The document discusses various methods for estimating construction costs. It describes the unit method, square meter method, cubic meter method, approximate quantities method, elemental method, and comparative method. It then selects the square meter method as the most appropriate for providing a cost estimate for a medium-cost housing development based on preliminary sketch drawings within a one day timeframe. The square meter method allows for a quick estimate, can be used early based on preliminary drawings, and does not require extensive expertise to apply.