SlideShare a Scribd company logo
1 of 7
Velmurugan B.
QA / QC Professional
Mobile: +91 9840935133
Email id: velm38@yahoo.co.in
Professional Summary
 Over 28 years of experience in Project management (civil), construction, quality management,
testing & inspection.
 Presently associated with Akshaya Private Ltd as DGM-QA/QC CIVIL
 Strong organizational experience with expertise in multidimensional execution of projects for
multiple clients along with optimizing resource utilization.
 Proven abilities in implementing the quality and safety procedure on site and conducting daily site
inspection and controlling all inspection activities on site.
 Skillful in liaising with internal departments & external authorities such as consultants, contractors &
Govt. authorities for seamless operations and timely completion of projects.
 Effective man management, communication skills and strong analytical/ problem solving skills.
Educational Qualifications
MBA in First Class, May 2015
Periyar University, Salem,Tamilnadu state
Bachelor of Engineering (Civil), Dec 2004 in First class
Anna University, Chennai.
Diploma in Civil Engineering, Apr 1985 in First class
Vellaichamy Nadar Polytechnic, Virudhunagar,Tamilnadu state
Professional Training Undertaken
ISO 9001: 2008 (QMS) Internal Auditor Training in TUV Nord, Chennai
Larsen and Toubro Ltd, Chennai in May 2012
IT Skills
 AutoCad - Drawing, MS Project
 Exhaustive experience of all tools of Ms Office.
Professional Experience
1.Akshaya Private Ltd., Chennai
DGM- QA / QC
From January 2015 to Till date
Reporting to: VP-Projects and Managing Director
Key Responsibility Areas:
 Head office Function, control of QA/ QC for all Project Sites in Chennai and Trichy
 Preparation of SOP and Methodologies for works including Checklist for all Project Sites
 Preparation of ITP for Construction Materials and Process for works
 Responsible for implementing the quality management plans at various project sites.
 Management and supervision of all quality control activities on site including quality control
personnel.
 Give final approval on all quality control inspections.
 Audit civil & architectural suppliers and Sub Contractors to assure conformance with ISO Quality
Management System and Project Specifications.
 Handling of BIS specifications with good knowledge about all codes and specification.
 Carrying out inspection at regular intervals at site such as concreting works and plant operation.
 Controlling and maintenance of the site QC laboratory in all sites.
 Checking and monitoring the frequency of testing of material and compliance with std specification.
Page 1 of 6
 Responsible for acceptance of Manufacturers Test Certificate of bought out items and material like
cement, steel and construction chemicals.
Projects Handled:
 Construction of Multi storied Residential and commercial buildings
2. LARSEN AND TOUBRO LIMITED, Buildings & Factories
Senior Manager - QA / QC
January 2012 to January 2015
Reporting to: Quality Head and Project Manager
Key Responsibility Areas:
 Responsible for implementing the quality management plans at site.
 Preparation of Quality Plan for Project Site
 Preparation of SOP-Methodologies for works including Check lists
 Management and supervision of all quality control activities on site including quality control
personnel.
 Give final approval on all quality control inspections.
 Conducting MRM at regular interval.
 Conducting internal Auditing at regular interval.
 Conducting Product quality rating at regular interval.
 Conducting training to all staff and sub-contractor relating methodology
 Handling of BIS specifications with good knowledge about all codes and specification.
 Controlling and maintenance of the site QC laboratory.
 Checking and monitoring the frequency of testing of material and compliance with standard
specification.
 Responsible for development and planning the testing of Ideas products.
 Responsible for site concrete Batching Plant.
 Responsible for acceptance of Manufacturers Test Certificate of bought out items and material like
cement, steel and construction chemicals.
.
Projects Handled:
 Construction of High Rise Residential building (Prestige Ferns Residency) for Prestige Estate
Projects Ltd, Bangalore,
 Construction of Multistoried Residential building (Commander’s Court) for DLF Home
developers Ltd, Chennai,
__________________________________________________________________________________
____
3. Akshaya Private Limited, Chennai
Manager QA / QC
From September 2010 to Jan 2012
Reporting to: Managing Director
Key Responsibility Areas:
 Responsible for implementing the quality management plans at various project sites.
 Management and supervision of all quality control activities on site including quality control
personnel.
 Give final approval on all quality control inspections.
 Audit civil & architectural suppliers and Sub Contractors to assure conformance with ISO Quality
Management System and Project Specifications.
 Handling of BIS specifications with good knowledge about all codes and specification.
 Carrying out inspection at regular intervals at site such as concreting works and plant operation.
 Controlling and maintenance of the site QC laboratory in all sites.
 Checking and monitoring the frequency of testing of material and compliance with standard
specification.
 Responsible for development and planning the testing of Ideas products.
Page 2 of 6
 Responsible for acceptance of Manufacturers Test Certificate of bought out items and material like
cement, steel and construction chemicals.
Projects Handled:
 Construction of Multi storied Residential and commercial buildings
Key Achievements:
 Successfully 2 projects completed and handed over to Customers and QA/QC Incharge for all
projects
4.Bureau Veritas India Pvt Ltd, Chennai
Sr. Surveyor
From January 2010 to September 2010
Reporting to: QA/QC Head
Key Responsibility Areas:
 Carrying out inspection at regular intervals at site such as steel structural erection work.
 Implementation of project quality plan in engineering, procurement, construction, inspection,
testing of works and others applicable areas.
 Controlling and maintenance of the site QC laboratory.
 Checking and monitoring the frequency of testing of material in compliance with standard
specification.
 Responsible for acceptance of Manufacturers Test Certificate of bought out items and material
likes cement, steel, construction chemicals.
 Liaison with client to resolve QA QC problems.
 Preparation of QA / QC report and maintaining the documents for audit purpose.
 Attending the factory visit with client to test the material at factory to prove that the material can be
used for the relevant works.
 To conduct internal audit at site and follow up for corrective action.
Projects Handled:
 Pot line, FTP, Bored cast in situ pile for foundation of silo, chimney, switchyard, Machinery
foundations and Transmission line for Aluminum Smelter expansion project in BALCO /
VEDANTA at Korba, Chhattisgarh.
 Construction of gas plant Bharat Petroleum Corporation Ltd in Gummidipundi
 Construction of wind mill foundation in Sankarankovil, Coimbatore
__________________________________________________________________________________
____
5. KETTANEH CONSTRUCTION SA LTD, Kingdom of Saudi Arabia
Project control Engineer-civil
From March 2007 to Nov 2009
Reporting to: Project Manager / Technical Manager
KETTANEH CONSTRUCTION SA LTD is a Aramco approved contractor involved in a broad range of
engineering contracts – general civil engineering, building and construction works, marine civil
engineering, as well as turnkey and specialized civil engineering projects and oil & gas sector.
Key Responsibility Areas:
 Handling of British, American and Aramco standard codes and specification.
 Quantity Surveying
 Carrying out inspection at regular intervals at site such as concreting works and plant operation,
 Implementation of project quality plan in engineering, procurement, construction, inspection,
testing of works and others applicable areas.
 Controlling and maintenance of the site QC laboratory.
 Responsible for acceptance of Manufacturers Test Certificate of bought out items and material
likes cement, steel, construction chemicals.
 Preparation and Maintenance of QA / QC documents & reports for audit purpose.
 Controlling the Concrete Batching plant at site and ensure the quality of concrete produced from
batching plant as per designs and requirements.
Page 3 of 6
Projects Handled:
 Construction of oil Plant foundations for depressurized vessels, Compressor, Pipe rack, Pipe
supports, Evaporation pond, road works and buildings of SAUDI ARAMCO PROJECT for
Khurais Crude Oil Processing Plant Project in Saudi Arabia
6. SAAG RR INFRA LTD, Chennai, India
Project Manager
From Oct 2006 to Jan 2007
Reporting to: Senior Project Manager
Key Responsibility Areas:
 Direct and manage project development from beginning to end.
 Define project scope, goals and deliverables that support business goals in collaboration with
senior management.
 Develop full-scale project plans and associated communications documents.
 Effectively communicate project expectations to team members in a time.
 Estimate the resources and participants needed to achieve project goals.
 Draft and submit budget proposals, and recommend subsequent budget changes where necessary.
 Determine and assess need for additional staff and/or consultants and make the appropriate
recruitments if necessary during project cycle.
 Set and continually manage project expectations with team members and other stakeholders.
 Delegate tasks and responsibilities to appropriate personnel.
 Identify and resolve issues and conflicts within the project team.
 Identify and manage project dependencies and critical path.
 Plan and schedule project timelines and milestones using appropriate tools.
 Track project milestones and deliverables.
Projects Handled:
 Construction of Saveetha Engineering College building in Chennai.
 Construction of curved roof Industrial building for cradle crane for BEML Project at Mysore,
Karnataka.
7. TRUE VALUE HOMES INDIA PVT LTD, Chennai, India
Assistant Project Manager
From May 2006 to Oct 2006
Reporting to: Project Manager
Key Responsibility Areas:
 Bored cast in situ piles for 10 blocks
 Coordination activities with Project and structural consultants, Main activities like Total Station
surveying
 Marking Pile foundation, Preparation and certification of contractor bills and other initial activities
 Preparing the construction schedule in conjunction with the contractors with details of specific
activities and respective dates of completion controlling the site laboratory.
 Ensuring that all works carried out are in accordance to the drawings, specifications, construction
plan, procedures method statements, etc.
 Develop and deliver progress reports, proposals, requirements documentation, and presentations.
 Proactively manage changes in project scope, identify potential crises, and devise contingency
plans.
Projects Handled:
Construction of Lumbini square-18 storied high-rise residential buildings in Purasaiwalkam, Chennai.
8. NILAKANTAN & BROTHERS CHENNAI PVT. LTD., Chennai, India
Project Engineer
From June 2005 to May 2006
Reporting to: Managing Director
Key Responsibility Areas:
 Incharge of all works including Spudleg Barge, Floating Barge, Supply Barge and Floating cat walk
for RMC supply using pile liners.
 Supervision of material handling through heavy machinery cranes during erection and lowering
steel liners and Barges into sea and sailing to work spot
Page 4 of 6
 Underwater survey to find out sea bed debris and positioning of Offshore Pile by Total station
submitting of report to Port Trust.
Projects Handled:
Construction of offshore bored Cast in situ piles of Marine structures-Mooring dolphin, Trestle line in
Chennai Port.
9. KINGSWAY CONSULTANT, ARCHITECT & ENGINEERS–Chennai, India
Senior Civil Engineer
From Apr1997 to Jun’2005
Reporting to: Managing Director
Key Responsibility Areas:
 Incharge for supervision of works, checking of bills and certifying payments.
 Incharge for all residential and commercial building construction.
 Inspection of building and finding site Quality issues and initiation of rectification in compliance
 Preparing Data for various item of works
 Liaison with Clients and contractors.
 Monitoring the progress of works.
 Checking on time schedule
Projects Handled:
 Construction of Catholic Church buildings and schools in Andaman Nicobar Islands
 Construction of multi storied residential and commercial buildings for Jamals construction in
Chennai.
 Construction of huge auditorium building in Seva Sadan higher secondary school in Chetpet,
Chennai.
 Construction of MCC School in chetpet, Chennai
 Construction of Vellore Institute of Technology buildings.
 Construction of Gimpex Factory extension in Hyderabad
10. ENTOMA HYDRO SYSTEM–Chennai, India
Site Engineer
From Oct 1994 to Aug 1996
Reporting to: Project Manager
Key Responsibility Areas:
 Preparation of Stencil Drawing for project works to get approval of BHE, Trichy.
 Construction of Bore well in 16 villages in Ramnad district and Testing for Desalination RO Plant.
 Execution and Supervision of works.
 Labour control and Material procurement for works.
 Preparation of Contract bills and labour bill.
 Commissioning of RO Plant
Projects Handled:
Construction of RO Plant, Buildings with foundations, Concrete Tanks for Potable and treated water
and Infrastructures in Ramnad district, Tamilnadu.
11. V.Ramasamy, AEE., PWD,BUILDINGS,VIRUDHUNAGAR, India
Technical Assistant Gr II-civil
From Jun 1991 to Oct 1993
Reporting to: Project Manager
Key Responsibility Areas:
 Marking of foundation for excavation as per drawing
 Site supervision and execution of building construction
 Preparation of contractor bill for works in Measurement Book
 Preparation and submission of RA bills.
 Checking & monitoring the frequency of testing of material in compliance with standard
specification.
 Preparation of QA/QC report.
Page 5 of 6
Projects Handled:
 Construction of Accident Emergency Ward, Steam laundry, 36 bedded ward and ICC unit building
at Government hospital in Virudhunagar for PWD Construction.
 Construction of Deaf school building at Virudhunagar.
 Constructions of Bus stand in T.Kallupatti, Madurai.
 Construction of AEE/EE Quarters in T.Kallupatti Madurai.
12. T.S.SANKARAPANDIAN, PWD CONTRACTOR
Technical Assistant Gr II-civil
From Dec 1986 to Jun 1991
Reporting to: Project Incharge
Key Responsibility Areas:
 Marking of foundation for excavation as per drawing
 Site supervision and execution of building construction
 Preparation of Subcontractor bill for works
 Preparation and submission of RA bills to PWD
 Material procurement for works
 Stock of all materials and material handling
 Coordination with PWD Engineers in execution and Contract RA bill approval
Projects Handled:
 Construction of District Collectorate complex and Housing board flat and PWD constructions in
Virudhunagar
 Construction of 230 KVA Substation building with Cable racks foundation and Transmissions line in
Naduvapatty (sattur) Tamilnadu Electricity board.
 Construction of surplus weir, sluice, and earthen embankment in Golwarpatty Dam at Sattur in
PWD Tamilnadu
13. Executive Engineer, PWD VIRUDHUNAGAR
Apprenticeship Trainee
From Dec 1985 to Dec 1986
Reporting to: Assistant Engineer
Projects Handled:
Construction of tanks, school repair and maintenance works, Residential Quarters in Virudhunagar
Switch Details
 Present Salary CTC/annum : Rs 12.00 Lakhs
 Present Notice Period : 30 Days
 Expected Salary : As per company policy
Profile Key Words
Project Quality Incharge,Quality assurance, Quality control, Engineering, Residential and commercial
Building construction,concrete, RMC, Internal QMS auditor, IS codes, embankment, pavement, QC
Laboratory, Testing, Inspection, Mix design, AutoCAD, M S Project
Personal Details
 Date of Birth : 19th
Feb, 1967
 Father’s Name : N.Balasubramanian (Late)
 Gender : Male
 Marital Status : Married
 Nationality : Indian
 Passport Details : Z 3321643, (Valid till 30th
July 2025)
 Address : 4A, First Floor, Nagalingam street,Pasumpon Nagar,Pammal,
Chennai-600075 Tamilnadu State, India
Chennai-600075 Yours Sincerely
B.Velmurugan
Page 6 of 6
Projects Handled:
 Construction of Accident Emergency Ward, Steam laundry, 36 bedded ward and ICC unit building
at Government hospital in Virudhunagar for PWD Construction.
 Construction of Deaf school building at Virudhunagar.
 Constructions of Bus stand in T.Kallupatti, Madurai.
 Construction of AEE/EE Quarters in T.Kallupatti Madurai.
12. T.S.SANKARAPANDIAN, PWD CONTRACTOR
Technical Assistant Gr II-civil
From Dec 1986 to Jun 1991
Reporting to: Project Incharge
Key Responsibility Areas:
 Marking of foundation for excavation as per drawing
 Site supervision and execution of building construction
 Preparation of Subcontractor bill for works
 Preparation and submission of RA bills to PWD
 Material procurement for works
 Stock of all materials and material handling
 Coordination with PWD Engineers in execution and Contract RA bill approval
Projects Handled:
 Construction of District Collectorate complex and Housing board flat and PWD constructions in
Virudhunagar
 Construction of 230 KVA Substation building with Cable racks foundation and Transmissions line in
Naduvapatty (sattur) Tamilnadu Electricity board.
 Construction of surplus weir, sluice, and earthen embankment in Golwarpatty Dam at Sattur in
PWD Tamilnadu
13. Executive Engineer, PWD VIRUDHUNAGAR
Apprenticeship Trainee
From Dec 1985 to Dec 1986
Reporting to: Assistant Engineer
Projects Handled:
Construction of tanks, school repair and maintenance works, Residential Quarters in Virudhunagar
Switch Details
 Present Salary CTC/annum : Rs 12.00 Lakhs
 Present Notice Period : 30 Days
 Expected Salary : As per company policy
Profile Key Words
Project Quality Incharge,Quality assurance, Quality control, Engineering, Residential and commercial
Building construction,concrete, RMC, Internal QMS auditor, IS codes, embankment, pavement, QC
Laboratory, Testing, Inspection, Mix design, AutoCAD, M S Project
Personal Details
 Date of Birth : 19th
Feb, 1967
 Father’s Name : N.Balasubramanian (Late)
 Gender : Male
 Marital Status : Married
 Nationality : Indian
 Passport Details : Z 3321643, (Valid till 30th
July 2025)
 Address : 4A, First Floor, Nagalingam street,Pasumpon Nagar,Pammal,
Chennai-600075 Tamilnadu State, India
Chennai-600075 Yours Sincerely
B.Velmurugan
Page 6 of 6

More Related Content

What's hot

Nabeeltd_CV_QCs
Nabeeltd_CV_QCsNabeeltd_CV_QCs
Nabeeltd_CV_QCs
NABEEL T D
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
Suresha Rao
 
2016_11_6_Revised Resume _R0
2016_11_6_Revised Resume _R02016_11_6_Revised Resume _R0
2016_11_6_Revised Resume _R0
cheng kwok fai
 
MANOJ PS-Welding Engineer Resume
MANOJ PS-Welding Engineer ResumeMANOJ PS-Welding Engineer Resume
MANOJ PS-Welding Engineer Resume
Manoj Ps
 

What's hot (20)

QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 
Resume_Anjanna
Resume_AnjannaResume_Anjanna
Resume_Anjanna
 
Cv senior qc manager mk-bencharif - english
Cv senior qc manager  mk-bencharif - englishCv senior qc manager  mk-bencharif - english
Cv senior qc manager mk-bencharif - english
 
Sujit TPI CV
Sujit TPI CVSujit TPI CV
Sujit TPI CV
 
Tamil_Updated_Resume
Tamil_Updated_ResumeTamil_Updated_Resume
Tamil_Updated_Resume
 
CV- AMAL
CV- AMALCV- AMAL
CV- AMAL
 
Balaji CV - 2015
Balaji CV - 2015Balaji CV - 2015
Balaji CV - 2015
 
Nivin Joseph- resume
Nivin Joseph- resumeNivin Joseph- resume
Nivin Joseph- resume
 
QA_QC PAINTING & COATING INSPECTOR - MOHAMMED IMAMUDDIN
QA_QC PAINTING & COATING INSPECTOR - MOHAMMED  IMAMUDDINQA_QC PAINTING & COATING INSPECTOR - MOHAMMED  IMAMUDDIN
QA_QC PAINTING & COATING INSPECTOR - MOHAMMED IMAMUDDIN
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
Nabeeltd_CV_QCs
Nabeeltd_CV_QCsNabeeltd_CV_QCs
Nabeeltd_CV_QCs
 
QC. CV
QC. CVQC. CV
QC. CV
 
CV QC
CV QCCV QC
CV QC
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
CV_QC_Mahaboob khan (2)
CV_QC_Mahaboob khan (2)CV_QC_Mahaboob khan (2)
CV_QC_Mahaboob khan (2)
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
2016_11_6_Revised Resume _R0
2016_11_6_Revised Resume _R02016_11_6_Revised Resume _R0
2016_11_6_Revised Resume _R0
 
Resume for quality
Resume for qualityResume for quality
Resume for quality
 
MANOJ PS-Welding Engineer Resume
MANOJ PS-Welding Engineer ResumeMANOJ PS-Welding Engineer Resume
MANOJ PS-Welding Engineer Resume
 

Viewers also liked (10)

Top 8 mechanics helper resume samples
Top 8 mechanics helper resume samplesTop 8 mechanics helper resume samples
Top 8 mechanics helper resume samples
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Resume_Saravanan(Updated-4.12.16)
Resume_Saravanan(Updated-4.12.16)Resume_Saravanan(Updated-4.12.16)
Resume_Saravanan(Updated-4.12.16)
 
Umesh Makkal Veedu 1
Umesh Makkal Veedu 1Umesh Makkal Veedu 1
Umesh Makkal Veedu 1
 
Babu resume.
Babu resume.Babu resume.
Babu resume.
 
SANJEEV KUMAR
SANJEEV KUMARSANJEEV KUMAR
SANJEEV KUMAR
 
MAINTENANCE MANAGER
MAINTENANCE MANAGERMAINTENANCE MANAGER
MAINTENANCE MANAGER
 
cv
cvcv
cv
 
Gopalakrishnan Updated New Resume 2016
Gopalakrishnan Updated   New Resume 2016Gopalakrishnan Updated   New Resume 2016
Gopalakrishnan Updated New Resume 2016
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution
 

Similar to VELMURUGAN-CV.docx

Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
Gowrijayashankar S V
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
Shabin Shajahan
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
Harvey Sarda
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
Sathish Murugesan
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
Edwin Aguinaldo
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
Kirana Devasya
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
ALPESH CONTRACTOR
 
RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10
Satyanarayana Raju
 

Similar to VELMURUGAN-CV.docx (20)

Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Dnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _ResumeDnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _Resume
 
Mohammed Naveed uddin CV
Mohammed Naveed uddin CVMohammed Naveed uddin CV
Mohammed Naveed uddin CV
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
cv of murtuza 2016
cv of murtuza 2016cv of murtuza 2016
cv of murtuza 2016
 
Suresh cv-21.01.16
Suresh  cv-21.01.16Suresh  cv-21.01.16
Suresh cv-21.01.16
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil Engineer
 

VELMURUGAN-CV.docx

  • 1. Velmurugan B. QA / QC Professional Mobile: +91 9840935133 Email id: velm38@yahoo.co.in Professional Summary  Over 28 years of experience in Project management (civil), construction, quality management, testing & inspection.  Presently associated with Akshaya Private Ltd as DGM-QA/QC CIVIL  Strong organizational experience with expertise in multidimensional execution of projects for multiple clients along with optimizing resource utilization.  Proven abilities in implementing the quality and safety procedure on site and conducting daily site inspection and controlling all inspection activities on site.  Skillful in liaising with internal departments & external authorities such as consultants, contractors & Govt. authorities for seamless operations and timely completion of projects.  Effective man management, communication skills and strong analytical/ problem solving skills. Educational Qualifications MBA in First Class, May 2015 Periyar University, Salem,Tamilnadu state Bachelor of Engineering (Civil), Dec 2004 in First class Anna University, Chennai. Diploma in Civil Engineering, Apr 1985 in First class Vellaichamy Nadar Polytechnic, Virudhunagar,Tamilnadu state Professional Training Undertaken ISO 9001: 2008 (QMS) Internal Auditor Training in TUV Nord, Chennai Larsen and Toubro Ltd, Chennai in May 2012 IT Skills  AutoCad - Drawing, MS Project  Exhaustive experience of all tools of Ms Office. Professional Experience 1.Akshaya Private Ltd., Chennai DGM- QA / QC From January 2015 to Till date Reporting to: VP-Projects and Managing Director Key Responsibility Areas:  Head office Function, control of QA/ QC for all Project Sites in Chennai and Trichy  Preparation of SOP and Methodologies for works including Checklist for all Project Sites  Preparation of ITP for Construction Materials and Process for works  Responsible for implementing the quality management plans at various project sites.  Management and supervision of all quality control activities on site including quality control personnel.  Give final approval on all quality control inspections.  Audit civil & architectural suppliers and Sub Contractors to assure conformance with ISO Quality Management System and Project Specifications.  Handling of BIS specifications with good knowledge about all codes and specification.  Carrying out inspection at regular intervals at site such as concreting works and plant operation.  Controlling and maintenance of the site QC laboratory in all sites.  Checking and monitoring the frequency of testing of material and compliance with std specification. Page 1 of 6
  • 2.  Responsible for acceptance of Manufacturers Test Certificate of bought out items and material like cement, steel and construction chemicals. Projects Handled:  Construction of Multi storied Residential and commercial buildings 2. LARSEN AND TOUBRO LIMITED, Buildings & Factories Senior Manager - QA / QC January 2012 to January 2015 Reporting to: Quality Head and Project Manager Key Responsibility Areas:  Responsible for implementing the quality management plans at site.  Preparation of Quality Plan for Project Site  Preparation of SOP-Methodologies for works including Check lists  Management and supervision of all quality control activities on site including quality control personnel.  Give final approval on all quality control inspections.  Conducting MRM at regular interval.  Conducting internal Auditing at regular interval.  Conducting Product quality rating at regular interval.  Conducting training to all staff and sub-contractor relating methodology  Handling of BIS specifications with good knowledge about all codes and specification.  Controlling and maintenance of the site QC laboratory.  Checking and monitoring the frequency of testing of material and compliance with standard specification.  Responsible for development and planning the testing of Ideas products.  Responsible for site concrete Batching Plant.  Responsible for acceptance of Manufacturers Test Certificate of bought out items and material like cement, steel and construction chemicals. . Projects Handled:  Construction of High Rise Residential building (Prestige Ferns Residency) for Prestige Estate Projects Ltd, Bangalore,  Construction of Multistoried Residential building (Commander’s Court) for DLF Home developers Ltd, Chennai, __________________________________________________________________________________ ____ 3. Akshaya Private Limited, Chennai Manager QA / QC From September 2010 to Jan 2012 Reporting to: Managing Director Key Responsibility Areas:  Responsible for implementing the quality management plans at various project sites.  Management and supervision of all quality control activities on site including quality control personnel.  Give final approval on all quality control inspections.  Audit civil & architectural suppliers and Sub Contractors to assure conformance with ISO Quality Management System and Project Specifications.  Handling of BIS specifications with good knowledge about all codes and specification.  Carrying out inspection at regular intervals at site such as concreting works and plant operation.  Controlling and maintenance of the site QC laboratory in all sites.  Checking and monitoring the frequency of testing of material and compliance with standard specification.  Responsible for development and planning the testing of Ideas products. Page 2 of 6
  • 3.  Responsible for acceptance of Manufacturers Test Certificate of bought out items and material like cement, steel and construction chemicals. Projects Handled:  Construction of Multi storied Residential and commercial buildings Key Achievements:  Successfully 2 projects completed and handed over to Customers and QA/QC Incharge for all projects 4.Bureau Veritas India Pvt Ltd, Chennai Sr. Surveyor From January 2010 to September 2010 Reporting to: QA/QC Head Key Responsibility Areas:  Carrying out inspection at regular intervals at site such as steel structural erection work.  Implementation of project quality plan in engineering, procurement, construction, inspection, testing of works and others applicable areas.  Controlling and maintenance of the site QC laboratory.  Checking and monitoring the frequency of testing of material in compliance with standard specification.  Responsible for acceptance of Manufacturers Test Certificate of bought out items and material likes cement, steel, construction chemicals.  Liaison with client to resolve QA QC problems.  Preparation of QA / QC report and maintaining the documents for audit purpose.  Attending the factory visit with client to test the material at factory to prove that the material can be used for the relevant works.  To conduct internal audit at site and follow up for corrective action. Projects Handled:  Pot line, FTP, Bored cast in situ pile for foundation of silo, chimney, switchyard, Machinery foundations and Transmission line for Aluminum Smelter expansion project in BALCO / VEDANTA at Korba, Chhattisgarh.  Construction of gas plant Bharat Petroleum Corporation Ltd in Gummidipundi  Construction of wind mill foundation in Sankarankovil, Coimbatore __________________________________________________________________________________ ____ 5. KETTANEH CONSTRUCTION SA LTD, Kingdom of Saudi Arabia Project control Engineer-civil From March 2007 to Nov 2009 Reporting to: Project Manager / Technical Manager KETTANEH CONSTRUCTION SA LTD is a Aramco approved contractor involved in a broad range of engineering contracts – general civil engineering, building and construction works, marine civil engineering, as well as turnkey and specialized civil engineering projects and oil & gas sector. Key Responsibility Areas:  Handling of British, American and Aramco standard codes and specification.  Quantity Surveying  Carrying out inspection at regular intervals at site such as concreting works and plant operation,  Implementation of project quality plan in engineering, procurement, construction, inspection, testing of works and others applicable areas.  Controlling and maintenance of the site QC laboratory.  Responsible for acceptance of Manufacturers Test Certificate of bought out items and material likes cement, steel, construction chemicals.  Preparation and Maintenance of QA / QC documents & reports for audit purpose.  Controlling the Concrete Batching plant at site and ensure the quality of concrete produced from batching plant as per designs and requirements. Page 3 of 6
  • 4. Projects Handled:  Construction of oil Plant foundations for depressurized vessels, Compressor, Pipe rack, Pipe supports, Evaporation pond, road works and buildings of SAUDI ARAMCO PROJECT for Khurais Crude Oil Processing Plant Project in Saudi Arabia 6. SAAG RR INFRA LTD, Chennai, India Project Manager From Oct 2006 to Jan 2007 Reporting to: Senior Project Manager Key Responsibility Areas:  Direct and manage project development from beginning to end.  Define project scope, goals and deliverables that support business goals in collaboration with senior management.  Develop full-scale project plans and associated communications documents.  Effectively communicate project expectations to team members in a time.  Estimate the resources and participants needed to achieve project goals.  Draft and submit budget proposals, and recommend subsequent budget changes where necessary.  Determine and assess need for additional staff and/or consultants and make the appropriate recruitments if necessary during project cycle.  Set and continually manage project expectations with team members and other stakeholders.  Delegate tasks and responsibilities to appropriate personnel.  Identify and resolve issues and conflicts within the project team.  Identify and manage project dependencies and critical path.  Plan and schedule project timelines and milestones using appropriate tools.  Track project milestones and deliverables. Projects Handled:  Construction of Saveetha Engineering College building in Chennai.  Construction of curved roof Industrial building for cradle crane for BEML Project at Mysore, Karnataka. 7. TRUE VALUE HOMES INDIA PVT LTD, Chennai, India Assistant Project Manager From May 2006 to Oct 2006 Reporting to: Project Manager Key Responsibility Areas:  Bored cast in situ piles for 10 blocks  Coordination activities with Project and structural consultants, Main activities like Total Station surveying  Marking Pile foundation, Preparation and certification of contractor bills and other initial activities  Preparing the construction schedule in conjunction with the contractors with details of specific activities and respective dates of completion controlling the site laboratory.  Ensuring that all works carried out are in accordance to the drawings, specifications, construction plan, procedures method statements, etc.  Develop and deliver progress reports, proposals, requirements documentation, and presentations.  Proactively manage changes in project scope, identify potential crises, and devise contingency plans. Projects Handled: Construction of Lumbini square-18 storied high-rise residential buildings in Purasaiwalkam, Chennai. 8. NILAKANTAN & BROTHERS CHENNAI PVT. LTD., Chennai, India Project Engineer From June 2005 to May 2006 Reporting to: Managing Director Key Responsibility Areas:  Incharge of all works including Spudleg Barge, Floating Barge, Supply Barge and Floating cat walk for RMC supply using pile liners.  Supervision of material handling through heavy machinery cranes during erection and lowering steel liners and Barges into sea and sailing to work spot Page 4 of 6
  • 5.  Underwater survey to find out sea bed debris and positioning of Offshore Pile by Total station submitting of report to Port Trust. Projects Handled: Construction of offshore bored Cast in situ piles of Marine structures-Mooring dolphin, Trestle line in Chennai Port. 9. KINGSWAY CONSULTANT, ARCHITECT & ENGINEERS–Chennai, India Senior Civil Engineer From Apr1997 to Jun’2005 Reporting to: Managing Director Key Responsibility Areas:  Incharge for supervision of works, checking of bills and certifying payments.  Incharge for all residential and commercial building construction.  Inspection of building and finding site Quality issues and initiation of rectification in compliance  Preparing Data for various item of works  Liaison with Clients and contractors.  Monitoring the progress of works.  Checking on time schedule Projects Handled:  Construction of Catholic Church buildings and schools in Andaman Nicobar Islands  Construction of multi storied residential and commercial buildings for Jamals construction in Chennai.  Construction of huge auditorium building in Seva Sadan higher secondary school in Chetpet, Chennai.  Construction of MCC School in chetpet, Chennai  Construction of Vellore Institute of Technology buildings.  Construction of Gimpex Factory extension in Hyderabad 10. ENTOMA HYDRO SYSTEM–Chennai, India Site Engineer From Oct 1994 to Aug 1996 Reporting to: Project Manager Key Responsibility Areas:  Preparation of Stencil Drawing for project works to get approval of BHE, Trichy.  Construction of Bore well in 16 villages in Ramnad district and Testing for Desalination RO Plant.  Execution and Supervision of works.  Labour control and Material procurement for works.  Preparation of Contract bills and labour bill.  Commissioning of RO Plant Projects Handled: Construction of RO Plant, Buildings with foundations, Concrete Tanks for Potable and treated water and Infrastructures in Ramnad district, Tamilnadu. 11. V.Ramasamy, AEE., PWD,BUILDINGS,VIRUDHUNAGAR, India Technical Assistant Gr II-civil From Jun 1991 to Oct 1993 Reporting to: Project Manager Key Responsibility Areas:  Marking of foundation for excavation as per drawing  Site supervision and execution of building construction  Preparation of contractor bill for works in Measurement Book  Preparation and submission of RA bills.  Checking & monitoring the frequency of testing of material in compliance with standard specification.  Preparation of QA/QC report. Page 5 of 6
  • 6. Projects Handled:  Construction of Accident Emergency Ward, Steam laundry, 36 bedded ward and ICC unit building at Government hospital in Virudhunagar for PWD Construction.  Construction of Deaf school building at Virudhunagar.  Constructions of Bus stand in T.Kallupatti, Madurai.  Construction of AEE/EE Quarters in T.Kallupatti Madurai. 12. T.S.SANKARAPANDIAN, PWD CONTRACTOR Technical Assistant Gr II-civil From Dec 1986 to Jun 1991 Reporting to: Project Incharge Key Responsibility Areas:  Marking of foundation for excavation as per drawing  Site supervision and execution of building construction  Preparation of Subcontractor bill for works  Preparation and submission of RA bills to PWD  Material procurement for works  Stock of all materials and material handling  Coordination with PWD Engineers in execution and Contract RA bill approval Projects Handled:  Construction of District Collectorate complex and Housing board flat and PWD constructions in Virudhunagar  Construction of 230 KVA Substation building with Cable racks foundation and Transmissions line in Naduvapatty (sattur) Tamilnadu Electricity board.  Construction of surplus weir, sluice, and earthen embankment in Golwarpatty Dam at Sattur in PWD Tamilnadu 13. Executive Engineer, PWD VIRUDHUNAGAR Apprenticeship Trainee From Dec 1985 to Dec 1986 Reporting to: Assistant Engineer Projects Handled: Construction of tanks, school repair and maintenance works, Residential Quarters in Virudhunagar Switch Details  Present Salary CTC/annum : Rs 12.00 Lakhs  Present Notice Period : 30 Days  Expected Salary : As per company policy Profile Key Words Project Quality Incharge,Quality assurance, Quality control, Engineering, Residential and commercial Building construction,concrete, RMC, Internal QMS auditor, IS codes, embankment, pavement, QC Laboratory, Testing, Inspection, Mix design, AutoCAD, M S Project Personal Details  Date of Birth : 19th Feb, 1967  Father’s Name : N.Balasubramanian (Late)  Gender : Male  Marital Status : Married  Nationality : Indian  Passport Details : Z 3321643, (Valid till 30th July 2025)  Address : 4A, First Floor, Nagalingam street,Pasumpon Nagar,Pammal, Chennai-600075 Tamilnadu State, India Chennai-600075 Yours Sincerely B.Velmurugan Page 6 of 6
  • 7. Projects Handled:  Construction of Accident Emergency Ward, Steam laundry, 36 bedded ward and ICC unit building at Government hospital in Virudhunagar for PWD Construction.  Construction of Deaf school building at Virudhunagar.  Constructions of Bus stand in T.Kallupatti, Madurai.  Construction of AEE/EE Quarters in T.Kallupatti Madurai. 12. T.S.SANKARAPANDIAN, PWD CONTRACTOR Technical Assistant Gr II-civil From Dec 1986 to Jun 1991 Reporting to: Project Incharge Key Responsibility Areas:  Marking of foundation for excavation as per drawing  Site supervision and execution of building construction  Preparation of Subcontractor bill for works  Preparation and submission of RA bills to PWD  Material procurement for works  Stock of all materials and material handling  Coordination with PWD Engineers in execution and Contract RA bill approval Projects Handled:  Construction of District Collectorate complex and Housing board flat and PWD constructions in Virudhunagar  Construction of 230 KVA Substation building with Cable racks foundation and Transmissions line in Naduvapatty (sattur) Tamilnadu Electricity board.  Construction of surplus weir, sluice, and earthen embankment in Golwarpatty Dam at Sattur in PWD Tamilnadu 13. Executive Engineer, PWD VIRUDHUNAGAR Apprenticeship Trainee From Dec 1985 to Dec 1986 Reporting to: Assistant Engineer Projects Handled: Construction of tanks, school repair and maintenance works, Residential Quarters in Virudhunagar Switch Details  Present Salary CTC/annum : Rs 12.00 Lakhs  Present Notice Period : 30 Days  Expected Salary : As per company policy Profile Key Words Project Quality Incharge,Quality assurance, Quality control, Engineering, Residential and commercial Building construction,concrete, RMC, Internal QMS auditor, IS codes, embankment, pavement, QC Laboratory, Testing, Inspection, Mix design, AutoCAD, M S Project Personal Details  Date of Birth : 19th Feb, 1967  Father’s Name : N.Balasubramanian (Late)  Gender : Male  Marital Status : Married  Nationality : Indian  Passport Details : Z 3321643, (Valid till 30th July 2025)  Address : 4A, First Floor, Nagalingam street,Pasumpon Nagar,Pammal, Chennai-600075 Tamilnadu State, India Chennai-600075 Yours Sincerely B.Velmurugan Page 6 of 6