Client Introduction: Our client is a global leader in advanced pumps solutions and trendsetter in water
technologies, presented in 56 countries and with the decades of company’s history on the market.
 Project Objectives:
 Identify manufacturers in supply market of Russia for below categories:
1) Low Voltage Electric Motors;
2) Grey and Nodular Iron Castings.
 Final deliverables:
Client Introduction & Project Objectives:
- To cover 2 categories in targeted Country.
2
STAGE 1 STAGE 2 STAGE 3
• Supplier database
• RFI analysis report
• Supplier profiles and ranking
• NDA Analysis
• Signed NDA’s from the
shortlisted suppliers.
• Quotes from the suppliers,
• Ex works, DDP price analyses
Russia
3
Approach & Schedule.
Supplier Pre-Qualification: Stage 1 - RFI process only.
No. Steps Deliverables
1.
Demand Analysis
Work with client to define and understand the products and requirements (volumes, materials, production
technology requirements, Quality tests, Standards, etc.)
 Kick-Off Report
2.
Supply Market Analysis
Identify long list of potential suppliers in the selected markets (Russia) by leveraging B2B Websites, DS
Database, Fair catalogues, Chamber of Commerce, Magazines, Network, References.
 Supplier Long List
3.
Telephone Pre-screening
Selection of suppliers to be included in the RFI process by telephone pre-screening based on agreed simple
criteria (e.g. capability to make the product, minimum company size, quality certifications, interest in
participating, innovations etc to be defined by the client).
 Shortlist for RFI
process
4.
Develop RFI document
Prepare an RFI template, with an aligned Balanced Scorecard that has the objective to pre-qualify the
capabilities of the suppliers, including: Background, Financial, Client and product experience, Quality
certification & processes, Social Responsibility, Manufacturing/technology capability.
 RFI Template
 Balanced Scorecard
5.
Conduct RFI Administration
The RFI is translated to the local languages as relevant, and distributed to the relevant suppliers, with
telephone follow-up to push for maximum participation.
• Completed RFI’s
6.
Analyze RFI Responses
Analysis of RFI responses and preparation of a report which profiles & objectively ranks the suppliers by
capability including a recommendation for those to be audited.
 RFI Report
 Supplier Profiles
 Proposed Shortlist for
Audit.
4
Approach & Schedule,
Supplier Pre-Qualification: Stage 2 (NDA Process) & Stage 3 (RFQ process).
No. Stage 2: NDA Process Deliverables
7.
NDA Process
NDA Administration with the shortlisted suppliers from the RFI process.
 Signed NDA’s from
suppliers.
No. Stage 3: RFQ Process Deliverables
8.
Develop RFQ document
Prepare an RFQ template based on the product specification that has the objective to collect Ex Works and
DDP price, packing, loading volumes, sampling, incoterms and other relevant information.
 RFQ Template
9.
Conduct RFQ Administration
The RFQ is translated to the local languages as relevant, and distributed to the relevant suppliers, with
telephone follow-up to push for maximum participation.
• Completed RFQ’s
10.
Analyze RFQ Responses
Analysis of RFQ responses and preparation of a report with Ex Works and DDP price analyses from each
supplier.
 RFQ Report analysis.
Demand Analysis.
Approximate yearly volumes were collected from the client at the beginning of the
project.
5
# Category Items
Estimated
Yearly Volumes
Estimated
Yearly Spend
1 LV Electric Motors Low Voltage Electric Motors Units XXX € XXX
2 Iron Castings Grey and Nodular Tons XXX € XXX
1. STAGE 1: RFI PROCESS
2. STAGE 2: NDA PROCESS
3. STAGE 3: RFQ PROCESS
6
Agenda
Dragon Sourcing has developed online software “Global Sourcing Platform” (GSP) to manage sourcing
projects locally as well internationally.
The GSP provides:
• A central database of suppliers
• Management of sourcing projects from start to finish
• Tools to facilitate supplier research, telephone pre-screening, RFI-RFQ & qualifying supplier.
 Complete unique online platform suitable for Global Strategic Sourcing process including qualifying the
supplier.
7
Approach & Schedule.
RFI/RFQ processes were completed in 8 weeks as per schedule.
RFI/RFQs received, suppliers
profiles forwarded to client
# Step Responsible
Week
0
Week
1
Week
2
Week
3
Week
4
Week
5
Week
6
Week
7
Week
8
Week
9
Week
10
13-17.
08
20-24.
08
27-31.
08
03-07.
09
10-14.
09
17-21.
09
24-28.
09
01-05.
10
08-12.
10
15-19.
10
22-26
10
0 Kick off Client/DS
1 Demand Analysis Client
2 Supply Market Analysis DS
3 Telephone pre-screening DS
4 Administer NDA DS
5 Develop the RFI-RFQ Client/DS
6 Conduct RFI/RFQ Administration DS
7 Analyze RFI/RFQ Responses Client/DS
1
2
Not started Started Finished Holiday RFI/RFQ process
start1 2
Process Steps Iron Casting Electric Motors Total
Supplier Identification • Suppliers identified 300 65 365
Pre-screening
• Supplier passed pre-screening so
far,
xxx xxx xxx
• Suppliers failed Pre- screening so
far,
xxx xxx xxx
• Suppliers pending for pre-screening xxx xxx xxx
Administer NDA
• NDA Sent xxx xxx xxx
• Preparing NDA xxx xxx xxx
• NDA Rejected to sign xxx xxx xxx
• NDA Returned, signed xxx xxx xxx
RFI-RFQ Administration
• RFIs sent xxx xxx xxx
• Intend to respond xxx xxx xxx
• Excluded from RFI/RFQ by client’s
category managers or DS.
xxx xxx xxx
• RFIs under consideration of client’s
category managers
xxx xxx xxx
• RFIs approved by client’s category
managers
xxx xxx xxx
• Number of RFQs, sent xxx xxx xxx
• Rejected to fill in RFQ/ excluded by
client’s category managers
xxx xxx xxx
• Number of RFQs received xxx xxx xxx
• Intend to respond xxx xxx xxx
Long list of suppliers, identified in targeted Country.
Supply market analysis per category was shared in the weekly progress report.
8
*xxx – Actual data from the report
9
Pre-screening, phone-calling process was administered to filter the potential suppliers for
further next steps.
Iron Castings Category
*Screenshots from GSP system, Phone-screening step.
Process Steps Iron Casting Electric Motors Total
Supplier Identification • Suppliers identified xxx xxx xxx
Pre-screening
• Supplier passed pre-screening so
far,
47 10 57
• Suppliers failed Pre- screening so
far,
253 55 308
• Suppliers pending for pre-screening 0 0 0
Administer NDA
• NDA Sent xxx xxx xxx
• Preparing NDA xxx xxx xxx
• NDA Rejected to sign xxx xxx xxx
• NDA Returned, signed xxx xxx xxx
RFI-RFQ Administration
• RFIs sent xxx xxx xxx
• Intend to respond xxx xxx xxx
• Excluded from RFI/RFQ by client’s
category managers or DS.
xxx xxx xxx
• RFIs under consideration of client’s
category managers
xxx xxx xxx
• RFIs approved by client’s category
managers
xxx xxx xxx
• Number of RFQs, sent xxx xxx xxx
• Rejected to fill in RFQ/ excluded by
client’s category managers
xxx xxx xxx
• Number of RFQs received xxx xxx xxx
• Intend to respond xxx xxx xxx
Phone-calling process results were shared in the weekly progress report.
10
*xxx – Actual data from the report
11
Post pre-screening the suppliers.
RFI process was administered to filter out most capable suppliers.
Supplier Profile example
*Screenshots from GSP system, RFI step.
12
RFI process was administered to filter out most capable suppliers.
Supplier Profile example
*Screenshots from GSP system, RFI step.
13
Category specific technical questions were added in the RFI relevant to Electric Motors
and Iron Castings Categories to understand suppliers capabilities and capacity.
Supplier Profile example
*Screenshots from GSP system, RFI step.
29
7
5
4
3
3
2
1
1
1
1
1
1 1 1 1
Phone screening rejection reasons - Electric motors
Don't produce required products
Traders/distributors or Importers only
Produce the motors but according to local standards, no IE2 or IE3.
The same manufacturer doesn't have any English speaking people, ISO 14001 and has only local environmental certificates.
Unable to contact them
We are only R&D company, no direct production
Duplicate suppliers
Outsource production in China
Not interested to take part in the selection process
Not possible to respond until late November.
We have checked RFI/RFQ and decided not to participate in this project because of no interest in production of items,
requested. We mainly produce HV Motors.
Will be able to consider the project only in Mid December
Excluded by client
Supply Market Analysis.
Supplier rejection analysis was shared for each step, Pre-screening, RFI,
NDA & RFQ administration.
14
Example of rejection analysis
Electric Motors Category
15
Suppliers location example – Electric Motors Category – RUSSIA.
Locations of the RFI/RFQ responders - manufacturers, highlighted on the map.
Supplier Location Marked
Mednogorsk
Moscow
Kamensk-Ural’skiy
16
Executive summary was shared with Result & Recommendation.
Electric Motors Category
Example of the executive summary
Manufacturers which provided RFI+ RFQs within project schedule:
1. Supplier 1 – Profile to download;
2. Supplier 2 – Profile to download;
3. Supplier 3 – Profile to download.
• RFQs can be downloaded from profiles directly.
• Detailed lists of manufacturers on all the steps can be found in detailed Progress Excel report:
Client’s summary file IC EM categories Final
1. STAGE 1: RFI PROCESS
2. STAGE 2: NDA PROCESS
3. STAGE 3: RFQ PROCESS
17
Agenda
Process Steps Iron Casting Electric Motors Total
Supplier Identification • Suppliers identified xxx xxx 365
Pre-screening
• Supplier passed pre-screening so
far,
xxx xxx xxx
• Suppliers failed Pre- screening so
far,
xxx xxx xxx
• Suppliers pending for pre-screening xxx xxx xxx
Administer NDA
• NDA Sent 47 10 57
• Preparing NDA 0 0 0
• NDA Rejected to sign 19 1 20
• NDA Returned, signed 28 9 37
RFI-RFQ Administration
• RFIs sent 28 9 37
• Intend to respond 2 0 2
• Excluded from RFI/RFQ by client’s
category managers or DS.
21 6 27
• RFIs under consideration of client’s
category managers
0 0 0
• RFIs approved by client’s category
managers
5 3 8
• Number of RFQs, sent xxx xxx xxx
• Rejected to fill in RFQ/ excluded by
client’s category managers
xxx xxx xxx
• Number of RFQs received xxx xxx xxx
• Intend to respond xxx xxx xxx
18
Executive summary on the RFI and NDA Processes results were shared
with the client in terms of weekly progress report.
*xxx – Actual data from the report
1. STAGE 1: RFI PROCESS
2. STAGE 2: NDA PROCESS
3. STAGE 3: RFQ PROCESS
19
Agenda
20
Ex Works and DDP price analyses were done based on the actual suppliers
prices.
Electric Motors Category
€ 842 € 842 € 842 € 842 € 842 € 842
€ 936 € 936 € 936 € 936 € 936
€ 1 805 € 1 805
€ 57 € 59 € 73 € 74 € 85 € 103
€ 173 € 176
€ 324
€ 553 € 589 € 578
€ 788
€ -
€ 200
€ 400
€ 600
€ 800
€ 1 000
€ 1 200
€ 1 400
€ 1 600
€ 1 800
€ 2 000
Item1
Item2
Item3
Item4
Item5
Item6
Item7
Item8
Item9
Item10
Item11
Item12
Item13
1 2 3 4 5 6 7 8 9 10 11 12 13
RFQ, EXW Price in EUR
Supplier 1 Supplier 2 Supplier 3
Process Steps Iron Casting Electric Motors Total
Supplier Identification • Suppliers identified xxx xxx 365
Pre-screening
• Supplier passed pre-screening so
far,
xxx xxx xxx
• Suppliers failed Pre- screening so
far,
xxx xxx xxx
• Suppliers pending for pre-screening xxx xxx xxx
Administer NDA
• NDA Sent xxx xxx xxx
• Preparing NDA xxx xxx xxx
• NDA Rejected to sign xxx xxx xxx
• NDA Returned, signed xxx xxx xxx
RFI-RFQ Administration
• RFIs sent xxx xxx xxx
• Intend to respond xxx xxx xxx
• Excluded from RFI/RFQ by client’s
category managers or DS.
xxx xxx xxx
• RFIs under consideration of client’s
category managers
xxx xxx xxx
• RFIs approved by client’s category
managers
xxx xxx xxx
• Number of RFQs, sent 5 3 8
• Rejected to fill in RFQ/ excluded by
client’s category managers
2 0 2
• Number of RFQs received 3 3 6
• Intend to respond 0 0 0
21
RFQ rejection analysis was shared with the client in terms of weekly, progress
report.
Iron Castings and Electric Motors Categories
*xxx – Actual data from the report
Conclusions
 Whole project was carried out with 365 suppliers identified; with 37 RFIs received as long as
signed NDAs & 6 suppliers finally responded with the RFQ document for both categories.
 As per instructions from client, the whole project was finalized during 10 weeks in comparison
to standard 12 weeks period, because of high level of urgency to get results and start audits.
 The producers, recommended by DS corresponded to the technical requirements of client and
had all the necessary certificates.
 DS recommended № of suppliers for visit/auditing with showing exact location of each
manufacturer on the map.
 The contact information about all the producers, identified, rejected, passed on all the selection
steps, was forwarded to client.
 Client visited DS recommended suppliers, responded to the RFQ process based on the stringent
qualification process.
22

More Related Content

What's hot

CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
New gTLD Program Update from ICANN 49
New gTLD Program Update from ICANN 49New gTLD Program Update from ICANN 49
New gTLD Program Update from ICANN 49ICANN
 
InstallerTraining11_14_2014Final _
InstallerTraining11_14_2014Final _InstallerTraining11_14_2014Final _
InstallerTraining11_14_2014Final _Jeremiah Diaz
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qcvipin joy
 
Final presentation
Final presentationFinal presentation
Final presentationAmogh Hajare
 
New York City Department of Buildings Filing rep course_102
 New York City Department of Buildings Filing rep course_102 New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102Safe Rise
 
Calibration Laboratory Audit Preparation Webinar
Calibration Laboratory Audit Preparation WebinarCalibration Laboratory Audit Preparation Webinar
Calibration Laboratory Audit Preparation WebinarTranscat
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02jitendra kumar biswas
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105Safe Rise
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTmuhammad jamil
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 

What's hot (19)

CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
New gTLD Program Update from ICANN 49
New gTLD Program Update from ICANN 49New gTLD Program Update from ICANN 49
New gTLD Program Update from ICANN 49
 
InstallerTraining11_14_2014Final _
InstallerTraining11_14_2014Final _InstallerTraining11_14_2014Final _
InstallerTraining11_14_2014Final _
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
QC
QCQC
QC
 
New York City Department of Buildings Filing rep course_102
 New York City Department of Buildings Filing rep course_102 New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102
 
Calibration Laboratory Audit Preparation Webinar
Calibration Laboratory Audit Preparation WebinarCalibration Laboratory Audit Preparation Webinar
Calibration Laboratory Audit Preparation Webinar
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
P._Perehinec_3-30-16
P._Perehinec_3-30-16P._Perehinec_3-30-16
P._Perehinec_3-30-16
 
Ng Eng Beng CV
Ng Eng Beng CVNg Eng Beng CV
Ng Eng Beng CV
 

Similar to Electric Motors and Iron Castings case study by Dragon Sourcing

Door Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingDoor Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingJohn William
 
Cleaning Sponge Case Study by Dragon Sourcing
Cleaning Sponge Case Study by Dragon SourcingCleaning Sponge Case Study by Dragon Sourcing
Cleaning Sponge Case Study by Dragon SourcingJohn William
 
Cotton Bags for Luxury Retail Brand Case Study
Cotton Bags for Luxury Retail Brand Case StudyCotton Bags for Luxury Retail Brand Case Study
Cotton Bags for Luxury Retail Brand Case StudyJohn William
 
Case Study-New Plant Building “Capex Sourcing in China”
Case Study-New Plant Building “Capex Sourcing in China”Case Study-New Plant Building “Capex Sourcing in China”
Case Study-New Plant Building “Capex Sourcing in China”John William
 
Decorative Luminaire Sourcing Project Case Study by Dragon Sourcing
Decorative Luminaire Sourcing Project Case Study by Dragon SourcingDecorative Luminaire Sourcing Project Case Study by Dragon Sourcing
Decorative Luminaire Sourcing Project Case Study by Dragon SourcingJohn William
 
Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudyJohn William
 
Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​John William
 
Case Study - Desalination Unit Project
Case Study - Desalination Unit ProjectCase Study - Desalination Unit Project
Case Study - Desalination Unit ProjectJohn William
 
Steel Shelving Rack Case Study by Dragon Sourcing
Steel Shelving Rack Case Study by Dragon SourcingSteel Shelving Rack Case Study by Dragon Sourcing
Steel Shelving Rack Case Study by Dragon SourcingJohn William
 
CNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyCNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyJohn William
 
Case study-Multiple categories sourcing project review
Case study-Multiple categories sourcing project reviewCase study-Multiple categories sourcing project review
Case study-Multiple categories sourcing project reviewJohn William
 
Case Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectCase Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectJohn William
 
Substation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon SourcingSubstation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon SourcingJohn William
 
Know the various facts in hat sourcing.
Know the various facts in hat sourcing.Know the various facts in hat sourcing.
Know the various facts in hat sourcing.John William
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case StudyDragon Sourcing
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case StudyJohn William
 
Cotton Bags For Luxury Retail Brand Case Study by Dragon Sourcing
Cotton Bags For Luxury Retail Brand Case Study by Dragon SourcingCotton Bags For Luxury Retail Brand Case Study by Dragon Sourcing
Cotton Bags For Luxury Retail Brand Case Study by Dragon SourcingJohn William
 
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing  Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing John William
 
Glass Bottles and Glass Jars Sourcing Project Case Study
Glass Bottles and Glass Jars Sourcing Project Case Study Glass Bottles and Glass Jars Sourcing Project Case Study
Glass Bottles and Glass Jars Sourcing Project Case Study John William
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptxxego1
 

Similar to Electric Motors and Iron Castings case study by Dragon Sourcing (20)

Door Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingDoor Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon Sourcing
 
Cleaning Sponge Case Study by Dragon Sourcing
Cleaning Sponge Case Study by Dragon SourcingCleaning Sponge Case Study by Dragon Sourcing
Cleaning Sponge Case Study by Dragon Sourcing
 
Cotton Bags for Luxury Retail Brand Case Study
Cotton Bags for Luxury Retail Brand Case StudyCotton Bags for Luxury Retail Brand Case Study
Cotton Bags for Luxury Retail Brand Case Study
 
Case Study-New Plant Building “Capex Sourcing in China”
Case Study-New Plant Building “Capex Sourcing in China”Case Study-New Plant Building “Capex Sourcing in China”
Case Study-New Plant Building “Capex Sourcing in China”
 
Decorative Luminaire Sourcing Project Case Study by Dragon Sourcing
Decorative Luminaire Sourcing Project Case Study by Dragon SourcingDecorative Luminaire Sourcing Project Case Study by Dragon Sourcing
Decorative Luminaire Sourcing Project Case Study by Dragon Sourcing
 
Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case Study
 
Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​
 
Case Study - Desalination Unit Project
Case Study - Desalination Unit ProjectCase Study - Desalination Unit Project
Case Study - Desalination Unit Project
 
Steel Shelving Rack Case Study by Dragon Sourcing
Steel Shelving Rack Case Study by Dragon SourcingSteel Shelving Rack Case Study by Dragon Sourcing
Steel Shelving Rack Case Study by Dragon Sourcing
 
CNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyCNC Parts Sourcing Case Study
CNC Parts Sourcing Case Study
 
Case study-Multiple categories sourcing project review
Case study-Multiple categories sourcing project reviewCase study-Multiple categories sourcing project review
Case study-Multiple categories sourcing project review
 
Case Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectCase Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing Project
 
Substation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon SourcingSubstation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon Sourcing
 
Know the various facts in hat sourcing.
Know the various facts in hat sourcing.Know the various facts in hat sourcing.
Know the various facts in hat sourcing.
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case Study
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case Study
 
Cotton Bags For Luxury Retail Brand Case Study by Dragon Sourcing
Cotton Bags For Luxury Retail Brand Case Study by Dragon SourcingCotton Bags For Luxury Retail Brand Case Study by Dragon Sourcing
Cotton Bags For Luxury Retail Brand Case Study by Dragon Sourcing
 
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing  Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
 
Glass Bottles and Glass Jars Sourcing Project Case Study
Glass Bottles and Glass Jars Sourcing Project Case Study Glass Bottles and Glass Jars Sourcing Project Case Study
Glass Bottles and Glass Jars Sourcing Project Case Study
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptx
 

More from John William

Sanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudySanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudyJohn William
 
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUNewsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUJohn William
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyJohn William
 
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamStudy on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamJohn William
 
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilStudy on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilJohn William
 
Study on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaStudy on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaJohn William
 
Sourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaSourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaJohn William
 
Study on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanStudy on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanJohn William
 
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaCase Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaJohn William
 
Case Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarCase Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarJohn William
 
Study on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaStudy on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaJohn William
 
Battery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingBattery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingJohn William
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingJohn William
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingJohn William
 
Decorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingDecorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingJohn William
 
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudySafety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudyJohn William
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing John William
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingJohn William
 
Nutrition Product Manufacturers Sourcing in Indonesia Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case StudyNutrition Product Manufacturers Sourcing in Indonesia Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case StudyJohn William
 

More from John William (20)

Sanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudySanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief Study
 
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUNewsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
 
Newsletter on PPE
Newsletter on PPENewsletter on PPE
Newsletter on PPE
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case Study
 
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamStudy on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in Vietnam
 
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilStudy on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in Brazil
 
Study on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaStudy on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in Ethiopia
 
Sourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaSourcing Opportunities in Malaysia
Sourcing Opportunities in Malaysia
 
Study on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanStudy on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in Pakistan
 
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaCase Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South Africa
 
Case Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarCase Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in Myanmar
 
Study on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaStudy on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in Indonesia
 
Battery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingBattery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon Sourcing
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon Sourcing
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon Sourcing
 
Decorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingDecorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon Sourcing
 
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudySafety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon Sourcing
 
Nutrition Product Manufacturers Sourcing in Indonesia Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case StudyNutrition Product Manufacturers Sourcing in Indonesia Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case Study
 

Recently uploaded

CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦anilsa9823
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 

Recently uploaded (20)

CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 

Electric Motors and Iron Castings case study by Dragon Sourcing

  • 1. Dragon Sourcing - 龙 源 Delivering sustainable sourcing value from emerging markets Electric Motors and Iron Castings Case Study
  • 2. Client Introduction: Our client is a global leader in advanced pumps solutions and trendsetter in water technologies, presented in 56 countries and with the decades of company’s history on the market.  Project Objectives:  Identify manufacturers in supply market of Russia for below categories: 1) Low Voltage Electric Motors; 2) Grey and Nodular Iron Castings.  Final deliverables: Client Introduction & Project Objectives: - To cover 2 categories in targeted Country. 2 STAGE 1 STAGE 2 STAGE 3 • Supplier database • RFI analysis report • Supplier profiles and ranking • NDA Analysis • Signed NDA’s from the shortlisted suppliers. • Quotes from the suppliers, • Ex works, DDP price analyses Russia
  • 3. 3 Approach & Schedule. Supplier Pre-Qualification: Stage 1 - RFI process only. No. Steps Deliverables 1. Demand Analysis Work with client to define and understand the products and requirements (volumes, materials, production technology requirements, Quality tests, Standards, etc.)  Kick-Off Report 2. Supply Market Analysis Identify long list of potential suppliers in the selected markets (Russia) by leveraging B2B Websites, DS Database, Fair catalogues, Chamber of Commerce, Magazines, Network, References.  Supplier Long List 3. Telephone Pre-screening Selection of suppliers to be included in the RFI process by telephone pre-screening based on agreed simple criteria (e.g. capability to make the product, minimum company size, quality certifications, interest in participating, innovations etc to be defined by the client).  Shortlist for RFI process 4. Develop RFI document Prepare an RFI template, with an aligned Balanced Scorecard that has the objective to pre-qualify the capabilities of the suppliers, including: Background, Financial, Client and product experience, Quality certification & processes, Social Responsibility, Manufacturing/technology capability.  RFI Template  Balanced Scorecard 5. Conduct RFI Administration The RFI is translated to the local languages as relevant, and distributed to the relevant suppliers, with telephone follow-up to push for maximum participation. • Completed RFI’s 6. Analyze RFI Responses Analysis of RFI responses and preparation of a report which profiles & objectively ranks the suppliers by capability including a recommendation for those to be audited.  RFI Report  Supplier Profiles  Proposed Shortlist for Audit.
  • 4. 4 Approach & Schedule, Supplier Pre-Qualification: Stage 2 (NDA Process) & Stage 3 (RFQ process). No. Stage 2: NDA Process Deliverables 7. NDA Process NDA Administration with the shortlisted suppliers from the RFI process.  Signed NDA’s from suppliers. No. Stage 3: RFQ Process Deliverables 8. Develop RFQ document Prepare an RFQ template based on the product specification that has the objective to collect Ex Works and DDP price, packing, loading volumes, sampling, incoterms and other relevant information.  RFQ Template 9. Conduct RFQ Administration The RFQ is translated to the local languages as relevant, and distributed to the relevant suppliers, with telephone follow-up to push for maximum participation. • Completed RFQ’s 10. Analyze RFQ Responses Analysis of RFQ responses and preparation of a report with Ex Works and DDP price analyses from each supplier.  RFQ Report analysis.
  • 5. Demand Analysis. Approximate yearly volumes were collected from the client at the beginning of the project. 5 # Category Items Estimated Yearly Volumes Estimated Yearly Spend 1 LV Electric Motors Low Voltage Electric Motors Units XXX € XXX 2 Iron Castings Grey and Nodular Tons XXX € XXX
  • 6. 1. STAGE 1: RFI PROCESS 2. STAGE 2: NDA PROCESS 3. STAGE 3: RFQ PROCESS 6 Agenda Dragon Sourcing has developed online software “Global Sourcing Platform” (GSP) to manage sourcing projects locally as well internationally. The GSP provides: • A central database of suppliers • Management of sourcing projects from start to finish • Tools to facilitate supplier research, telephone pre-screening, RFI-RFQ & qualifying supplier.  Complete unique online platform suitable for Global Strategic Sourcing process including qualifying the supplier.
  • 7. 7 Approach & Schedule. RFI/RFQ processes were completed in 8 weeks as per schedule. RFI/RFQs received, suppliers profiles forwarded to client # Step Responsible Week 0 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 13-17. 08 20-24. 08 27-31. 08 03-07. 09 10-14. 09 17-21. 09 24-28. 09 01-05. 10 08-12. 10 15-19. 10 22-26 10 0 Kick off Client/DS 1 Demand Analysis Client 2 Supply Market Analysis DS 3 Telephone pre-screening DS 4 Administer NDA DS 5 Develop the RFI-RFQ Client/DS 6 Conduct RFI/RFQ Administration DS 7 Analyze RFI/RFQ Responses Client/DS 1 2 Not started Started Finished Holiday RFI/RFQ process start1 2
  • 8. Process Steps Iron Casting Electric Motors Total Supplier Identification • Suppliers identified 300 65 365 Pre-screening • Supplier passed pre-screening so far, xxx xxx xxx • Suppliers failed Pre- screening so far, xxx xxx xxx • Suppliers pending for pre-screening xxx xxx xxx Administer NDA • NDA Sent xxx xxx xxx • Preparing NDA xxx xxx xxx • NDA Rejected to sign xxx xxx xxx • NDA Returned, signed xxx xxx xxx RFI-RFQ Administration • RFIs sent xxx xxx xxx • Intend to respond xxx xxx xxx • Excluded from RFI/RFQ by client’s category managers or DS. xxx xxx xxx • RFIs under consideration of client’s category managers xxx xxx xxx • RFIs approved by client’s category managers xxx xxx xxx • Number of RFQs, sent xxx xxx xxx • Rejected to fill in RFQ/ excluded by client’s category managers xxx xxx xxx • Number of RFQs received xxx xxx xxx • Intend to respond xxx xxx xxx Long list of suppliers, identified in targeted Country. Supply market analysis per category was shared in the weekly progress report. 8 *xxx – Actual data from the report
  • 9. 9 Pre-screening, phone-calling process was administered to filter the potential suppliers for further next steps. Iron Castings Category *Screenshots from GSP system, Phone-screening step.
  • 10. Process Steps Iron Casting Electric Motors Total Supplier Identification • Suppliers identified xxx xxx xxx Pre-screening • Supplier passed pre-screening so far, 47 10 57 • Suppliers failed Pre- screening so far, 253 55 308 • Suppliers pending for pre-screening 0 0 0 Administer NDA • NDA Sent xxx xxx xxx • Preparing NDA xxx xxx xxx • NDA Rejected to sign xxx xxx xxx • NDA Returned, signed xxx xxx xxx RFI-RFQ Administration • RFIs sent xxx xxx xxx • Intend to respond xxx xxx xxx • Excluded from RFI/RFQ by client’s category managers or DS. xxx xxx xxx • RFIs under consideration of client’s category managers xxx xxx xxx • RFIs approved by client’s category managers xxx xxx xxx • Number of RFQs, sent xxx xxx xxx • Rejected to fill in RFQ/ excluded by client’s category managers xxx xxx xxx • Number of RFQs received xxx xxx xxx • Intend to respond xxx xxx xxx Phone-calling process results were shared in the weekly progress report. 10 *xxx – Actual data from the report
  • 11. 11 Post pre-screening the suppliers. RFI process was administered to filter out most capable suppliers. Supplier Profile example *Screenshots from GSP system, RFI step.
  • 12. 12 RFI process was administered to filter out most capable suppliers. Supplier Profile example *Screenshots from GSP system, RFI step.
  • 13. 13 Category specific technical questions were added in the RFI relevant to Electric Motors and Iron Castings Categories to understand suppliers capabilities and capacity. Supplier Profile example *Screenshots from GSP system, RFI step.
  • 14. 29 7 5 4 3 3 2 1 1 1 1 1 1 1 1 1 Phone screening rejection reasons - Electric motors Don't produce required products Traders/distributors or Importers only Produce the motors but according to local standards, no IE2 or IE3. The same manufacturer doesn't have any English speaking people, ISO 14001 and has only local environmental certificates. Unable to contact them We are only R&D company, no direct production Duplicate suppliers Outsource production in China Not interested to take part in the selection process Not possible to respond until late November. We have checked RFI/RFQ and decided not to participate in this project because of no interest in production of items, requested. We mainly produce HV Motors. Will be able to consider the project only in Mid December Excluded by client Supply Market Analysis. Supplier rejection analysis was shared for each step, Pre-screening, RFI, NDA & RFQ administration. 14 Example of rejection analysis Electric Motors Category
  • 15. 15 Suppliers location example – Electric Motors Category – RUSSIA. Locations of the RFI/RFQ responders - manufacturers, highlighted on the map. Supplier Location Marked Mednogorsk Moscow Kamensk-Ural’skiy
  • 16. 16 Executive summary was shared with Result & Recommendation. Electric Motors Category Example of the executive summary Manufacturers which provided RFI+ RFQs within project schedule: 1. Supplier 1 – Profile to download; 2. Supplier 2 – Profile to download; 3. Supplier 3 – Profile to download. • RFQs can be downloaded from profiles directly. • Detailed lists of manufacturers on all the steps can be found in detailed Progress Excel report: Client’s summary file IC EM categories Final
  • 17. 1. STAGE 1: RFI PROCESS 2. STAGE 2: NDA PROCESS 3. STAGE 3: RFQ PROCESS 17 Agenda
  • 18. Process Steps Iron Casting Electric Motors Total Supplier Identification • Suppliers identified xxx xxx 365 Pre-screening • Supplier passed pre-screening so far, xxx xxx xxx • Suppliers failed Pre- screening so far, xxx xxx xxx • Suppliers pending for pre-screening xxx xxx xxx Administer NDA • NDA Sent 47 10 57 • Preparing NDA 0 0 0 • NDA Rejected to sign 19 1 20 • NDA Returned, signed 28 9 37 RFI-RFQ Administration • RFIs sent 28 9 37 • Intend to respond 2 0 2 • Excluded from RFI/RFQ by client’s category managers or DS. 21 6 27 • RFIs under consideration of client’s category managers 0 0 0 • RFIs approved by client’s category managers 5 3 8 • Number of RFQs, sent xxx xxx xxx • Rejected to fill in RFQ/ excluded by client’s category managers xxx xxx xxx • Number of RFQs received xxx xxx xxx • Intend to respond xxx xxx xxx 18 Executive summary on the RFI and NDA Processes results were shared with the client in terms of weekly progress report. *xxx – Actual data from the report
  • 19. 1. STAGE 1: RFI PROCESS 2. STAGE 2: NDA PROCESS 3. STAGE 3: RFQ PROCESS 19 Agenda
  • 20. 20 Ex Works and DDP price analyses were done based on the actual suppliers prices. Electric Motors Category € 842 € 842 € 842 € 842 € 842 € 842 € 936 € 936 € 936 € 936 € 936 € 1 805 € 1 805 € 57 € 59 € 73 € 74 € 85 € 103 € 173 € 176 € 324 € 553 € 589 € 578 € 788 € - € 200 € 400 € 600 € 800 € 1 000 € 1 200 € 1 400 € 1 600 € 1 800 € 2 000 Item1 Item2 Item3 Item4 Item5 Item6 Item7 Item8 Item9 Item10 Item11 Item12 Item13 1 2 3 4 5 6 7 8 9 10 11 12 13 RFQ, EXW Price in EUR Supplier 1 Supplier 2 Supplier 3
  • 21. Process Steps Iron Casting Electric Motors Total Supplier Identification • Suppliers identified xxx xxx 365 Pre-screening • Supplier passed pre-screening so far, xxx xxx xxx • Suppliers failed Pre- screening so far, xxx xxx xxx • Suppliers pending for pre-screening xxx xxx xxx Administer NDA • NDA Sent xxx xxx xxx • Preparing NDA xxx xxx xxx • NDA Rejected to sign xxx xxx xxx • NDA Returned, signed xxx xxx xxx RFI-RFQ Administration • RFIs sent xxx xxx xxx • Intend to respond xxx xxx xxx • Excluded from RFI/RFQ by client’s category managers or DS. xxx xxx xxx • RFIs under consideration of client’s category managers xxx xxx xxx • RFIs approved by client’s category managers xxx xxx xxx • Number of RFQs, sent 5 3 8 • Rejected to fill in RFQ/ excluded by client’s category managers 2 0 2 • Number of RFQs received 3 3 6 • Intend to respond 0 0 0 21 RFQ rejection analysis was shared with the client in terms of weekly, progress report. Iron Castings and Electric Motors Categories *xxx – Actual data from the report
  • 22. Conclusions  Whole project was carried out with 365 suppliers identified; with 37 RFIs received as long as signed NDAs & 6 suppliers finally responded with the RFQ document for both categories.  As per instructions from client, the whole project was finalized during 10 weeks in comparison to standard 12 weeks period, because of high level of urgency to get results and start audits.  The producers, recommended by DS corresponded to the technical requirements of client and had all the necessary certificates.  DS recommended № of suppliers for visit/auditing with showing exact location of each manufacturer on the map.  The contact information about all the producers, identified, rejected, passed on all the selection steps, was forwarded to client.  Client visited DS recommended suppliers, responded to the RFQ process based on the stringent qualification process. 22