SlideShare a Scribd company logo
1 of 3
S U N I L . K U M A R
+91- 8792627970,9538693710,
E-mail id: sunil.cct029@gmail.com
S/O Ningappa pujari
21/9 LTRT 15th cross ALSTOM COLONY,Shahabad,Gulbarga
Karanataka.
CERAMIC ENGINEER
Seeking a position to utilize my experience, skills and abilities in an Industry that offers
professional growth while being resourceful.
PROFILE:
 Competent and result-oriented professional having 2.9 years of experience
with ZAIN REFRATEK PVT LTD –Toranagallu, Bellary’s.
 In the areas of iron and steel making at JSW COREX MODULE-1 shutdown in
REFRACTORY Erection with S-VAI UK refractory experts.
 NON RECOVERY COKE OVEN REFRACTORY Relining at
 2 COLD ROLL MILL PROJECTS at jsw steel, toranagallu,karantaka.
 TRAVELLING GATE IRON ORE PELLET PLANT PROJECT in MINERA
STEEL AND POWERS limited.
 BLAST FURNACE STOVES PROJECT at JSW steel limited,toranagallu.
 BLAST FURNACE PROJECT at JSW steel limited.toranagallu.
 Gained knowledge in understanding the complicated designs and drawings
related to refractories and much more, along with interacting with Indians,
Europeans, Russian and Japanese.
 Possess in-depth understanding of various refractory types, application
methodologies and proven in coordinating and leading variety of contractual
people and projects with an ability to develop strategic plans.
PROFESSIONAL EXPERIENCE
ZAIN REFRACTEK PVT LTD, Torangallu, Bellary
From June 2013 till date
Position held - Site Incharge (Refractory Engineer)
Erection:
 Worked as a GET for the construction of Refractories for COREX MODULE-2
shutdown at JSW Steel limited, Toranagallu, Karnataka and successfully
completed in the time period of 76 days
 Involved in refractory insulation lining and stainless steel plate cladding in 0.95
MPTA CONTINOUS ANNEALING LINE-1 AND CONTINOUS GALVANISING
LINE-1 furance in COLD ROLL MILL-2 Project at JSW Steel limited.
 Successfully completed the Refractory relining for NON RECOVERY COKE
OVEN of 32 batteries of 10,000tonnes refractory brick lining and 1000tonnes
castables at JSW STEEL limited as a site engineer from dec 2013 to march 2014.
 Involved in 0.6MPTA TRAVELLING GRATE IRON ORE PELLET PLANT
PROJECT as a site engineer at MINERA STEEL & POWERS limited from march
2014 to june.
 As a project leader completed the CONTINOUS ANNEALING LINE-2 furance
of COLD ROOL MILL-2 Project at JSW Steel limited from june 2014 to dec 2014.
 As a project leader completed 3 new KALUGIN SHAFTLESS HOT BLAST
STOVE BLAST FURANCE #1 at JSW Steel limited as project leader from dec
2014 to june 2015.
 As a site incharge completed new 90meters KALUGIN HOT BLAST MAIN of
innner diameter 1.3 m refractory constructions which connects 3 new stoves to
blast furance#1 buzzle main at jsw steel limited august 2015 to dec 2015.
 As a site incharge worked in modernisation, size increase and capacity
expansion, No.1 Blast Furnace at JSW Steel’s Vijayanagar Works, Toranagallu,
Karnataka and successfully completed BUZZLE MAIN refracroty lining in
record time of 26days in jan 2016 and completed BLAST FURANCE refracroty
lining and protecting refracroty lining of PAUL WRUTH design. The furnace has
now an inner volume of volume of 2,307 m3
(instead of 1,250 m3
), an increased
hearth diameter (enlarged from 8 to 10.4 m) and increased number of hot blast
tuyeres (from 18 to 28). The daily hot metal rate is 5,250 tons for a total yearly
iron production of about 1.7 million tons, some 89% more than before the
modernisation. These figures represent one of the largest capacity increases ever
seen from one single blast furnace rebuild.
Resource Management:
 Planning for day-to-day erection and maintenance activities, man-hours
requirement.
 Day to day Planning, Co-ordination with Contractors, Engineering Division and
Various other Departments(safety, electrical, mechanical, instrumentation &
operation) for Smooth flow of Work.
 Material logistics (receiving, unloading, proper storage in sequence of erection
requirement).
 Invoicing, technical explanation for client, contractor, consultant, designer for
smooth problem free process during erection, supply, and Billing.
 Special Training on safety standards at JSW
Key Skills:
 Ability to handle all the site activities in good co-ordination with the
refractory erectors, consultants & technology providers.
 In depth knowledge of safety measures at a steel plant construction site as
well as at shop floors.
 Ability to analyse the complex refractory drawings, and to work in 12 hrs
shifts at site for day / night as per the job requirement.
 Good verbal & written communication skills with ability to handle the
complex situations towards the required result.
ACHIVEMENTS:
 Awarded as BEST EMPLOYEE OF YEAR 2015-2016 for working as site
incharge in blast furnance and stoves project.
ACADEMIA
 Bachelor of Engineering from PDA College of Engineering with aggregate
CGPA of 7.56
 PUC+2 from BEST College (Bellary) with 52.16%.
 SSLC from Mount Carmel Convent(Shahabad) with 81.44%
SOFTWARE KNOWLEDGE
 MS-Office.
 windows 8,7& XP.
 Date of Birth: 31st
March 1989
 Languages spoken: English, Hindi, and Kannada
 Marital status: Single

More Related Content

What's hot

Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Piyush resume 500 tpd kiln(mechanical)
Piyush resume 500 tpd kiln(mechanical)Piyush resume 500 tpd kiln(mechanical)
Piyush resume 500 tpd kiln(mechanical)piyush kumar
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Resume of Electrical Draughtsman
Resume of Electrical DraughtsmanResume of Electrical Draughtsman
Resume of Electrical DraughtsmanAromal V V
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer ResumeRavi Kumar
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANSUDARSANAN NANU
 

What's hot (20)

Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
SRIDHARAN.R RESUME
SRIDHARAN.R RESUMESRIDHARAN.R RESUME
SRIDHARAN.R RESUME
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Piyush resume 500 tpd kiln(mechanical)
Piyush resume 500 tpd kiln(mechanical)Piyush resume 500 tpd kiln(mechanical)
Piyush resume 500 tpd kiln(mechanical)
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
resume piping
resume pipingresume piping
resume piping
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Resume of Electrical Draughtsman
Resume of Electrical DraughtsmanResume of Electrical Draughtsman
Resume of Electrical Draughtsman
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 

Viewers also liked

Viewers also liked (6)

Red mill pond section 506
Red mill pond section 506Red mill pond section 506
Red mill pond section 506
 
WV CV_Eng_2016
WV CV_Eng_2016WV CV_Eng_2016
WV CV_Eng_2016
 
Advd lecture 08 -inverte rpart3
Advd   lecture 08 -inverte rpart3Advd   lecture 08 -inverte rpart3
Advd lecture 08 -inverte rpart3
 
Business intelligence
Business intelligenceBusiness intelligence
Business intelligence
 
internship report
internship reportinternship report
internship report
 
DevOps: All About Automation
DevOps: All About AutomationDevOps: All About Automation
DevOps: All About Automation
 

Similar to sunil.kumar resume

number 1. pro cv
number 1. pro cvnumber 1. pro cv
number 1. pro cvDave Chase
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017Peter Fitzpatrick
 
Hot Dip Galvanization with Substation Structure..pptx
Hot Dip Galvanization with Substation Structure..pptxHot Dip Galvanization with Substation Structure..pptx
Hot Dip Galvanization with Substation Structure..pptxTanya/Prashant Galvanizers
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsKoshalendra Pandey
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profileJanakbhatt
 
Vause Wayne - 6829
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829wayne vause
 
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANTMudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANTBasant Kumar Sahu
 
Edifice engineering enterprise pvt. ltd. presentation
Edifice engineering enterprise pvt. ltd. presentationEdifice engineering enterprise pvt. ltd. presentation
Edifice engineering enterprise pvt. ltd. presentationRajib Ghosh
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSpArpit Dubey
 
JC Professional Profile 2
JC Professional Profile 2JC Professional Profile 2
JC Professional Profile 2John Churchill
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CVRupert Davison
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Dockarl luke
 

Similar to sunil.kumar resume (20)

Manoranjan Bal Resume
Manoranjan Bal ResumeManoranjan Bal Resume
Manoranjan Bal Resume
 
Nirala_CV (1)
Nirala_CV (1)Nirala_CV (1)
Nirala_CV (1)
 
number 1. pro cv
number 1. pro cvnumber 1. pro cv
number 1. pro cv
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017
 
Hot Dip Galvanization with Substation Structure..pptx
Hot Dip Galvanization with Substation Structure..pptxHot Dip Galvanization with Substation Structure..pptx
Hot Dip Galvanization with Substation Structure..pptx
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
richies cv (1)
richies cv (1)richies cv (1)
richies cv (1)
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profile
 
Vause Wayne - 6829
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829
 
Resume Eric Pickering
Resume Eric PickeringResume Eric Pickering
Resume Eric Pickering
 
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANTMudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
 
Edifice engineering enterprise pvt. ltd. presentation
Edifice engineering enterprise pvt. ltd. presentationEdifice engineering enterprise pvt. ltd. presentation
Edifice engineering enterprise pvt. ltd. presentation
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSp
 
JC Professional Profile 2
JC Professional Profile 2JC Professional Profile 2
JC Professional Profile 2
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
MANOJ RESUME
MANOJ RESUMEMANOJ RESUME
MANOJ RESUME
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CV
 
CURICULAM VAITE
CURICULAM VAITECURICULAM VAITE
CURICULAM VAITE
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
 

sunil.kumar resume

  • 1. S U N I L . K U M A R +91- 8792627970,9538693710, E-mail id: sunil.cct029@gmail.com S/O Ningappa pujari 21/9 LTRT 15th cross ALSTOM COLONY,Shahabad,Gulbarga Karanataka. CERAMIC ENGINEER Seeking a position to utilize my experience, skills and abilities in an Industry that offers professional growth while being resourceful. PROFILE:  Competent and result-oriented professional having 2.9 years of experience with ZAIN REFRATEK PVT LTD –Toranagallu, Bellary’s.  In the areas of iron and steel making at JSW COREX MODULE-1 shutdown in REFRACTORY Erection with S-VAI UK refractory experts.  NON RECOVERY COKE OVEN REFRACTORY Relining at  2 COLD ROLL MILL PROJECTS at jsw steel, toranagallu,karantaka.  TRAVELLING GATE IRON ORE PELLET PLANT PROJECT in MINERA STEEL AND POWERS limited.  BLAST FURNACE STOVES PROJECT at JSW steel limited,toranagallu.  BLAST FURNACE PROJECT at JSW steel limited.toranagallu.  Gained knowledge in understanding the complicated designs and drawings related to refractories and much more, along with interacting with Indians, Europeans, Russian and Japanese.  Possess in-depth understanding of various refractory types, application methodologies and proven in coordinating and leading variety of contractual people and projects with an ability to develop strategic plans. PROFESSIONAL EXPERIENCE ZAIN REFRACTEK PVT LTD, Torangallu, Bellary From June 2013 till date Position held - Site Incharge (Refractory Engineer) Erection:  Worked as a GET for the construction of Refractories for COREX MODULE-2 shutdown at JSW Steel limited, Toranagallu, Karnataka and successfully completed in the time period of 76 days  Involved in refractory insulation lining and stainless steel plate cladding in 0.95 MPTA CONTINOUS ANNEALING LINE-1 AND CONTINOUS GALVANISING LINE-1 furance in COLD ROLL MILL-2 Project at JSW Steel limited.
  • 2.  Successfully completed the Refractory relining for NON RECOVERY COKE OVEN of 32 batteries of 10,000tonnes refractory brick lining and 1000tonnes castables at JSW STEEL limited as a site engineer from dec 2013 to march 2014.  Involved in 0.6MPTA TRAVELLING GRATE IRON ORE PELLET PLANT PROJECT as a site engineer at MINERA STEEL & POWERS limited from march 2014 to june.  As a project leader completed the CONTINOUS ANNEALING LINE-2 furance of COLD ROOL MILL-2 Project at JSW Steel limited from june 2014 to dec 2014.  As a project leader completed 3 new KALUGIN SHAFTLESS HOT BLAST STOVE BLAST FURANCE #1 at JSW Steel limited as project leader from dec 2014 to june 2015.  As a site incharge completed new 90meters KALUGIN HOT BLAST MAIN of innner diameter 1.3 m refractory constructions which connects 3 new stoves to blast furance#1 buzzle main at jsw steel limited august 2015 to dec 2015.  As a site incharge worked in modernisation, size increase and capacity expansion, No.1 Blast Furnace at JSW Steel’s Vijayanagar Works, Toranagallu, Karnataka and successfully completed BUZZLE MAIN refracroty lining in record time of 26days in jan 2016 and completed BLAST FURANCE refracroty lining and protecting refracroty lining of PAUL WRUTH design. The furnace has now an inner volume of volume of 2,307 m3 (instead of 1,250 m3 ), an increased hearth diameter (enlarged from 8 to 10.4 m) and increased number of hot blast tuyeres (from 18 to 28). The daily hot metal rate is 5,250 tons for a total yearly iron production of about 1.7 million tons, some 89% more than before the modernisation. These figures represent one of the largest capacity increases ever seen from one single blast furnace rebuild. Resource Management:  Planning for day-to-day erection and maintenance activities, man-hours requirement.  Day to day Planning, Co-ordination with Contractors, Engineering Division and Various other Departments(safety, electrical, mechanical, instrumentation & operation) for Smooth flow of Work.  Material logistics (receiving, unloading, proper storage in sequence of erection requirement).  Invoicing, technical explanation for client, contractor, consultant, designer for smooth problem free process during erection, supply, and Billing.  Special Training on safety standards at JSW
  • 3. Key Skills:  Ability to handle all the site activities in good co-ordination with the refractory erectors, consultants & technology providers.  In depth knowledge of safety measures at a steel plant construction site as well as at shop floors.  Ability to analyse the complex refractory drawings, and to work in 12 hrs shifts at site for day / night as per the job requirement.  Good verbal & written communication skills with ability to handle the complex situations towards the required result. ACHIVEMENTS:  Awarded as BEST EMPLOYEE OF YEAR 2015-2016 for working as site incharge in blast furnance and stoves project. ACADEMIA  Bachelor of Engineering from PDA College of Engineering with aggregate CGPA of 7.56  PUC+2 from BEST College (Bellary) with 52.16%.  SSLC from Mount Carmel Convent(Shahabad) with 81.44% SOFTWARE KNOWLEDGE  MS-Office.  windows 8,7& XP.  Date of Birth: 31st March 1989  Languages spoken: English, Hindi, and Kannada  Marital status: Single