TURBINE DESIGN NEED OF THE HOUR
By:- A. P. Samal AGM(PE-Mech / TG)
Abstract
Starting with the success of bulk tendering projects NTPC has installed a new fleet of supercritical
and ultra-supercritical steam turbines. The fleet covers a variety of technology covering almost all
the gamut of turbine OEMS worldwide. This has ensured adoption of state-of the art technology
to meet the present day demand from our end customers. Justifying the phrase “necessity is the
mother of all inventions”, lot of changes have been made in the equipment design as well as in
the system design to make the plant more suitable to take care of transients. Continuous endeavor
is also made to make the system more and more suitable to meet the demand. This paper aims
at listing down the features and their advantages and the flexibility offered by the specific feature
to the operating staff.
1.0 Flexible operation and its demand from the plant
Ideal power plant is a plant which responds to the demand of the grid instantaneously and infinite
number of times without compromising the efficiency and life of the equipment’s. Unfortunately
such ideal plants are not in existence and every system has its own inertia, finite life and operates
with deteriorated efficiency when it is operated away from its design point. Among all types of
power plants coal based thermal power plants (lest nuclear power plants) has highest response
time as it possesses lot of mechanical and thermal inertia in it. Endeavor is always made by all
OEMs and utilities to reduce this inertia and reduce the response time. There are many yard sticks
to measure the plants capability for flexible operation. Some of the important parameters are as
listed below. We will discuss the features of our fleet which some how or the other tries to address
the requirement. The some of the unique features may be specific to some OEMS having design
patents and may not be available in the machines of other OEMS. Same purpose could also be
achieved by different design features by different OEMs.
Important yardsticks of flexible operation
(a) Ramp rate (both for load up and down)
(b) Minimum stable load
(c) Lower start up time (cold, warm and hot)
(d) Capable of higher number of start ups.
(e) Part load efficiency
(f) Above flexibility with minimum consumption of life
2.0 Design features and their effect
Some of the design features described below are specific to particular OEMs and hence all the
features may not be present in all units. Some features may be available in some turbines where
other features will be available in other turbines. Different OEMs may incorporate different
features to meet same requirement. Some of the features are specified by NTPC and hence shall
be common to all units.
2.1 Axially split barrel type HPT outer casing (curtesy Siemens/ BHEL)
The HP turbine is designed as double shell casing with vertically split guide blade carrier and
axially split barrel type outer casing. The
barrel-type construction enables almost
complete rotational symmetry and large
asymmetrical deformation and thermal
stresses avoided, even with high steam
parameter. The Rotor consists of mono-block
forging with integrally forged coupling flanges.
Due to the barrel outer casing design the
thickness of the inner casing can be optimised
and the differential temperature across the
inner casing also minimised. This reduces the
stress levels and also variation of stress during
transients are minimised. It helps in achieving
higher ramp rates as well as reduced start up
time.
2.2 Shrink ring design for inner casing without flanges
The turbine is of double shell design with an outer and an inner casing. The parting plane of
the outer casing is horizontal at the level of the rotor axis. The outer casing is assembled by
means of hydraulically tightened expansion bolts. The inner casing is mainly assembled by
means of number of Shrink Rings instead of flanges and bolts. Thick flanges in the inner
casing as well as the tightening bolts are avoided. The Shrink ring design allows for a
rotationally symmetric casing resulting in reduced distortions while clearances are maintained
during operation- providing sustained higher efficiency.
It offers a compact design with smaller wall thickness
for flexible load cycling and faster start up time.
Since the distortions are less, the design ensures leak-
free operation for a longer period under steady state as
well as transient operating conditions. Due to
axisymmetric design the stress levels are very low
even with higher temperature gradients across the
casing. Hydraulic bolts along with shrink ring design
reduces the assembly / disassembly time and hence
overhauling duration. Overall weight of the turbine is
also reduced due to avoidance of flanges and bolts.
The design helps in rapid start up / shut down, two
shifting operation and also exhibits excellent behavior
during cycling loadings.
2.3 Welded Rotor design
The rotor is of welded type with integral coupling halves. This design allows selection of
appropriate forging material based on temperature level at each section. Materials having higher
creep / yield strength at higher temperature are susceptible to brittle failure at lower temperatures.
Fig:- 1 Axially spilt barrel casing (curtesy Siemens/ BHEL)
Fig: 2 Shrink ring HP turbine inner casing (Curtesy GE )
This design has the flexibility to select high ductile material at lower temperature zones. Because
of smaller forgings number of suppliers are available and the lead time is also low. Further due to
smaller size forgings the quality can be more accurately controlled and the defects can be
detected / rectified easily. The weight of the rotors are less (hollow spaces in between) as
compared to solid mono block forged rotors. It results in stress reduction during thermal transients
for faster and frequent load cycling.
Fig: 3 Welded rotor design (Curtesy GE )
2.4 Internal cooling of outer casing and balancing piston
HP turbine inlet section is the point where the turbine experiences highest temperature as well as
highest pressure. In order to accommodate the high pressure and high temperature the
components are bound to be very thick. During transients the temperature as well as the pressure
at this location also changes very fast inducing higher thermal as well as mechanical stresses.
The situation further aggravates due to thicker components. Higher the thickness higher the
thermal stresses inducing higher fatigue loading. OEMs always thrive to reduce the thickness of
the casings (both inner as well as outer casing) be it by introducing double casing design or shrink
ring design / barrel outer casing eliminating flanges etc. In this design lower temperature and
lower pressure steam is extracted from the HP turbine intermediates stage through the annular
space between inner casing and outer casing and introduced to the balancing piston. This steam
is divided into two parts. First part
flows toward the shaft glands and
the remaining steam towards
mixing chamber where it get mixed
with the leak off after the diagonal
stage and flows back to further
downstream stages.
This arrangement serves two
purposes (1) it cools the outer
casing thereby not exposing the
outer casing to higher temperature
of Main Steam. This reduces the thickness of the outer casing as well as the stress levels. Further
the turbine glands are also exposed to lower pressure and temperature. This feature can
accommodate higher ramp rates as well as lowers the startup time.
Fig4:- HPT internal cooling arrangement (Curtesy- Siemens/ BHEL ltd.)
2.6 Concept of rotor and blade cooling / Heat shield at the highest temperature location
It shields the highly stressed components and thereby exposing the metal to much lower
temperature than the expected temperature. Increases fatigue and creep life of the highly
stressed components. Normally at the inlet section of IPT as it is the highest temperature location.
Due to this arrangement the rotor is exposed to much lower temperature and hence have lower
creep and Low Cycle fatigue stresses. Some design envisages cooling the inlet stages of IP
turbine stationary and rotating blades by introduction of steam of lower temperature through drilled
holes in the blades. This way thermal stress in the highly stressed component like rotor is reduced
facilitating better transient behavior.
Fig: 5 Thermal shield for IP turbine (Curtesy Siemens / BHEL)
2.7 Single bearing design with sliding casing / Bearing pedestal design
2.7.1 Single bearing concept
Only one bearing is envisaged between two turbine cylinders even between LP turbine and
Generator. This design enables more accurate prediction of bearing loads as compared to
individual bearing design due to manufacturing and erection reasons. Due to determined bearing
loading / stiffness the critical speeds can also be predicted more accurately. Accurate prediction
of bearing loading & critical speed reduces the shaft vibration levels. This design reduces the lube
oil consumption as well as bearing losses. Overall length of the shaft line also gets reduced.
2.7.2 Sliding bearing pedestal / casing
The bulk material temperature for the
turbine shaft and the turbine casing are
always different. The difference is more
during startup / shut down and minimum
during steady state operation. Higher the
differential expansion higher the chance of
interference between static and rotating
parts. The thermal expansion of the turbine
shafts from HP to LP is bound to be added
up as the shafts are directly coupled with
each other. However the expansion of the
casings only start from the respective fixed
points. If individual shafts have their own
fixed point ( as in case of older designs) then the casing expansions are not integrated with each
Fig:6 Expansion diagram with self-compensating nature
other and the differential expansion is more at the farthest point of absolute shaft fixed point (i.e.
thrust bearing). Sliding bearing pedestal / casing design has only one absolute fixed point for the
casings also wrt thermal expansion point of view. This gives rise to self-compensating nature of
the turbine train.
2.8 Abradable seal design
It is the endeavor of all OEMs to reduce the clearance between static and rotating components.
Higher the clearances higher the losses results into lower efficiency. However lower the
clearances higher the chances of interference between static and rotating components specifically
during transient conditions like startup, shutdown & load changes etc. and hence reduced long
term sustained efficiency. The relative position of the shaft and the casings are different during
steady state condition as compared to that of during startup / shutdown. This fact is exploited by
use of softer coating over the shaft (abradable seals) in the seal area and closing down the
clearances. During startup / shut down when the differential expansions are higher the gaps
between static and rotating components close down and even the seals are allowed to rub the
softer coating increasing the gap. As the units moves towards steady state condition the relating
position of the shaft and casings changes and the seals faces the unrubbed portion of the coating
where the clearances are still low (un-rubbed). This increases the steady state efficiency
maintaining the reliability during transients.
Fig: 7 Abradable seals (curtesy:- Toshiba)
2.9 Shifting the design point
The thermal cycle and its components are optimized for a particular condition. This condition is
called the design point and Operation at this condition results in maximum efficiency. Any
deviation / departure from this point results into off design operating condition and obviously
results in deteriorated efficiency. Higher the deviation / departure lower the efficiency. Hence all
endeavor should be made for operating the plant as close as possible to the design point. While
designing the power plant the expected operating regime is kept in mind so that the design point
should match with the expected most frequent (maximum number of hours) operating point in the
life time of the plant. Till about 2015 plants were operating with very high PLF (~90%) i.e. most of
the time the units were operating very near to the rated load and sometimes even at 105% of the
rated load (VWO condition). Hence all the plants are optimized for 100% TMCR condition having
highest efficiency at 100% TMCR load. Off late due to the advent of renewable energy the plant
are operating at lower PLF (~60%) and in future it is expected that the PLF will further go down
and the thermal plants are expected to run at part load for most of the time. Hence it is necessary
that the plants be optimized at part load condition rather than at rated load so as to derive most
efficient operation. Keeping above objective in view certain changes have been done in the
specification stage itself.
2.9.1 Provision of over load valve
The plants are designed for a continuous unrestricted capacity of 105% of the rated load. This is
necessary to meet the grid demand / Indian grid code. Hence all the turbine components including
MS control valves possess this capability irrespective of its operating point. During lower load
operation the plant is envisaged to operate sliding pressure mode. However operating in pure
sliding pressure operation reduces the instantaneous load peaking capability of the unit as there
is no thermal reserve. Hence the units have to operate under modified sliding pressure operation
with a throttle reserve of about 5%. Hence about 5% throttling takes place in the MS control
valves. Throttling in the MSCV results in continuous loss in efficiency. Provision of overload valve
(OLV) allows operation on the unit in pure sliding pressure mode of operation without
compromising the load peaking capability. The OLV bypasses some initial stages of the HP
turbine and the steam is admitted after say 4th
stage. This
increases the swallowing capacity of the turbine without
increasing the inlet pressure (increasing the area of
admission). The MSCV always operates full open and the
peaking capability is realized by OLV. During operation of
OLV the plant efficiency reduces but for a very short period
of time allowing efficient operation during normal operation.
2.9.2 Cycle optimization for partial load
Previously the plants were being optimized for near about full load condition and accordingly the
heat rate guarantees were asked for at 100% TMCR and VWO (105% TMCR) condition. Bid
evaluation factors are specified for the quoted heat rate by various vendors. Credit for better heat
rate is given to the bidders based on this factor. During PG test if the contractor fails to meet the
quoted guarantees then Liquidated Damages (LD) are deducted based on previously specified
LD values. In order to get higher evaluation credit the OEMs optimize the cycle at near about
100% load condition. Off late the requirement for more efficient operation in partial load condition
has arisen. Accordingly the guarantee point have now changed to 100% TMCR and 60% TMCR
condition so as to encourage the bidders to optimize the cycle and the equipment’s somewhere
between 60 – 100% load. Instead of separate guarantees at different load points one single
weighted average guarantee has been asked with 50% weightage for 60% load and 50% at 100%
load condition.
2.10 Startup modes with the aid of TSE
During design all the designers apply factor of safety in the design. This factor is also known as
factor of unknowns or uncertainty. Lesser the knowledge on the subject higher the factor of
uncertainty to be applied to take care of unknowns. Higher the available information in terms of
measurements, prediction tools this factor can be reduces and the capability of the equipment’s /
components can be exploited without the fear of failure. The Turbine Stress Evaluator plays a
vital role during startup providing all information to the operator to control the startup process.
This also protects the turbine from damage. In the initial generation turbines this tool was not
H
Fig: 8 Provision of Overload valve
available (some plants are still operating without TSE). The startups were governed by certain
thumb rules / time dependent criteria specified by the turbine manufacturer. Obviously this method
cannot exploit full capability of the machines. Subsequently the tool was developed and
refinements were carried out as the technology matured. Following are the different stages of
development of TSE giving more and more accurate prediction of life consumption.
Generation # I TSE:- The life consumption of critical turbine components were calculated based
on number of startups and operating hours.
Generation # II TSE:- Startup mode were differentiated. Life consumption during Cold, warm and
hot startups were differentiated. Similarly different modes of startup (slow, moderate & faster)
were also envisaged so that the operator can decide for faster startups based on grid requirement.
The information on life consumption is also made available.
Generation # III TSE:- This was based on actual stress measurement of critical components. This
method provided more accurate predication of life consumption as it is based on measurement.
Generation # IV TSE:- Present day TSE also takes load changes into account while calculating
the life consumption.
From the above developments it can be seen that more and more information is being made
available to the operating staff during actual operation so that the capability of the plant can be
utilized to the fullest.
3.0 Snapshot of yardsticks
Due to continuous upgradation process lot of improvements have been achieved in the
performance parameters which will help in meeting the present day demand. Keeping the present
day grid demand in view comparison of some of the yardsticks of flexible operation (older units
vs present day units) has been compiled in the table below.
Parameters Older units Present day units
Primary mode of operation Base load operation Two shifting / Cyclic load operation
Total Number of startups in life
time
Cold:- 150
Warm:- 450
Hot:-1400
Cold:- 150
Warm:- 1000
Hot:-4000
Startup time Cold:-340
Warm:- 200
Hot:-90
Cold:- 126
Warm:- 60
Hot:- 20
Steady state Ramp rate 1% per minute 5% per minute
4.0 Conclusion
Design upgradation is a continuous process. The expectations of the end customers are also
changing day by day. Even if the technology is matured it is necessary to make changes in the
existing features to meet the present day requirement. Further market forces such as competition
from peers also acts as catalyst for upgradation. Call of the present day in power sector is flexible
operation of thermal units. Accordingly lot of modifications are done to make the unit more capable
of flexible operation. The endeavor shall continue in future depending upon need / demand from
the end users.
References
1. Ministry of Power, Government of India website
2. Central Electricity website.
3. Technical presentations and O&M manual of various OEMs (Siemens, GE, Toshiba, LMZ etc.)
4. IEC 60045

More Related Content

What's hot

A Project on Pressure and temperature analysis of tilted pad thrust bearing u...
A Project on Pressure and temperature analysis of tilted pad thrust bearing u...A Project on Pressure and temperature analysis of tilted pad thrust bearing u...
A Project on Pressure and temperature analysis of tilted pad thrust bearing u...Juned Patel
 
Tilting pad thrust bearing
Tilting pad thrust bearingTilting pad thrust bearing
Tilting pad thrust bearingMugesh kanna
 
Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Dr. Arzu Javadova
 
Report on horizontal vertical christmas tree
Report on horizontal vertical christmas treeReport on horizontal vertical christmas tree
Report on horizontal vertical christmas treeAmar Gaikwad
 
Catálogo Geral Milton Roy
Catálogo Geral Milton RoyCatálogo Geral Milton Roy
Catálogo Geral Milton RoyVibropac
 
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.womgroup
 
Design Reliability and Product Integrity on a Hydraulic Cylinder
Design Reliability and Product Integrity on a Hydraulic CylinderDesign Reliability and Product Integrity on a Hydraulic Cylinder
Design Reliability and Product Integrity on a Hydraulic Cylinderprashanth884
 
Hydraulic system and seal
Hydraulic system and sealHydraulic system and seal
Hydraulic system and sealAman Dutt
 
Viking motor-speed-pumps
Viking motor-speed-pumpsViking motor-speed-pumps
Viking motor-speed-pumpsCarotek
 
Zero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsZero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsCraig Carter
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls externalBladimir R
 
WELL HEAD pcp overview1234
WELL HEAD  pcp overview1234WELL HEAD  pcp overview1234
WELL HEAD pcp overview1234Afsal Ameen c
 
Multi Stage Flash Type Marine Evaporator
Multi Stage Flash Type Marine EvaporatorMulti Stage Flash Type Marine Evaporator
Multi Stage Flash Type Marine EvaporatorSasi Villa
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )guest521158
 
Casing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM GroupCasing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM Groupwomgroup
 

What's hot (20)

A Project on Pressure and temperature analysis of tilted pad thrust bearing u...
A Project on Pressure and temperature analysis of tilted pad thrust bearing u...A Project on Pressure and temperature analysis of tilted pad thrust bearing u...
A Project on Pressure and temperature analysis of tilted pad thrust bearing u...
 
6A CAT-M.PDF
6A CAT-M.PDF6A CAT-M.PDF
6A CAT-M.PDF
 
Tilting pad thrust bearing
Tilting pad thrust bearingTilting pad thrust bearing
Tilting pad thrust bearing
 
Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)
 
Report on horizontal vertical christmas tree
Report on horizontal vertical christmas treeReport on horizontal vertical christmas tree
Report on horizontal vertical christmas tree
 
Catálogo Geral Milton Roy
Catálogo Geral Milton RoyCatálogo Geral Milton Roy
Catálogo Geral Milton Roy
 
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
 
Design Reliability and Product Integrity on a Hydraulic Cylinder
Design Reliability and Product Integrity on a Hydraulic CylinderDesign Reliability and Product Integrity on a Hydraulic Cylinder
Design Reliability and Product Integrity on a Hydraulic Cylinder
 
Regulators
RegulatorsRegulators
Regulators
 
Hydraulic system and seal
Hydraulic system and sealHydraulic system and seal
Hydraulic system and seal
 
Viking motor-speed-pumps
Viking motor-speed-pumpsViking motor-speed-pumps
Viking motor-speed-pumps
 
Zero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsZero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on Ships
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls external
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
WELL HEAD pcp overview1234
WELL HEAD  pcp overview1234WELL HEAD  pcp overview1234
WELL HEAD pcp overview1234
 
Multi Stage Flash Type Marine Evaporator
Multi Stage Flash Type Marine EvaporatorMulti Stage Flash Type Marine Evaporator
Multi Stage Flash Type Marine Evaporator
 
Bba petroleo pesado
Bba petroleo pesadoBba petroleo pesado
Bba petroleo pesado
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
Casing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM GroupCasing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM Group
 

Similar to Turbine design need of the hour

Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Shaun West
 
IRJET- Fatigue Life Estimation of Small Gas Turbine Blisk
IRJET-  	  Fatigue Life Estimation of Small Gas Turbine BliskIRJET-  	  Fatigue Life Estimation of Small Gas Turbine Blisk
IRJET- Fatigue Life Estimation of Small Gas Turbine BliskIRJET Journal
 
Report steffones
Report steffonesReport steffones
Report steffonesSteffones K
 
Thermal analysis of piston
Thermal analysis of pistonThermal analysis of piston
Thermal analysis of pistonsankrit07
 
exhaust manifold
exhaust manifold exhaust manifold
exhaust manifold Ravi Gour
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorIRJET Journal
 
Generator Baisc Construction.pptx
Generator Baisc Construction.pptxGenerator Baisc Construction.pptx
Generator Baisc Construction.pptxSunnyBhardwaj32
 
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET Journal
 
3 d modeling and dynamic charectarization of steam turbine packet blade and c...
3 d modeling and dynamic charectarization of steam turbine packet blade and c...3 d modeling and dynamic charectarization of steam turbine packet blade and c...
3 d modeling and dynamic charectarization of steam turbine packet blade and c...eSAT Journals
 
3 d modeling and dynamic charectarization of steam turbine packet blade and c...
3 d modeling and dynamic charectarization of steam turbine packet blade and c...3 d modeling and dynamic charectarization of steam turbine packet blade and c...
3 d modeling and dynamic charectarization of steam turbine packet blade and c...eSAT Publishing House
 
Meet the Engineer 2015
Meet the Engineer 2015Meet the Engineer 2015
Meet the Engineer 2015Productiv Ltd
 
Exploiting the benefits of coolant in parting and grooving
Exploiting the benefits of coolant in parting and groovingExploiting the benefits of coolant in parting and grooving
Exploiting the benefits of coolant in parting and groovingSandvik Coromant
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
High pressure-spindle-finish
High pressure-spindle-finishHigh pressure-spindle-finish
High pressure-spindle-finishDave Davidson
 
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET Journal
 

Similar to Turbine design need of the hour (20)

Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
 
IRJET- Fatigue Life Estimation of Small Gas Turbine Blisk
IRJET-  	  Fatigue Life Estimation of Small Gas Turbine BliskIRJET-  	  Fatigue Life Estimation of Small Gas Turbine Blisk
IRJET- Fatigue Life Estimation of Small Gas Turbine Blisk
 
Report steffones
Report steffonesReport steffones
Report steffones
 
Thermal analysis of piston
Thermal analysis of pistonThermal analysis of piston
Thermal analysis of piston
 
exhaust manifold
exhaust manifold exhaust manifold
exhaust manifold
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure Accumulator
 
Generator Baisc Construction.pptx
Generator Baisc Construction.pptxGenerator Baisc Construction.pptx
Generator Baisc Construction.pptx
 
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
 
3 d modeling and dynamic charectarization of steam turbine packet blade and c...
3 d modeling and dynamic charectarization of steam turbine packet blade and c...3 d modeling and dynamic charectarization of steam turbine packet blade and c...
3 d modeling and dynamic charectarization of steam turbine packet blade and c...
 
3 d modeling and dynamic charectarization of steam turbine packet blade and c...
3 d modeling and dynamic charectarization of steam turbine packet blade and c...3 d modeling and dynamic charectarization of steam turbine packet blade and c...
3 d modeling and dynamic charectarization of steam turbine packet blade and c...
 
Meet the Engineer 2015
Meet the Engineer 2015Meet the Engineer 2015
Meet the Engineer 2015
 
Tm als f-2011
Tm als f-2011Tm als f-2011
Tm als f-2011
 
pulsejet
pulsejetpulsejet
pulsejet
 
D1302032028
D1302032028D1302032028
D1302032028
 
Exploiting the benefits of coolant in parting and grooving
Exploiting the benefits of coolant in parting and groovingExploiting the benefits of coolant in parting and grooving
Exploiting the benefits of coolant in parting and grooving
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
High pressure-spindle-finish
High pressure-spindle-finishHigh pressure-spindle-finish
High pressure-spindle-finish
 
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
 
Engine blade
Engine bladeEngine blade
Engine blade
 

More from Udhayakumar Venkataraman

Sintering process of Iron Ore General.docx
Sintering process of Iron Ore General.docxSintering process of Iron Ore General.docx
Sintering process of Iron Ore General.docxUdhayakumar Venkataraman
 
Performance Paramters of Coal Fired TPS in General for our team.pptx
Performance Paramters of Coal Fired TPS in General for our team.pptxPerformance Paramters of Coal Fired TPS in General for our team.pptx
Performance Paramters of Coal Fired TPS in General for our team.pptxUdhayakumar Venkataraman
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaUdhayakumar Venkataraman
 
Efficiency by controlling modulation of actuators
Efficiency by controlling modulation of actuatorsEfficiency by controlling modulation of actuators
Efficiency by controlling modulation of actuatorsUdhayakumar Venkataraman
 
Efficiency by controlling modulation of actuators
Efficiency by controlling modulation of actuatorsEfficiency by controlling modulation of actuators
Efficiency by controlling modulation of actuatorsUdhayakumar Venkataraman
 

More from Udhayakumar Venkataraman (20)

Sugar Industrial Boiler tube failure.pdf
Sugar Industrial Boiler tube failure.pdfSugar Industrial Boiler tube failure.pdf
Sugar Industrial Boiler tube failure.pdf
 
How do you use PID in PLC.docx
How do you use PID in PLC.docxHow do you use PID in PLC.docx
How do you use PID in PLC.docx
 
Sintering process of Iron Ore General.docx
Sintering process of Iron Ore General.docxSintering process of Iron Ore General.docx
Sintering process of Iron Ore General.docx
 
IA & SA Compressed Air system.docx
IA & SA Compressed Air system.docxIA & SA Compressed Air system.docx
IA & SA Compressed Air system.docx
 
Performance Paramters of Coal Fired TPS in General for our team.pptx
Performance Paramters of Coal Fired TPS in General for our team.pptxPerformance Paramters of Coal Fired TPS in General for our team.pptx
Performance Paramters of Coal Fired TPS in General for our team.pptx
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
Fgd general norms
Fgd general normsFgd general norms
Fgd general norms
 
Condenser vacuum discussion
Condenser vacuum discussionCondenser vacuum discussion
Condenser vacuum discussion
 
Bfp aspetcs
Bfp aspetcsBfp aspetcs
Bfp aspetcs
 
Condenser vacuum discussion
Condenser vacuum discussionCondenser vacuum discussion
Condenser vacuum discussion
 
By abb motor e book
By abb motor  e bookBy abb motor  e book
By abb motor e book
 
Maintenance strategy forf power plant
Maintenance strategy forf power plantMaintenance strategy forf power plant
Maintenance strategy forf power plant
 
Bearing over greasing failures ]
Bearing over greasing failures ]Bearing over greasing failures ]
Bearing over greasing failures ]
 
Bearings type and selection
Bearings type and selectionBearings type and selection
Bearings type and selection
 
Seals of turbine and improvement
Seals of turbine and improvementSeals of turbine and improvement
Seals of turbine and improvement
 
Soot blowing and advantages
Soot blowing and advantagesSoot blowing and advantages
Soot blowing and advantages
 
Gross turbine cycle_heat_rate_ch-8.2
Gross turbine cycle_heat_rate_ch-8.2Gross turbine cycle_heat_rate_ch-8.2
Gross turbine cycle_heat_rate_ch-8.2
 
Efficiency by controlling modulation of actuators
Efficiency by controlling modulation of actuatorsEfficiency by controlling modulation of actuators
Efficiency by controlling modulation of actuators
 
Boiler optimization journey
Boiler optimization journeyBoiler optimization journey
Boiler optimization journey
 
Efficiency by controlling modulation of actuators
Efficiency by controlling modulation of actuatorsEfficiency by controlling modulation of actuators
Efficiency by controlling modulation of actuators
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

Turbine design need of the hour

  • 1. TURBINE DESIGN NEED OF THE HOUR By:- A. P. Samal AGM(PE-Mech / TG) Abstract Starting with the success of bulk tendering projects NTPC has installed a new fleet of supercritical and ultra-supercritical steam turbines. The fleet covers a variety of technology covering almost all the gamut of turbine OEMS worldwide. This has ensured adoption of state-of the art technology to meet the present day demand from our end customers. Justifying the phrase “necessity is the mother of all inventions”, lot of changes have been made in the equipment design as well as in the system design to make the plant more suitable to take care of transients. Continuous endeavor is also made to make the system more and more suitable to meet the demand. This paper aims at listing down the features and their advantages and the flexibility offered by the specific feature to the operating staff. 1.0 Flexible operation and its demand from the plant Ideal power plant is a plant which responds to the demand of the grid instantaneously and infinite number of times without compromising the efficiency and life of the equipment’s. Unfortunately such ideal plants are not in existence and every system has its own inertia, finite life and operates with deteriorated efficiency when it is operated away from its design point. Among all types of power plants coal based thermal power plants (lest nuclear power plants) has highest response time as it possesses lot of mechanical and thermal inertia in it. Endeavor is always made by all OEMs and utilities to reduce this inertia and reduce the response time. There are many yard sticks to measure the plants capability for flexible operation. Some of the important parameters are as listed below. We will discuss the features of our fleet which some how or the other tries to address the requirement. The some of the unique features may be specific to some OEMS having design patents and may not be available in the machines of other OEMS. Same purpose could also be achieved by different design features by different OEMs. Important yardsticks of flexible operation (a) Ramp rate (both for load up and down) (b) Minimum stable load (c) Lower start up time (cold, warm and hot) (d) Capable of higher number of start ups. (e) Part load efficiency (f) Above flexibility with minimum consumption of life 2.0 Design features and their effect Some of the design features described below are specific to particular OEMs and hence all the features may not be present in all units. Some features may be available in some turbines where other features will be available in other turbines. Different OEMs may incorporate different features to meet same requirement. Some of the features are specified by NTPC and hence shall be common to all units.
  • 2. 2.1 Axially split barrel type HPT outer casing (curtesy Siemens/ BHEL) The HP turbine is designed as double shell casing with vertically split guide blade carrier and axially split barrel type outer casing. The barrel-type construction enables almost complete rotational symmetry and large asymmetrical deformation and thermal stresses avoided, even with high steam parameter. The Rotor consists of mono-block forging with integrally forged coupling flanges. Due to the barrel outer casing design the thickness of the inner casing can be optimised and the differential temperature across the inner casing also minimised. This reduces the stress levels and also variation of stress during transients are minimised. It helps in achieving higher ramp rates as well as reduced start up time. 2.2 Shrink ring design for inner casing without flanges The turbine is of double shell design with an outer and an inner casing. The parting plane of the outer casing is horizontal at the level of the rotor axis. The outer casing is assembled by means of hydraulically tightened expansion bolts. The inner casing is mainly assembled by means of number of Shrink Rings instead of flanges and bolts. Thick flanges in the inner casing as well as the tightening bolts are avoided. The Shrink ring design allows for a rotationally symmetric casing resulting in reduced distortions while clearances are maintained during operation- providing sustained higher efficiency. It offers a compact design with smaller wall thickness for flexible load cycling and faster start up time. Since the distortions are less, the design ensures leak- free operation for a longer period under steady state as well as transient operating conditions. Due to axisymmetric design the stress levels are very low even with higher temperature gradients across the casing. Hydraulic bolts along with shrink ring design reduces the assembly / disassembly time and hence overhauling duration. Overall weight of the turbine is also reduced due to avoidance of flanges and bolts. The design helps in rapid start up / shut down, two shifting operation and also exhibits excellent behavior during cycling loadings. 2.3 Welded Rotor design The rotor is of welded type with integral coupling halves. This design allows selection of appropriate forging material based on temperature level at each section. Materials having higher creep / yield strength at higher temperature are susceptible to brittle failure at lower temperatures. Fig:- 1 Axially spilt barrel casing (curtesy Siemens/ BHEL) Fig: 2 Shrink ring HP turbine inner casing (Curtesy GE )
  • 3. This design has the flexibility to select high ductile material at lower temperature zones. Because of smaller forgings number of suppliers are available and the lead time is also low. Further due to smaller size forgings the quality can be more accurately controlled and the defects can be detected / rectified easily. The weight of the rotors are less (hollow spaces in between) as compared to solid mono block forged rotors. It results in stress reduction during thermal transients for faster and frequent load cycling. Fig: 3 Welded rotor design (Curtesy GE ) 2.4 Internal cooling of outer casing and balancing piston HP turbine inlet section is the point where the turbine experiences highest temperature as well as highest pressure. In order to accommodate the high pressure and high temperature the components are bound to be very thick. During transients the temperature as well as the pressure at this location also changes very fast inducing higher thermal as well as mechanical stresses. The situation further aggravates due to thicker components. Higher the thickness higher the thermal stresses inducing higher fatigue loading. OEMs always thrive to reduce the thickness of the casings (both inner as well as outer casing) be it by introducing double casing design or shrink ring design / barrel outer casing eliminating flanges etc. In this design lower temperature and lower pressure steam is extracted from the HP turbine intermediates stage through the annular space between inner casing and outer casing and introduced to the balancing piston. This steam is divided into two parts. First part flows toward the shaft glands and the remaining steam towards mixing chamber where it get mixed with the leak off after the diagonal stage and flows back to further downstream stages. This arrangement serves two purposes (1) it cools the outer casing thereby not exposing the outer casing to higher temperature of Main Steam. This reduces the thickness of the outer casing as well as the stress levels. Further the turbine glands are also exposed to lower pressure and temperature. This feature can accommodate higher ramp rates as well as lowers the startup time. Fig4:- HPT internal cooling arrangement (Curtesy- Siemens/ BHEL ltd.)
  • 4. 2.6 Concept of rotor and blade cooling / Heat shield at the highest temperature location It shields the highly stressed components and thereby exposing the metal to much lower temperature than the expected temperature. Increases fatigue and creep life of the highly stressed components. Normally at the inlet section of IPT as it is the highest temperature location. Due to this arrangement the rotor is exposed to much lower temperature and hence have lower creep and Low Cycle fatigue stresses. Some design envisages cooling the inlet stages of IP turbine stationary and rotating blades by introduction of steam of lower temperature through drilled holes in the blades. This way thermal stress in the highly stressed component like rotor is reduced facilitating better transient behavior. Fig: 5 Thermal shield for IP turbine (Curtesy Siemens / BHEL) 2.7 Single bearing design with sliding casing / Bearing pedestal design 2.7.1 Single bearing concept Only one bearing is envisaged between two turbine cylinders even between LP turbine and Generator. This design enables more accurate prediction of bearing loads as compared to individual bearing design due to manufacturing and erection reasons. Due to determined bearing loading / stiffness the critical speeds can also be predicted more accurately. Accurate prediction of bearing loading & critical speed reduces the shaft vibration levels. This design reduces the lube oil consumption as well as bearing losses. Overall length of the shaft line also gets reduced. 2.7.2 Sliding bearing pedestal / casing The bulk material temperature for the turbine shaft and the turbine casing are always different. The difference is more during startup / shut down and minimum during steady state operation. Higher the differential expansion higher the chance of interference between static and rotating parts. The thermal expansion of the turbine shafts from HP to LP is bound to be added up as the shafts are directly coupled with each other. However the expansion of the casings only start from the respective fixed points. If individual shafts have their own fixed point ( as in case of older designs) then the casing expansions are not integrated with each Fig:6 Expansion diagram with self-compensating nature
  • 5. other and the differential expansion is more at the farthest point of absolute shaft fixed point (i.e. thrust bearing). Sliding bearing pedestal / casing design has only one absolute fixed point for the casings also wrt thermal expansion point of view. This gives rise to self-compensating nature of the turbine train. 2.8 Abradable seal design It is the endeavor of all OEMs to reduce the clearance between static and rotating components. Higher the clearances higher the losses results into lower efficiency. However lower the clearances higher the chances of interference between static and rotating components specifically during transient conditions like startup, shutdown & load changes etc. and hence reduced long term sustained efficiency. The relative position of the shaft and the casings are different during steady state condition as compared to that of during startup / shutdown. This fact is exploited by use of softer coating over the shaft (abradable seals) in the seal area and closing down the clearances. During startup / shut down when the differential expansions are higher the gaps between static and rotating components close down and even the seals are allowed to rub the softer coating increasing the gap. As the units moves towards steady state condition the relating position of the shaft and casings changes and the seals faces the unrubbed portion of the coating where the clearances are still low (un-rubbed). This increases the steady state efficiency maintaining the reliability during transients. Fig: 7 Abradable seals (curtesy:- Toshiba) 2.9 Shifting the design point The thermal cycle and its components are optimized for a particular condition. This condition is called the design point and Operation at this condition results in maximum efficiency. Any deviation / departure from this point results into off design operating condition and obviously results in deteriorated efficiency. Higher the deviation / departure lower the efficiency. Hence all endeavor should be made for operating the plant as close as possible to the design point. While designing the power plant the expected operating regime is kept in mind so that the design point should match with the expected most frequent (maximum number of hours) operating point in the life time of the plant. Till about 2015 plants were operating with very high PLF (~90%) i.e. most of the time the units were operating very near to the rated load and sometimes even at 105% of the rated load (VWO condition). Hence all the plants are optimized for 100% TMCR condition having highest efficiency at 100% TMCR load. Off late due to the advent of renewable energy the plant are operating at lower PLF (~60%) and in future it is expected that the PLF will further go down
  • 6. and the thermal plants are expected to run at part load for most of the time. Hence it is necessary that the plants be optimized at part load condition rather than at rated load so as to derive most efficient operation. Keeping above objective in view certain changes have been done in the specification stage itself. 2.9.1 Provision of over load valve The plants are designed for a continuous unrestricted capacity of 105% of the rated load. This is necessary to meet the grid demand / Indian grid code. Hence all the turbine components including MS control valves possess this capability irrespective of its operating point. During lower load operation the plant is envisaged to operate sliding pressure mode. However operating in pure sliding pressure operation reduces the instantaneous load peaking capability of the unit as there is no thermal reserve. Hence the units have to operate under modified sliding pressure operation with a throttle reserve of about 5%. Hence about 5% throttling takes place in the MS control valves. Throttling in the MSCV results in continuous loss in efficiency. Provision of overload valve (OLV) allows operation on the unit in pure sliding pressure mode of operation without compromising the load peaking capability. The OLV bypasses some initial stages of the HP turbine and the steam is admitted after say 4th stage. This increases the swallowing capacity of the turbine without increasing the inlet pressure (increasing the area of admission). The MSCV always operates full open and the peaking capability is realized by OLV. During operation of OLV the plant efficiency reduces but for a very short period of time allowing efficient operation during normal operation. 2.9.2 Cycle optimization for partial load Previously the plants were being optimized for near about full load condition and accordingly the heat rate guarantees were asked for at 100% TMCR and VWO (105% TMCR) condition. Bid evaluation factors are specified for the quoted heat rate by various vendors. Credit for better heat rate is given to the bidders based on this factor. During PG test if the contractor fails to meet the quoted guarantees then Liquidated Damages (LD) are deducted based on previously specified LD values. In order to get higher evaluation credit the OEMs optimize the cycle at near about 100% load condition. Off late the requirement for more efficient operation in partial load condition has arisen. Accordingly the guarantee point have now changed to 100% TMCR and 60% TMCR condition so as to encourage the bidders to optimize the cycle and the equipment’s somewhere between 60 – 100% load. Instead of separate guarantees at different load points one single weighted average guarantee has been asked with 50% weightage for 60% load and 50% at 100% load condition. 2.10 Startup modes with the aid of TSE During design all the designers apply factor of safety in the design. This factor is also known as factor of unknowns or uncertainty. Lesser the knowledge on the subject higher the factor of uncertainty to be applied to take care of unknowns. Higher the available information in terms of measurements, prediction tools this factor can be reduces and the capability of the equipment’s / components can be exploited without the fear of failure. The Turbine Stress Evaluator plays a vital role during startup providing all information to the operator to control the startup process. This also protects the turbine from damage. In the initial generation turbines this tool was not H Fig: 8 Provision of Overload valve
  • 7. available (some plants are still operating without TSE). The startups were governed by certain thumb rules / time dependent criteria specified by the turbine manufacturer. Obviously this method cannot exploit full capability of the machines. Subsequently the tool was developed and refinements were carried out as the technology matured. Following are the different stages of development of TSE giving more and more accurate prediction of life consumption. Generation # I TSE:- The life consumption of critical turbine components were calculated based on number of startups and operating hours. Generation # II TSE:- Startup mode were differentiated. Life consumption during Cold, warm and hot startups were differentiated. Similarly different modes of startup (slow, moderate & faster) were also envisaged so that the operator can decide for faster startups based on grid requirement. The information on life consumption is also made available. Generation # III TSE:- This was based on actual stress measurement of critical components. This method provided more accurate predication of life consumption as it is based on measurement. Generation # IV TSE:- Present day TSE also takes load changes into account while calculating the life consumption. From the above developments it can be seen that more and more information is being made available to the operating staff during actual operation so that the capability of the plant can be utilized to the fullest. 3.0 Snapshot of yardsticks Due to continuous upgradation process lot of improvements have been achieved in the performance parameters which will help in meeting the present day demand. Keeping the present day grid demand in view comparison of some of the yardsticks of flexible operation (older units vs present day units) has been compiled in the table below. Parameters Older units Present day units Primary mode of operation Base load operation Two shifting / Cyclic load operation Total Number of startups in life time Cold:- 150 Warm:- 450 Hot:-1400 Cold:- 150 Warm:- 1000 Hot:-4000 Startup time Cold:-340 Warm:- 200 Hot:-90 Cold:- 126 Warm:- 60 Hot:- 20 Steady state Ramp rate 1% per minute 5% per minute 4.0 Conclusion Design upgradation is a continuous process. The expectations of the end customers are also changing day by day. Even if the technology is matured it is necessary to make changes in the existing features to meet the present day requirement. Further market forces such as competition from peers also acts as catalyst for upgradation. Call of the present day in power sector is flexible operation of thermal units. Accordingly lot of modifications are done to make the unit more capable of flexible operation. The endeavor shall continue in future depending upon need / demand from the end users.
  • 8. References 1. Ministry of Power, Government of India website 2. Central Electricity website. 3. Technical presentations and O&M manual of various OEMs (Siemens, GE, Toshiba, LMZ etc.) 4. IEC 60045