KP Govt Plans Peshawar Uplift Program to Improve Civic Amenities
1. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
SUMMARY FOR THE CHIEF MINISTER KHYBER PAKHTUNKHWA
Subject: - PESHAWAR UPLIFT PROGRAM (PUP)
1. The rapid increase in population and ill planned construction of new buildings in and around
the provincial capital are main sources of plethora of civic and health problems. Irrigation
channels are being used for sewer, which is a source of many water borne diseases. As there is
no water treatment plant in the capital city, some drain water falls into the rivers, which pollutes
them and pose threat to aquatic life. As per KP Multiple Indicator Cluster Survey, only 9% of
the Peshawar population is linked to main sewer line while 76% of the population is linked to
drain outside their houses. The position of solid waste disposal is not very different with only
21% of the population are using solid waste disposal facility of municipal committees while
rest are dumping the solid waste in open streets, grounds, and dig holes.
2. In past, the development schemes for improving the community infrastructure were being
carried out in isolation by various stakeholder including city Government, Municipal, Town
Committees, PDA, Municipal Services Delivery Program etc, which resulted in poor quality of
civic amenities and municipal services in Peshawar. In order to carry out the development
activities in an integrated manner, the present Government has resolved to address these issues
by initiating a mega project with the nomenclature of, “PESHAWAR UPLIFT PROGRAM” at
a total cost of Rs. 1000 million with an allocation of Rs. 500 million during the current financial
year. The following objectives have been envisaged to be accomplished:-
Improvement of civic amenities in Peshawar
Awareness raising for proper dumping of house-waste and garbage
Improvement of the environment of housing, Industrial development, traffic,
transportation, health, education, water supply, sewerage, drainage, solid waste disposal
and matter connected with these.
3. Implementation Strategy: As per implementation strategy, the Peshawar Uplift Program will
be housed at Planning and Development Department and will be implemented in a program
mode instead of project mode in order to follow a flexible, transparent and accountable service
delivery. The activities and works will be executed in a close coordination of all stakeholders
including city government, Municipal Corporation, Town Committees, PDA, Municipal
Services Delivery Program etc.
4. The Honorable Chief Minister Khyber Pakhtunkhwa may be requested to accord approval to
the implementation strategy proposed at para 3 above.
(Dr Asad Ali Khan)
Secretary, P&D Department
Additional Chief Secretary,
P&D Department
2. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - SUBBMISSION OF UPDATED/REVIEWED DEPARTMENTIAL
STRATEGIC REVIEW, OUTCOMES, OUTPUTS, INDICATORS AND
TARGETS UNDER MEDIUM TERM BUDGETARY
FRAMEWORK/OUTPUT BASED BUDGETING (MTBF/OBB) 2013-16
The Finance Department has informed through PUC that the subject titled as
“Budget Call Circular for the year 2013-14 (Budget Estimates), 2012-13 (Revised Estimates)
and medium Term Budgetary Framework/out Based Budgeting (MTBF/OBB) 2013-16 along
with enclosure addressed to all administrative Secretaries with the request to furnished to the
requisite information to the Finance Department
The Finance Department letter along with enclosures was circulated to all Chief
of Section of P&D Department vide F/A.
The response received from Chief of Section is placed below vide F/B, along with
consolidated report prepared by the consultant in light of the response of Chief of Sections report
has been placed below vide F/C, for perusal and approval of the Secretary P&D and for onward
submission to Finance Department.
(SYED LIAQAT SHAH)
Chief Coordination
Chief (Economist), P&DD
3. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - PAKISTAN REMOTE SENSING SATELITE (PRSS).
Planning Commission P&D Division has informed that it has been decided in the
meeting of CDWP held on 05.10.2012 where a committee constituted comprised the following
for the subject cited above. (F/A).
1. Secretary P&D Division Islamabad Chairman
2. Science & Technology of Planning Commission Member
3. I & M of Planning Commission Member
4. One member from each Province Member of KPK
(To be decided)
The above Committee would discuss the role of above cited subject system
(Press) in the Social Sector Development and to enhance its benefits for the province.
The planning Commission has requestedto nominate some official as a member
of he committee expert to the social sector to represent the Province Khyber Pakhtunkhwa.
(Copy of CDWP minutes Attached) (F/B)
The Chief Secretary has asked in margin remarks in ACS P&D Department and
Secretary ST & IT to examine and put up proposel.
Submitted for information/further order please.
(SYED LIAQAT SHAH)
Chief Coordination
Assistant Chief (Coordination)
Chief (Coordination), P&DD
4. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - CHANGING OF ONGOING SCHEMES UNDER ADP OF DISTRICT
KARAK.
08 PUC is a letter from CM’s Secretariat enclosing a letter from Malik Qasim Khan
Khattak MPA PK-4. Remarks of the worthy Secretary P&DD, recorded on the PUC is given as
under:-
“Views of Coordination on points”
09 The point “5” was regarding Southern Area Development Project as such the RD
section was requested to provide views/comments. The RD section of P&DD have already
responded to the EAD Islamabad in this regard and a copy endorsed to the Principal Secretary
CM’s Secretariat (F/A refers).
10 May we endorse a copy of the letter at F/A to CM’s Secretariat in response to the
remainder at page 04/C.
CHIEF COORDINATION
Chief (Economist), P&DD
5. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: MEETING OF THE FUNCTIOINAL COMMITTEE ON PROBLEMS OF
LESS DEVELOPED AREAS.
Through PUC, Senator Mr. Mohammad Yousaf Badini, Chairman, Functional
Committee on Problems of Less Developed Areas has desired to convene a meeting of the said
committee on 23rd July,2013 at 10.30 AM in the committee Room No.4 Parliament House,
Islamabad with the following agenda.
1. Province wise detail of amounts allocated under N.F.C award during 2010-2013.
2. Detail of amounts specified / released/ spent for the uplift of the less developed areas
of the country during 2010-13 with province wise break up.
3. Future plane for the uplift of the less developed areas with allocation of budget for
each plan.
4. Any other item with the permission of the chair.
They have further informed that the information received up to 15th July, 2013
will be appreciated and in case no reply is received till the target date, it will be assumed that
you have no objection to holding of the said meeting.
They have further informed that notice of the proposed meeting will be
issued accordingly.
It is to inform that the PUC was circulated to the concerned and the requisite
information received is placed bellow in K.C dully flagged and the remaining action will be
taken accordingly.
File is be submitted for perusal and further action please.
RESEARCH OFFICER
ASSISTANT CHIEF
6. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
S.# Items Status Further action to be
taken by
1. The normal life of the projects shall
be kept at minimum possible and in
no case should be exceeding 2-3
year. All PC-1 should be precisely
costed with provision for
escalion/de-escalation, contingency
and advertisement coasts and no
revision would be allowed
P&D Department shall
examine the new
development schemes
under ADP 2013-14and
list out projects which
may continue beyond
June 2016.
P&D Department to take
up the process and submit
strategy complete the
schemes within 2-3 years
and to avoid revision of
PC-Is.
2. Prevention of corrupt practices
A complaint cell shall be
established in each administrative
department with provis on of
necessary facilities within one
week’s time and the system should
be in sync with the complaint cell of
the CM’s Secretariat. Mr.
Rafqatullah Babar will coordinate
the exercise. It must be ensured that
all complainants provide/prove
their identity and bonafide before
registration of any complaint. In
case of final disposal of any
complaint involving financial
The Complaint Cell at
the departmental level
has already been
established vide
Irrigation Department
Notification No.
SO(G)IRR/6-13/2009
dated 26.06.2013 and is
functional since. The
directions for
disbursing of rewards
etc. to the complainant
will be followed as and
when
All administrative
departments to comply,
Finance and law
Department to work out
implementation strategy
and present it for approval
of the competent authority.
3. Vigilance in case ongoing
projects
Each administration department
will notify a vigilance committee to
monitor the ongoing development
projects and identify corrupt
project.
Staff and conniving contractors for
reporting to the administrative
departments for necessary action.
Department Vigilance
Committee has been
installed by the
Irrigation Department
vide its.
Notification
SO(E)/IRR/6-5/Cell
dated 28-06-2013 and
shall work under the
directed TORs.
All departments to comply
accordingly
4. The P&DD will circulate necessary
instructions to the concerned
departments as per decisions
reflected above.
P&D Department
informed to have issued
necessary directions
from time to time.
All works and the
departments to follow and
implement. The directions
in this regard
ACTION TO BE TAKEN
7. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
To resolve the issue, it was suggested that the Umbrella PC-1sbe prepared on typical estimate/quantities,
for the broad scope of work and get it administratively approved by the PDWP/competent fourm.
The sub works will be finalized by the concerned department and got approved by the conce ned forum as
per the respective delegation of Financial Powers of the forum.
Subject: INCLUSION OF VARIOUS SCHEMES IN RESPECT OF PK-47
DISSTRICT ABBOTTABAD IN NEXT FINANCIAL YEAR ADP 2014-15
PUC is the letter received from Section Officer-III, Chief Minister’s Secretariat,
forwarding the demands of Sardar Aurangzeb Nelotha, MPA PK-47, District
Abbottabad for inclusion of the following projects in the Next Financial Year ADP
2014-15.
i. Construction of Tehsil Building Hawailian.
ii. Construction of Water Supply Schemes for Nalota village, Kiyala, Chango,
Gohar, hajia, Thaise Balko and kangar Hotar
iii. Construction of 16 Kilometer road from Bhartham to Bara Gali.
The above mentioned schemes pertaining to Roads, LG&RD and Water sectors,
therefore, it is suggested that we may forward the same to Chief Infrastructure and
Chief RD for further necessary action, please.
Submitted for Perusal and further orders, please
Research officer-III
(coord section)
Chief Coordination
8. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: RECORD NOTE OF THE MEETING OF THE HONORABLE CHIEF MINISTER,
KHYBER PAKHTUNKHWA WITH FEDERAL MINISTERS HELD IN
COMMITTEE ROOM OF THE FINIANCE DIVISION, PAK SECRETARIAT,
ISLAMABAD ON 24.02.2015
The subject meeting was held among the provincial ministers, federal ministers,
Secretaries, and senior govt. officers on the numerous agenda items mostly related to
Energy & Power sector, however the below decision against the agenda items are
concerned to P&DD with the instructions for early follow up:-
S.No Agenda item Decision
1. 09) Inclusion of Khyber Pakhtunkhwa in Trade
and Energy Corridor.
I.Chashma Right Bank Canal (CRBC).
II.Swat Express-Way.
III.Hydel Projects.
The Provincial Govt. requested the Federal
Govt. for the inclusion of the aforementioned
mega projects in Trade and Energy Corridor.
A meeting can be
held in March, 2015
between the
Provincial
Government and the
Deputy Chairman PC
to consider and
ensure inclusion of
these projects.
P&DD, Khyber
Pakhtunkhwa will
follow up the matter
with concerned
federal quarters for
the needful.
2. 13) Adequate allocation, releases and utilization
of Public Sector Development Programme
(PSDP) in Khyber Pakhtunkhwa and also be
made non lapsable.
A meeting will be
convened under the
Chairmanship of
Secretary PR&D
Division with
provincial P&DD in
March, 2015 on the
agenda to discuss the
provincial priority
projects to be
included in Federal
PSDP and ensure
timely releases.
It is, therefore, suggested that the concerned sections of the P&DD may
accordingly be made sensitized to meet the decisions taken in the subject meeting on
urgent basis.
9. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Submitted for Perusal and further orders, please
Research officer-II
(coord section)
Chief Coordination
10. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: REPAIR & PROVISIOJN OF2 NOSTYRESOF VEHICLE NO.
A4826
As per damage Rs. 9360/- expenditure have been carried out in the
above vehicle (original voucher enclosed).
Besides the above during inspection of the vehicle it was observed
that wheel alignment and balancing is OK. However, the front 2 tires are out of
order and need replacement to avoid further damage.
Repair expenditure of Rs. 9360/- and replacement of front 2 tire may
kindly be made at the earliest before Ramadan, to ensure labor payment to the
mechanics please.
Assistant Chief
(coord section)
SO (G)
11. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: PROVISION OF VEHICLE
I invite your kind attendtion to the following three lines for your
consideration please.
As and when a government officer transfer from one seat to another
one, he will have to left all the facilities given to him by the government.
It is understood that I have posted as Chief Coordination P&D
Department and the Ex-Chief Coordination has retained his vehicle given to him.
As per directives of Additional Chief Secretary it is proposedthat the
vehicle retained by Ex-Chief Coordination may please be handed over to the
undersigned as per rules.
Chief Coordination
Deputy Secretary(Admin)
12. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: SECTORAL COORDINATION COMMITTEE
PREPARATORY MEETING FOR HIGH LEVEL DIALOGUE
UNDER SDPF
Vide PUC the Establishment Department is inform that the subject
meeting is re-scheduled to be held under the Chairmanship Special Secretary
Establishment Department in the office on 02-03-2016 at 11:30 am to discuss the
subject matter. The director Anticorruption Establishment being focal person of
Establishment Department will updatethe forum onthe subject, and record/prepare
minutes of the meeting for onward submission to the Additional Chief Secretary
P&D Department.
Beside other PUC has been addressed to Secretary P&D Department
and Chief infrastructure P&D Department to make it convenient to attend the
meeting on the date, time and Avenue mentioned above.
File is submitted for information and further necessary action, please.
AssistantChief (Coord)
Chief (Coord)
13. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - ISSUANCE OF ORDER AS ASSISTAN CHIEF IN OWN PAY
SCALE (OPS)
Sir, it is important to bring in your notice that Syed Haroon Shah
Assistant Chief BPS-18 is retiring and his retirement order has been issued by the
establishment and administration section of P&D Department.
Abdul Ghaffar Research Officer Coordination has been serving the
Govt:since 23 years and have been reached to the sealing of(BPS-17) and personal
pay has been started. Being the senior most and in order to fill the vacant post, it is
requested to designate/post the undersigned as Assistant Chief in his own pay scale
(OPS).
Abdul Ghaffar
Research Officer (Coord)
Chief (Coord)
Subject: - ADP 2016-17- PROPOSED CHANGES NOT COVERED IN
SUMMARY APPROVED BY CHIEF MINISTER ON 01/08/2016
14. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Besides amendments approved by the Chief Minster, the Departments/
sections has also proposed and recommended some minor corrections like
correction of approval dates, approved cost, Expenditure, revival of ongoing
scheme, deletion of schemes completed by June 2016 etc.
Consolidate list of changes is placed at Flag A for approval please. The
P&D Department is authorized to make such adjustment as per decision of the
Provincial Cabinet while approving the ADP for 2016-17.
Chief (Coord)
Chief Economist
Subject: - MINUTES OF THE MEETING OF THE PROVINCIAL
CABINET DATED 26-07-2016.
Through PUC the Provincial Cabinet has forwarded the following
decision for the subject meeting held under the Chairmanship of Hon’ble Chief
Minister Khyber Pakhtunkhwa for implementation.
15. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
In order to furnish implementation status of the above decisions file
may be marked to the Administration/Chief PPP with the request to forward the
implementation report directly to the quarter concerned under the intimation to this
office.
Assistant Chief (Coord)
Chief (Coord)
Subject: - CONSTRUCTION OF POLICE CHAUKI PANIAL AT
MANSEHRA.
PUC is a letter addressed to Additional Chief Secretary P&D
Department on the subject along with Annexure which is self-explanatory wherein
Haji Ibrar Hussain Tanoli MPA PK-57 has requested to include the subject Police
Chauki in the present ADP 2016-17 and copyofthe same has sent to the Secretary
P&D Department.
S# Decision Implementation Status
1 Proposed Amendment in the Khyber Pakhtunkhwa
Public Procurement Regulatory Authority Act, 2012
The Cabinet approved the Khyber Pakhtunkhwa
Public Procurement Regulatory Authority Act, 2012.
It was decided by the Cabinet that in future all
Acts/Bills/Regulations/Amendment in Rules of
Business need to prepared and approved within
specified specific time so as to avoid unnecessary
delay.
2 The Cabinet directed that in future all the
Advertisement/Budget should be routed through
Information Department and showed concerned over
the non-implementation of the Cabinet Decisions.
16. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
It is worth mentioning that the ADP 2016-17 has been printed and at
this stage it is impossible to include the subject Police Chauki in ADP 2016-17.
If agree, we may forward the PUC to the Chief Economic Analysis
for consideration/feasibility/inclusion in any umbrella scheme of Police Chauki
(Station) as desired by Hon’ble MPA.
AssistantChief (Coord)
Chief (Coord)
Subject: - IMPLEMENTATION OF THE ANNOUNCEMENT IN THE
BUDGET SPEECH 2016-17
PUC on the above cited subject received from Finance Department,
regarding the latest progress/implementation of Para No. 89 & 92 of the Budget
Speech 2016-17. The requisite information has been received from Chief of
Section Regional/Rural Development. (F/A)
If agree, we may forward the same to the Finance Department as
desired please. In this respect DFA is placed below for perusal/approval, please.
17. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Chief Coordination
CHIEF ECONOMIST
18. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: ALLOTMENT OF OFFICIAL VEHICLE.
It is stated that the marriage ceremony of one of our colleague Mr.
Imran Stenographer is being held in Abbottabad on 31-07-2016 and he has invite
us (Coordination Section) for participation. Therefore, we are going to attend our
beloved colleague marriage ceremony in Abbottabad on Sunday, 31-07-2016.
It is therefore, requested to kindly issue/allot the Official Vehicle for
One Day only to Coordination Section for the participation in the said ceremony.
CHIEF( COORDINATION)
CHIEF ECONOMIST, P&DD
19. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: FOLLOW UP MEETING TO DISCUSS ADDITIONAL RESOURCE
GENERATION (COMMERCIALIZATION OF GOVERNMENT
PROPERTIES).
The subject meeting is scheduled to be held on Tuesday 27th September, 2016 at
01:30 PM under the Chairmanship of Hon’ble Chief Minister at Chief Minister Secretariat
Peshawar. The following are requested to attend the meeting.
1. Senior Minister Irrigation
2. The Minister E&P
3. The Minister Finance
4. The Minister Revenue
5. Dr. Haider Ali ( Parliamentary Secretary)
6. Additional Chief Secretary, P&D Deptt:
7. Senior Member Board of Revenue
8. Secretary Finance
9. Secretary P&DD
10. Secretary Law
11. Secretary Relief
12. CEO EZDMC
The Subject information regarding Board of Revenue, C&W, Industries, Sarhad
Development Authority (SDA) and Small Industries development Board Kohat Road Peshawar
(SIDB) is placed below in KC duly flagged.
The file is submitted for perusal and for further necessary action, please
CHIEF( COORDINATION)
ADDITIONAL SECRETARY, P&DD
20. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: ANNUAL CONFIDENTIAL REPORT OF SYED ZAHIR ALI
SHAH CHIEF COORDINATION P&DD.
The Subject Annual Confidential Report of the undersigned for the
period from 01-07-2014 to 31-12-2014 is submitted for your kind signature, please.
SYED ZAHIR ALI SHAH
CHIEF COORDINATION
Syed Zafar Ali Shah
Secretary Higher Education Department
Ex-SECRETARY, P&DD
21. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: FOLLOW UP MEETING TO DISCUSS ADDITIONAL RESOURCE
GENERATION (COMMERCIALIZATION OF GOVERNMENT
PROPERTIES).
The subject meeting is scheduled to be held on Wednesday 7th December, 2016
at 02:00 PM under the Chairmanship of Hon’ble Chief Minister at Chief Minister Secretariat
Peshawar. The following are requested to attend the meeting.
1. Senior Minister Irrigation
2. The Minister E&P
3. The Minister Finance
4. The Minister Revenue
5. Dr. Haider Ali ( Parliamentary Secretary)
6. Additional Chief Secretary, P&D Deptt:
7. Senior Member Board of Revenue
8. Secretary Finance
9. Secretary P&DD
10. Secretary Law
11. Secretary Relief
12. CEO EZDMC
The Subject information regarding Board of Revenue, C&W, Industries, Sarhad
Development Authority (SDA) and Small Industries development Board Kohat Road Peshawar
(SIDB) is placed below in KC duly flagged.
The file is submitted for perusal and for further necessary action, please
CHIEF( COORDINATION)
ADDITIONAL SECRETARY, P&DD
22. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - WRIT PETITION NO.4684-P/2016 WALI MUHAMMAD VS
GOVERNMENT OF KPK ETC.
PUC on the above cited subject received from Deputy Registrar (J)
Peshawar High Court Peshawar along with the order sheet dated 13-12-2016.
Wherein the letter states that the member Provincial Assemly Wali Muhammad
Khan constituency no.PK-59 Battagram from Pakistan Muslim League (Nawaz)
has submitted writ Petition in Peshawar High Court, Peshawar verses Government
of Khyber Pakhtunkhwa through Chief Secretary including P&D Department etc.
The PHC order sheet further states that funds for executing the ADP
schemes of the petitioner under the enabling provision of Khyber Pakhtunkhwa
Act No.IV of 1989 have illegally be diverted by the Government for executing the
works intimated onthe instruction of the advice ofthe District Nazim. Furthermore
the Court directed in the order sheet that the respondents file the relevant record
and to come up for further proceeding on dated 22-12-2016.
In this regard resource center informed that the present Government
has not in the favor of discretionary funds to MPA however funds
allocation/release to scheme in different constituency of the province through
Chief Minister’s Directives has related to Finance Department and will be in better
Position to provide the relevant information.
File is submitted, please.
ASSISTANT CHIEF (COORD )
SECTION OFFICER (litigation)
23. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Regarding schemes reflected in ADP of devolved departments
Economic Analysis to Districts of Khyber Pakhtunkhwa is executing under the
concerned executing Departments under the Local Government.
24. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
UNDERTAKING
I Mr Abdul Ghaffar S/O Mr.Mir Azam solemnly affirm
on oath that I am working as Assistant Chief in P&D Department
in his own pay scale BPS-17 has been upgraded to BPS-18 in
light of the High Court decision dated / /2017.
Furthermore, as per implementation of the decision
of Peshawar High Court Peshawar, order/Judgment dated /
/2017, all the perks and privileges provided to us in shape
of salary enhancement/kinds etc, will be returned if the
pending appeal in supreme court of Pakistan decided against
the undersigned.
I further undertake that nothing has been concealed
in the aforementioned statement.
Dated: / /2017
Deponent
Abdull Ghaffar
Assistant Chief (Coord)
P&D Department
26. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Refer Para 5 & 6, it is stated that coordination section is already over-
burden. On the analogy of other cases/matters/meetings those which have been
attended by BPS-17 officers on behalf of Secretary, Additional Secretary and
Deputy Secretary i.e interviews, DDWP meetings and likewise.
It is, suggested, that all the court matters being dealt by the litigation
section and SO Litigation maintains a close liaison with all the Courts on daily
basis. Therefore, it would be more appropriate that if he may be nominated
/directed to share the requisite contacts with the law department for the purpose.
Submitted, please.
ASSISTANT
Chief
Coordination
CHIEF COORDINATION
27. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - INTERNAL PREPARATORY NFC MEETING
PUC on the above cited subject received from Finance Department
Wherein, it has been informed that pursuant the decision taken in the internal NFC
meeting held on 25-4-2017 the next internal NFC meeting is schedule to be held
on Tuesday 9th May 2017 at 10:00 A.M in the Committee Room of Finance
Department under the Chairmanship of Minister for Finance Khyber Pakhtunkhwa.
The agenda items are as under.
1). Presentation by the CEO KPOGCL to KP NFC team on the issues
containing in the list communicated bythe Energy & Power Department vide letter
No.SOG(E&P)2-22/2017/NFC dated 26-04-2017.
2). Presentation by the Planning & Development Department about
allocation/ releases and pending KP projects pursuant to the decision taken in the
internal NFC meeting dated 25-04-2017.
3). Review the progress of amendments in the IRSA Act pursuant to
the decision taken in the internal NFC meeting dated 25-04-2017.
PUC further informed that the requisite information / progress report
related to P&D Department may kindly be shared to this Department by 6th May,
2017, positively and also requested to make it convenient to attend the meeting on
schedule date, time and venue. Please.
The agenda of the PUC has been circulated to Chief Water, Chief
Power and Chief Economic Analysis for information and necessary action, please.
In order to attend the meeting file is submitted, please.
ASSISTANT CHIEF
(COORD)
CHIEF (COORD)
Subject: EXTENSION OF INTERNSHIP PERIOD
28. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Kindly refer to the subjectnoted above, it is stated that Mr.
Mujahid Hussain, has been working in this section from 6th
June, 2016 to till date
as an internee. His internship period was from June2016 to September, 2016. He
is working properly in this section and this section further needs his services.
It is therefore, requested that he may be granted extension period
from September 2016 to till date and onwards, pleases.
DFA is placed below for perusal/approval, please.
CHIEF (COORD)
CHIEF ECONOMIST
29. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - DEVELOPMENT ATLAS ON PAKISTAN.
Vide PUC the subject task has been given to Ministry of Planning
Development & Reform ICT section, Islamabad to showcase and commemorate
70 years of development across Pakistan and being a high priority projects to
launch and celebrates 70 years ofPakistan’s independence and informed to identify
three other pieces of data, information or themes that may consider a development
success story of Pakistan Independence/ (Government of Khyber
Pakhtunkhwa) as per annexure-I which is self-explanatory.
The PUC further informed that the subject issue is extremely
important and requested for cooperation in the matter that a comprehensive draft
may be furnished by 31st May, 2017 to present the Ministry for planning,
development and reform for approval.
In order to collect the requisite information PUC may be circulated to
All Administrative Departments of Khyber Pakhtunkhwa for provision the subject
information.
In this respect DFA is placed below for perusal/approval, please.
ASSISTANT CHIEF (COORD)
CHIEF ECONOMIST
30. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - SUPREME COURT OF PAKISTAN, ISLAMABAD NOTICE
FOR TRIAL (CRI. A.399/2012)
It is submitted that a notice for appearing to the Supreme Court of
Pakistan has been received to the undersigned on dated 7-6-2017 at 9:00 A.M at
Islamabad.
The Copyof Notice enclosed.
It is requested to kindly allow the undersigned to attend the Court
hearing on 7-6-2017 as per schedule attached.
SYED ZAHIR ALI SHAH
CHIEF COORDINATION,
P&D DEPARTMENT
CHIEF ECONOMIST, P&DD
31. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
PUC on the above cited subject received from Supreme Court of
Pakistan, Islamabad wherein it has been informed that the hearing of the trial of
Mr Adeel international (private limited) will be held on 07-06-2017 at 9:00 AM or
may be late according to the order of the Court.
It is further informed that before coming to Islamabad checks the
website for the confirmation of trail date, and also bring original NIC in the
premises of Judiciary.
File is submitted, please.
CHIEF (COORD)
CHIEF ECONOMIST, P&DD.
32. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: RENEWAL OF SERVICE ID CARD.
Referring to the subject: The undersigned has been upgraded from
Research officer to Assistant Chief in his own pay scale (OPS). The undersigned
requested AO (CBP), P&D Department for renewal of his service card and also computer
operator of the section was contacted for the purposed.
In view of the above, all the relevant data of the undersigned has been
provided to Mr. Masood Computer Operator (CBP) on 13/07/2017 via his email address
i.e masood_ur_rehman@hotmail.com.
It is worth mentioning that as the undersigned inquired about the card
that weather it is prepared or not, Mr. Masood replied that it needs Rs. 200 as fee to be
charged.
The undersigned has provided the aforesaid amount to Mr. Masood
through a special messenger as fee for renewal of card.
It is, therefore, requested that AO (CBP) may kindly be directed to look
into the matter personally for early disposal.
Submitted, please
Assistant Chief
(Coord)
CHIEF (COORD)
33. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: MEETING TO DISCUSS ISSUES RELATED TO KP-BOIT.
The subject meeting has been scheduled to be held on Thursday, 10th
August, 2017 at 2:00 P.M under the Chairmanship of Hon’ble Chief Minister at Chief
Minister’s Secretariat Peshawar.
The agenda of the meeting comprises of 7 items out of which brief on 4
agenda items have been received from Chief industries, RD, Power and CEPEC, which
are dully flagged.
The Secretary P&DD has been requested to attend the meeting.
Submitted, please
CHIEF (COORD)
SECRETARY, P&DD
34. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: DEVELOPMENT STATISTIC OF KHYBER PAKHTUNKHWA 2017, IMPORTANT
DISTRICT-WISE SOCIO-ECONOMIC INDICATORS OF KHYBER PAKHTUNKHWA
2017.
PUC refers: The Directorate of Bureau of Statistics, Khyber Pakhtunkhwa
has prepared and released the subject publication for the year 2017 at F/A.
The worthy ACS, P&D Department has noted remarks thereupon on the
PUC that:
(1) Plz. Discuss the Forest figures with me why is the figures encircled in
page 9 not reflected in the other relevant pages pertaining to forest sector.
(2) All section chiefs should P.U an a nalysis report from their book
pertaining to their respective sector.
In view of the above, the Agriculture section has been approached and
they have responded that the issue was discussed with worthy ACS. However, all the
remaining Chiefs shall be approached to accordingly prepare the report and put up the
same to the worthy Additional Chief Secretary.
DFA is submitted for perusal/approval, please
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
Subject: DEVELOPMENT CAMPAIGN/DUE FOR COMPLETION PROJECTS.
35. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
The subject meeting has been scheduled to be held tomorrow at 10:00
AM under the Chairmanship of Secretary P&D Department. Section-wise timeline is
hereby proposed:
The worthy ACS, P&D Department has noted remarks thereupon on the
PUC that:
(1) Plz. Discuss the Forest figures with me why is the figures encircled in
page 9 not reflected in the other relevant pages pertaining to forest sector.
(2) All section chiefs should P.U an a nalysis report from their book
pertaining to their respective sector.
In view of the above, the Agriculture section has been approached and
they have responded that the issue was discussed with worthy ACS. However, all the
remaining Chiefs shall be approached to accordingly prepare the report and put up the
same to the worthy Additional Chief Secretary.
DFA is submitted for perusal/approval, please
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
36. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: INTERNATIONAL UNION FOR CONSERVATION OF NATURE (IUCN).
PUC refer: The IUCN has scheduled a meeting of Pakistan National
Committee to be held on October 24, 2017 (Tuesday) from 1000 hours to 1330 hours
at the IUCN office at 1, Bath Island, Road, Clifton Karachi.
In this regard, Secretary P&D Department being a member of IUCN,
Pakistan National Committee has been requested to attend the meeting of Pakistan
National Committee (PNC).
Tentative agenda of the meeting is duly flagged.
Submitted please.
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
37. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: PROJECT BOARD / INSTITUTIONAL REFORM GROUP (IRG) MEETING.
PUC refer: The 2nd
meeting of the project board constituted under the
project titled “Reform and Innovation in Governance for High Performance” will be
held on 23rd
November, 2017 at 12:00 Noon instead of 14th
November, 2017 in the
Auditorium of the ‘P’ Block, Pak Secretariat, Islamabad under the Chairmanship of
Minister for Planning, Development and Reform. The UNDP Country Director will be the
Co-chair of the meeting. The agenda of the meeting is as under:
i. Review the progress made under the project during the year.
ii. Approval of the Annual Work Plan 2018
iii. Any other issue with the approval of Chair.
Working paper of the meeting is awaited from Federal Government.
Secretary P&D Department has been requested to attend the subject
meeting, please.
Submitted please.
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
38. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: PROVISION OF FUNDS/ SUPPLEMENTARY GRANT FOR
DEVELOPMENTAL PROJECTS OF IMPORTANT NATURE.
The Hon: Chief Minister, Khyber Pakhtunkhwa has been pleased to
approve supplementary grant of Rs. 2390 million for various sectors, detail of which is
as under:
It, is therefore, suggested that the same may be forwarded to the Cabinet
Section, Administration Department for its placement as additional agenda item in the
forthcoming meeting as it needs approval of the Provincial Cabinet as well, please.
Draft summary for Cabinet is submitted for signature, please.
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
PS TO SECRETARY, P&DD
S# SECTOR Supply: Grant
Rs. In million
1. PKHA 4000
2. C&W 5000
3. Priority Projects.
Special Package.
District Development Initiatives
7000
4. Irrigation/water 2000
5. Higher Education Department 1000
6. E&SED 1000
7. PHED 2000
8. SNGPL 300
9. Electrification works 1600
10.Solarization of schemes in
Mardan
30
Grand total 23930
39. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: DEVELOPMENT CAMPAIGN.
The subject task was assigned to the P&D Department for completion of
due for completion projects/facilities, so that general public could be facilitated. The
P&DD rigorously followed the campaign keeping all implementing/execution bodies on
board. Similarly, all departments were asked to nominate full pledge focal persons for
this important task (list of focal persons is at F/A).
In view of the above, it is, suggested that.
Draft summary for Cabinet is submitted for signature, please.
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
PS TO SECRETARY, P&DD
40. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: MINUTES OF THE MEETING ON DEVELOPMENT OF DISTRICT
DEVELOPMENTPROJECT MANAGEMENTSYSTEM IN ALL DISTRICTS
OF KHYBER PAKHTUNKHWA.
Minutes of the subject meeting held under the Chairmanship of Chief
Economist, P&D Department on dated 05/12/2017, forwarded by Project Director, GIS
Hub, P&DD is submitted for perusal/approval, please.
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
41. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: ASSEMBLY QUESTION ON CPEC/ROAD SHOW.
The Hon: Member Provincial Assembly.
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
42. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: MEETING OF THE GOVERNOR’S COMMITTEE ON TEN YEAR FATA
DEVELOPMENT PLAN.
The P&D Department, Fata Secretariat has articulated a Ten Year FATA
Development Plan (TYFDP) for socio-Economic Development and solicits approval of the
same form the subject committee. The Committee will meet on dated 27th
December,
2017 at 1230 hours, worthy ACS, P&DD Khyber Pakhtunkhwa has been requested to
attend the meeting.
A brief on the report may be perused at F/Brief for the meeting, please.
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
43. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - HANDING/TAKING OF EXTRA ITEMS.
The following extra items may be returned to Accounts Officer
(CBP), P&D Department. Details of the items are as under;
S.# Particulars No of items
1. Computer Two
2. Monitor One
3. Fax machine (out of order) One
4. Gas Heater One
5. Water cooler Two
6. cupboard glass Two
DFA placed below for perusal/approval, please.
Chief Coordination
Chief Economist, P&DD
44. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: - HANDING/TAKING CERTIFICATE ( ITEMS )
S.# Particulars No of items
1. Computer Two
2. Monitor One
3. Fax machine (out of order) One
4. Gas Heater One
5. Water cooler Two
6. cupboard glass Two
Handing over
Name________________________
Section_______________________
Designation___________________
Signature_____________________
45. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: ADP 2016-17 AND 2017-18.
The National Accountability Bureau (NAB) Khyber Pakhtunkhwa has
requested information i.e Minutes of QuarterlyProgressReview Meetings held in
the subject tenure.
The requested information to be forwarded to NAB duly flagged is
submitted for approval/further orders, please.
CHIEF COORDINATION
CHIEF ECONOMIST, P&DD
46. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: TRANSFER BACK ON INSTITUTIONS/FUNCTIONS.
PUC on the subject received from Inter Provincial Coordination
Department alongwith decision of the FederalCabinet meeting held on 10th
January,2018 F/A.
They have requested for the proposal in the subject matter be
submitted to IPCDepartmentand in case,Ifthere is no proposal,a “Nil” reply may
be furnished, please.
DFA is submitted for perusal/approval, please.
CHIEF COORDINATION
ADDITIONAL SECRETARY, P&DD
47. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: PROPOSED/DRAFT ADP 2018-19 PROJECTS (SPECIAL PROJECTS)
The subjectmeeting is scheduled to be held on dated 21-
03-2018 at12:00PMunder theChairmanship of Secretary P&D in the Committee
room of P&D Department.
Inthis regard all the concerned administrativeSecretaries havebeen
informed (F/A).
The presentation/brief received from water and agriculturesections
are dully flagged.
CHIEF COORDINATION
SECRETARY, P&DD
48. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: INLAND STUDY TOUR SC-2017/18.
PUC refers:the letter received from Deputy Director Protocol from
Administration Department Government of Khyber Pakhtunkhwa, wherein the
letter statesthat the visit programeof InlandStudyTour SC-2017/18,comprising
of 21 officers and 4 faculty members, who will visit Governor House, Peshawar
on 03rd
April,2018 at 09:40 AM.
The competent authority has desired that Secretary P&D
Department may prepare and brief the participants regarding Annual
Development Programme.
Presentation of Planning & Development Department is placed
below for information and further necessary action, please.
CHIEF COORDINATION
PS TO MS TO GOVERNOR KHYBER PAKHTUNKWA.
49. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: REVIEWING PERFORMANCE EVALUATION REPORT (PER)
PROFORMA FOR ENSURING PROFESSIONAL WORKING, EFFECTIVE
DECISION AND POLICY MAKING.
PUC refers: theletter received from establishmentP&D Department
alongwith the letter received from Establishment Department with the request
to furnish views/comments regarding improving the existing PER format
identifying best practices alongwith comprehensive performance indicators by
25.05.2018 positively for onward submission to Establishment Department.
File is submitted.
CHIEF COORDINATION
PA TO CHIEF ECONOMIST, P&DD.
50. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: REPAIR OF VEHICLE NO.4123
The following machinery needs to be repair/replaced in the account
of safe journey.
S.No Item
a) Hydraulic power system
b) Power pump
c) Bush
d) Power oil
e) Frontwheels repair
It is, therefore requested that the concerned may be directed to
ensure maintenance of the above items on urgent basis, please.
File is submitted.
ASSISTANTCHIEF COORDINATION
SECTION OFFICER (G), P&DD.
51. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: NOTIFICATION NO.GPP/PIM/2018-3032-62 DATED:29-05-2018.
PUC refers: the letter received from Irrigation Department wherein
it has been requested to include Director (PMC) or Senior Planning Officer (PMC)
in the said PIMworking Group instead of Deputy Secretary Technical as all the
Members of the Group are from the Planning & Development wing of their
respective departments.
If agree we may issue corrigendum regarding the subject
notification.
Submitted for further orders, please.
CHIEF COORDINATION
PA TO CHIEF ECONOMIST, P&DD.
52. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: NOTIFICATION NO.GPP/PIM/2018-3032-62 DATED: 29-05-2018.
The Planning and Development Department, Khyber Pakhtunkhwa
has constituted a working group under the chairmanship of Secretary P&DD and
has circulated its TORs for finalization of draft Public Investment Management
(PIM) Plan.
The Deputy Secretary technical irrigation Department has been
nominated as a member of the mentioned working group to representIrrigation
Department. The DeputySecretaryIrrigationdepartmenthas communicated that
DS,Irrigationisnotthe relevantofficerforthe aforesaidworkinggroup andSenior
Planning officer, Irrigation Departmentmay be nominated as member of the PIM
Working Group, being the relevant officer.
It is, therefore, suggested that a corrigendum may be issued in the
matter in order to resolve the issue and to avoid complications in future, please.
ASSISTANTCHIEF
(COORD)
CHIEF COORD, P&DD.
53. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: RESULT BASED FINANCING FOR KP REVENUE MOBILIZATION AND
RESOURCE MANAGEMENT PROGRAM-IDA ASSISTED.
PUC refers: the letter received from Finance Department wherein
the letter stated that the subjectmeeting is scheduled to be held on 26th
& 27th
June, 2018 regarding Governmentof Khyber Pakhtunkhwa prospectiveprogram
on Revenue Mobilization and Resource Management Program with assistance
from the World Bank. The program development objective is to enhance GoKP
fiscal space to increase own source revenues and resource management to
improve public service delivery.
In this connection World Bank Task Team is visiting Peshawar and
will meet the key stakeholders for pre-appraisal of the subject program.
The un-approved list of projects and summary is placed below duly
flagged.
File is submitted.
CHIEF COORDINATION
PA TO CHIEF ECONOMIST, P&DD.
54. GOVERNMENT OF KHYBER PAKHTUNKHWA
PLANNING AND DEVELOPMENT DEPARTMENT
Subject: ANNUAL DEVELOPMENT PROGRAME 2018-19 FOR (4TH
MONTHS
JULY TO OCTOBER)
This is brought into your kind notice that we have photocopies 200
hundred sets of ADP 2018-19 for (4th
Months July to October) which is now
exhausted.
We need further 70 morecopies of ADP 2018-19for (4th
Months July
to October) for presenting before the upcoming Government of Khyber
Pakhtunkhwa
File is submitted for approval, please.
CHIEF COORDINATION
ADDITIONAL SECRETARY, P&DD.