
 
Lamyu 1
Lamyu 1Lamyu 1
Lamyu 1
 
Estimating final
Estimating  final Estimating  final
Estimating final
 
Estimating presentation (final)
Estimating presentation (final)Estimating presentation (final)
Estimating presentation (final)
 
Supply chain invidividual123123
Supply chain invidividual123123Supply chain invidividual123123
Supply chain invidividual123123
 
Supply chain invidividual
Supply chain invidividualSupply chain invidividual
Supply chain invidividual
 
Ms (1)
Ms (1)Ms (1)
Ms (1)
 
Sc bim
Sc bimSc bim
Sc bim
 
Bs1 (1)
Bs1 (1)Bs1 (1)
Bs1 (1)
 
Final ct aa slides
Final ct aa slidesFinal ct aa slides
Final ct aa slides
 
Smart tunnel
Smart tunnelSmart tunnel
Smart tunnel
 
Bs finallll (1)
Bs finallll (1)Bs finallll (1)
Bs finallll (1)
 
Site surveying-almost-1
Site surveying-almost-1Site surveying-almost-1
Site surveying-almost-1
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1
 
Pile cap
Pile cap Pile cap
Pile cap
 

Recently uploaded

Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Recently uploaded (20)

Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

Tutorial 2 (2)

  • 1. Factors 1. Accessibility to site 2. Available Facilities 3. Water Table 4. Subsoil 5. Underground Services 6. Site Clearance
  • 2. Accessibility to site  Temporary road is required to access construction site  Carry load to site Water Table  Ground water level ( pump out all the underground water )
  • 3. Available facilities  If issues is schools/shop or any other facilities we need to be extra careful due to the peoples might go into the construction site.  Public facilities such as hospital, school and others need to be taken under consideration before undergo any activities for construction (if any)  Avoid unnecessary noise or disruption during operational hours
  • 4. Subsoil  Sand ( excavate until a certain depth to reach the minimum movement of construction)  Clay  Gravel  Hard rock ( high excavation cost, good foundation, high bearing capacity)
  • 5. Underground Services  Water pipelines ( prevent from damage while excavating )  Electricity Cable ( engage with Licensed Cable Detection Workers ( LCDW) to carry out cable detection works )
  • 6. Security & Safety Fencing  For the safety of labourer Hoarding  Provide public safety  Avoid unauthorised access  To confined any risk during demolition, exaction or any unprecedented falling objects Potential hazards for workers in construction include:  Falls (from heights)  Trench collapse  Scaffold collapse  Electric shock and arc flash/arc blast  Failure to use proper personal protective equipment  Repetitive motion injuries.  Training provided for safety reason  Gloves, head protection
  • 7. Types of accommodation Construction site container  It can be stacked vertically or jointly horizontally .  Living places for the construction workers .  Accommodate construction stuff .  Time saving  Convenient  They are built of readily available materials .  A method which is widely used in construction site .  Quick construction without heavy tools and equipment .  Save cost or the expenses in a construction .  Low waterproof resistance.  It is not strong enough to resist major wind events . Wooden huts
  • 8. Gravel Road  Consists of crushed stone ,sand & fines .  Suitable to be used in construction side .  Need frequent maintenance Dirt road  Slightly narrower than than gravel road .  Muddy & slippery when wet . Temporary Roads (accessibility to site)
  • 9. Scaffolding Steel  Common scaffold  Durable  Reliable Aluminium  Ideal for residential project  Painting & Installing window Fibreglass  Prevent electrocution  High portability
  • 10. Provide space for material storage Designate storage  Maximise storing capability  plant, materials, waste, flammable substances Remove waste  To improve site safety
  • 11.
  • 12. Group members  Low Wei Jian (0328646)  Tang Lam Yu (0324966)  Lai Eugene (0324075)  Sow Wei Henn (0324998)