SAFETY AND ENVIRNOMENTAL
ISSUES IN MECHANIZATION
SNEHA
MECHANIZATION
• DEFINATION
The condition of having a highly
technical implementation or the Act of
implementing the control of equipment with
advance technology; usually involving
electronic hardware ; automation replace
human workers by machines.
NEEDS FOR MECHNIZATION IN
CONSTRUCTION INDUSTRY :
• The work can be done speedily.
• The work can be done in time.
• Large quantity of materials can be handled, so the
size of the project can be increased.
• The complex project involving high grade material.
• High quality standards can be maintained.
• Time schedule can be kept.
• optimum use of material, man power and finance.
SAFETY ISSUES IN MECHANIZATION :
• SAFETY MEASURES IN EXCAVATION
There are different types of protective systems. Sloping
involves cutting back the trench wall at an angle inclined
away from the excavation. Shoring requires installing
aluminum hydraulic or other types of supports to
prevent soil movement.
Shielding protects workers by using trench boxes or
other types of supports to prevent soil cave-ins.
Designing a protective system can be complex
because you must consider many factors: soil
classification, depth of cut, water content of soil,
changes due to weather or climate, surcharge loads.
DRILLING AND BLASTING:
(1) An employer must ensure that a blasting
operation is under the direction and control of a
blaster.
(2) If more than 1 blaster will be involved in a
blasting operation, an employer must, before the
blasting operation begins, designate 1 blaster as the
blaster with direction and control of the blasting
operation.
(3) An employer must ensure that all persons in the
blasting area are made aware of the identity of the
blaster with direction and control of the blasting
operation.
(4) An employer must ensure that no person participates
in a blasting activity unless that person has been provided
with the information, instruction, training, supervision
and facilities necessary for the person to safely
participate.
(5) Supervisor directing work in a blasting area must
ensure that all tasks in the blasting area are coordinated
so that they may be performed safely.
SCAFFOLDING:
OSHA guidelines require workers to use fall
protection – a safety harness or belt attached to a
stable structure, such as a building. This applies to
employees who are erecting a scaffold, as well as
workers on the scaffolding.
If you’re working in a situation where there’s a
danger of falling debris, you should wear a hard hat. If
you’re working on scaffolding over water, such as in a
shipyard, you should wear a life vest.
Some scaffolding must have guard rails, and OSHA
dictates the height of these guardrails. Scaffolding
must have a safe way of getting on and off the
platform, such as stairs.
LADDERING:
Before you get on a ladder, always read and follow all
instruction and warning labels. Check for ladder weight
limits. Ladders are designed to hold a certain amount of
weight,
Check to see that the ladder is sturdy with no cracked or
damaged parts. Aluminum is a stronger and lighter material
than wood. All bolts and screws should be secured and
working properly.
DO NOT use a metal ladder near power lines or exposed
energized electrical equipment. Ladders must be free of
any slippery material like water, oil, ice, ect.
The positioning of a ladder to a wall, make sure the
ladder angel is no wider than 75 degrees or about 4
feet from the ground to the wall.
Wear a hardhat or safety helmet when working on a
ladder. Wear work boots or shoes with tread. It is very
easy to slip if you are wearing smooth soled shoes.
FORMWORK
1. Maintenance of good housekeeping around working area
and passage.
2. Guarding of edges and floor openings.
3. Adequate space for safe working.
4. Safety training of workmen involved in formwork and
concreting works.
5. Use of all personal protective equipment (PPEs).
6. Removal of all unused and hanging forms, loose materials
etc. stored on exposed floors.
7. Removal of defective props.
8. Height and spacing between props should be inspected.
8. All props should be rested on bearing plates.
9. Props should be placed on hard bearing surface.
DEMOLITION
1. Each and every employee must understand what
equipment should be used during a demolition and how to
properly protect themselves with safety equipment and
ensure that it’s being worn at all times during the demolition.
2. Proper protections like hard hat, mask, gloves, steel-toe
work boots, and safety vest. Do a sweep before you begin
demolition to ensure employees’ safety and check that all
equipment is ready and up-to-date to perform the task ahead.
3. Only trained employees should handle any
dangerous or explosive materials. Certified employees
have experience to handle any demolition situation and
prevent accidents on-site.
4. Ceilings and walkways is a first safety tip for any
demolition. This provides extra support in case of an
accident. Bracing prevents a large number of accidents,
injuries, and even deaths.
5. Employees should be equipped with the proper
equipment to clean up any and all debris once the
demolition is over. This equipment includes gloves,
masks, boots for their protection, as well as any
heavier equipment that needs to be used to clear the
mess.
6. You need to ensure that only authorized and trained
employees are present during cleanup and demolition.
ENVIRNOMENTAL ISSUES IN
MECHANIZATION:
• The biggest reason so far all kind of environmental
degradation is the exorbitant amount of gases which is
harmful to environment and exhibits gases like
CO2,SO2,NH3,etc. This is the main reason for ozone
hole and global warming.
• Deforestation causes major problems for environment
which decreases the number of trees which clean the
environment, provide oxygen and also affects the rain
pattern.
• Mining creates a lot of pollution, mainly because it
releases particulate matter which can enter our lungs
and can harm entire respiratory system.
•The surface water runoff and groundwater at and
close to construction site become polluted with various
materials used in the construction work. The
construction contaminates like VOCs, paints, clues,
diesel, oil, other toxic chemicals , and cement. effects in
creating turbidity in runoff water and ground water.
water pollution from construction site is
underestimated and has potential to generate severe
environmental problems.
•Soil at and around a construction site may become
contaminated due to air transport fallowed by deposition
of construction contaminants. soil may constitute a sink
for pollutants and some of those may accumulate in soil
and presist over longer period of time.
• It is usually associated with construction work although
modern preventive measures may substantially reduce the
amount of noise. Noise may adversely affect the health
such as stress, sleep disturbance, BP and hearing loss.
CONCLUSION:
The study has established that the mechanization of
construction operations increases the occurrence of
accidents and injuries to workers in the construction
industry. mechanization actually control the hazards. Such
safety plans should include hazard analyses in accordance
with site conditions and the nature of the construction
activities. The apparent benefits of a safety plan are
derived from considering precautions before starting any
activity and by analysing the hazards associated with each
activity.

More Related Content

What's hot

Building crack,types,causes & its repairing
Building crack,types,causes & its repairingBuilding crack,types,causes & its repairing
Building crack,types,causes & its repairingGAUTAMSWALA
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction pptBeing Deepak
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concreteSelva Prakash
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniquesNayana 54321
 
Concrete Honeycombs
Concrete Honeycombs Concrete Honeycombs
Concrete Honeycombs Dimuthuchat
 
PPT on Commerical building
PPT on Commerical buildingPPT on Commerical building
PPT on Commerical buildingLOKESH
 
Aggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitsAggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitslalitha moorthy
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Abhishek Gupta
 
Assessment and rehabilitation technique of fire damaged structures
Assessment and rehabilitation technique of fire damaged structuresAssessment and rehabilitation technique of fire damaged structures
Assessment and rehabilitation technique of fire damaged structuresMohammed Faazil
 
Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...Shanmugasundaram N
 

What's hot (20)

Soil exploration
Soil explorationSoil exploration
Soil exploration
 
Building crack,types,causes & its repairing
Building crack,types,causes & its repairingBuilding crack,types,causes & its repairing
Building crack,types,causes & its repairing
 
Foundations
FoundationsFoundations
Foundations
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
 
Voided slab
Voided slabVoided slab
Voided slab
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Diaphragm Wall
 Diaphragm Wall Diaphragm Wall
Diaphragm Wall
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
 
Concrete Honeycombs
Concrete Honeycombs Concrete Honeycombs
Concrete Honeycombs
 
PPT on Commerical building
PPT on Commerical buildingPPT on Commerical building
PPT on Commerical building
 
Aggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitsAggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limits
 
Hardened Concrete
Hardened ConcreteHardened Concrete
Hardened Concrete
 
Concrete equipment
Concrete equipmentConcrete equipment
Concrete equipment
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Fresh concrete
Fresh concreteFresh concrete
Fresh concrete
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
 
Assessment and rehabilitation technique of fire damaged structures
Assessment and rehabilitation technique of fire damaged structuresAssessment and rehabilitation technique of fire damaged structures
Assessment and rehabilitation technique of fire damaged structures
 
Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...
 

Viewers also liked

3Com ETHERLINK/MC TP
3Com ETHERLINK/MC TP3Com ETHERLINK/MC TP
3Com ETHERLINK/MC TPsavomir
 
Escolhas coragem para ser diferente
Escolhas coragem para ser diferenteEscolhas coragem para ser diferente
Escolhas coragem para ser diferenteHugo Machado
 
PPT Kerajinan oleh Agnia n
PPT Kerajinan oleh Agnia nPPT Kerajinan oleh Agnia n
PPT Kerajinan oleh Agnia nsan3garut
 
презентация проекта растим здорового ребенка
презентация проекта растим здорового ребенкапрезентация проекта растим здорового ребенка
презентация проекта растим здорового ребенкаdenchk
 
post traumatic enophthalmos and hypoglobus
 post traumatic enophthalmos and hypoglobus post traumatic enophthalmos and hypoglobus
post traumatic enophthalmos and hypoglobusJamil Kifayatullah
 
Second sunday2017
Second sunday2017Second sunday2017
Second sunday2017chuyen tran
 
Basics of HVAC by Jitendra Jha
Basics of HVAC by Jitendra JhaBasics of HVAC by Jitendra Jha
Basics of HVAC by Jitendra JhaJitendra Jha
 
#искусствоналицо: каталог выставки
#искусствоналицо: каталог выставки#искусствоналицо: каталог выставки
#искусствоналицо: каталог выставкиЛеонид Цой
 
zygomatic reduction,which comes when
 zygomatic reduction,which comes when zygomatic reduction,which comes when
zygomatic reduction,which comes whenJamil Kifayatullah
 
Director of Product at Glassdoor Talks: How to Transition to Product Management
Director of Product at Glassdoor Talks:  How to Transition to Product ManagementDirector of Product at Glassdoor Talks:  How to Transition to Product Management
Director of Product at Glassdoor Talks: How to Transition to Product ManagementProduct School
 
Mitel MiVoice 5505 Guest IP Phone
Mitel MiVoice 5505 Guest IP PhoneMitel MiVoice 5505 Guest IP Phone
Mitel MiVoice 5505 Guest IP PhoneNorcomLinkedin
 
Đừng bao giờ nói những câu nói này nếu không muốn con thất bại trong cuộc sống
Đừng bao giờ nói những câu nói này nếu không muốn con thất bại trong cuộc sốngĐừng bao giờ nói những câu nói này nếu không muốn con thất bại trong cuộc sống
Đừng bao giờ nói những câu nói này nếu không muốn con thất bại trong cuộc sốnggiangcdby03
 

Viewers also liked (20)

3Com ETHERLINK/MC TP
3Com ETHERLINK/MC TP3Com ETHERLINK/MC TP
3Com ETHERLINK/MC TP
 
Trabajo contabilidad
Trabajo contabilidadTrabajo contabilidad
Trabajo contabilidad
 
Escolhas coragem para ser diferente
Escolhas coragem para ser diferenteEscolhas coragem para ser diferente
Escolhas coragem para ser diferente
 
Apple
AppleApple
Apple
 
PPT Kerajinan oleh Agnia n
PPT Kerajinan oleh Agnia nPPT Kerajinan oleh Agnia n
PPT Kerajinan oleh Agnia n
 
презентация проекта растим здорового ребенка
презентация проекта растим здорового ребенкапрезентация проекта растим здорового ребенка
презентация проекта растим здорового ребенка
 
post traumatic enophthalmos and hypoglobus
 post traumatic enophthalmos and hypoglobus post traumatic enophthalmos and hypoglobus
post traumatic enophthalmos and hypoglobus
 
04 zmc fracture
04 zmc fracture04 zmc fracture
04 zmc fracture
 
Origen de la vida
Origen  de  la  vidaOrigen  de  la  vida
Origen de la vida
 
Second sunday2017
Second sunday2017Second sunday2017
Second sunday2017
 
Basics of HVAC by Jitendra Jha
Basics of HVAC by Jitendra JhaBasics of HVAC by Jitendra Jha
Basics of HVAC by Jitendra Jha
 
#искусствоналицо: каталог выставки
#искусствоналицо: каталог выставки#искусствоналицо: каталог выставки
#искусствоналицо: каталог выставки
 
zygomatic reduction,which comes when
 zygomatic reduction,which comes when zygomatic reduction,which comes when
zygomatic reduction,which comes when
 
Director of Product at Glassdoor Talks: How to Transition to Product Management
Director of Product at Glassdoor Talks:  How to Transition to Product ManagementDirector of Product at Glassdoor Talks:  How to Transition to Product Management
Director of Product at Glassdoor Talks: How to Transition to Product Management
 
Etapas de control
Etapas de controlEtapas de control
Etapas de control
 
Debates em Psiquiatria
Debates em PsiquiatriaDebates em Psiquiatria
Debates em Psiquiatria
 
Ley orgánica de elecciones
Ley orgánica de eleccionesLey orgánica de elecciones
Ley orgánica de elecciones
 
Mitel MiVoice 5505 Guest IP Phone
Mitel MiVoice 5505 Guest IP PhoneMitel MiVoice 5505 Guest IP Phone
Mitel MiVoice 5505 Guest IP Phone
 
Proteinse quencing
Proteinse quencingProteinse quencing
Proteinse quencing
 
Đừng bao giờ nói những câu nói này nếu không muốn con thất bại trong cuộc sống
Đừng bao giờ nói những câu nói này nếu không muốn con thất bại trong cuộc sốngĐừng bao giờ nói những câu nói này nếu không muốn con thất bại trong cuộc sống
Đừng bao giờ nói những câu nói này nếu không muốn con thất bại trong cuộc sống
 

Similar to Safety and envirnomental issues in mechanization

UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdfUNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdfPinakRay1
 
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterConstruction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterMuizz Anibire
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfPinakRay1
 
construction safety.pptx
construction safety.pptxconstruction safety.pptx
construction safety.pptxMarwa Merghani
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252zul husni
 
Building Construction I Project 1 Compilation
Building Construction I Project 1 CompilationBuilding Construction I Project 1 Compilation
Building Construction I Project 1 CompilationNatalie Yunxian
 
BUILDING CONSTRUCTION 1
BUILDING CONSTRUCTION 1BUILDING CONSTRUCTION 1
BUILDING CONSTRUCTION 1Alexis Wei
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group reportXingYue0907
 
constructionsafety-EAA.pdf
constructionsafety-EAA.pdfconstructionsafety-EAA.pdf
constructionsafety-EAA.pdfssuser2c065e
 
Construction safety
Construction  safetyConstruction  safety
Construction safetyRanty Poddar
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Abirami V Veeramani
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptxShijo25
 
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls Muizz Anibire
 
Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Jervain Ng
 
Building Construction: Experiencing Construction
Building Construction: Experiencing ConstructionBuilding Construction: Experiencing Construction
Building Construction: Experiencing ConstructionJoyce Wee
 
Building construction
Building constructionBuilding construction
Building constructionRicco Wei
 

Similar to Safety and envirnomental issues in mechanization (20)

UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdfUNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
 
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterConstruction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over Water
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
construction safety.pptx
construction safety.pptxconstruction safety.pptx
construction safety.pptx
 
Safety measures
Safety measuresSafety measures
Safety measures
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 
Building Construction I Project 1 Compilation
Building Construction I Project 1 CompilationBuilding Construction I Project 1 Compilation
Building Construction I Project 1 Compilation
 
BUILDING CONSTRUCTION 1
BUILDING CONSTRUCTION 1BUILDING CONSTRUCTION 1
BUILDING CONSTRUCTION 1
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 
constructionsafety-EAA.pdf
constructionsafety-EAA.pdfconstructionsafety-EAA.pdf
constructionsafety-EAA.pdf
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)
 
CS S3
CS S3CS S3
CS S3
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptx
 
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
 
Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1
 
Building Construction: Experiencing Construction
Building Construction: Experiencing ConstructionBuilding Construction: Experiencing Construction
Building Construction: Experiencing Construction
 
Building construction
Building constructionBuilding construction
Building construction
 

Recently uploaded

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 

Recently uploaded (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Safety and envirnomental issues in mechanization

  • 1. SAFETY AND ENVIRNOMENTAL ISSUES IN MECHANIZATION SNEHA
  • 2. MECHANIZATION • DEFINATION The condition of having a highly technical implementation or the Act of implementing the control of equipment with advance technology; usually involving electronic hardware ; automation replace human workers by machines.
  • 3. NEEDS FOR MECHNIZATION IN CONSTRUCTION INDUSTRY : • The work can be done speedily. • The work can be done in time. • Large quantity of materials can be handled, so the size of the project can be increased. • The complex project involving high grade material. • High quality standards can be maintained. • Time schedule can be kept. • optimum use of material, man power and finance.
  • 4. SAFETY ISSUES IN MECHANIZATION : • SAFETY MEASURES IN EXCAVATION There are different types of protective systems. Sloping involves cutting back the trench wall at an angle inclined away from the excavation. Shoring requires installing aluminum hydraulic or other types of supports to prevent soil movement. Shielding protects workers by using trench boxes or other types of supports to prevent soil cave-ins. Designing a protective system can be complex because you must consider many factors: soil classification, depth of cut, water content of soil, changes due to weather or climate, surcharge loads.
  • 5. DRILLING AND BLASTING: (1) An employer must ensure that a blasting operation is under the direction and control of a blaster. (2) If more than 1 blaster will be involved in a blasting operation, an employer must, before the blasting operation begins, designate 1 blaster as the blaster with direction and control of the blasting operation. (3) An employer must ensure that all persons in the blasting area are made aware of the identity of the blaster with direction and control of the blasting operation.
  • 6. (4) An employer must ensure that no person participates in a blasting activity unless that person has been provided with the information, instruction, training, supervision and facilities necessary for the person to safely participate. (5) Supervisor directing work in a blasting area must ensure that all tasks in the blasting area are coordinated so that they may be performed safely.
  • 7. SCAFFOLDING: OSHA guidelines require workers to use fall protection – a safety harness or belt attached to a stable structure, such as a building. This applies to employees who are erecting a scaffold, as well as workers on the scaffolding. If you’re working in a situation where there’s a danger of falling debris, you should wear a hard hat. If you’re working on scaffolding over water, such as in a shipyard, you should wear a life vest. Some scaffolding must have guard rails, and OSHA dictates the height of these guardrails. Scaffolding must have a safe way of getting on and off the platform, such as stairs.
  • 8. LADDERING: Before you get on a ladder, always read and follow all instruction and warning labels. Check for ladder weight limits. Ladders are designed to hold a certain amount of weight, Check to see that the ladder is sturdy with no cracked or damaged parts. Aluminum is a stronger and lighter material than wood. All bolts and screws should be secured and working properly. DO NOT use a metal ladder near power lines or exposed energized electrical equipment. Ladders must be free of any slippery material like water, oil, ice, ect.
  • 9. The positioning of a ladder to a wall, make sure the ladder angel is no wider than 75 degrees or about 4 feet from the ground to the wall. Wear a hardhat or safety helmet when working on a ladder. Wear work boots or shoes with tread. It is very easy to slip if you are wearing smooth soled shoes.
  • 10. FORMWORK 1. Maintenance of good housekeeping around working area and passage. 2. Guarding of edges and floor openings. 3. Adequate space for safe working. 4. Safety training of workmen involved in formwork and concreting works. 5. Use of all personal protective equipment (PPEs). 6. Removal of all unused and hanging forms, loose materials etc. stored on exposed floors. 7. Removal of defective props. 8. Height and spacing between props should be inspected.
  • 11. 8. All props should be rested on bearing plates. 9. Props should be placed on hard bearing surface. DEMOLITION 1. Each and every employee must understand what equipment should be used during a demolition and how to properly protect themselves with safety equipment and ensure that it’s being worn at all times during the demolition. 2. Proper protections like hard hat, mask, gloves, steel-toe work boots, and safety vest. Do a sweep before you begin demolition to ensure employees’ safety and check that all equipment is ready and up-to-date to perform the task ahead.
  • 12. 3. Only trained employees should handle any dangerous or explosive materials. Certified employees have experience to handle any demolition situation and prevent accidents on-site. 4. Ceilings and walkways is a first safety tip for any demolition. This provides extra support in case of an accident. Bracing prevents a large number of accidents, injuries, and even deaths. 5. Employees should be equipped with the proper equipment to clean up any and all debris once the demolition is over. This equipment includes gloves, masks, boots for their protection, as well as any heavier equipment that needs to be used to clear the mess.
  • 13. 6. You need to ensure that only authorized and trained employees are present during cleanup and demolition. ENVIRNOMENTAL ISSUES IN MECHANIZATION: • The biggest reason so far all kind of environmental degradation is the exorbitant amount of gases which is harmful to environment and exhibits gases like CO2,SO2,NH3,etc. This is the main reason for ozone hole and global warming. • Deforestation causes major problems for environment which decreases the number of trees which clean the environment, provide oxygen and also affects the rain pattern.
  • 14. • Mining creates a lot of pollution, mainly because it releases particulate matter which can enter our lungs and can harm entire respiratory system. •The surface water runoff and groundwater at and close to construction site become polluted with various materials used in the construction work. The construction contaminates like VOCs, paints, clues, diesel, oil, other toxic chemicals , and cement. effects in creating turbidity in runoff water and ground water. water pollution from construction site is underestimated and has potential to generate severe environmental problems.
  • 15. •Soil at and around a construction site may become contaminated due to air transport fallowed by deposition of construction contaminants. soil may constitute a sink for pollutants and some of those may accumulate in soil and presist over longer period of time. • It is usually associated with construction work although modern preventive measures may substantially reduce the amount of noise. Noise may adversely affect the health such as stress, sleep disturbance, BP and hearing loss.
  • 16. CONCLUSION: The study has established that the mechanization of construction operations increases the occurrence of accidents and injuries to workers in the construction industry. mechanization actually control the hazards. Such safety plans should include hazard analyses in accordance with site conditions and the nature of the construction activities. The apparent benefits of a safety plan are derived from considering precautions before starting any activity and by analysing the hazards associated with each activity.