SlideShare a Scribd company logo
1 of 10
1
August 2020
Offshore Structures
Specifications Task
Force – JIP35
Phase 2
2
Standardisation of Offshore Structures Specifications
• An IOGP initiative, funded by JIP35, following the successful IOGP JIP33 initiative on the
standardisation of equipment specifications
• 10 Contributing Operators: BP, Chevron, ENI, Equinor, ExxonMobil, INPEX, Shell, Suncor, Total,
Woodside making up the Offshore Structures Specifications Task Force, under the Offshore
Structures Subcommittee
• Objective: Selection of an agreed base standard; using these operators’ specifications as input,
identify and agree minimum, essential common requirements, documenting these in jointly
approved supplementary specifications, published by IOGP
• 12 Teams covering: Concrete, General Requirements, Metocean, Stationkeeping, Marine Soil
Investigations, Seismic, Foundations, Weight Management, Topsides, Fixed Jackets, Floating
Structures, Arctic
• Task Force Chairman: Simen Moxnes of Equinor; Task Force Vice-Chair: Philip Smedley of BP
3
Topic (IOGP Supplementary Spec) Selected Base Standard
General Requirements (S-631-01) ISO 19900
Metocean (S-631-09) ISO 19901-1 (API 2MET is a modified adoption)
Seismic (S-631-08) ISO 19901-2 (API RP 2EQ is a modified adoption)
Topsides (S-631-04) ISO 19901-3: 2014 (API RP 2TOP is near equivalent)
Foundations (S-631-05) ISO 19901-4 (API 2GEO is a modified adoption)
Weight Management (S-631-06) ISO 19901-5
Stationkeeping (S-631-07) ISO 19901-7 (API RP 2SK is near equivalent)
Marine Soil Invest. (S-631-10) ISO 19901-8
Fixed Jacket (S-631-11) ISO 19902 (API RP 2A (LRFD) is a modified adoption)
Concrete (S-631-03) ISO 19903
Arctic (S-631-02) ISO 19906 (API RP 2N is a modified adoption)
Floating N/A – Position paper issued. Phase 3 Scope
Selected Base Standards
4
Topic (IOGP Supplementary Specification)
Total Company
Requirements
Minimum Essential
Requirements
General Reqs (S-631-01) – Published 44 5
Concrete (S-631-03) – Published 216 43
Seismic (S-631-08) – Published 255 5
Arctic (S-631-02) – Published 170 0
Marine Soil Invest. (S-631-10) – Published 883 90
Stationkeeping (S-631-07) – Published 1111 53
Topsides (S-631-04) – Published 1936 60
Fixed Jacket (S-631-11) – Publish September 2020 1931 ~90
Consolidation and Reduction of Company Requirements
5
Available on IOGP website – www.iogp.org/jip35
Publications: Supplementary Specifications
6
Topic Status
Weight Management (S-631-06)
Published
Worked directly through ISO TC 67/SC 7/WG 6
Metocean (S-631-09)
Publish January 2021*
Worked directly through ISO TC 67/SC 7/WG 3. DIS ballot draft
approximately December 2020
Foundations (S-631-05)
Publish March 2021*
Worked directly through ISO TC 67/SC 7/WG 10. DIS ballot draft
approximately February 2021
Floating Systems
Brief position paper issued by Task Force. Further work is planned
during Phase 3
Other Topics
* Publication of IOGP Specification, referencing the ISO DIS (publicly available from ISO) and no supplementary requirements
7
Published Supplementary Specifications:
Pre-JIP35 vs Minimum Essential Requirements
8
Published Supplementary Specifications:
Pre-JIP35 vs Minimum Essential Requirements
Operator:
9
Further Opportunities
• Offer these supplementary requirements for incorporation into the ISO base
standards at next revision/opportunity
• Downgrading of company requirements to recommendations or guidelines
• Further alignment between the ISO and API standards
• Improved technical writing of these standards and company specifications
• Phase 3 scope to be initiated in October 2020
10
For more information please contact:
www.iogp.org
Registered Office
City Tower
Level 14
40 Basinghall Street
London EC2V 5DE
United Kingdom
+44 (0)20 3763 9700
reception@iogp.org
Houston Office
19219 Katy Freeway
Suite 175
Houston, TX 77094
United States
+1 (713) 261 0411
reception@iogp.org
Brussels Office
Avenue de Tervuren 188A
B-1150 Brussels
Belgium
+32 (0)2 790 7762
eu-reception@iogp.org
Simen Moxnes, Equinor
smox@equinor.com
Philip Smedley, BP
philip.smedley@uk.bp.com
Diane Gonsalves, IOGP
dg@iogp.org

More Related Content

Similar to JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (August2020)

ADEN Monthly review meeting May 2024.pptx
ADEN Monthly review meeting May 2024.pptxADEN Monthly review meeting May 2024.pptx
ADEN Monthly review meeting May 2024.pptx
adentrivandrum
 
3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf
MaanMrabet1
 
FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)
Narasimha Sharma
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
UKTI2014
 
IGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.pptIGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.ppt
grssieee
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
ssuser8685dc
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
Ulimella Siva Sankar
 
Retaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportRetaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering Report
Joshua Yu
 
2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...
smarter2011
 

Similar to JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (August2020) (20)

Soil nailing
Soil nailingSoil nailing
Soil nailing
 
M Abe JCCS
M Abe JCCSM Abe JCCS
M Abe JCCS
 
Training PPT
Training PPTTraining PPT
Training PPT
 
ADEN Monthly review meeting May 2024.pptx
ADEN Monthly review meeting May 2024.pptxADEN Monthly review meeting May 2024.pptx
ADEN Monthly review meeting May 2024.pptx
 
3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 Presentation
 
FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Aegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense PresentationAegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense Presentation
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
 
IGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.pptIGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.ppt
 
Presentation on steel
Presentation on steel Presentation on steel
Presentation on steel
 
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
 
Valdicotry final final 10.00 20 dec
Valdicotry final final  10.00 20 decValdicotry final final  10.00 20 dec
Valdicotry final final 10.00 20 dec
 
Retaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportRetaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering Report
 
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRODESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
 
2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...
 

Recently uploaded

ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
Madan Karki
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
Kamal Acharya
 
Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...
IJECEIAES
 

Recently uploaded (20)

Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 

JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (August2020)

  • 2. 2 Standardisation of Offshore Structures Specifications • An IOGP initiative, funded by JIP35, following the successful IOGP JIP33 initiative on the standardisation of equipment specifications • 10 Contributing Operators: BP, Chevron, ENI, Equinor, ExxonMobil, INPEX, Shell, Suncor, Total, Woodside making up the Offshore Structures Specifications Task Force, under the Offshore Structures Subcommittee • Objective: Selection of an agreed base standard; using these operators’ specifications as input, identify and agree minimum, essential common requirements, documenting these in jointly approved supplementary specifications, published by IOGP • 12 Teams covering: Concrete, General Requirements, Metocean, Stationkeeping, Marine Soil Investigations, Seismic, Foundations, Weight Management, Topsides, Fixed Jackets, Floating Structures, Arctic • Task Force Chairman: Simen Moxnes of Equinor; Task Force Vice-Chair: Philip Smedley of BP
  • 3. 3 Topic (IOGP Supplementary Spec) Selected Base Standard General Requirements (S-631-01) ISO 19900 Metocean (S-631-09) ISO 19901-1 (API 2MET is a modified adoption) Seismic (S-631-08) ISO 19901-2 (API RP 2EQ is a modified adoption) Topsides (S-631-04) ISO 19901-3: 2014 (API RP 2TOP is near equivalent) Foundations (S-631-05) ISO 19901-4 (API 2GEO is a modified adoption) Weight Management (S-631-06) ISO 19901-5 Stationkeeping (S-631-07) ISO 19901-7 (API RP 2SK is near equivalent) Marine Soil Invest. (S-631-10) ISO 19901-8 Fixed Jacket (S-631-11) ISO 19902 (API RP 2A (LRFD) is a modified adoption) Concrete (S-631-03) ISO 19903 Arctic (S-631-02) ISO 19906 (API RP 2N is a modified adoption) Floating N/A – Position paper issued. Phase 3 Scope Selected Base Standards
  • 4. 4 Topic (IOGP Supplementary Specification) Total Company Requirements Minimum Essential Requirements General Reqs (S-631-01) – Published 44 5 Concrete (S-631-03) – Published 216 43 Seismic (S-631-08) – Published 255 5 Arctic (S-631-02) – Published 170 0 Marine Soil Invest. (S-631-10) – Published 883 90 Stationkeeping (S-631-07) – Published 1111 53 Topsides (S-631-04) – Published 1936 60 Fixed Jacket (S-631-11) – Publish September 2020 1931 ~90 Consolidation and Reduction of Company Requirements
  • 5. 5 Available on IOGP website – www.iogp.org/jip35 Publications: Supplementary Specifications
  • 6. 6 Topic Status Weight Management (S-631-06) Published Worked directly through ISO TC 67/SC 7/WG 6 Metocean (S-631-09) Publish January 2021* Worked directly through ISO TC 67/SC 7/WG 3. DIS ballot draft approximately December 2020 Foundations (S-631-05) Publish March 2021* Worked directly through ISO TC 67/SC 7/WG 10. DIS ballot draft approximately February 2021 Floating Systems Brief position paper issued by Task Force. Further work is planned during Phase 3 Other Topics * Publication of IOGP Specification, referencing the ISO DIS (publicly available from ISO) and no supplementary requirements
  • 7. 7 Published Supplementary Specifications: Pre-JIP35 vs Minimum Essential Requirements
  • 8. 8 Published Supplementary Specifications: Pre-JIP35 vs Minimum Essential Requirements Operator:
  • 9. 9 Further Opportunities • Offer these supplementary requirements for incorporation into the ISO base standards at next revision/opportunity • Downgrading of company requirements to recommendations or guidelines • Further alignment between the ISO and API standards • Improved technical writing of these standards and company specifications • Phase 3 scope to be initiated in October 2020
  • 10. 10 For more information please contact: www.iogp.org Registered Office City Tower Level 14 40 Basinghall Street London EC2V 5DE United Kingdom +44 (0)20 3763 9700 reception@iogp.org Houston Office 19219 Katy Freeway Suite 175 Houston, TX 77094 United States +1 (713) 261 0411 reception@iogp.org Brussels Office Avenue de Tervuren 188A B-1150 Brussels Belgium +32 (0)2 790 7762 eu-reception@iogp.org Simen Moxnes, Equinor smox@equinor.com Philip Smedley, BP philip.smedley@uk.bp.com Diane Gonsalves, IOGP dg@iogp.org

Editor's Notes

  1. Draft as number of intended company requirements are not finalised as yet