PROJECT 1
Understanding Forces in Skeletal Structures
G R O U P M E M B E R S
J a n n a h J a i l a n i ( 0 3 1 0 2 1 0 )
M e e r a N a z r e e n ( 0 3 0 9 6 3 0 )
S h a r i f a h D i y a n a ( 1 0 0 6 A H 7 8 3 7 3 )
S o h Y o u S h i n g ( 0 3 0 8 3 1 0 )
S u r a y y n S e l v a n ( 0 3 0 9 8 1 8 )
BUILDING CONSTRUCTION 2
[ ARC 2513 ]
C O N T E N T PA G E
I N T R O D U C T I O N
D E S I G N C O N C E P T
P H A S E S
EXPLORATION
JOINT SYSTEMS
LOAD BEARING SYSTEMS
CONSTRUCTION
LOAD TESTING
A N A LY S I S
LOAD DISTRIBUTION
TIME LAPSE
RESULTS
C O N C L U S I O N
I N T R O D U C T I O N
This project required us to produce a skeletal load bearing structure that can stand up
to a minimum of 1.25kg load. The materials used, however, were limited to popsicle
sticks, toothpicks, threads and pins. No adhesive materials were allowed and the
structure was to stand on top of an A5 base. The number of popsicle sticks were
limited to 100 pieces only. Once the structure has been completed, it must be tested
and an analysis in the form of a report must be produced.
D E S I G N C O N C E P T
The design concept of our structure was a result from researching and analyzing
different types of braces possible with the use of popsicle sticks. Due to the
prohibition of using any adhesive material, different methods have been
experimented and applied to the structure in order to achieve the maximum
strength and bearing weight.
The key elements that were highlighted and included:
1. Joints – Suitable joining methods to hold the structure together that allows a
higher load to be bore.
Example: Pins, string
2. Form – The form of the structure is a consequence of the shapes used as the
base of the structure.
Example: Triangle, square
1. Bracing – Proper and sturdy bracing allows the load to be distributed equally
between parts, providing the structure with stability and strength.
Example: V-bracing
P H A S E S
E X P L O R A T I O N
J O I N T I N G S Y S T E M S
Method 1
Popsicle Sticks Tied With Strings
With Bracings
Connecting the popsicle sticks using
string allows flexible joining among the
popsicle sticks. The bracing actually
helps to strengthen the joint system.
Method 2
Interlocking Popsicle Sticks
Interlocking the popsicle sticks is
strong as it can withstand high
pressure but it can only be done in
certain angle (90 degree).
Method 3
Popsicle Sticks Tied With Strings
With A Cut Hole
This method is not as efficient as the
previous two methods as the strings
came off easily and the cut hole is not
really helping the popsicle sticks to be
tied together with the string.
P H A S E S
E X P L O R A T I O N
J O I N T I N G S Y S T E M S
Method 4
Popsicle Sticks Connected Using
Pin
The pin helps the joints to held closely
together but the popsicle sticks crack
slight especially under high tension.
The Combination Method
Popsicle Sticks Connected Using
Pin And String
Using pin and string to tie the popsicle
sticks make it much stronger although
there is still a slightly crack on the
popsicle sticks.
The Combination Method
Cross Bracing Using Pin And String
For the bracing part, we decided to use
string to tie the popsicle sticks together
and also connecting it using pin and
bend the excess pin. It helps the
bracing to be held together closely.
P H A S E S
E X P L O R A T I O N
L O A D B E A R I N G S Y S T E M S
1. VERTICAL LOAD BEARING SYSTEM
The vertical force that acts on the structure is called the
compression force. This force squashes the structure, shortening
it. The vertical members intend to transfer the load to the
structures below.
2. HORIZONTAL LOAD BEARING SYSTEM
The horizontal force acting upon the structure is called the tension
force. The horizontal members of the structure intend to transfer
this tension downwards to the member below it.
3. ARCHED LOAD BEARING SYSTEM
The structure that is subjected to both compression and tension
force is being bent. When compressed, the arch functions as a
system in which the load is transferred equally throughout the
structure.
From top left, anti-clockwise:
Cross bracing structure, V- bracing structure, arch
member, digital model of a v-shaped structure,
triangular shaped member
Acting Load
Compression Force
Tension Force
P H A S E S
C O N S T R U C T I O N
Step 1
Connecting Main Component
Connecting the popsicle sticks by
using pins to strengthen the joint
system and creating a modular
component. The bracing helps in
supporting the component.
Step 2
Reinforcing Main Component
The joints are then reinforced by tying
of strings . This makes the component
stronger and more stable.
Step 3
Slotting Of Components
The components are then slotted
together. The pins are slotted in
between the popsicle sticks of another
component.
P H A S E S
C O N S T R U C T I O N
Step 4
Connecting square component
Four modular components are slotted
together to form a square base. This
strengthens the form of the tower.
Step 5
Reinforcing square component
The square components are then
reinforced by tying strings at all of the
joints. This stabilizes the square form.
Step 6
Building the tower
Three square modular components are
then placed on top of each other to
create a tower. The joints are then
reinforced and tied together by using
strings.
P H A S E S
L O A D T E S T I N G
FINAL WEIGHT OF EACH TEST:
1ST TEST – 6.6 KG
2ND TEST – 7.5 KG
3RD TEST – 12.5 KG
The initial testing was to test our base structure which consisted of V bracing in the middle of each sides. The popsicle sticks were connected
and reinforced with threads as well as pins on each end. This test was conducted by using laptops and a bottle full of water. At the weight of 6.6
KG, the structure had leaned towards its side due to the lack in strength of the threads.
F I R S T T E S T
1.2 KG 2.4 KG 3.6 KG 6.6 KGBASE STRUCTURE
The second testing was done to a 3 level of the similar structure in the first trial with actual weight load. However each structure was not tied up
or connected together. The middle structure was placed upside down for a better load flow. At the weight of 7.5KG, the structure started to
wobble. The testing was stopped as the structure cannot support anymore weight as they were not connected properly. Nevertheless, the tying
method of the thread has been reinforced and standardized for each part.
S E C O N D T E S T
2.5 KG 5 KG 6.25 KG 7.5 KG
The final testing for the structure has been done after all of the 3 structures were connected properly with a proper tying with the thread on each
4 sides. On the initial for this testing started off with a 2 KG of weight which progressively increases up until it reached 12.5 KG.
T H I R D T E S T
P H A S E S
L O A D T E S T I N G
2.5 KG 5 KG 7.5 KG 10 KG 11.25 KG 12.5 KG
A N A LY S I S
L O A D D I S T R I B U T I O N
After analysis, we concluded that the V-bracing would be the best fit for our structure. This is
because of the point load area that is located at the top that transfers the load equally to the
next modular structure located below. The square base gives more area for the load to be
distributed to the ground.
TENSION FORCE
COMPRESSION FORCE
12 2
3
Popsicle stick 1 transfers the loads horizontally to the
vertical popsicle sticks 2. While this happens, the load
transfers equally to popsicle stick V-bracing 3.
1 2
3 3
The compression force acting on popsicle stick 1, is
transferred downwards vertically. The load applied to point
2, is transferred equally on the V-bracing towards popsicle
stick 3, which is horizontal.
A N A LY S I S
T I M E L A P S E
Weight (kg) 2.5 5.0 7.5 10.0
Changes To The
Structure
Weight (kg) 12.0 14.0 16.0 18.0
Changes To The
Structure
A N A LY S I S
R E S U L T S
Failure 1
The popsicle stick detached from the
tower as the pin was not strong enough
due to high tension. In order to
overcome this problem, we could drill
the holes instead of using hammer.
This method will prevent the popsicle
sticks to crack.
Failure 2
The string was loosen which caused
the bracing to split. The solution for this
is by using toothpick so that the
popsicle sticks can be attached tightly.
Thus, the bracing will be strong
enough.
Failure 3
The tower lost it’s balance as the
bracing was split as shown and
causing it to fall. One way to solve this
is by making the base more stable,
example creating a bigger base,
change the way of bracing, etc.
C O N C L U S I O N
By completing this project, we have a deeper understanding towards the importance
of building construction in architectural design. We are able to explore construction
design, structural analysis, skeleton strength and load distribution through this project.
This gives us knowledge on different joint methods and how each structure reacts to a
system. Every single structure in a system is as equally important to make it stand.
Through constructing structures and load testing, we were able to learn important
points that would help improvise our final structure.

More Related Content

What's hot

Comparative Study on Dynamic Behaviour of Multi-Storey Building with and With...
Comparative Study on Dynamic Behaviour of Multi-Storey Building with and With...Comparative Study on Dynamic Behaviour of Multi-Storey Building with and With...
Comparative Study on Dynamic Behaviour of Multi-Storey Building with and With...IRJET Journal
 
IRJET- Seismic Performance of RC Structures Considering Foundation Flexib...
IRJET-  	  Seismic Performance of RC Structures Considering Foundation Flexib...IRJET-  	  Seismic Performance of RC Structures Considering Foundation Flexib...
IRJET- Seismic Performance of RC Structures Considering Foundation Flexib...IRJET Journal
 
Coupling beams design كمرات وجوائز ربط بجدران القص
Coupling beams design   كمرات وجوائز ربط بجدران القصCoupling beams design   كمرات وجوائز ربط بجدران القص
Coupling beams design كمرات وجوائز ربط بجدران القصDr.Youssef Hammida
 
Sesmic strengthining of multi storey building with soft storey week 2
Sesmic strengthining of multi storey building with soft storey  week 2Sesmic strengthining of multi storey building with soft storey  week 2
Sesmic strengthining of multi storey building with soft storey week 2SVMohtesham
 
Sesmic strengthening and evalution of multi storey building with soft storey ...
Sesmic strengthening and evalution of multi storey building with soft storey ...Sesmic strengthening and evalution of multi storey building with soft storey ...
Sesmic strengthening and evalution of multi storey building with soft storey ...SVMohtesham
 
Chapter 9 stability
Chapter 9 stabilityChapter 9 stability
Chapter 9 stabilityIzudin Hasan
 

What's hot (10)

Comparative Study on Dynamic Behaviour of Multi-Storey Building with and With...
Comparative Study on Dynamic Behaviour of Multi-Storey Building with and With...Comparative Study on Dynamic Behaviour of Multi-Storey Building with and With...
Comparative Study on Dynamic Behaviour of Multi-Storey Building with and With...
 
Response Spectrum Method for the Analysis of a Vertically Irregular R.C. Buil...
Response Spectrum Method for the Analysis of a Vertically Irregular R.C. Buil...Response Spectrum Method for the Analysis of a Vertically Irregular R.C. Buil...
Response Spectrum Method for the Analysis of a Vertically Irregular R.C. Buil...
 
IRJET- Seismic Performance of RC Structures Considering Foundation Flexib...
IRJET-  	  Seismic Performance of RC Structures Considering Foundation Flexib...IRJET-  	  Seismic Performance of RC Structures Considering Foundation Flexib...
IRJET- Seismic Performance of RC Structures Considering Foundation Flexib...
 
Coupling beams design كمرات وجوائز ربط بجدران القص
Coupling beams design   كمرات وجوائز ربط بجدران القصCoupling beams design   كمرات وجوائز ربط بجدران القص
Coupling beams design كمرات وجوائز ربط بجدران القص
 
Sesmic strengthining of multi storey building with soft storey week 2
Sesmic strengthining of multi storey building with soft storey  week 2Sesmic strengthining of multi storey building with soft storey  week 2
Sesmic strengthining of multi storey building with soft storey week 2
 
Research non seismic walls
Research  non seismic wallsResearch  non seismic walls
Research non seismic walls
 
Bridge Structure
Bridge StructureBridge Structure
Bridge Structure
 
Sesmic strengthening and evalution of multi storey building with soft storey ...
Sesmic strengthening and evalution of multi storey building with soft storey ...Sesmic strengthening and evalution of multi storey building with soft storey ...
Sesmic strengthening and evalution of multi storey building with soft storey ...
 
Chapter 9 stability
Chapter 9 stabilityChapter 9 stability
Chapter 9 stability
 
C046031318
C046031318C046031318
C046031318
 

Viewers also liked

Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Building construction project 1 report
Building construction project 1 reportBuilding construction project 1 report
Building construction project 1 reportchenliang923
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 
Building Construction Project 2 Booklet
Building Construction Project 2 BookletBuilding Construction Project 2 Booklet
Building Construction Project 2 BookletSürayyn Selvan
 
Bus shelter report
Bus shelter reportBus shelter report
Bus shelter reportJy Chong
 
Acção: Construção 2011 - Apresentação 13- Reabilitação: O Futuro, Eng. Vitor ...
Acção: Construção 2011 - Apresentação 13- Reabilitação: O Futuro, Eng. Vitor ...Acção: Construção 2011 - Apresentação 13- Reabilitação: O Futuro, Eng. Vitor ...
Acção: Construção 2011 - Apresentação 13- Reabilitação: O Futuro, Eng. Vitor ...TECAD - Soluções Integradas de Projecto
 
Aplicação da metodologia BIM na gestão de edifícios
Aplicação da metodologia BIM na gestão de edifíciosAplicação da metodologia BIM na gestão de edifícios
Aplicação da metodologia BIM na gestão de edifíciosJoão Poças Martins
 
Acção: Construção 2011 - Apresentação 09 - Valor BIM em Projecto, Construção ...
Acção: Construção 2011 - Apresentação 09 - Valor BIM em Projecto, Construção ...Acção: Construção 2011 - Apresentação 09 - Valor BIM em Projecto, Construção ...
Acção: Construção 2011 - Apresentação 09 - Valor BIM em Projecto, Construção ...TECAD - Soluções Integradas de Projecto
 
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTBUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTDarshiini Vig
 
Construction of roads presentations
Construction of roads presentationsConstruction of roads presentations
Construction of roads presentationsIjaz Hassan Khan
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Summary, Conclusions and Recommendations
Summary, Conclusions and RecommendationsSummary, Conclusions and Recommendations
Summary, Conclusions and RecommendationsRoqui Malijan
 
Chapter 5 SUMMARY OF FINDINGS, CONCLUSION AND RECCOMENDATION
Chapter 5 SUMMARY OF FINDINGS, CONCLUSION AND RECCOMENDATIONChapter 5 SUMMARY OF FINDINGS, CONCLUSION AND RECCOMENDATION
Chapter 5 SUMMARY OF FINDINGS, CONCLUSION AND RECCOMENDATIONLJ Villanueva
 
A project report on online trading
A project report on online tradingA project report on online trading
A project report on online tradingKumar Gaurav
 
road construction project
road construction projectroad construction project
road construction projectnishant singh
 
Método de harmonia, formação de acordes e escalas para improvisação. por gil...
Método de harmonia, formação de acordes e escalas para improvisação.  por gil...Método de harmonia, formação de acordes e escalas para improvisação.  por gil...
Método de harmonia, formação de acordes e escalas para improvisação. por gil...Gilmar Damião
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
The Future Of Work & The Work Of The Future
The Future Of Work & The Work Of The FutureThe Future Of Work & The Work Of The Future
The Future Of Work & The Work Of The FutureArturo Pelayo
 

Viewers also liked (20)

Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Building construction project 1 report
Building construction project 1 reportBuilding construction project 1 report
Building construction project 1 report
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
Building Construction Project 2 Booklet
Building Construction Project 2 BookletBuilding Construction Project 2 Booklet
Building Construction Project 2 Booklet
 
Bus shelter report
Bus shelter reportBus shelter report
Bus shelter report
 
Acção: Construção 2011 - Apresentação 13- Reabilitação: O Futuro, Eng. Vitor ...
Acção: Construção 2011 - Apresentação 13- Reabilitação: O Futuro, Eng. Vitor ...Acção: Construção 2011 - Apresentação 13- Reabilitação: O Futuro, Eng. Vitor ...
Acção: Construção 2011 - Apresentação 13- Reabilitação: O Futuro, Eng. Vitor ...
 
Aplicação da metodologia BIM na gestão de edifícios
Aplicação da metodologia BIM na gestão de edifíciosAplicação da metodologia BIM na gestão de edifícios
Aplicação da metodologia BIM na gestão de edifícios
 
Acção: Construção 2011 - Apresentação 09 - Valor BIM em Projecto, Construção ...
Acção: Construção 2011 - Apresentação 09 - Valor BIM em Projecto, Construção ...Acção: Construção 2011 - Apresentação 09 - Valor BIM em Projecto, Construção ...
Acção: Construção 2011 - Apresentação 09 - Valor BIM em Projecto, Construção ...
 
Aeroportos contemplados com plano de aviação regional
Aeroportos contemplados com plano de aviação regionalAeroportos contemplados com plano de aviação regional
Aeroportos contemplados com plano de aviação regional
 
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTBUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
 
Construction of roads presentations
Construction of roads presentationsConstruction of roads presentations
Construction of roads presentations
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Summary, Conclusions and Recommendations
Summary, Conclusions and RecommendationsSummary, Conclusions and Recommendations
Summary, Conclusions and Recommendations
 
Chapter 5 SUMMARY OF FINDINGS, CONCLUSION AND RECCOMENDATION
Chapter 5 SUMMARY OF FINDINGS, CONCLUSION AND RECCOMENDATIONChapter 5 SUMMARY OF FINDINGS, CONCLUSION AND RECCOMENDATION
Chapter 5 SUMMARY OF FINDINGS, CONCLUSION AND RECCOMENDATION
 
A project report on online trading
A project report on online tradingA project report on online trading
A project report on online trading
 
road construction project
road construction projectroad construction project
road construction project
 
Método de harmonia, formação de acordes e escalas para improvisação. por gil...
Método de harmonia, formação de acordes e escalas para improvisação.  por gil...Método de harmonia, formação de acordes e escalas para improvisação.  por gil...
Método de harmonia, formação de acordes e escalas para improvisação. por gil...
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
Apostila de acordes
Apostila de acordesApostila de acordes
Apostila de acordes
 
The Future Of Work & The Work Of The Future
The Future Of Work & The Work Of The FutureThe Future Of Work & The Work Of The Future
The Future Of Work & The Work Of The Future
 

Similar to Understanding Forces in Skeletal Structures

Project 1 Building Construction 2
Project 1 Building Construction 2Project 1 Building Construction 2
Project 1 Building Construction 2En Huey
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1Gertrude Lee
 
Bcon report final
Bcon report finalBcon report final
Bcon report finalDaniel Yap
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]Jannah Jailani
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridgenadiacbass
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Reporthiewyennee
 
Fettucine Truss Bridge Report
Fettucine Truss Bridge ReportFettucine Truss Bridge Report
Fettucine Truss Bridge Reportkimberlywjs
 
Building Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss BridgeBuilding Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss BridgeEe Dong Chen
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportForestedTiger
 
Bcon project 1 pdf report
Bcon project 1 pdf reportBcon project 1 pdf report
Bcon project 1 pdf reportAnderson Wong
 
TRUSS ANALYSIS (TERM PAPER REPORT)
TRUSS ANALYSIS (TERM PAPER REPORT)TRUSS ANALYSIS (TERM PAPER REPORT)
TRUSS ANALYSIS (TERM PAPER REPORT)Sunil Kumar
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge reportIvy Yee
 
Assignment 1 bcons 2 report
Assignment 1 bcons 2 reportAssignment 1 bcons 2 report
Assignment 1 bcons 2 reportYaseen Syed
 

Similar to Understanding Forces in Skeletal Structures (20)

Project 1 Building Construction 2
Project 1 Building Construction 2Project 1 Building Construction 2
Project 1 Building Construction 2
 
Final
FinalFinal
Final
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
 
Bridge report
Bridge reportBridge report
Bridge report
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridge
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
Fettucine Truss Bridge Report
Fettucine Truss Bridge ReportFettucine Truss Bridge Report
Fettucine Truss Bridge Report
 
Merged
MergedMerged
Merged
 
Building Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss BridgeBuilding Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss Bridge
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
bus shelter
bus shelterbus shelter
bus shelter
 
Bcon project 1 pdf report
Bcon project 1 pdf reportBcon project 1 pdf report
Bcon project 1 pdf report
 
BCON II PROJECT 1
BCON II PROJECT 1BCON II PROJECT 1
BCON II PROJECT 1
 
TRUSS ANALYSIS (TERM PAPER REPORT)
TRUSS ANALYSIS (TERM PAPER REPORT)TRUSS ANALYSIS (TERM PAPER REPORT)
TRUSS ANALYSIS (TERM PAPER REPORT)
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge report
 
Assignment 1 bcons 2 report
Assignment 1 bcons 2 reportAssignment 1 bcons 2 report
Assignment 1 bcons 2 report
 

Recently uploaded

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 

Recently uploaded (20)

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 

Understanding Forces in Skeletal Structures

  • 1. PROJECT 1 Understanding Forces in Skeletal Structures G R O U P M E M B E R S J a n n a h J a i l a n i ( 0 3 1 0 2 1 0 ) M e e r a N a z r e e n ( 0 3 0 9 6 3 0 ) S h a r i f a h D i y a n a ( 1 0 0 6 A H 7 8 3 7 3 ) S o h Y o u S h i n g ( 0 3 0 8 3 1 0 ) S u r a y y n S e l v a n ( 0 3 0 9 8 1 8 ) BUILDING CONSTRUCTION 2 [ ARC 2513 ]
  • 2. C O N T E N T PA G E I N T R O D U C T I O N D E S I G N C O N C E P T P H A S E S EXPLORATION JOINT SYSTEMS LOAD BEARING SYSTEMS CONSTRUCTION LOAD TESTING A N A LY S I S LOAD DISTRIBUTION TIME LAPSE RESULTS C O N C L U S I O N
  • 3. I N T R O D U C T I O N This project required us to produce a skeletal load bearing structure that can stand up to a minimum of 1.25kg load. The materials used, however, were limited to popsicle sticks, toothpicks, threads and pins. No adhesive materials were allowed and the structure was to stand on top of an A5 base. The number of popsicle sticks were limited to 100 pieces only. Once the structure has been completed, it must be tested and an analysis in the form of a report must be produced.
  • 4. D E S I G N C O N C E P T The design concept of our structure was a result from researching and analyzing different types of braces possible with the use of popsicle sticks. Due to the prohibition of using any adhesive material, different methods have been experimented and applied to the structure in order to achieve the maximum strength and bearing weight. The key elements that were highlighted and included: 1. Joints – Suitable joining methods to hold the structure together that allows a higher load to be bore. Example: Pins, string 2. Form – The form of the structure is a consequence of the shapes used as the base of the structure. Example: Triangle, square 1. Bracing – Proper and sturdy bracing allows the load to be distributed equally between parts, providing the structure with stability and strength. Example: V-bracing
  • 5. P H A S E S E X P L O R A T I O N J O I N T I N G S Y S T E M S Method 1 Popsicle Sticks Tied With Strings With Bracings Connecting the popsicle sticks using string allows flexible joining among the popsicle sticks. The bracing actually helps to strengthen the joint system. Method 2 Interlocking Popsicle Sticks Interlocking the popsicle sticks is strong as it can withstand high pressure but it can only be done in certain angle (90 degree). Method 3 Popsicle Sticks Tied With Strings With A Cut Hole This method is not as efficient as the previous two methods as the strings came off easily and the cut hole is not really helping the popsicle sticks to be tied together with the string.
  • 6. P H A S E S E X P L O R A T I O N J O I N T I N G S Y S T E M S Method 4 Popsicle Sticks Connected Using Pin The pin helps the joints to held closely together but the popsicle sticks crack slight especially under high tension. The Combination Method Popsicle Sticks Connected Using Pin And String Using pin and string to tie the popsicle sticks make it much stronger although there is still a slightly crack on the popsicle sticks. The Combination Method Cross Bracing Using Pin And String For the bracing part, we decided to use string to tie the popsicle sticks together and also connecting it using pin and bend the excess pin. It helps the bracing to be held together closely.
  • 7. P H A S E S E X P L O R A T I O N L O A D B E A R I N G S Y S T E M S 1. VERTICAL LOAD BEARING SYSTEM The vertical force that acts on the structure is called the compression force. This force squashes the structure, shortening it. The vertical members intend to transfer the load to the structures below. 2. HORIZONTAL LOAD BEARING SYSTEM The horizontal force acting upon the structure is called the tension force. The horizontal members of the structure intend to transfer this tension downwards to the member below it. 3. ARCHED LOAD BEARING SYSTEM The structure that is subjected to both compression and tension force is being bent. When compressed, the arch functions as a system in which the load is transferred equally throughout the structure. From top left, anti-clockwise: Cross bracing structure, V- bracing structure, arch member, digital model of a v-shaped structure, triangular shaped member Acting Load Compression Force Tension Force
  • 8. P H A S E S C O N S T R U C T I O N Step 1 Connecting Main Component Connecting the popsicle sticks by using pins to strengthen the joint system and creating a modular component. The bracing helps in supporting the component. Step 2 Reinforcing Main Component The joints are then reinforced by tying of strings . This makes the component stronger and more stable. Step 3 Slotting Of Components The components are then slotted together. The pins are slotted in between the popsicle sticks of another component.
  • 9. P H A S E S C O N S T R U C T I O N Step 4 Connecting square component Four modular components are slotted together to form a square base. This strengthens the form of the tower. Step 5 Reinforcing square component The square components are then reinforced by tying strings at all of the joints. This stabilizes the square form. Step 6 Building the tower Three square modular components are then placed on top of each other to create a tower. The joints are then reinforced and tied together by using strings.
  • 10. P H A S E S L O A D T E S T I N G FINAL WEIGHT OF EACH TEST: 1ST TEST – 6.6 KG 2ND TEST – 7.5 KG 3RD TEST – 12.5 KG The initial testing was to test our base structure which consisted of V bracing in the middle of each sides. The popsicle sticks were connected and reinforced with threads as well as pins on each end. This test was conducted by using laptops and a bottle full of water. At the weight of 6.6 KG, the structure had leaned towards its side due to the lack in strength of the threads. F I R S T T E S T 1.2 KG 2.4 KG 3.6 KG 6.6 KGBASE STRUCTURE
  • 11. The second testing was done to a 3 level of the similar structure in the first trial with actual weight load. However each structure was not tied up or connected together. The middle structure was placed upside down for a better load flow. At the weight of 7.5KG, the structure started to wobble. The testing was stopped as the structure cannot support anymore weight as they were not connected properly. Nevertheless, the tying method of the thread has been reinforced and standardized for each part. S E C O N D T E S T 2.5 KG 5 KG 6.25 KG 7.5 KG The final testing for the structure has been done after all of the 3 structures were connected properly with a proper tying with the thread on each 4 sides. On the initial for this testing started off with a 2 KG of weight which progressively increases up until it reached 12.5 KG. T H I R D T E S T P H A S E S L O A D T E S T I N G 2.5 KG 5 KG 7.5 KG 10 KG 11.25 KG 12.5 KG
  • 12. A N A LY S I S L O A D D I S T R I B U T I O N After analysis, we concluded that the V-bracing would be the best fit for our structure. This is because of the point load area that is located at the top that transfers the load equally to the next modular structure located below. The square base gives more area for the load to be distributed to the ground. TENSION FORCE COMPRESSION FORCE 12 2 3 Popsicle stick 1 transfers the loads horizontally to the vertical popsicle sticks 2. While this happens, the load transfers equally to popsicle stick V-bracing 3. 1 2 3 3 The compression force acting on popsicle stick 1, is transferred downwards vertically. The load applied to point 2, is transferred equally on the V-bracing towards popsicle stick 3, which is horizontal.
  • 13. A N A LY S I S T I M E L A P S E Weight (kg) 2.5 5.0 7.5 10.0 Changes To The Structure Weight (kg) 12.0 14.0 16.0 18.0 Changes To The Structure
  • 14. A N A LY S I S R E S U L T S Failure 1 The popsicle stick detached from the tower as the pin was not strong enough due to high tension. In order to overcome this problem, we could drill the holes instead of using hammer. This method will prevent the popsicle sticks to crack. Failure 2 The string was loosen which caused the bracing to split. The solution for this is by using toothpick so that the popsicle sticks can be attached tightly. Thus, the bracing will be strong enough. Failure 3 The tower lost it’s balance as the bracing was split as shown and causing it to fall. One way to solve this is by making the base more stable, example creating a bigger base, change the way of bracing, etc.
  • 15. C O N C L U S I O N By completing this project, we have a deeper understanding towards the importance of building construction in architectural design. We are able to explore construction design, structural analysis, skeleton strength and load distribution through this project. This gives us knowledge on different joint methods and how each structure reacts to a system. Every single structure in a system is as equally important to make it stand. Through constructing structures and load testing, we were able to learn important points that would help improvise our final structure.