Measuring Manufacturing
Performance
OEE & TEEP
Manufacturing Performance-OEE
Overall Equipment Effectiveness(OEE) helps manufacturers to measure
manufacturing productivity . OEE measurement gives insight for underlying
losses .
It measures the percentage of scheduled productive time that is fully productive.
OEE= Availability X Performance X Quality
where , Availability = Run Time/Planned Production Time
Performance =(Ideal Cycle Time X Total Count)/Run Time
Quality= Good Count / Total Count
hence ; OEE= Good Count X Ideal Cycle Time)/Planned Production Time
Manufacturing Performance-TEEP
Total Overall Equipment Effectiveness (TEEP) helps the manufacturers
to analyze and improve asset utilization and hence provide the true
potential of a manufacturing operation .
It is a method of performance measurement with respect to total
capacity.
It measures the percentage of total calendar hours that are fully
productive.
TEEP= Availability X Performance X Quality X Utilization
where , Utilization = Planned Production Time/All Time
EFFECTIVENESS LOSSES
-Process defects
-Reduced Yields
NOT
SCHEDULED
TIME
(No
shift
planned
for
production
)
OVERALL EQUIPMENT EFFECTIVENESS
TOTAL EFFECTIVE EQUIPMENT PERFORMANCE
QUALITY
PERFORMANCE
AVAILABILITY
All Available Time(24 hrs -365 days a year)
Quality Losses
Performance Losses
-Minor Stoppages/Idling
-Reduced Speed
Availability Losses
-Equipment breakdown
-Setup & Adjustments
GOOD PRODUCT
ACTUAL OUTPUT
ACTUAL OUTPUT
THEORETICAL PUTPUT= Running Time X Theoretical Speed)
ACTUAL PRODUCTION TIME(Machine running)
POTENTIAL PRODUCTION TIME(Actual 'Shift Time')
OEE & TEEP
OEE & TEEP
OEE-
Overall Equipment Effectiveness
TEEP-
Total Effective Equipment
Performance
What Effectiveness of equipment Effectiveness of Management in
extracting value from assets
Measurement Measurement of Operating
effectiveness.
Measurement of revenue
effectiveness
Decision making
Tool
Tool for Decision making-
Improvement scope
Tool for Decision making-
Capital Investment
How to Calculate OEE= Availability X Performance
X Quality
TEEP=OEE X Utilization
Downtime-Avaliability Losses Shutdown Losses
Speed-Performance Losses
Quality-Acceptance Losses
Factors
Eg.:No Demand,Time not scheduled
OEE - Six Big Losses
UNPLANNED STOPS Equipment Breakdowns
PLANNED STOPS Setup and Adjustments
SMALL STOPS IdIng and Minor Stops
SLOW CYCLES Reduced Speeds
PRODUCTION REJECTS Process Defects
STARTUP REJECTS Reduced Yields
OEE FULLY PRODUCTIVE TIME Valuable Operating Time
Overall Equipment
Effectiveness
SIX BIG LOSSES
AVAILABILITY LOSS
PERFORMANCE LOSS
QUALITY LOSS
Countermeasures for SIX losses
S.No. SIX Loss Category OEE Measure Reasons for Losses Countermeasures
Changeover SMED
Asset Care Benchmrking
Planned Maintenance Planned Downtime log /Matrix
Material Shortages ABC Planning
Labour Shortages
Equipment Failure Asset Care or Preventive Maintenance
Major Component failure CLIT
Unplanned Maintenance Root Cause Analysis
Short Equipment Failure Reduction of MTBF
Fallen product Periodic Servicing by Manufacturer (AMC)
Obsurtuction Focussed Improvement
Blockages SIC
Running lower than rated speed Optimization-Line Balancing
Untrained Operator not able to Training and awareness of line balancing
run at nominal speed
Machine Iding
Product out of spection Root Cause Analysis
Damaged product SPC
Scrap
Product out of spection at machine start Precision settings
Damaged product SOP-Complete all checks before startup
Scrap
4 Speed Loss PERFORMANCE
QUALITY
Production Rejects
5
6 Startup Rejects QUALITY
Planned Downtime
/External
unplanned event
AVAILABILITY
1
AVAILABILITY
Breakdowns
2
PERFORMANCE
Minor Stops
3
REFERENCES
• https://academy.lineview.com.
• Jayaswal, Rajput :"A Total Productive Maintenance Approach to
Improve Overall Equipment Effectiveness." International Journal of
Modern Engineering Research, 2012: 4383-4386.

More Related Content

What's hot

Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleFrank-G. Adler
 
Powerful TPM-OEE implementation details
Powerful TPM-OEE  implementation details Powerful TPM-OEE  implementation details
Powerful TPM-OEE implementation details Tan Moses
 
OEE for Process Improvement
OEE for Process ImprovementOEE for Process Improvement
OEE for Process ImprovementEdward Brown
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & ChecklistsAnand Subramaniam
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleFrank-G. Adler
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)Lean Teams USA
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 WastesLean for U
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleFrank-G. Adler
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniquesHakeem-Ur- Rehman
 

What's hot (20)

The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Powerful TPM-OEE implementation details
Powerful TPM-OEE  implementation details Powerful TPM-OEE  implementation details
Powerful TPM-OEE implementation details
 
OEE for Process Improvement
OEE for Process ImprovementOEE for Process Improvement
OEE for Process Improvement
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training Module
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
OEE
OEEOEE
OEE
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
The 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation PosterThe 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation Poster
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniques
 

Similar to Measure Manufacturing Performance with OEE and TEEP

Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
A038301010
A038301010A038301010
A038301010theijes
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityJason Corder
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityParsec_Automation_Corp
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityCorey Vodvarka
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)Marco Bueno
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessahmed_shimi
 
OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)mechanicalinventors
 
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryOverall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryInfoStream Solutions
 
6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that lossesdrneerajbhandari
 
Top OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms ExplainedTop OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms ExplainedJon Addison
 
Project cycle
Project cycleProject cycle
Project cycleDema Dias
 
Maintenance
Maintenance Maintenance
Maintenance NsbmUcd
 

Similar to Measure Manufacturing Performance with OEE and TEEP (20)

Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
 
lean & agile
lean & agilelean & agile
lean & agile
 
A038301010
A038301010A038301010
A038301010
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivness
 
OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)
 
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryOverall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
 
6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses
 
Oee part 2
Oee part  2 Oee part  2
Oee part 2
 
OEE workshop v5.pptx
OEE workshop v5.pptxOEE workshop v5.pptx
OEE workshop v5.pptx
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Top OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms ExplainedTop OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms Explained
 
Project cycle
Project cycleProject cycle
Project cycle
 
Maintenance
Maintenance Maintenance
Maintenance
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

Measure Manufacturing Performance with OEE and TEEP

  • 2. Manufacturing Performance-OEE Overall Equipment Effectiveness(OEE) helps manufacturers to measure manufacturing productivity . OEE measurement gives insight for underlying losses . It measures the percentage of scheduled productive time that is fully productive. OEE= Availability X Performance X Quality where , Availability = Run Time/Planned Production Time Performance =(Ideal Cycle Time X Total Count)/Run Time Quality= Good Count / Total Count hence ; OEE= Good Count X Ideal Cycle Time)/Planned Production Time
  • 3. Manufacturing Performance-TEEP Total Overall Equipment Effectiveness (TEEP) helps the manufacturers to analyze and improve asset utilization and hence provide the true potential of a manufacturing operation . It is a method of performance measurement with respect to total capacity. It measures the percentage of total calendar hours that are fully productive. TEEP= Availability X Performance X Quality X Utilization where , Utilization = Planned Production Time/All Time
  • 4. EFFECTIVENESS LOSSES -Process defects -Reduced Yields NOT SCHEDULED TIME (No shift planned for production ) OVERALL EQUIPMENT EFFECTIVENESS TOTAL EFFECTIVE EQUIPMENT PERFORMANCE QUALITY PERFORMANCE AVAILABILITY All Available Time(24 hrs -365 days a year) Quality Losses Performance Losses -Minor Stoppages/Idling -Reduced Speed Availability Losses -Equipment breakdown -Setup & Adjustments GOOD PRODUCT ACTUAL OUTPUT ACTUAL OUTPUT THEORETICAL PUTPUT= Running Time X Theoretical Speed) ACTUAL PRODUCTION TIME(Machine running) POTENTIAL PRODUCTION TIME(Actual 'Shift Time') OEE & TEEP
  • 5. OEE & TEEP OEE- Overall Equipment Effectiveness TEEP- Total Effective Equipment Performance What Effectiveness of equipment Effectiveness of Management in extracting value from assets Measurement Measurement of Operating effectiveness. Measurement of revenue effectiveness Decision making Tool Tool for Decision making- Improvement scope Tool for Decision making- Capital Investment How to Calculate OEE= Availability X Performance X Quality TEEP=OEE X Utilization Downtime-Avaliability Losses Shutdown Losses Speed-Performance Losses Quality-Acceptance Losses Factors Eg.:No Demand,Time not scheduled
  • 6. OEE - Six Big Losses UNPLANNED STOPS Equipment Breakdowns PLANNED STOPS Setup and Adjustments SMALL STOPS IdIng and Minor Stops SLOW CYCLES Reduced Speeds PRODUCTION REJECTS Process Defects STARTUP REJECTS Reduced Yields OEE FULLY PRODUCTIVE TIME Valuable Operating Time Overall Equipment Effectiveness SIX BIG LOSSES AVAILABILITY LOSS PERFORMANCE LOSS QUALITY LOSS
  • 7. Countermeasures for SIX losses S.No. SIX Loss Category OEE Measure Reasons for Losses Countermeasures Changeover SMED Asset Care Benchmrking Planned Maintenance Planned Downtime log /Matrix Material Shortages ABC Planning Labour Shortages Equipment Failure Asset Care or Preventive Maintenance Major Component failure CLIT Unplanned Maintenance Root Cause Analysis Short Equipment Failure Reduction of MTBF Fallen product Periodic Servicing by Manufacturer (AMC) Obsurtuction Focussed Improvement Blockages SIC Running lower than rated speed Optimization-Line Balancing Untrained Operator not able to Training and awareness of line balancing run at nominal speed Machine Iding Product out of spection Root Cause Analysis Damaged product SPC Scrap Product out of spection at machine start Precision settings Damaged product SOP-Complete all checks before startup Scrap 4 Speed Loss PERFORMANCE QUALITY Production Rejects 5 6 Startup Rejects QUALITY Planned Downtime /External unplanned event AVAILABILITY 1 AVAILABILITY Breakdowns 2 PERFORMANCE Minor Stops 3
  • 8. REFERENCES • https://academy.lineview.com. • Jayaswal, Rajput :"A Total Productive Maintenance Approach to Improve Overall Equipment Effectiveness." International Journal of Modern Engineering Research, 2012: 4383-4386.