BUILDING CONSTRUCTION 2
P R O J E C T 1 - S H E LT E R F O R O N E
L O W Y O N G G I N G 0 3 1 3 6 7 9
L I M Y E E Q U N 0 3 1 9 1 2 1
C H U N G W E I J I N 0 3 1 3 7 8 9
O N G H U E Y F E N 0 3 1 4 2 6 3
L E E C H A E R S H E A N 0 3 1 3 6 7 5
P E H K E R N E N G 0 3 1 4 6 1 9
CO N TEN TS
1 . INTR O DU CTI O N
2 . D ESI G N CO N C EPT
3 . M ATER I A LS
5 . CO N STR U CTI O N P R O C ES S
6 . STR U CTUR A L CO N STR U CTI O N E LEM ENT
4 . P R O C ES S IN M A K IN G
7 . M E CH A NIS M
8 . CO N CLU SI O N
1
INTR O DU CTI O N
The main objectives of this project are:
• To create an understanding of skeletal structure and its relevant
structural components.
• To understand how a skeletal structure reacts under loading.
• To demonstrate a convincing understanding of how Skeletal
Construction works.
• To be able to manipulate Skeletal Construction to solve an oblique
design problem.
The learning outcomes of this project include:
• Apply construction system in design.
• Recognize the implication of construction systems in design.
• Analyse the issues of strength, stiffness and stability of structures
including modes of structural systems, forces, stress and strain and
laws of static.
Example
of
shelters
The design concept of our shelter is inspired by the trishaw in which
we aim to provide a comfortable space that shields people from the weather
and at the same time it is an interactive shelter in a way that people get to
transform the shelter into any way they want. We analyzed the structure
and form of the trishaw and created our own design of a shelter.
Design concept:
2
M ATER I A LS
PLYWOOD
ADVANTAGES:
• High resistance to breaking and can withstand a large weight.
Therefore, it is used as the base of the shelter.
• High resistance to cracking thus it does not crack easily when sawed.
• Easily assembled and can be recycled.
WATER PROOF CANVAS
ADVANTAGES:
• Can withstand heat as the white surface of the canvas reflects heat off the
surface of the shelter, thus providing thermal comfort to the people in the shelter.
• Resistant to stain.
• Durable as it is resistant to rip and tears.
3
*ALL MATERIALS ARE RECYCLE OR REUSED
P R O C ES S IN M A K IN G
1.Plywood planks with the
correct measurements and
shapes drawn were prepared.
2.The bridle joint and cross-halving
joint were cut out using machines.
3.Plywood that were sawed were
sanded by using sanding paper
before setting them up.
4.The waffle slab base was set up by
using cross-halving joints whereas
the seating was set up by using
bridle joint.
5.The plywood planks needed for the
fixed frame and also the retractable
frame were sawed and also sanded.
6.The fixed frame was nailed to both
sides of the base.
7.The retractable frames were secured
to the base by using bolt and nut and
tied together using strings.
8.A plank of plywood was nailed
diagonally at the back of the
shelter to further stabilize it.
9.Waterproof canvas was secured
to the retractable frame by using
nails.
10.Testing the ability of the
shelter to support
load>60kg.
4
CO N STR U CTI O N P R O C ES S
1. The waffle slab base is constructed by
crisscrossing plywood planks into a
square base.
2. The base is then covered on four sides by
four pieces of plywood planks. A seating that
can be assembled and disassembled is then
slot into the waffle slab base.
3. The fixed frame that supports both sides
of the shelter is then built up.
4. Another plank of plywood is then nailed diagonally
at the back of the shelter to further stabilize it.
Two additional plywood planks are nailed to the bottom
of the waffle slab base to secure the base.
5. The retractable frame is then built up by securing
three pieces of plywood on both sides of the shelter
with bolt and nut.
6. Lastly, the water proof canvas is then secured to the
retractable frame with nails.
5
STR U CTUR A L CO N STR U CTI O N E LEM ENT
Cross Halving Joint
•Two pieces of woods are interlock with each other to form the grid structure or
waffle slab as the base.
•It is chosen to form the base due to its high strength and stability of supporting.
•Part of each pieces of the woods has been cut away to form a cross halving joint
Mortise and tenon
•Two pieces of wood are joined together with an angle of 90 degree.
•Used to support the waffle slab.
•The protruding tenon is fitted into a rectangular slot, mortise to
produce a strong and neat joint.
•Non-movable and difficult to separate once it is fitted.
Flat Head Wood Screw
•Used to lift up the waffle slab and position them.
•Gives greater strength to the base and resist of loosing compare to nails.
•Full thread screw is chosen due to its long-term strength.
Full Thread Bolt and Nut
•Used as the supporter of the roof structure.
•Bolt is locked into the woods and but is tighten at the end of the bolt.
•Pieces of woods are joined together with bolt and nut to make it movable.
6
F UN CTI O N S A ND A ESTH E TI C S
M E C H A N I S M
The framing is divided into one fixed frame and smaller frames attached to it .
The smaller frames are retractable , allowing the shelter to open up to healthy sunlight and hygienic reasons while closed to block out rain and excessive
heat source, achieving thermal comfort .The platform above the base is detachable , forming a bench for sitting purpose. It is customised to assemble
firmly , with the legs of the bench attached to the base as a whole .
Load distribution After Weight
Load distribution is divided, from the platform and the frames.
With the grid arrangement of the base, load is distributed evenly
across the base to the four corners and later on, evenly into the ground.
The arrangement of the base is in a grid manner , allowing load to be
distributed evenly across the 4 corners .
Load Distribution before Weight
When there is no load , the Load distribution is derived from
the frames and distributed down to the base before being
disposed to the ground.
7
FIXED FRAME
RETRACTABLE FRAME
CO N CLU SI O N
8
After completing this project, we have a better understanding and were able to demonstrate our understanding on how a
Skeletal Construction works. With the understanding we learnt after this project, we can apply the construction system in
our future design. In addition, we were able to analyse the issues of strength, stiffness and stabilty of the structure including
different methods of joints and how forces of load react on the structure.

More Related Content

What's hot

What's hot (20)

How do Brick Masonry Houses behave during Earthquakes?
How do Brick Masonry Houses behave during Earthquakes?How do Brick Masonry Houses behave during Earthquakes?
How do Brick Masonry Houses behave during Earthquakes?
 
Earthquake collapse pattern
Earthquake collapse patternEarthquake collapse pattern
Earthquake collapse pattern
 
structures
structuresstructures
structures
 
Earthquake resistant designs - timber, steel skeletal structures.
Earthquake resistant designs - timber, steel skeletal structures.Earthquake resistant designs - timber, steel skeletal structures.
Earthquake resistant designs - timber, steel skeletal structures.
 
Foundation Rehabilitation
Foundation RehabilitationFoundation Rehabilitation
Foundation Rehabilitation
 
SHEAR WALL
SHEAR WALLSHEAR WALL
SHEAR WALL
 
Earthquake Resistant Designs - Timber and Steel
Earthquake Resistant Designs - Timber and SteelEarthquake Resistant Designs - Timber and Steel
Earthquake Resistant Designs - Timber and Steel
 
Lintel
LintelLintel
Lintel
 
EQ RESISTANCE
EQ RESISTANCE EQ RESISTANCE
EQ RESISTANCE
 
Earthquake resistant buildings
Earthquake resistant buildings Earthquake resistant buildings
Earthquake resistant buildings
 
Earthquake Resisting Structure Techniques
Earthquake Resisting Structure TechniquesEarthquake Resisting Structure Techniques
Earthquake Resisting Structure Techniques
 
Earthquake resistant building
Earthquake resistant buildingEarthquake resistant building
Earthquake resistant building
 
Earthquake tip 12
Earthquake tip   12Earthquake tip   12
Earthquake tip 12
 
Earthquake resisting building....isolated bearing
Earthquake resisting building....isolated bearingEarthquake resisting building....isolated bearing
Earthquake resisting building....isolated bearing
 
Base Isolation(2000.12.28)
Base Isolation(2000.12.28)Base Isolation(2000.12.28)
Base Isolation(2000.12.28)
 
Shear wall ppt
Shear wall ppt Shear wall ppt
Shear wall ppt
 
Lintels and arches
Lintels and archesLintels and arches
Lintels and arches
 
4326
43264326
4326
 
Base isolation
Base isolationBase isolation
Base isolation
 
Shear wall
Shear wallShear wall
Shear wall
 

Viewers also liked

Presentation2
Presentation2Presentation2
Presentation2kerneng
 
Presentation3
Presentation3Presentation3
Presentation3kerneng
 
Presentation1
Presentation1Presentation1
Presentation1kerneng
 
Presentation4
Presentation4Presentation4
Presentation4kerneng
 
Presentation1
Presentation1Presentation1
Presentation1kerneng
 
Presentation1
Presentation1Presentation1
Presentation1kerneng
 
Building construction-2 project-2
Building construction-2 project-2Building construction-2 project-2
Building construction-2 project-2kerneng
 

Viewers also liked (7)

Presentation2
Presentation2Presentation2
Presentation2
 
Presentation3
Presentation3Presentation3
Presentation3
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation4
Presentation4Presentation4
Presentation4
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation1
Presentation1Presentation1
Presentation1
 
Building construction-2 project-2
Building construction-2 project-2Building construction-2 project-2
Building construction-2 project-2
 

Similar to Merged

Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportForestedTiger
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 reportOng Seng Peng Jeff
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 ReportWilden How
 
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdfNotes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdfVICTOR A. KIPLAGAT
 
Advance structural system. pptx
Advance structural system. pptxAdvance structural system. pptx
Advance structural system. pptxShivani Nandgowle
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelterYung Kai
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelterhongbinng
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelterJoe Onn Lim
 
Building Construction 2
Building Construction 2 Building Construction 2
Building Construction 2 leejanicee
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 reportYq Chong
 
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportProject 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportTan Jaden
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13Minhal Haider
 
Bcon report final
Bcon report finalBcon report final
Bcon report finalDaniel Yap
 
Advance structural system
Advance structural system Advance structural system
Advance structural system Vikas Mehta
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures rohan joshi
 

Similar to Merged (20)

Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 report
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
 
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdfNotes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
 
Advance structural system. pptx
Advance structural system. pptxAdvance structural system. pptx
Advance structural system. pptx
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelter
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelter
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelter
 
Bcon Report 1
Bcon Report 1Bcon Report 1
Bcon Report 1
 
2.1 RC superstructures.pdf
2.1 RC superstructures.pdf2.1 RC superstructures.pdf
2.1 RC superstructures.pdf
 
Building Construction 2
Building Construction 2 Building Construction 2
Building Construction 2
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 report
 
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportProject 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
 
Bcon report final
Bcon report finalBcon report final
Bcon report final
 
Advance structural system
Advance structural system Advance structural system
Advance structural system
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures
 
bus shelter
bus shelterbus shelter
bus shelter
 

More from kerneng

Project management networking
Project management networkingProject management networking
Project management networkingkerneng
 
Final site analysis board
Final site analysis boardFinal site analysis board
Final site analysis boardkerneng
 
Merged document
Merged documentMerged document
Merged documentkerneng
 
Bscience report
Bscience reportBscience report
Bscience reportkerneng
 
Bscience board
Bscience boardBscience board
Bscience boardkerneng
 
Final bscience report compilation
Final bscience report compilationFinal bscience report compilation
Final bscience report compilationkerneng
 
C1 (3 files merged)
C1 (3 files merged)C1 (3 files merged)
C1 (3 files merged)kerneng
 
Sec 1 (5 files merged) (1)
Sec 1 (5 files merged) (1)Sec 1 (5 files merged) (1)
Sec 1 (5 files merged) (1)kerneng
 
Plan 1 (6 files merged)
Plan 1 (6 files merged)Plan 1 (6 files merged)
Plan 1 (6 files merged)kerneng
 
E1 (3 files merged)
E1 (3 files merged)E1 (3 files merged)
E1 (3 files merged)kerneng
 
Ph 4 (9 files merged)
Ph 4 (9 files merged)Ph 4 (9 files merged)
Ph 4 (9 files merged)kerneng
 
I1 (4 files merged)
I1 (4 files merged)I1 (4 files merged)
I1 (4 files merged)kerneng
 
1 (4 files merged) (1)
1 (4 files merged) (1)1 (4 files merged) (1)
1 (4 files merged) (1)kerneng
 
Theory project-2-analytical-paper
Theory project-2-analytical-paperTheory project-2-analytical-paper
Theory project-2-analytical-paperkerneng
 
5 elements-kerneng
5 elements-kerneng5 elements-kerneng
5 elements-kernengkerneng
 
R1 (5 files merged)
R1 (5 files merged)R1 (5 files merged)
R1 (5 files merged)kerneng
 

More from kerneng (20)

Project management networking
Project management networkingProject management networking
Project management networking
 
Final
FinalFinal
Final
 
btech 2
btech 2btech 2
btech 2
 
Final site analysis board
Final site analysis boardFinal site analysis board
Final site analysis board
 
Merged document
Merged documentMerged document
Merged document
 
Btech
BtechBtech
Btech
 
Images
ImagesImages
Images
 
Bscience report
Bscience reportBscience report
Bscience report
 
Bscience board
Bscience boardBscience board
Bscience board
 
Final bscience report compilation
Final bscience report compilationFinal bscience report compilation
Final bscience report compilation
 
C1 (3 files merged)
C1 (3 files merged)C1 (3 files merged)
C1 (3 files merged)
 
Sec 1 (5 files merged) (1)
Sec 1 (5 files merged) (1)Sec 1 (5 files merged) (1)
Sec 1 (5 files merged) (1)
 
Plan 1 (6 files merged)
Plan 1 (6 files merged)Plan 1 (6 files merged)
Plan 1 (6 files merged)
 
E1 (3 files merged)
E1 (3 files merged)E1 (3 files merged)
E1 (3 files merged)
 
Ph 4 (9 files merged)
Ph 4 (9 files merged)Ph 4 (9 files merged)
Ph 4 (9 files merged)
 
I1 (4 files merged)
I1 (4 files merged)I1 (4 files merged)
I1 (4 files merged)
 
1 (4 files merged) (1)
1 (4 files merged) (1)1 (4 files merged) (1)
1 (4 files merged) (1)
 
Theory project-2-analytical-paper
Theory project-2-analytical-paperTheory project-2-analytical-paper
Theory project-2-analytical-paper
 
5 elements-kerneng
5 elements-kerneng5 elements-kerneng
5 elements-kerneng
 
R1 (5 files merged)
R1 (5 files merged)R1 (5 files merged)
R1 (5 files merged)
 

Recently uploaded

Retail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College ParkRetail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College Parkjosebenzaquen
 
Karachi Escorts | +923070433345 | Escort Service in Karachi
Karachi Escorts | +923070433345 | Escort Service in KarachiKarachi Escorts | +923070433345 | Escort Service in Karachi
Karachi Escorts | +923070433345 | Escort Service in KarachiAyesha Khan
 
Strip Zagor Extra 322 - Dva ortaka.pdf
Strip   Zagor Extra 322 - Dva ortaka.pdfStrip   Zagor Extra 322 - Dva ortaka.pdf
Strip Zagor Extra 322 - Dva ortaka.pdfStripovizijacom
 
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | DelhiFULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | DelhiMalviyaNagarCallGirl
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtowndajasot375
 
Faridabad Call Girls : ☎ 8527673949, Low rate Call Girls
Faridabad Call Girls : ☎ 8527673949, Low rate Call GirlsFaridabad Call Girls : ☎ 8527673949, Low rate Call Girls
Faridabad Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Call Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceCall Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceAyesha Khan
 
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl serviceDelhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl serviceashishs7044
 
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur DubaiBur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubaidajasot375
 
Laxmi Nagar Call Girls : ☎ 8527673949, Low rate Call Girls
Laxmi Nagar Call Girls : ☎ 8527673949, Low rate Call GirlsLaxmi Nagar Call Girls : ☎ 8527673949, Low rate Call Girls
Laxmi Nagar Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts ServiceRussian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Servicedoor45step
 
Mandi House Call Girls : ☎ 8527673949, Low rate Call Girls
Mandi House Call Girls : ☎ 8527673949, Low rate Call GirlsMandi House Call Girls : ☎ 8527673949, Low rate Call Girls
Mandi House Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
The First Date by Daniel Johnson (Inspired By True Events)
The First Date by Daniel Johnson (Inspired By True Events)The First Date by Daniel Johnson (Inspired By True Events)
The First Date by Daniel Johnson (Inspired By True Events)thephillipta
 
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiMalviyaNagarCallGirl
 
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comBridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comthephillipta
 
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | DelhiMalviyaNagarCallGirl
 
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | DelhiFULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | DelhiMalviyaNagarCallGirl
 
Zagor VČ OP 055 - Oluja nad Haitijem.pdf
Zagor VČ OP 055 - Oluja nad Haitijem.pdfZagor VČ OP 055 - Oluja nad Haitijem.pdf
Zagor VČ OP 055 - Oluja nad Haitijem.pdfStripovizijacom
 
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call GirlsPragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 

Recently uploaded (20)

Retail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College ParkRetail Store Scavanger Hunt - Foundation College Park
Retail Store Scavanger Hunt - Foundation College Park
 
Karachi Escorts | +923070433345 | Escort Service in Karachi
Karachi Escorts | +923070433345 | Escort Service in KarachiKarachi Escorts | +923070433345 | Escort Service in Karachi
Karachi Escorts | +923070433345 | Escort Service in Karachi
 
Strip Zagor Extra 322 - Dva ortaka.pdf
Strip   Zagor Extra 322 - Dva ortaka.pdfStrip   Zagor Extra 322 - Dva ortaka.pdf
Strip Zagor Extra 322 - Dva ortaka.pdf
 
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | DelhiFULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
 
Faridabad Call Girls : ☎ 8527673949, Low rate Call Girls
Faridabad Call Girls : ☎ 8527673949, Low rate Call GirlsFaridabad Call Girls : ☎ 8527673949, Low rate Call Girls
Faridabad Call Girls : ☎ 8527673949, Low rate Call Girls
 
Call Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceCall Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl Service
 
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl serviceDelhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
Delhi Room Call Girls : ☎ 8527673949, Low rate Call girl service
 
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur DubaiBur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
 
Bur Dubai Call Girls # 971504361175 # Call Girls In Bur Dubai || (UAE)
Bur Dubai Call Girls # 971504361175 # Call Girls In Bur Dubai || (UAE)Bur Dubai Call Girls # 971504361175 # Call Girls In Bur Dubai || (UAE)
Bur Dubai Call Girls # 971504361175 # Call Girls In Bur Dubai || (UAE)
 
Laxmi Nagar Call Girls : ☎ 8527673949, Low rate Call Girls
Laxmi Nagar Call Girls : ☎ 8527673949, Low rate Call GirlsLaxmi Nagar Call Girls : ☎ 8527673949, Low rate Call Girls
Laxmi Nagar Call Girls : ☎ 8527673949, Low rate Call Girls
 
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts ServiceRussian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
 
Mandi House Call Girls : ☎ 8527673949, Low rate Call Girls
Mandi House Call Girls : ☎ 8527673949, Low rate Call GirlsMandi House Call Girls : ☎ 8527673949, Low rate Call Girls
Mandi House Call Girls : ☎ 8527673949, Low rate Call Girls
 
The First Date by Daniel Johnson (Inspired By True Events)
The First Date by Daniel Johnson (Inspired By True Events)The First Date by Daniel Johnson (Inspired By True Events)
The First Date by Daniel Johnson (Inspired By True Events)
 
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
 
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comBridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
 
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
 
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | DelhiFULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
 
Zagor VČ OP 055 - Oluja nad Haitijem.pdf
Zagor VČ OP 055 - Oluja nad Haitijem.pdfZagor VČ OP 055 - Oluja nad Haitijem.pdf
Zagor VČ OP 055 - Oluja nad Haitijem.pdf
 
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call GirlsPragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
Pragati Maidan Call Girls : ☎ 8527673949, Low rate Call Girls
 

Merged

  • 1. BUILDING CONSTRUCTION 2 P R O J E C T 1 - S H E LT E R F O R O N E L O W Y O N G G I N G 0 3 1 3 6 7 9 L I M Y E E Q U N 0 3 1 9 1 2 1 C H U N G W E I J I N 0 3 1 3 7 8 9 O N G H U E Y F E N 0 3 1 4 2 6 3 L E E C H A E R S H E A N 0 3 1 3 6 7 5 P E H K E R N E N G 0 3 1 4 6 1 9
  • 2. CO N TEN TS 1 . INTR O DU CTI O N 2 . D ESI G N CO N C EPT 3 . M ATER I A LS 5 . CO N STR U CTI O N P R O C ES S 6 . STR U CTUR A L CO N STR U CTI O N E LEM ENT 4 . P R O C ES S IN M A K IN G 7 . M E CH A NIS M 8 . CO N CLU SI O N 1
  • 3. INTR O DU CTI O N The main objectives of this project are: • To create an understanding of skeletal structure and its relevant structural components. • To understand how a skeletal structure reacts under loading. • To demonstrate a convincing understanding of how Skeletal Construction works. • To be able to manipulate Skeletal Construction to solve an oblique design problem. The learning outcomes of this project include: • Apply construction system in design. • Recognize the implication of construction systems in design. • Analyse the issues of strength, stiffness and stability of structures including modes of structural systems, forces, stress and strain and laws of static. Example of shelters The design concept of our shelter is inspired by the trishaw in which we aim to provide a comfortable space that shields people from the weather and at the same time it is an interactive shelter in a way that people get to transform the shelter into any way they want. We analyzed the structure and form of the trishaw and created our own design of a shelter. Design concept: 2
  • 4. M ATER I A LS PLYWOOD ADVANTAGES: • High resistance to breaking and can withstand a large weight. Therefore, it is used as the base of the shelter. • High resistance to cracking thus it does not crack easily when sawed. • Easily assembled and can be recycled. WATER PROOF CANVAS ADVANTAGES: • Can withstand heat as the white surface of the canvas reflects heat off the surface of the shelter, thus providing thermal comfort to the people in the shelter. • Resistant to stain. • Durable as it is resistant to rip and tears. 3 *ALL MATERIALS ARE RECYCLE OR REUSED
  • 5. P R O C ES S IN M A K IN G 1.Plywood planks with the correct measurements and shapes drawn were prepared. 2.The bridle joint and cross-halving joint were cut out using machines. 3.Plywood that were sawed were sanded by using sanding paper before setting them up. 4.The waffle slab base was set up by using cross-halving joints whereas the seating was set up by using bridle joint. 5.The plywood planks needed for the fixed frame and also the retractable frame were sawed and also sanded. 6.The fixed frame was nailed to both sides of the base. 7.The retractable frames were secured to the base by using bolt and nut and tied together using strings. 8.A plank of plywood was nailed diagonally at the back of the shelter to further stabilize it. 9.Waterproof canvas was secured to the retractable frame by using nails. 10.Testing the ability of the shelter to support load>60kg. 4
  • 6. CO N STR U CTI O N P R O C ES S 1. The waffle slab base is constructed by crisscrossing plywood planks into a square base. 2. The base is then covered on four sides by four pieces of plywood planks. A seating that can be assembled and disassembled is then slot into the waffle slab base. 3. The fixed frame that supports both sides of the shelter is then built up. 4. Another plank of plywood is then nailed diagonally at the back of the shelter to further stabilize it. Two additional plywood planks are nailed to the bottom of the waffle slab base to secure the base. 5. The retractable frame is then built up by securing three pieces of plywood on both sides of the shelter with bolt and nut. 6. Lastly, the water proof canvas is then secured to the retractable frame with nails. 5
  • 7. STR U CTUR A L CO N STR U CTI O N E LEM ENT Cross Halving Joint •Two pieces of woods are interlock with each other to form the grid structure or waffle slab as the base. •It is chosen to form the base due to its high strength and stability of supporting. •Part of each pieces of the woods has been cut away to form a cross halving joint Mortise and tenon •Two pieces of wood are joined together with an angle of 90 degree. •Used to support the waffle slab. •The protruding tenon is fitted into a rectangular slot, mortise to produce a strong and neat joint. •Non-movable and difficult to separate once it is fitted. Flat Head Wood Screw •Used to lift up the waffle slab and position them. •Gives greater strength to the base and resist of loosing compare to nails. •Full thread screw is chosen due to its long-term strength. Full Thread Bolt and Nut •Used as the supporter of the roof structure. •Bolt is locked into the woods and but is tighten at the end of the bolt. •Pieces of woods are joined together with bolt and nut to make it movable. 6
  • 8. F UN CTI O N S A ND A ESTH E TI C S M E C H A N I S M The framing is divided into one fixed frame and smaller frames attached to it . The smaller frames are retractable , allowing the shelter to open up to healthy sunlight and hygienic reasons while closed to block out rain and excessive heat source, achieving thermal comfort .The platform above the base is detachable , forming a bench for sitting purpose. It is customised to assemble firmly , with the legs of the bench attached to the base as a whole . Load distribution After Weight Load distribution is divided, from the platform and the frames. With the grid arrangement of the base, load is distributed evenly across the base to the four corners and later on, evenly into the ground. The arrangement of the base is in a grid manner , allowing load to be distributed evenly across the 4 corners . Load Distribution before Weight When there is no load , the Load distribution is derived from the frames and distributed down to the base before being disposed to the ground. 7 FIXED FRAME RETRACTABLE FRAME
  • 9. CO N CLU SI O N 8 After completing this project, we have a better understanding and were able to demonstrate our understanding on how a Skeletal Construction works. With the understanding we learnt after this project, we can apply the construction system in our future design. In addition, we were able to analyse the issues of strength, stiffness and stabilty of the structure including different methods of joints and how forces of load react on the structure.