Sustainable Solid
Waste Management
Practices at Urban
Level
(Water and Sanitation
Service Peshawar - WSSP).
Existing Situation
• Population of Peshawar City: 1.97 Million (2017
census)
• Annual Growth Rate 3.96 % (Highest in Pakistan)
• Estimated generation of Solid Waste 1000 tons/day
• Collection of Solid Waste by WSSP around 800
tons/day
• Final disposal: Dumping at Bahdur Kalai at a rental
location
Proposed Solution for Sustainable SWM
1. Sanitary Land Fill (Estimated Cost Rs. 2.5 billion)
2. Construction and development of Compost Plant
(Estimated Cost Rs. 2 billion)
3. Waste to Energy project (Estimated Cost Rs. 7.4
billion)
Estimated Cost : 2.5 Billion PKR
Land Requirement : 600 Kanal
Development of Sanitary Land Fill
Allied Facilities
• Installation of Weigh Bridges
• Development of the Service road for waste unloading vehicles
till sanitary landfill cell
• Development of Buffer Zone/Green Belt across the landfill site
• Requirements
• Distance from Urban area 30 Km
• Total area of Landfill Facility 600 Kanal
• Area of Land Fill 400 Kanal
• Design Capacity 500 – 1000 tons/day
Acquisition of Land for Sanitary Land Fill Site, Peshawar
Locality Land
Required
Current Update
Mouza
Ghari
Faizullah
600
Kanals
 Meetings by Chief Minister on 28-03-2018 and 03-04-
2018.
 Landfill sites at Maryamzai (Badabher) and Surizai
Maira, at Urmar were abandoned.
 Deputy Commissioner Peshawar to de-notify the
section-4, imposed earlier for Peshawar Housing
Scheme, on parcel of land selected for sanitary
landfill site. The de-notification will be made to the
extent of land required for landfill site.
 The Deputy Commissioner Peshawar shall take action
under emergency clauses of the land acquisition act
and notify section-4 for acquisition of land for
sanitary landfill site at Shamshatoo on priority basis.
Construction and Development of Compost Plant
Estimated Cost: 2.5 billion PKR
Land Required: 100 – 120 Kanal
Design Capacity: 300 – 500 tons/day
• Around 300 - 500 tons of MSW can be processed through composting plant
• Highly Suitable due to:
• High moisture content, high Carbon Nitrogen (C/N) ratio and low
value of volatile content of solid waste
• Cheap process.
• Environment friendly
• 100% natural, no chemical addition
• Improves soil strength - therefore it is called soil conditioner / supplement
• Improves fertility of soil through pure organic matter
• Increases water holding capacity of soil
• Act as natural pesticide
• In ecosystems, it is useful for erosion control, land and stream reclamation,
wetland construction, and as landfill cover.
Link
Roughly 20 million tons solid waste is generated with
2.4% growth each year.
Potential of 1000 MW is available through Municipal
Solid Waste.
City wise waste and estimated generation of electricity is
as under:
 Karachi 15,000 ton per day 300 MW
 Lahore 8,000 ton per day 160 MW
 Peshawar 1,000 ton per day 30 MW
 Quetta 300-400 ton per day 10 MW
Link
Estimated Cost: 7.4 Billion PKR
Land Required: 20-25 Acre land for 20-30 MW power plant
Waste to Energy
Benefits of WTE projects
• Cleaner environment as a result of elimination of
municipal waste
• Recovery of recyclable material of more than 50%
• Conversion of waste into useful product like power /
energy.
• Gain of carbon credit from international agencies
• Furnace ash collection & reutilization as bricks and
roads paving materials
• Savings in foreign exchange (Imported petroleum
products).
• Jobs for local human resource both in permanent and
contractual category.
Solid Waste Compost Plant at Lahore, Punjab
Process at Compost Plant
Compost processing is done through aerobic decomposition
using Windrow technology without any addition of chemicals.
Windrow means a long heap of regular shape and cross
section, prepared with the organic material.
The composting process normally takes around 60 days to
complete.
The plant and machinery supplied by MENART of Belgium, has
a capacity to produce around 40,000 MT of compost per
annum.(Lahore Compost)
Process Benefits
Composting process employed not only
controls the emission of Green House Gases
(GHG) to the environment but also turns the
organic material extracted from MSW into a
useful product which eventually go back to the
soil, hence facilitates effective and efficient
management of waste.
Compost Making Operations
Compost making operations include:
1. Sorting of MSW
2. Shredding of compostable material and
mixing
3. Windrows management
4. Compost sieving and bagging
What is Compost?
Compost is a stable, humus like product resulting from
the biological decomposition of organic matter under
controlled conditions.
Controlled biological decomposition process is what
differentiates composting from the natural
decomposition of organic matter.
Organic materials are decomposed regardless of
whether or not we compost them, but regulating and
optimizing conditions ensures a faster and environment
friendly process, thus producing quality end product.
Operations Flow Chart
MSW Sorting +
Screening
Combustible
Material
Organic
Material
Organic
Piling Area
Cow Dung +
Green Waste
Compost
Shed
Composting
(Windrows)
Compost
Sieving
Bagging
Rejected
Material
Rejected
Material
Ware House
Manual Segregation at Conveyor Belt
Windrows Management
Windrows Parameter Monitoring
General Composition
1. Carbon to Nitrogen Ratio (C:N)
2. Organic matter
3. Moisture
4. Cation Exchange Capacity (CEC)
5. pH
6. Electrical Conductivity (EC)
7. Total Dissolved Solids (TDS)
Windrow TurningWindrow Turner
Compost Sieving & Bagging
Cont…..
Roughly 20 million tons solid waste is generated with
2.4% growth each year.
Potential of 1000 MW is available through Municipal
Solid Waste.
City wise waste and estimated generation of
electricity is as under:
 Karachi 15,000 ton per day 300 MW
 Lahore 8,000 ton per day 160 MW
 Peshawar 1,000 ton per day 30 MW
 Quetta 300-400 ton per day 10 MW
Project 2: Waste To Energy
Cost : 7.4 Billion PKR (Source: NEPRA)
Solid Waste Management at Urban Level
Solid Waste Management at Urban Level
Peshawar generates 800-1000 ton waste per day
The garbage is dumped at temporary sites
identified by WSSP
The Peshawar City has potential of 30 MW
20-25 Acre land will be required for 30 MW
power plant
Private Sector :
Power & Energy Development Corporation
• The PEDC is an authorized consultant of
Hangzhou- Jinjiang Group China. It is a
Chinese company that has authorized PEDC to
contact District Local Authorities of Pakistan
for waste to energy (WTE) project proposal &
implementation.
• 500 tons/day MSW generate 10 MW
Modes of Project Implementation
• Public Private Partnership (PPP) for commercial
agreement between Hangzhou Jinjiang group & local
government or its associated company. Following are
the wide range of contractual options of which
anyone could be opted
 Built –OWN- Operate (BOO)  Built–Own-Operate-transfer
(BOOT)
 Built- Transfer(BT)  Built- transfer and Operate(BTO)
 Built –Operate and
transfer(BOT)
 Built-Lease-Transfer(BLT)
 Joint Venture (JV)
Benefits of the WTE projects
• Cleaner environment as a result of elimination of
municipal waste
• Recovery of recyclable material of more than 50%
• Conversion of waste into useful product like power /
energy.
• Gain of carbon credit from international agencies
• Furnace ash collection & reutilization as bricks and
roads paving materials
• Energy self-reliance and savings in much needed
foreign exchange.
• Jobs for local human resource both in permanent and
contractual category.
WASTE To Energy

More Related Content

Similar to Solid waste

Honeysuckers - Sanitation solution from the informal sector
Honeysuckers - Sanitation solution from the informal sectorHoneysuckers - Sanitation solution from the informal sector
Honeysuckers - Sanitation solution from the informal sectorzenrain man
 
Waste to energy india
Waste to energy indiaWaste to energy india
Waste to energy indiaKishlay Kumar
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptxssuser9b43b32
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptxAkshat Jain
 
Waste Management 3 YASH.pptx
Waste Management 3 YASH.pptxWaste Management 3 YASH.pptx
Waste Management 3 YASH.pptxYashSolanki372360
 
The management of sludge in the informal sector, India
The management of sludge in the informal sector, IndiaThe management of sludge in the informal sector, India
The management of sludge in the informal sector, Indiazenrain man
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalManuel Hidalgo
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalManuel Hidalgo
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWGLA University
 
Ppt dated 7th recycle &Reuse
Ppt dated 7th recycle &ReusePpt dated 7th recycle &Reuse
Ppt dated 7th recycle &ReuseAmit Mishra
 
Waste to energy proposal
Waste to energy proposalWaste to energy proposal
Waste to energy proposalMubbara Arshad
 
IRJET- Study of Bioreactors for Biological Treatment of Wastewater
IRJET- Study of Bioreactors for Biological Treatment of WastewaterIRJET- Study of Bioreactors for Biological Treatment of Wastewater
IRJET- Study of Bioreactors for Biological Treatment of WastewaterIRJET Journal
 
IRJET- Study of Bioreactors for Biological Treatment of Wastewater
IRJET- Study of Bioreactors for Biological Treatment of WastewaterIRJET- Study of Bioreactors for Biological Treatment of Wastewater
IRJET- Study of Bioreactors for Biological Treatment of WastewaterIRJET Journal
 
Best practices in infrastructure
Best practices in infrastructureBest practices in infrastructure
Best practices in infrastructureAdithyaA16
 

Similar to Solid waste (20)

Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
 
ORS Corporate(N)
ORS Corporate(N)ORS Corporate(N)
ORS Corporate(N)
 
Honeysuckers - Sanitation solution from the informal sector
Honeysuckers - Sanitation solution from the informal sectorHoneysuckers - Sanitation solution from the informal sector
Honeysuckers - Sanitation solution from the informal sector
 
Waste to energy india
Waste to energy indiaWaste to energy india
Waste to energy india
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptx
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
 
Waste Management 3 YASH.pptx
Waste Management 3 YASH.pptxWaste Management 3 YASH.pptx
Waste Management 3 YASH.pptx
 
The management of sludge in the informal sector, India
The management of sludge in the informal sector, IndiaThe management of sludge in the informal sector, India
The management of sludge in the informal sector, India
 
ORS Mkt BIC
ORS Mkt BICORS Mkt BIC
ORS Mkt BIC
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOW
 
Novateurs
NovateursNovateurs
Novateurs
 
Ppt dated 7th recycle &Reuse
Ppt dated 7th recycle &ReusePpt dated 7th recycle &Reuse
Ppt dated 7th recycle &Reuse
 
Waste to energy proposal
Waste to energy proposalWaste to energy proposal
Waste to energy proposal
 
IRJET- Study of Bioreactors for Biological Treatment of Wastewater
IRJET- Study of Bioreactors for Biological Treatment of WastewaterIRJET- Study of Bioreactors for Biological Treatment of Wastewater
IRJET- Study of Bioreactors for Biological Treatment of Wastewater
 
IRJET- Study of Bioreactors for Biological Treatment of Wastewater
IRJET- Study of Bioreactors for Biological Treatment of WastewaterIRJET- Study of Bioreactors for Biological Treatment of Wastewater
IRJET- Study of Bioreactors for Biological Treatment of Wastewater
 
Best practices in infrastructure
Best practices in infrastructureBest practices in infrastructure
Best practices in infrastructure
 
Energy From Waste Options
Energy From Waste OptionsEnergy From Waste Options
Energy From Waste Options
 

More from hosting guests

Tourism task force updated tariq sab
Tourism task force updated tariq sabTourism task force updated tariq sab
Tourism task force updated tariq sabhosting guests
 
Kp delegation-of-financial-power-rules-2018
Kp delegation-of-financial-power-rules-2018Kp delegation-of-financial-power-rules-2018
Kp delegation-of-financial-power-rules-2018hosting guests
 
Tourism task force final
Tourism task force finalTourism task force final
Tourism task force finalhosting guests
 
Khyber pass economic corridor project p159577 (1)
Khyber pass economic corridor project   p159577 (1)Khyber pass economic corridor project   p159577 (1)
Khyber pass economic corridor project p159577 (1)hosting guests
 
Final implement ppt.03.05.2018
Final implement ppt.03.05.2018Final implement ppt.03.05.2018
Final implement ppt.03.05.2018hosting guests
 
Working paper on 1st off road rally (final)
Working paper on 1st off road rally (final)Working paper on 1st off road rally (final)
Working paper on 1st off road rally (final)hosting guests
 
Draft to rs for dmps clean
Draft to rs for dmps   cleanDraft to rs for dmps   clean
Draft to rs for dmps cleanhosting guests
 
Project management unit for kite project (1)
Project management unit for kite project (1)Project management unit for kite project (1)
Project management unit for kite project (1)hosting guests
 
Tourism task force with input of aftab rana
Tourism task force with input of aftab ranaTourism task force with input of aftab rana
Tourism task force with input of aftab ranahosting guests
 
Performance review benchmarks
Performance review benchmarksPerformance review benchmarks
Performance review benchmarkshosting guests
 
Provision of small machinery
Provision of small machineryProvision of small machinery
Provision of small machineryhosting guests
 
Small scale youth business
Small scale youth businessSmall scale youth business
Small scale youth businesshosting guests
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)hosting guests
 
Solarized cold storages
Solarized cold storagesSolarized cold storages
Solarized cold storageshosting guests
 
Stacy five years_plan_revised_only_for_tourism
Stacy five years_plan_revised_only_for_tourismStacy five years_plan_revised_only_for_tourism
Stacy five years_plan_revised_only_for_tourismhosting guests
 

More from hosting guests (20)

Tourism task force updated tariq sab
Tourism task force updated tariq sabTourism task force updated tariq sab
Tourism task force updated tariq sab
 
Kp delegation-of-financial-power-rules-2018
Kp delegation-of-financial-power-rules-2018Kp delegation-of-financial-power-rules-2018
Kp delegation-of-financial-power-rules-2018
 
Tourism task force final
Tourism task force finalTourism task force final
Tourism task force final
 
Khyber pass economic corridor project p159577 (1)
Khyber pass economic corridor project   p159577 (1)Khyber pass economic corridor project   p159577 (1)
Khyber pass economic corridor project p159577 (1)
 
Frame work on tourism
Frame work on tourismFrame work on tourism
Frame work on tourism
 
Final implement ppt.03.05.2018
Final implement ppt.03.05.2018Final implement ppt.03.05.2018
Final implement ppt.03.05.2018
 
Working paper on 1st off road rally (final)
Working paper on 1st off road rally (final)Working paper on 1st off road rally (final)
Working paper on 1st off road rally (final)
 
Draft to rs for dmps clean
Draft to rs for dmps   cleanDraft to rs for dmps   clean
Draft to rs for dmps clean
 
Mineral mapping
Mineral mappingMineral mapping
Mineral mapping
 
Project management unit for kite project (1)
Project management unit for kite project (1)Project management unit for kite project (1)
Project management unit for kite project (1)
 
Tourism task force with input of aftab rana
Tourism task force with input of aftab ranaTourism task force with input of aftab rana
Tourism task force with input of aftab rana
 
Performance review benchmarks
Performance review benchmarksPerformance review benchmarks
Performance review benchmarks
 
Note sheet
Note sheetNote sheet
Note sheet
 
Strategic roadmap
Strategic roadmapStrategic roadmap
Strategic roadmap
 
Provision of small machinery
Provision of small machineryProvision of small machinery
Provision of small machinery
 
Small scale youth business
Small scale youth businessSmall scale youth business
Small scale youth business
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)
 
Slf
SlfSlf
Slf
 
Solarized cold storages
Solarized cold storagesSolarized cold storages
Solarized cold storages
 
Stacy five years_plan_revised_only_for_tourism
Stacy five years_plan_revised_only_for_tourismStacy five years_plan_revised_only_for_tourism
Stacy five years_plan_revised_only_for_tourism
 

Recently uploaded

Offences against property (TRESPASS, BREAKING
Offences against property (TRESPASS, BREAKINGOffences against property (TRESPASS, BREAKING
Offences against property (TRESPASS, BREAKINGPRAKHARGUPTA419620
 
一比一原版旧金山州立大学毕业证学位证书
 一比一原版旧金山州立大学毕业证学位证书 一比一原版旧金山州立大学毕业证学位证书
一比一原版旧金山州立大学毕业证学位证书SS A
 
如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书Fir L
 
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝soniya singh
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书FS LS
 
A Short-ppt on new gst laws in india.pptx
A Short-ppt on new gst laws in india.pptxA Short-ppt on new gst laws in india.pptx
A Short-ppt on new gst laws in india.pptxPKrishna18
 
如何办理(KPU毕业证书)加拿大昆特兰理工大学毕业证学位证书
 如何办理(KPU毕业证书)加拿大昆特兰理工大学毕业证学位证书 如何办理(KPU毕业证书)加拿大昆特兰理工大学毕业证学位证书
如何办理(KPU毕业证书)加拿大昆特兰理工大学毕业证学位证书Fir sss
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A HistoryJohn Hustaix
 
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书FS LS
 
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书SD DS
 
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一jr6r07mb
 
如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
 如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书 如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书Sir Lt
 
如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书Fir L
 
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书SD DS
 
如何办理佛蒙特大学毕业证学位证书
 如何办理佛蒙特大学毕业证学位证书 如何办理佛蒙特大学毕业证学位证书
如何办理佛蒙特大学毕业证学位证书Fir sss
 
POLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxPOLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxAbhishekchatterjee248859
 
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书SD DS
 
Test Identification Parade & Dying Declaration.pptx
Test Identification Parade & Dying Declaration.pptxTest Identification Parade & Dying Declaration.pptx
Test Identification Parade & Dying Declaration.pptxsrikarna235
 
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSDr. Oliver Massmann
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Dr. Oliver Massmann
 

Recently uploaded (20)

Offences against property (TRESPASS, BREAKING
Offences against property (TRESPASS, BREAKINGOffences against property (TRESPASS, BREAKING
Offences against property (TRESPASS, BREAKING
 
一比一原版旧金山州立大学毕业证学位证书
 一比一原版旧金山州立大学毕业证学位证书 一比一原版旧金山州立大学毕业证学位证书
一比一原版旧金山州立大学毕业证学位证书
 
如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书
 
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
 
A Short-ppt on new gst laws in india.pptx
A Short-ppt on new gst laws in india.pptxA Short-ppt on new gst laws in india.pptx
A Short-ppt on new gst laws in india.pptx
 
如何办理(KPU毕业证书)加拿大昆特兰理工大学毕业证学位证书
 如何办理(KPU毕业证书)加拿大昆特兰理工大学毕业证学位证书 如何办理(KPU毕业证书)加拿大昆特兰理工大学毕业证学位证书
如何办理(KPU毕业证书)加拿大昆特兰理工大学毕业证学位证书
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A History
 
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
 
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
 
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
 
如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
 如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书 如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
 
如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书
 
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
 
如何办理佛蒙特大学毕业证学位证书
 如何办理佛蒙特大学毕业证学位证书 如何办理佛蒙特大学毕业证学位证书
如何办理佛蒙特大学毕业证学位证书
 
POLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxPOLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptx
 
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
 
Test Identification Parade & Dying Declaration.pptx
Test Identification Parade & Dying Declaration.pptxTest Identification Parade & Dying Declaration.pptx
Test Identification Parade & Dying Declaration.pptx
 
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
 

Solid waste

  • 1. Sustainable Solid Waste Management Practices at Urban Level (Water and Sanitation Service Peshawar - WSSP).
  • 2. Existing Situation • Population of Peshawar City: 1.97 Million (2017 census) • Annual Growth Rate 3.96 % (Highest in Pakistan) • Estimated generation of Solid Waste 1000 tons/day • Collection of Solid Waste by WSSP around 800 tons/day • Final disposal: Dumping at Bahdur Kalai at a rental location
  • 3. Proposed Solution for Sustainable SWM 1. Sanitary Land Fill (Estimated Cost Rs. 2.5 billion) 2. Construction and development of Compost Plant (Estimated Cost Rs. 2 billion) 3. Waste to Energy project (Estimated Cost Rs. 7.4 billion)
  • 4. Estimated Cost : 2.5 Billion PKR Land Requirement : 600 Kanal Development of Sanitary Land Fill Allied Facilities • Installation of Weigh Bridges • Development of the Service road for waste unloading vehicles till sanitary landfill cell • Development of Buffer Zone/Green Belt across the landfill site • Requirements • Distance from Urban area 30 Km • Total area of Landfill Facility 600 Kanal • Area of Land Fill 400 Kanal • Design Capacity 500 – 1000 tons/day
  • 5. Acquisition of Land for Sanitary Land Fill Site, Peshawar Locality Land Required Current Update Mouza Ghari Faizullah 600 Kanals  Meetings by Chief Minister on 28-03-2018 and 03-04- 2018.  Landfill sites at Maryamzai (Badabher) and Surizai Maira, at Urmar were abandoned.  Deputy Commissioner Peshawar to de-notify the section-4, imposed earlier for Peshawar Housing Scheme, on parcel of land selected for sanitary landfill site. The de-notification will be made to the extent of land required for landfill site.  The Deputy Commissioner Peshawar shall take action under emergency clauses of the land acquisition act and notify section-4 for acquisition of land for sanitary landfill site at Shamshatoo on priority basis.
  • 6. Construction and Development of Compost Plant Estimated Cost: 2.5 billion PKR Land Required: 100 – 120 Kanal Design Capacity: 300 – 500 tons/day • Around 300 - 500 tons of MSW can be processed through composting plant • Highly Suitable due to: • High moisture content, high Carbon Nitrogen (C/N) ratio and low value of volatile content of solid waste • Cheap process. • Environment friendly • 100% natural, no chemical addition • Improves soil strength - therefore it is called soil conditioner / supplement • Improves fertility of soil through pure organic matter • Increases water holding capacity of soil • Act as natural pesticide • In ecosystems, it is useful for erosion control, land and stream reclamation, wetland construction, and as landfill cover. Link
  • 7. Roughly 20 million tons solid waste is generated with 2.4% growth each year. Potential of 1000 MW is available through Municipal Solid Waste. City wise waste and estimated generation of electricity is as under:  Karachi 15,000 ton per day 300 MW  Lahore 8,000 ton per day 160 MW  Peshawar 1,000 ton per day 30 MW  Quetta 300-400 ton per day 10 MW Link Estimated Cost: 7.4 Billion PKR Land Required: 20-25 Acre land for 20-30 MW power plant Waste to Energy
  • 8. Benefits of WTE projects • Cleaner environment as a result of elimination of municipal waste • Recovery of recyclable material of more than 50% • Conversion of waste into useful product like power / energy. • Gain of carbon credit from international agencies • Furnace ash collection & reutilization as bricks and roads paving materials • Savings in foreign exchange (Imported petroleum products). • Jobs for local human resource both in permanent and contractual category.
  • 9. Solid Waste Compost Plant at Lahore, Punjab
  • 10. Process at Compost Plant Compost processing is done through aerobic decomposition using Windrow technology without any addition of chemicals. Windrow means a long heap of regular shape and cross section, prepared with the organic material. The composting process normally takes around 60 days to complete. The plant and machinery supplied by MENART of Belgium, has a capacity to produce around 40,000 MT of compost per annum.(Lahore Compost)
  • 11. Process Benefits Composting process employed not only controls the emission of Green House Gases (GHG) to the environment but also turns the organic material extracted from MSW into a useful product which eventually go back to the soil, hence facilitates effective and efficient management of waste.
  • 12. Compost Making Operations Compost making operations include: 1. Sorting of MSW 2. Shredding of compostable material and mixing 3. Windrows management 4. Compost sieving and bagging
  • 13. What is Compost? Compost is a stable, humus like product resulting from the biological decomposition of organic matter under controlled conditions. Controlled biological decomposition process is what differentiates composting from the natural decomposition of organic matter. Organic materials are decomposed regardless of whether or not we compost them, but regulating and optimizing conditions ensures a faster and environment friendly process, thus producing quality end product. Operations Flow Chart MSW Sorting + Screening Combustible Material Organic Material Organic Piling Area Cow Dung + Green Waste Compost Shed Composting (Windrows) Compost Sieving Bagging Rejected Material Rejected Material Ware House
  • 14. Manual Segregation at Conveyor Belt
  • 17. General Composition 1. Carbon to Nitrogen Ratio (C:N) 2. Organic matter 3. Moisture 4. Cation Exchange Capacity (CEC) 5. pH 6. Electrical Conductivity (EC) 7. Total Dissolved Solids (TDS)
  • 19. Cont….. Roughly 20 million tons solid waste is generated with 2.4% growth each year. Potential of 1000 MW is available through Municipal Solid Waste. City wise waste and estimated generation of electricity is as under:  Karachi 15,000 ton per day 300 MW  Lahore 8,000 ton per day 160 MW  Peshawar 1,000 ton per day 30 MW  Quetta 300-400 ton per day 10 MW Project 2: Waste To Energy Cost : 7.4 Billion PKR (Source: NEPRA) Solid Waste Management at Urban Level
  • 20. Solid Waste Management at Urban Level Peshawar generates 800-1000 ton waste per day The garbage is dumped at temporary sites identified by WSSP The Peshawar City has potential of 30 MW 20-25 Acre land will be required for 30 MW power plant
  • 21. Private Sector : Power & Energy Development Corporation • The PEDC is an authorized consultant of Hangzhou- Jinjiang Group China. It is a Chinese company that has authorized PEDC to contact District Local Authorities of Pakistan for waste to energy (WTE) project proposal & implementation. • 500 tons/day MSW generate 10 MW
  • 22. Modes of Project Implementation • Public Private Partnership (PPP) for commercial agreement between Hangzhou Jinjiang group & local government or its associated company. Following are the wide range of contractual options of which anyone could be opted  Built –OWN- Operate (BOO)  Built–Own-Operate-transfer (BOOT)  Built- Transfer(BT)  Built- transfer and Operate(BTO)  Built –Operate and transfer(BOT)  Built-Lease-Transfer(BLT)  Joint Venture (JV)
  • 23. Benefits of the WTE projects • Cleaner environment as a result of elimination of municipal waste • Recovery of recyclable material of more than 50% • Conversion of waste into useful product like power / energy. • Gain of carbon credit from international agencies • Furnace ash collection & reutilization as bricks and roads paving materials • Energy self-reliance and savings in much needed foreign exchange. • Jobs for local human resource both in permanent and contractual category.

Editor's Notes

  1. Procure proper landfill sites for SWM in line with EPA guidelines Scientifically designed disposal sites to have up to four separate processing areas, Composting yard Recycling area Incinerator Landfill site