SlideShare a Scribd company logo
1 of 62
Andaman & Nicobar
1 Name of implementing agency ED, A&N Island
2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021
3 Capacity tendered 5 MW
4 No. of empaneled vendors 1 No.
5 Rates discovered Rs 86405 to Rs 59180 per kW
6 Online portal of DISCOMs YES
7 Applications received -
8 Applications approved -
9 Capacity of projects installed nil
10 Amount of CFA disbursed to the vendors Nil out of Rs. 35.40 lakh released by MNRE
11 Issues Latest MPR not Submitted. Only 9 days is left for
validity.
Solar City selected by State Govt. : Shaheed Dweep
Andhra Pradesh
1 Name of implementing agency APEPDCL
2 Capacity Sanctioned by MNRE 8 MW in FY 2020-21 valid up to 23.09.2022
3 Capacity tendered 8 MW
4 No. of empaneled vendors More than 16 Nos
5 Rates discovered Rs (50,000-36,000) per kWp
6 Online portal of DISCOMs Yes
7 Applications received 106 Nos. Applications, for 454 KWp
8 Applications approved 70 Nos. applications for 289 KWp
9 Capacity of projects installed 7 Nos for 27 KWp
10 Amount of CFA disbursed to the vendors
NIL (Advance released Rs. 2.01 crores by MNRE recently)
11 Issues Need to popularise the scheme
Solar City selected by State Govt. : Nil
Andhra Pradesh
1 Name of implementing agency APSPDCL
2 Capacity Sanctioned by MNRE 17 MW in FY 2020-21 valid
up to 24.03.2022
3 Capacity tendered No progress
4 No. of empaneled vendors No progress
5 Rates discovered No progress
6 Online portal of DISCOMs No progress
7 Applications received -
8 Applications approved -
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 Issues MPR not Submitted
Solar City selected by State Govt. : NIL
Arunachal Pradesh
1 Name of implementing agency
2 Capacity Sanctioned by MNRE No Proposal received
3 Capacity tendered -
4 No. of empaneled vendors (slab wise) -
5 Rates discovered (slab wise) -
6 Online portal of DISCOMs -
7 Applications received -
8 Applications approved -
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 Issues MPR not Submitted
Solar City selected by State Govt. :Nil
Assam
1 Name of implementing agency Assam Power Distribution Company Limited (APDCL)
2 Capacity Sanctioned by MNRE 2 MW in FY 2020-21 valid up to 24.03.2022
3 Capacity tendered 2 MW
4 No. of empaneled vendors (slab wise) Minimum 06 vendors
5 Rates discovered (slab wise) Rs 50001.50 to 43005.00 per kW
6 Online portal of DISCOMs Yes
7 Applications received 1317 Nos. and 4.798 MW
8 Applications approved 60 Nos. and 0.221 MW
9 Capacity of projects installed Nil
10 Amount of CFA disbursed to the vendors Nil
11 Issues Facing issue in submission of UC/refund details in pfms
portal due to which release of advance CFA could not be
processed.
There is huge difference between number of application
received vs. approved
Solar City selected by State Govt. : Majuli District
Bihar
1 Name of implementing agency NBPDCL
2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 21.11.2021
10 MW in 20-21 valid upto 30.06.2022
3 Capacity tendered 2 MW
4 No. of empaneled vendors (slab wise) 11 nos.
5 Rates discovered (slab wise) 1kW -10 kW: Rs. 49,710 per kW
10kW -100 kW: Rs. 46,210 per kW
6 Online portal Yes
7 Applications received 4231 nos for 7.184 MW
8 Applications approved 2 MW
9 No. and capacity of projects installed 121 nos for 0.368 MW
10 Total amount of CFA disbursed to the vendors Rs. 0.0123 Crore against Rs. 0.59 Crore
11 Issues Extension requested upto December 2021
No provision to submit new application in portal.
Not using EAT module
Solar City selected by State Govt. : Gaya
Bihar
1 Name of implementing agency SBPDCL
2 Capacity Sanctioned by MNRE 3 MW in 19-20 valid upto 21.11.2021
10 MW in 20-21 valid upto 30.06.2022
3 Capacity tendered 3 MW
4 No. of empaneled vendors (slab wise) 11 nos.
5 Rates discovered (slab wise) 1kW -10 kW: Rs. 49,710 per kW
10kW -100 kW: Rs. 46,210 per kW
6 Online portal Yes
7 Applications received 2355 nos. (5.286 MW)
8 Applications approved 3 MW
9 No. and capacity of projects installed 220 nos ( 0.725 MW)
10 Total amount of CFA disbursed to the
vendors
Rs. 0.55 Crore against Rs. 0.894 Crore (as per EAT report)
11 Issue Latest MPR Not Submitted.
Extension requested upto December 2021
No provision to submit new application in portal.
Solar City selected by State Govt. : Gaya
Chhattisgarh
1 Name of implementing agency CSPDCL
2 Capacity Sanctioned by MNRE 5 MW in FY 2019-20 valid upto 03.10.2021
3 Capacity tendered 5 MW
4 No. of empaneled vendors (slab wise) 1-10 kW: 20 nos,
10-100 kW: 14 nos,
100 kW to 500 kW: 15 nos.
5 Rates discovered (slab wise) Rs. 40,000 per kW to Rs. 36,000 per kW
6 Online portal of DISCOMs Yes
7 Applications received 83 nos. 0.909 MW
8 Applications approved 83 nos. 0.909 MW
9 Capacity of projects installed 22 nos. (0.223 MW)
10 Amount of CFA disbursed to the vendors Nil. MNRE has released the funds recently ( Rs. 1.2
crore)
11 Issues New proposal of 5 MW submitted by CSPDCL
Solar City selected by State Govt. : New Raipur
Chandigarh
1 Name of implementing agency Electricity Department through CREST
2 Capacity Sanctioned by MNRE 15 MW in 19-20 valid upto 03.10.2021
70 MW in 20-21 valid upto 23.06.2022
3 Capacity tendered 2019-20: 3 MW
2020-21: Nil - EOI invited/20 received.
4 No. of empanelled vendors (slab wise) 12 nos ( Note: Fresh EOI invited on June 28, 2021 and 20 EOI
received )
5 Rates discovered (slab wise) 1 kWp – 3 – Rs. 51,200 per kW
>1 to 2 kWp – 4 – Rs. 43,000 per KW
>2 to 3 kWp – 10 – Rs. 40,400 per kW
>3 to 10 kWp – 12 – Rs. 39,050 per kW
6 Online portal Yes
7 Applications received 785 applications for 4.220 MW
8 Applications approved 785 applications for 4.220 MW
9 No. and capacity of projects installed 708 applications for 3.239 MW
10 Total amount of CFA disbursed to the
vendors
Rs. 33.38 lacs against Rs. 84.60 Lakh
11 Issue Latest MPR Not Submitted.
Not using EAT
Solar City selected by UT : Nil
Delhi
1 Name of implementing agency TATA Power DDL
2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 19.08.2021
8 MW in 20-21 valid upto 20.05.2022
3 Capacity tendered 10 MW
4 No. of empanelled vendors (slab
wise)
Capex:1-3 kW: 5 nos, 4-10 kW: 13 nos,
11-100 nos: 9 nos, 101-500kW : 1 nos.,
1-3 kW ( elevated ) : 3 nos
RESCO : 2 nos.
5 Rates discovered (slab wise) Rs. 37000 per kW to 33,931 per kW
6 Online portal Yes
7 Applications received 73 nos. (638 KW )
8 Applications approved 54 nos. ( 504 KW )
9 No. and capacity of projects
installed
39 nos. (244.45 KW )
10 Total amount of CFA disbursed to
the vendors
Not disbursed.
11 Issues Timeline of 1st project expired.
Solar City selected by State Govt. : NDMC Area
Delhi
1 Name of implementing agency BRPL
2 Capacity Sanctioned by MNRE 10 MW for FY 2019-20 upto 03.10.2021
3 Capacity tendered 30 MW Common Tender (10MW for BRPL,10MWp for BYPL
and 10 MW for TPDDL)
4 No. of empanelled vendors (slab wise) 43 vendors in CAPEX (General & Open category) and 5
vendors in RESCO
5 Rates discovered (slab wise) Rs. 37000 per kW to Rs. 33,931 per kW
6 Online portal Yes
7 Applications received 193 nos (1.499 MW)
8 Applications approved 193 nos ( 1.431 MW)
9 No. and capacity of projects installed 103 nos. (0.776 MW)
10 Total amount of CFA disbursed to the vendors Rs. 5.55 Lakh against Rs. 1.11 Crore
11 Issues Latest MPR not Submitted.
New proposal of 5 MW for FY 21-22 submitted by BRPL
Not using EAT module
Solar City selected by State Govt. : NDMC Area
Delhi
1 Name of implementing agency BYPL
2 Capacity Sanctioned by MNRE 10 MW in 19-20 valid upto 03.10.2021
3 Capacity tendered 10 MW
4 No. of empanelled vendors (slab wise) Capex:1-3 kW: 5 nos, 4-10 kW: 13 nos,
11-100 nos: 9 nos, 101-500kW : 1 nos., 1-3 kW ( elevated ) : 3 nos
RESCO : 2 nos.
5 Rates discovered (slab wise) Rs. 37000 per kW to 33,931 per kW
6 Online portal Yes
7 Applications received 28 nos. (284.91 kW)
8 Applications approved 27 nos. (281.91 kW)
9 No. and capacity of projects installed 10 nos. ( 64.67 kW )
10 Total amount of CFA disbursed to the vendors Nil against MNRE release of Rs.0.56 crore
11 Issues Latest MPR not Submitted.
New proposal of 3 MW for FY 21-22 submitted by BRPL
Not using EAT module
Solar City selected by State Govt. : NDMC Area
Delhi
1 Name of implementing agency NDMC
2 Capacity Sanctioned by MNRE 1.5 MW valid upto 23rd June 2022
3 Capacity tendered Adopted same selected bidders of 3 DISCOMs of
Delhi
4 No. of empaneled vendors (slab wise) Capex:1-3 kW: 5 nos, 4-10 kW: 13 nos,
11-100 nos: 9 nos, 101-500kW : 1 nos., 1-3 kW (
elevated ) : 3 nos
RESCO : 2 nos.
5 Rates discovered (slab wise) Rs. 37000 per kW to 33,931 per kW
6 Online portal No
7 Applications received 4 nos ( hardcopy)
8 Applications approved 4 nos ( hardcopy)
9 No. and capacity of projects installed
10 Total amount of CFA disbursed to the vendors Nil
11 Issues Submitted advance request. However UC and refund of
unspent and interest are pending under phase I of the RTS
programme .Portal to be developed
Solar City selected by State Govt. : NDMC Area
Goa
1 Name of implementing agency Electricity Department
2 Capacity Sanctioned by MNRE 80 MW in FY 2020-21 valid upto 23.06.2022
3 Capacity tendered 80 MW out of which 16 MW LoA issued
4 No. of empaneled vendors (slab wise) 1 kW : 11 nos , 2 kW: 12 nos., 3 kW: 14 nos.,4 -10 kW:14
nos.,11 kW to 100 KW: 7 nos and 101-500 kW: 10 nos.
5 Rates discovered (slab wise) Rs. 46949 to Rs. 35949 per kW
6 Online portal of DISCOMs No
7 Applications received nil
8 Applications approved Nil
9 Capacity of projects installed nil
10 Amount of CFA disbursed to the vendors nil
11 Issue Latest MPR not Submitted
Solar City selected by State Govt. :Nil
Gujarat
1 Name of implementing agency MGVCL, UGVCL, PGVCL, DGVCL,Torrent (Surat), Torrent ( Ahmd)
2 Capacity Sanctioned by MNRE FY-2019-20 :- 440 MW , FY-2020-21 :- 492 MW
Total :- 932 MW (valid upto 20-08-2021, 04-10-2021, 21-12-2021 &
24-06-2022)
3 Capacity tendered Tender-I :- 600MW & Tender-II :- 600MW
4 No. of empaneled vendors (slab
wise)
Tender-I :- 459 (In all slab) & Tender-II :- 548 (In all slab)
5 Rates discovered (slab wise) Tender-I: Rs. 46827 per kW to Rs. 33999 per kW
Tender-II: Rs. 46827 per kW to Rs. 30492 per kW
6 Online portal of DISCOMs yes
7 Applications received 269222 nos. for 1048.2 MW
8 Applications approved 257351 nos. for 997.6 MW
9 Capacity of projects installed 225070 Nos., 866.2 MW
10 Amount of CFA disbursed to the
vendors
Rs. 1134.21 Cr. against CFA released by MNRE Rs. 429.47 Cr
11 Issues Request of release of CFA received from DISCOMs with
PCRs/Ucs/SoEs which is under process
Additional capacity request has been submitted by GUVNL for about
258 MW
Solar City selected by State Govt. :Dwarka
Haryana
1 Name of implementing agency UHBVN
2 Capacity Sanctioned by MNRE 5 MW in 19-20 valid upto 03.10.2021
10 MW in 20-21 valid upto 23.06.2022 (likely to
surrender)
3 Capacity tendered 5 MW
4 No. of empaneled vendors (slab wise) 9 vendors
5 Rates discovered (slab wise) 1-10 kW : Rs. 45780 per kW
Above 10-100 kW : Rs. 41000 per kW
Above 100-500 kW : Rs. 36950 per kW
6 Online portal Developed
7 Applications received 1025 Nos (6.071 MW )
8 Applications approved 929 Nos (5.529 MW )
9 No. and capacity of projects installed 864 Nos (5.137 MW )
10 Total amount of CFA disbursed to the vendors Rs. 1.37 crore out of Rs. 1.37 Crore
11 Issues Additional capacity request for 1.5 MW.
3 months timeline extension request received .
Demand for release of 2nd instalment may be
submitted by UHBVN
Solar City selected by State Govt. : Panchkula
Haryana
1 Name of implementing agency DHBVN
2 Capacity Sanctioned by MNRE 10 MW in 19-20 valid upto 03.10.2021
15 MW in 20-21 valid upto 23.06.2022
3 Capacity tendered 10 MW
4 No. of empaneled vendors (slab wise) 12 vendors
5 Rates discovered (slab wise) 1-10 kW : Rs. 45780 per kW
Above 10-100 kW : Rs. 41000 per kW
Above 100-500 kW : Rs. 36950 per kW
6 Online portal Developed
7 Applications received 2434 Nos (15.498 MW)
8 Applications approved 2213 Nos. (14.264 MW )
9 No. and capacity of projects installed 2041 Nos. (13.152 MW)
10 Total amount of CFA disbursed to the
vendors
Rs. 2.74 crore out of Rs. 2.74Crore released by
MNRE
11 Issues Additional capacity request for 5 MW.
6 months timeline extension request received .
Demand for release of 2nd instalment may be
submitted by DHBVN
Himachal Pradesh
1 Name of implementing agency HPSEB through Himurja
2 Capacity Sanctioned by MNRE 15 MW in FY 2019-20 valid upto 26.01.2022
3 Capacity tendered 15 MW
4 No. of empaneled vendors (slab wise) 22 nos.
5 Rates discovered (slab wise) Rs. 42000 per kW to Rs. 35000 per kW
6 Online portal of DISCOMs No
7 Applications received 361 Nos ( 1.038 MW)
8 Applications approved 361 Nos ( 1.038 MW)
9 Capacity of projects installed 147 nos.
10 Amount of CFA disbursed to the vendors Rs. 74,16,318/- ( Advance CFA request not received from
HPSEB)
11 Issues MPR not Submitted. HPSEB has submitted advance CFA
request. Bank details not updated in pfms
Solar City selected by State Govt. : Shimla
Jharkhand
1 Name of implementing agency JBVNL
2 Capacity Sanctioned by MNRE 10 MW in 19-20 valid upto 21.11.2021
50 MW in 19-20 valid upto 23.06.2022
3 Capacity tendered 10 MW in FY 19-20
25 MW on 12.04.2021
4 No. of empaneled vendors (slab wise) 11 nos under 10 MW
5 Rates discovered (slab wise) 1-3 kW : 45000 per kW, 3-10 kW: 42000 per kW and 10-100
kW : 40500 per kW
6 Online portal yes
7 Applications received 505 nos and (3.504 MW )
8 Applications approved 87 nos and (0.470 MW)
9 No. and capacity of projects installed 36 Nos and (0.170 MW)
10 Total amount of CFA disbursed to the vendors Nil .
11 Issues Latest MPR not Submitted. Release of Rs. 0.56 Crore
pending due to non-mapping of bank details in pfms
Solar City selected by State Govt. : Giridih
Jharkhand
1 Name of implementing agency TSUISL(Submitted on 03.08.2021)
2 Capacity Sanctioned by MNRE 0.1 MW in FY 2019-20 valid upto 03.10.2021
3 Capacity tendered Same tender of JBVNL
4 No. of empanelled vendors (slab wise) 11 nos under 10 MW
5 Rates discovered (slab wise) 1-3 kW : 45000 per kW, 3-10 kW: 42000 per kW and 10-100 kW : 40500
per kW
6 Online portal yes
7 Applications received Nil (As of 31-07-2021)
8 Applications approved Nil
9 No. and capacity of projects installed Nil
10 Total amount of CFA disbursed to the vendors Nil
11 Issues MPR not Submitted
Solar City selected by State Govt. : Giridih
Jharkhand
1 Name of implementing agency Tata Steel Limited (Submitted on 03.08.2021)
2 Capacity Sanctioned by MNRE 0.6 MW in Fy 19-20 valid upto 03.10.2021
3 Capacity tendered Same tender of JBVNL
4 No. of empanelled vendors (slab wise) 11 nos under 10 MW
5 Rates discovered (slab wise) 1-3 kW : 45000 per kW, 3-10 kW: 42000 per
kW and 10-100 kW : 40500 per kW
6 Online portal yes
7 Applications received 02 Nos and (13 Kwp)
8 Applications approved 02 Nos and (13 Kwp)
9 No. and capacity of projects installed 02 Nos and (13 Kwp)
10 Total amount of CFA disbursed to the
vendors
Nil
11 Issues MPR Not Submitted
Solar City selected by State Govt. : Giridih
Karnataka
1 Name of implementing agency BESCOM
2 Capacity Sanctioned by MNRE 30 MW in FY 2019-20 valid up to 03.10.2021 and 300 MW in FY 2020-21
valid up to 23.06.2022
3 Capacity tendered 30 MW for FY 2019-20
4 No. of empaneled vendors 01 vendor
5 Rates discovered Rs 46,999 to Rs 35,950 per kW
6 Online portal of DISCOMs Yes
7 Applications received 1110 Nos. for 3.633 MW capacity
8 Applications approved Nil approval.
9 Capacity of projects installed nil
10 Amount of CFA disbursed to the
vendors
Nil
11 Issues • Only one vendor. Extension may be required ( say upto 15th November
2021)
• Pre bid meeting held. Tender may be floated for 300 MW by next
month.
• Bank details not mapped in pfms portal ( for CFA/incentive)
Solar City selected by State Govt. : Hosapete City in Bellari
Karnataka
1 Name of implementing agency HESCOM
2 Capacity Sanctioned by MNRE 20 MW in FY 2019-20 valid up to
26.01.2022
3 Capacity tendered 20MW
4 No. of empaneled vendors 3 vendors finalized, LOA yet to be
issued
5 Rates discovered Rs 53,500 to Rs 34,500 per kW
6 Online portal of DISCOMs No
7 Applications received ---
8 Applications approved ---
9 Capacity of projects installed ---
10 Amount of CFA disbursed to the
vendors
---
11 Issues No application received .
Bank details has not mapped in pfms.
Solar City selected by State Govt. : Hosapete City in Bellari
Karnataka
1 Name of implementing agency CSEC
2 Capacity Sanctioned by MNRE 10 MW in FY 2020-21 valid up to 24.03.2022
3 Capacity tendered 10MW. What is the tentative date of vendor
selection ??? ( 30.09.2021)
4 No. of empaneled vendors -
5 Rates discovered -
6 Online portal of DISCOMs No. Server installed and Integration with BESCOM
Portal is under process ( target date 20.09.2021).
7 Applications received 1441 Nos
(11.176 MW )
8 Applications approved 1419 Nos
(6MW)
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 Issues Latest MPR not received
Solar City selected by State Govt. : Hosapete City in Bellari
Karnataka
1 Name of implementing agency GESCOM
2 Capacity Sanctioned by MNRE 10 MW in FY 2019-20 valid up to 26.01.2022
3 Capacity tendered 500kWp (Minimum)
4 No. of empaneled vendors
Earlier vendor selection through tender cancelled ….Retender
done …024.09.2021 is the last date of bid submission.
5 Rates discovered -
6 Online portal of DISCOMs Under process
7 Applications received 16 Nos and 50 Kwp
8 Applications approved -
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 issues Latest MPR not received. Requested for extension for 6 month.
May surrender the capacity and request for fresh capacity
Solar City selected by State Govt. : Hosapete City in Bellari
Karnataka
1 Name of implementing agency MESCOM
2 Capacity Sanctioned by MNRE 2 MW in FY 2020-21 valid up to 24.03.2022
3 Capacity tendered No Progress
4 No. of empaneled vendors No Progress
5 Rates discovered No Progress
6 Online portal of DISCOMs No Progress
7 Applications received -
8 Applications approved
9 Capacity of projects installed
10 Amount of CFA disbursed to the vendors
11 Issues MPR not Submitted
Solar City selected by State Govt. : Hosapete City in Bellari
Kerala
1 Name of implementing agency KSEBL
2 Capacity Sanctioned by MNRE 50 MW in FY 2019-20 valid up to
20.08.2021 and 200 MW in FY 2020-21
valid up to 23.06.2022
3 Capacity tendered 150 MW in FY 19-20 and 200 MW in FY
20-21
4 No. of empaneled vendors 3nos. in FY 19-20 and
7 nos.in FY 20-21
5 Rates discovered Rs 42999 to Rs 37999 per kW in FY 19-20
and Rs 53651 to Rs 39900 per kW in FY
19-20
6 Online portal of DISCOMs YES
7 Applications received 21219 Nos and 71.997 MW
8 Applications approved 3722 Nos and 14.172 MW
9 Capacity of projects installed 229 Nos and 0.790 MW
10 Amount of CFA disbursed to the vendors 0.65 Lakh out of 10.49 Cr
11 Issues --
Solar City selected by State Govt. : Thiruvananthapuram
Lakshadweep
1 Name of implementing agency LED
2 Capacity Sanctioned by MNRE 10 MW in FY 2020-21 valid up to 23.06.2022
3 Capacity tendered 0
4 No. of empaneled vendors NA as above
5 Rates discovered NA as above
6 Online portal of DISCOMs Portal is developed (Deployment and
integration with MNRE to pin portal is
pending)
7 Applications received -
8 Applications approved -
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 Issues MPR not Submitted
Solar City selected by State Govt. :Nil
Madhya Pradesh
1 Name of implementing agency MPCZ
2 Capacity Sanctioned by MNRE 20 MW in FY 19-20 valid upto 22.12.2021
3 Capacity tendered 20 MW
4 No. of empaneled vendors 17 nos
5 Rates discovered (slab wise) 1-3 kW: Rs. 37000 per kW
3-10 kW:Rs. 39800 per kW
10-100kW: Rs 36500 per kW
100-500kW: Rs 34900 per kW
6 Online portal of DISCOMs Yes
7 Applications received 1477 nos. ( 5.928 MW)
8 Applications approved 1246 nos. (5.193 MW)
9 Capacity of projects installed 863 nos. (3.647 MW)
10 Amount of CFA disbursed to the
vendors
Rs. 1.69 Crore against 4.06 Crore
11 Issues Request received from Vendor for extension.
Solar City selected by State Govt. :Sanchi
Madhya Pradesh
1 Name of implementing agency MPEZ
2 Capacity Sanctioned by MNRE 10 MW in FY 19-20 valid upto 01.01.2022
3 Capacity tendered 5.67 MW
4 No. of empaneled vendors (slab wise) 11 nos
5 Rates discovered (slab wise) 1-3 kW: Rs. 37000 per kW
3-10 kW:Rs. 39800 per kW
10-100kW: Rs 36700 per kW
100-500kW: Rs 34900 per kW
6 Online portal of DISCOMs
7 Applications received 390 Nos. for 1600 KW
8 Applications approved 240 Nos.1008 KW
9 Capacity of projects installed
187 Nos. 868 KW
10 Amount of CFA disbursed to the
vendors
Nil against MNRE advance release of Rs.
1.34 Crore
11 Issues ---
Solar City selected by State Govt. :Sanchi
Madhya Pradesh
1 Name of implementing agency MPWZ
2 Capacity Sanctioned by MNRE 15 MW in FY19-20 valid upto 12.01.2022
3 Capacity tendered 15 MW
4 No. of empaneled vendors (slab
wise)
1-3 kW: 5 nos, 3-10kW: 10 nos and 100 -500
kW:15 nos
5 Rates discovered (slab wise) 1-3 kW: Rs. 37000 per kW
3-10 kW:Rs. 39800 per kW
10-100kW: Rs 36500 per kW
100-500kW: Rs 34900 per kW
6 Online portal of DISCOMs yes
7 Applications received 1018 Nos and 4.607 MW
8 Applications approved 764 Nos and 3.385 MW
9 Capacity of projects installed 613 Nos and 2.734 MW
10 Amount of CFA disbursed to the
vendors
Rs. 1.35 crore released against MNRE
advance of Rs. 3.10 Crore
11 Issues ---
Solar City selected by State Govt. : Sanchi
Maharashtra
1 Name of implementing agency MSEDCL
2 Capacity Sanctioned by MNRE 25 MW in FY 19-20 valid upto 01.01.2022
500 MW in FY 20-21 valid upto 23.06.2022
3 Capacity tendered 25 MW
4 No. of empaneled vendors (slab wise) Total 26 Nos ( 06 Nos for slab from 1KW to 100KW and 20
Nos for slab from 1KW to 10KW)
5 Rates discovered (slab wise) 1KW – 46.82 Rs/Watt
Above 1KW & up to 2KW – 42.47 Rs/Watt
Above 2KW & up to 3KW – 41.38 Rs/Watt
Above 3KW & up to 10KW – 40.29 Rs/Watt
Above 10KW & up to 100KW – 37.02 Rs/Watt
6 Online portal of DISCOMs yes
7 Applications received 898nos. ( 3.039MW)
8 Applications approved 713 nos. (2.305 MW)
9 Capacity of projects installed 202 nos. (0.804 MW)
10 Amount of CFA disbursed to the vendors Nil released out of MNRE advance of Rs. 3.21 Crore
11 Issues 500 MW new proposal by surrendering 500 MW of proposal
of FY 2020-21
Solar City selected by State Govt. :nil
Maharashtra
1 Name of implementing agency Tata Power Mumbai
2 Capacity Sanctioned by MNRE 0.4 MW in FY 19-20 valid upto 19.08.2021
2 MW in FY 20-21 valid upto 23.07.2022
3 Capacity tendered 0.4 MW and 2 MW
4 No. of empaneled vendors (slab wise) 1-100 KW slab - 8 nos; 100-500 KW slab-4 nos.
5 Rates discovered (slab wise) 1KW=Rs.46000/-, 1 to 2 KW=Rs.42000/-,
2 to 3 KW=Rs.41000/-, 3 to10 KW=Rs.40000/-,
10 to 100KW=Rs.37000/-,
100 to 500KW=Rs.34000/-
6 Online portal of DISCOMs Yes
7 Applications received 1 number of 5 KW capacity
8 Applications approved 1 number of 5 KW capacity
9 Capacity of projects installed Nil
10 Amount of CFA disbursed to the
vendors
Nil
11 Issues Needs publicity
Solar City selected by State Govt. :nil
Maharashtra
1 Name of implementing agency AEML
2 Capacity Sanctioned by MNRE 3.5 MW in FY 19-20 valid upto
22.12.2021
3 Capacity tendered 3.5 MW
4 No. of empaneled vendors (slab
wise)
1kW:2 nos,1-2 kW: 2 nos,2-3 kW: 2
nos,3-10 kW: 3 nos.,10-100 kW: 4 nos
and 100-500 kW: 2 nos.
5 Rates discovered (slab wise) Rs. 46000 per kW to Rs. 34000 per kW
6 Online portal of DISCOMs Yes
7 Applications received 8 nos (0.081 MW)
8 Applications approved 8 nos (0.081 MW)
9 Capacity of projects installed 7 nos (0.071 MW)
10 Amount of CFA disbursed to the
vendors
nil
11 Issues Needs publicity
Solar City selected by State Govt. :Nil
Maharashtra
1 Name of implementing agency BEST
2 Capacity Sanctioned by MNRE 0.58 MW in FY 19-20 valid upto
21.11.2021
3 Capacity tendered 0.58 MW
4 No. of empaneled vendors (slab
wise)
3 nos
5 Rates discovered (slab wise) Rs (50,400-36,500) per KW
6 Online portal of DISCOMs Yes
7 Applications received nil
8 Applications approved nil
9 Capacity of projects installed nil
10 Amount of CFA disbursed to the
vendors
nil
11 Issues Latest MPR not submitted
Solar City selected by State Govt. :Nil
Manipur
1 Name of implementing agency Manipur State Power Distribution Company Limited
(MSPDCL)
2 Capacity Sanctioned by MNRE 1 MW in FY 2020-21 valid up to 24.03.2022
3 Capacity tendered 1 MW
4 No. of empaneled vendors (slab wise) 12
5 Rates discovered (slab wise) Rs 48828 to 39438 per KW
6 Online portal of DISCOMs Yes
7 Applications received 48 Nos. ( 347 KW)
8 Applications approved 32 Nos. (227 KW )
9 Capacity of projects installed Nil
10 Amount of CFA disbursed to the vendors nil
11 Issues Advance request with document not recived
Solar City selected by State Govt. :
Meghalaya
1 Name of implementing agency Meghalaya Power Distribution Corporation Limited
(MePDCL)
2 Capacity Sanctioned by MNRE 70 MW in FY 2020-21 valid up to 20.06.2022
3 Capacity tendered 10 MWp
4 No. of empaneled vendors (slab wise) Seven (07)
5 Rates discovered (slab wise) Rs 52000 to 42000 per Kw
6 Online portal of DISCOMs Yes
7 Applications received 551 (5722 kWp Including Non-Subsidized RTS
Projects)
8 Applications approved Nil
9 Capacity of projects installed Nil
10 Amount of CFA disbursed to the vendors nil
11 Issues Latest MPR not Submitted. Release of advance CFA
is pending due to non submission of UC
Solar City selected by State Govt. : Tura
Mizoram
1 Name of implementing agency Power & Electricity Department, Government of Mizoram
2 Capacity Sanctioned by MNRE 0.5 MW in FY 2019-20 valid up to 21.11.2021 and
1 MW in FY 2020-21 valid up to 23.06.2022
3 Capacity tendered 0.5 MW
4 No. of empaneled vendors (slab wise) Minimum 2 nos.
5 Rates discovered (slab wise) Rs. 54990/- for 1-10kW
6 Online portal of DISCOMs No
7 Applications received 21 nos. (88.46 kW)
8 Applications approved Nil
9 Capacity of projects installed Nil
10 Amount of CFA disbursed to the vendors Nil
11 Issues Latest MPR not recived
Solar City selected by State Govt. :Saitual
Nagaland
1 Name of implementing agency EDN
2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 21.11.2021 and 3.8
MW in FY 2020-21 valid up to 23.06.2022
3 Capacity tendered No progress
4 No. of empaneled vendors (slab wise) -
5 Rates discovered (slab wise) -
6 Online portal of DISCOMs -
7 Applications received -
8 Applications approved -
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 Issues MPR not Submitted
Solar City selected by State Govt. :nil
Odisha
1 Name of implementing agency TPCODL (Earlier CESU)
2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021
3 Capacity tendered 1 MW(Tender By OREDA)
4 No. of empaneled vendors 8 empanelled against which 3 LoA issued
5 Rates discovered Rs. 38000 to 32000 per KW
6 Online portal of DISCOMs Yes
7 Applications received 1.267 MW
8 Applications approved 1.267 MW
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 Issues Latest MPR not Submitted. Requested for extension
of 6 months
Solar City selected by State Govt. :Bhubaneswar
Odisha
1 Name of implementing agency TPSODL (Earlier SOUTHCO)
2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021
3 Capacity tendered 1 MW (Tender By OREDA)
4 No. of empaneled vendors 8 empaneled vendors of which 6 LoA issued
5 Rates discovered -
6 Online portal of DISCOMs Yes
7 Applications received -
8 Applications approved -
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 Issues Latest MPR not Submitted. Requested
for extension of 6 months
Solar City selected by State Govt. : Bhubaneswar
Odisha
1 Name of implementing agency TPWODL (Earlier WESCO)
2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021
3 Capacity tendered 1MW (Tender By OREDA)
4 No. of empaneled vendors LOI Issued to 8 vendors out of which only 1 vendors has
submitted BG.
5 Rates discovered Rs. 38000 to 32000 per KW
6 Online portal of DISCOMs Yes (http://rts.Odisha.gov.in/)
7 Applications received 143nos. (1.3 MW)
8 Applications approved
9 Capacity of projects installed
10 Amount of CFA disbursed to the vendors
11 Issues MPR not Submitted
Solar City selected by State Govt. : Bhubaneswar
Odisha
1 Name of implementing agency TPNODL (Earlier NESCO)
2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021
3 Capacity tendered 1 MW(Tender By OREDA)
4 No. of empaneled vendors LOA issued to 3 nos. of vendors out of 8nos.
5 Rates discovered (slab wise) Rs. 38000 to 32000 per KW
6 Online portal of DISCOMs Yes (http://rts.odisha.gov.in)
7 Applications received 202 nos. with capacity 3125 KW
8 Applications approved 1 no. with capacity 2.5KW
9 Capacity of projects installed 1 no. with capacity 2.5KW
10 Amount of CFA disbursed to the vendors NIL
11 Issues MPR not Submitted
Solar City selected by State Govt. : Bhubaneswar
Puducherry
1 Name of implementing agency Electricity Department, Puducherry
2 Capacity Sanctioned by MNRE 5 MW in FY 2019-20 valid up to
03.10.2021 and 25 MW in FY 2020-21
valid up to 23.02.2022
3 Capacity tendered 30 MW
4 No. of empaneled vendors 5
5 Rates discovered Rs. 35,900/ KW to Rs. 34,350/ KW
6 Online portal of DISCOMs Online portal is functional.
7 Applications received -
8 Applications approved -
9 Capacity of projects installed -
10 Amount of CFA disbursed to the vendors -
11 Issues Latest MPR not Submitted. Advance
CFA release request not received.
Solar City selected by State Govt. : NIL
Punjab
1 Name of implementing agency PSPCL
2 Capacity Sanctioned by MNRE 30 MW in 19-20 valid upto 03.10.2021
50 MW in 20-21 valid upto 23.07.2022
3 Capacity tendered 80 MW
4 No. of empanelled vendors (slab wise) 1kW – 06 nos.,1kW to 2kW- 07 nos,2kW to 3kW- nos., 3kW
to 10kW- 10 nos,10kW to 100kW- 02 nos,100kW to 500kW-
01 nos
5 Rates discovered (slab wise) Rs. 45000 per kW to Rs. 32000 per kW
6 Online portal Developed
7 Applications received 3764 Nos (19.724 MW)
8 Applications approved 3718 Nos ( 19.489MW)
9 No. and capacity of projects installed 2730 Nos (14.314 MW)
10 Total amount of CFA disbursed to the vendors About Rs. 3.3 Crore out of advance release of Rs. 3.3 Crore.
11 Issues Further release of 3.3 Crore under process ( sanction
issued)
Solar City selected by State Govt. : Amritsar
Rajasthan
1 Name of implementing agency JVVNL through RREC
2 Capacity Sanctioned by MNRE 25 MW in 19-20 valid upto 03.10.2021
3 Capacity tendered 25 MW through RREC
4 No. of empaneled vendors (slab wise) 22 (Established Category), 70 (Startup)
5 Rates discovered (slab wise) 1-3 kW: Rs. 43000 per kW
3-10kW:Rs. 42210 per kW
10-50 kW: Rs. 35000 per kW
50-500 kW:Rs. 32000 per kW
6 Online portal of DISCOMs Portal developed but not deployed.
7 Applications received 2823 nos. (20.063 MW)
8 Applications approved 2666 nos ( 19 MW)
9 Capacity of projects installed 1851 nos ( 14.079 MW)
10 Amount of CFA disbursed to the vendors Released Rs. 6.21 Crore out of Rs. 6.45 Crore released by
MNRE
11 Issues 3 months extension request received from RREC
Not using EAT.
Request for release of 2nd trance of CFA not received
Solar City selected by State Govt. :Jaipur and Jodhpur
Rajasthan
1 Name of implementing agency JdVVNL through RREC
2 Capacity Sanctioned by MNRE 15 MW in 19-20 valid upto 03.10.2021
3 Capacity tendered 15 MW through RREC
4 No. of empaneled vendors (slab wise) 8 (Established Category), 7 (Startup)
5 Rates discovered (slab wise) 1-3 kW: Rs. 43250 per kW
3-10kW:Rs. 42600 per kW
10-50 kW: Rs. 35000 per kW
50-500 kW:Rs. 32000 per kW
6 Online portal of DISCOMs Portal developed but not deployed.
7 Applications received 2044 nos. (12.874 MW)
8 Applications approved 1933 nos. (12.158 MW)
9 Capacity of projects installed 995 nos. (6.880 MW)
10 Amount of CFA disbursed to the vendors Rs. 2.59 crore released against Rs. 2.61 Crore released by MNRE
11 Issues 3 months extension request received from RREC
Not using EAT. Request for release of 2nd trance of CFA not received
Solar City selected by State Govt. :Jaipur and Jodhpur
Rajasthan
1 Name of implementing agency AVVNL through RREC
2 Capacity Sanctioned by MNRE 5 MW in 19-20 valid upto 03.10.2021
3 Capacity tendered 5 MW through RREC
4 No. of empaneled vendors (slab wise) 11 (Established Category), 17 (Startup)
5 Rates discovered (slab wise) 1-3 kW: Rs. 43620 per kW
3-10kW:Rs. 42600 per kW
10-50 kW: Rs. 35000 per kW
50-500 kW:Rs. 32000 per kW
6 Online portal of DISCOMs Portal developed but not deployed.
7 Applications received 634 nos (3.69 MW)
8 Applications approved 607 nos. (3.544 MW)
9 Capacity of projects installed 355 nos (3.026 MW)
10 Amount of CFA disbursed to the
vendors
Rs. 1.29 Crore out of Rs. 1.29 Crore released by MNRE
11 Issues Latest MPR not submitted. 3 months extension request received from
RREC.Request for release of 2nd trance of CFA not received
Solar City selected by State Govt. :Jaipur and Jodhpur
Sikkim
1 Name of implementing agency Power Department, Government of Sikkim
2 Capacity Sanctioned by MNRE (5 MW allocated on 22/01/2020 surrendered due
to no progress)
2 MW in FY 2021-22 valid up to 17.09.2022
3 Capacity tendered Under process
4 No. of empaneled vendors (slab wise) Not Applicable
5 Rates discovered (slab wise) Yet to be finalised
6 Online portal of DISCOMs Yes
7 Applications received Nil
8 Applications approved Nil
9 Capacity of projects installed Nil
10 Amount of CFA disbursed to the vendors Nil
11 Issues Latest MPR not Submitted. SPIN ID to be created by
MNRE
Solar City selected by State Govt. : Jorethang
Tamil Nadu
1 Name of implementing agency TANGEDCO
2 Capacity Sanctioned by MNRE 5 MW in FY 2019-20 valid up to 01.01.2022 and 50 MW in FY
2020-21 valid up to 23.06.2022
3 Capacity tendered 5 MW
4 No. of empaneled vendors LoI issued under the 5 MW sanction. LoA will be issued shortly.
5 Rates discovered (slab wise) 1 KW - Rs.41,470/-, > 1 to 2 KW – Rs.40,470/-,
> 2 to 3 KW – Rs.39,970/-, > 3 to10 KW – Rs.39,770/-,
> 10 to 100 KW - Rs.36,170/- , > 100 to 500 KW –Rs.34,879/-
6 Online portal of DISCOMs Yes
7 Applications received -
8 Applications approved -
9 Capacity of projects installed -
10 Amount of CFA disbursed to the
vendors
-
11 Issues May like to surrender the 50 MW capacity and seek frash allocation
when ready as tender is yet to be floated for 50 MW capacity
allocated in FY 20-21
Solar City selected by State Govt. : NIL
Telangana
1 Name of implementing agency TSNPDCL
2 Capacity Sanctioned by MNRE 1.5 MW in FY 2019-20 valid up to 19.08.2021
and 5 MW in FY 2020-21 valid up to 24.03.2022
3 Capacity tendered 6.5 MW
4 No. of empaneled vendors Minimum 75 no. in FY 19-20
Minimum 66 no. in FY 19-20
5 Rates discovered Rs. 52000 to Rs 43500 per kW in FY 19-20 and
Rs. 52000 to Rs 39200 per kW in FY 20-21
6 Online portal of DISCOMs Yes
7 Applications received 527 Nos.(2.155 MW)
8 Applications approved 509 Nos.(2.093 MW)
9 Capacity of projects installed 342 Nos. (1.314 MW)
10 Amount of CFA disbursed to the vendors Rs.0. 46 crore out of Rs 1.72 crore released by
MNRE
11 Issues CFA and Incentives are not being released due
to pending EAT entry.
Solar City selected by State Govt. : NIL
Telangana
1 Name of implementing agency TSSPDCL
2 Capacity Sanctioned by MNRE 10.78 MW in FY 2019-20 valid up to 19.08.2021
and 20 MW in FY 2020-21 valid up to 24.03.2022
3 Capacity tendered 30.78 MW
4 No. of empaneled vendors About 75 no. in FY 19-20
About 66 no. in FY 19-20
5 Rates discovered Rs 52000 to Rs 43500 per kW in FY 19-20 and
Rs 52000 to Rs 39200 per kW in FY 20-21
6 Online portal of DISCOMs Yes
7 Applications received 3658 no. (15.774 MW)
8 Applications approved 3598 Nos. (15.505 MW)
9 Capacity of projects installed 2594 no. (10.545 MW)
10 Amount of CFA disbursed to the
vendors
Rs. 6.65 Crore out of Rs 11.66 Crore released by
MNRE
11 Issues ---
Solar City selected by State Govt. :Nil
Tripura
1 Name of implementing agency Tripura State Electricity Corporation Limited (TSECL)
2 Capacity Sanctioned by MNRE 1 MW in FY 2021-22 valid up to 17.09.2022
3 Capacity tendered Nil (Tender is under approval Stage)
4 No. of empaneled vendors (slab wise) Nil
5 Rates discovered (slab wise) Nil
6 Online portal of DISCOMs No
7 Applications received Nil
8 Applications approved Nil
9 Capacity of projects installed Nil
10 Amount of CFA disbursed to the vendors Nil
11 Issues MPR Not Submitted. Tendering process may be
expedited
Solar City selected by State Govt. : Udaipur Town
Uttarakhand
1 Name of implementing agency UPCL
2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 21.11.2021
10 MW in 20-21 valid upto 20.05.2022
16 MW in 20-21valid upto 23.06.2022
3 Capacity tendered 10 MW
4 No. of empaneled vendors (slab wise) 15 vendors
5 Rates discovered (slab wise) • Rs.50800 per KW upto 4 KW (For hilly areas- 53800 per KW
upto 4KW)
• Rs. 48900 per KW from 5 KW to 10 KW (For hilly areas-
51900 per KW from 5KW to 10 KW)
6 Online portal Developed
7 Applications received 2259 of 13.227 MW
8 Applications approved 2077 of 11.492 MW
9 No. and capacity of projects installed 1002 of 5.458 MW
10 Total amount of CFA disbursed to the
vendors
Rs. 2.51 crore released against Rs. 2.52 Crore advance
releasesed by MNRE
11 Issues Pending EAT entry. May submit 2nd instalment release request
with online UC and PCRs of 1/3rd sanctioned capacity
Uttar Pradesh
1 Name of implementing agency MVVNL
2 Capacity Sanctioned by MNRE 19 MW in 19-20 upto 03.10.2021
3 Capacity tendered 19 MW
4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw)
6Nos.(FOR 11-100kw)
5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw)
Rs.32000/- (For 11-100kw)
6 Online portal Yes, developed by UPNEDA (upneda
solarrooftopportal.com)
7 Applications received 4476 Nos. and 19 MW
8 Applications approved 2783 Nos. and 14.038 MW
9 No. and capacity of projects installed 2159 Nos. and 10.694 MW
10 Total amount of CFA disbursed to the
vendors
Rs. 4.30 nos. of Rs.4.33 Crore advance
release
11 Issues Release of 2nd instalment request received
recently . No fresh proposal received.
Allocated capacity expires in 9 days.
Solar City selected by State Govt. : Ayodhya and Prayagraj
Uttar Pradesh
1 Name of implementing agency PuVVNL
2 Capacity Sanctioned by MNRE 10 MW in FY 19-20 vaid upto
03.10.2021
3 Capacity tendered 10 MW
4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw)
6Nos.(FOR 11-100kw)
5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw)
Rs.32000/- (For 11-100kw)
6 Online portal Yes, developed by UPNEDA (upneda
solarrooftopportal.com)
7 Applications received 1074 Nos and 4.218 MW
8 Applications approved 282 Nos and 1.294 MW
9 No. and capacity of projects installed 210 Nos and 0.985 MW
10 Total amount of CFA disbursed to the
vendors
--
11 Issues No fresh proposal received. Allocated
capacity expires in 9 days.
Solar City selected by State Govt. : Ayodhya and Prayagraj
Uttar Pradesh
1 Name of implementing agency PVVNL
2 Capacity Sanctioned by MNRE 12 MW in FY 19-20 valid upto 03.10.2021
3 Capacity tendered 12 MW
4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw)
6Nos.(FOR 11-100kw)
5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw)
Rs.32000/- (For 11-100kw)
6 Online portal Yes, developed by UPNEDA (upneda
solarrooftopportal.com)
7 Applications received 830 nos ( 3.704 MW)
8 Applications approved 254 nos. (1.408 MW)
9 No. and capacity of projects installed 164 nos. ( 1.010 MW)
10 Total amount of CFA disbursed to the
vendors
----
11 Issues Latest MPR not Submitted. No fresh
proposal received. Allocated capacity
expires in 9 days.
Solar City selected by State Govt. : Ayodhya and Prayagraj
Uttar Pradesh
1 Name of implementing agency DVVNL
2 Capacity Sanctioned by MNRE 11 MW in 19-20 upto 03.10.2021
3 Capacity tendered 11 MW
4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw)
6Nos.(FOR 11-100kw)
5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw)
Rs.32000/- (For 11-100kw)
6 Online portal Yes, developed by UPNEDA (upneda
solarrooftopportal.com)
7 Applications received 659 No, 2.29252 MW
8 Applications approved 185 No, 0.82496 MW
9 No. and capacity of projects installed 110 No, 0.456 MW
10 Total amount of CFA disbursed to the
vendors
Rs. 7.59 lakh out of Rs. 2.508 Crore
11 Issues Latest MPR Not Submitted. No fresh
proposal received. Allocated capacity
expires in 9 days.
Solar City selected by State Govt. : Ayodhya and Prayagraj
Uttar Pradesh
1 Name of implementing agency KESCO
2 Capacity Sanctioned by MNRE 4 MW in 19-20 valid upto 03.10.2021
3 Capacity tendered 4 MW
4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw)
6Nos.(FOR 11-100kw)
5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw)
Rs.32000/- (For 11-100kw)
6 Online portal Yes, developed by UPNEDA (upneda
solarrooftopportal.com)
7 Applications received 171 Nos and 0.814 MW
8 Applications approved 111 Nos and 0.476 MW
9 No. and capacity of projects installed 71 Nos and 0.238 MW
10 Total amount of CFA disbursed to the
vendors
-
11 Issues No fresh proposal received. Allocated
capacity expires in 9 days.
Solar City selected by State Govt. : Ayodhya and Prayagraj
Uttar Pradesh
1 Name of implementing agency NPCL
2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 03.10.2021
3 Capacity tendered 2 MW
4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw)
6Nos.(FOR 11-100kw)
5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw)
Rs.32000/- (For 11-100kw)
6 Online portal Yes, developed by UPNEDA (upneda
solarrooftopportal.com)
7 Applications received 50 nos ( 0.269 MW)
8 Applications approved 44 nos. ( 0.269 MW)
9 No. and capacity of projects installed 25 nos ( 0.145 MW)
10 Total amount of CFA disbursed to the
vendors
nil
11 Issues No fresh proposal received. Allocated
capacity expires in 9 days.
Solar City selected by State Govt. : Ayodhya and Prayagraj
Uttar Pradesh
1 Name of implementing agency Torrent Power , Agra
2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 03.10.2021
3 Capacity tendered 2 MW
4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw)
6Nos.(FOR 11-100kw)
5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw)
Rs.32000/- (For 11-100kw)
6 Online portal Yes, developed by UPNEDA (upneda
solarrooftopportal.com)
7 Applications received 317 Nos. and 1.778 MW
8 Applications approved 182 Nos. and 1.308 MW
9 No. and capacity of projects installed 170 Nos. and 1.238 MW
10 Total amount of CFA disbursed to the
vendors
nil
11 Issues No fresh proposal received. Allocated
capacity expires in 9 days.
Solar City selected by State Govt. : Ayodhya and Prayagraj
West Bengal
1 Name of implementing agency WBSEDCL
2 Capacity Sanctioned by MNRE 50 MW in FY 2020-21 valid up to
23/07/2022
3 Capacity tendered No progress
4 No. of empaneled vendors No progress
5 Rates discovered No progress
6 Online portal of DISCOMs Not developed
7 Applications received --
8 Applications approved --
9 Capacity of projects installed --
10 Amount of CFA disbursed to the vendors --
11 Issues MPR Not Submitted. Tendering
process may be expedited.
• Solar City selected by State Govt. :Prantik in Birbhum, Shantiniketan
• Proposal from other DISCOMs not received for RTS

More Related Content

Similar to Statewise Progress.pptx

Solar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaSolar power projects under rec mechanism in india
Solar power projects under rec mechanism in india
Bhargav Parmar
 
Final_12th_NPC_Minutes_of_the_Meeting.pdf
Final_12th_NPC_Minutes_of_the_Meeting.pdfFinal_12th_NPC_Minutes_of_the_Meeting.pdf
Final_12th_NPC_Minutes_of_the_Meeting.pdf
ssuser4bcf3b
 
Wind Force Newsletter January, Edition, 2012
Wind Force Newsletter   January, Edition, 2012Wind Force Newsletter   January, Edition, 2012
Wind Force Newsletter January, Edition, 2012
rupeshsingh_1
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
Sanman Rajput
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
Sanman Rajput
 

Similar to Statewise Progress.pptx (20)

Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesFinal draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
 
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in Delhi
 
200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA
 
Solar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaSolar power projects under rec mechanism in india
Solar power projects under rec mechanism in india
 
Final_12th_NPC_Minutes_of_the_Meeting.pdf
Final_12th_NPC_Minutes_of_the_Meeting.pdfFinal_12th_NPC_Minutes_of_the_Meeting.pdf
Final_12th_NPC_Minutes_of_the_Meeting.pdf
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
Renewable energy projects in jordan
Renewable energy projects in jordanRenewable energy projects in jordan
Renewable energy projects in jordan
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
 
Wind Force Newsletter January, Edition, 2012
Wind Force Newsletter   January, Edition, 2012Wind Force Newsletter   January, Edition, 2012
Wind Force Newsletter January, Edition, 2012
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
exp_sewage.pptx
exp_sewage.pptxexp_sewage.pptx
exp_sewage.pptx
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, Jordan
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of India
 
Solar Rooftop Business in India
Solar Rooftop Business in IndiaSolar Rooftop Business in India
Solar Rooftop Business in India
 

Recently uploaded

☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
mikehavy0
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
c3384a92eb32
 

Recently uploaded (20)

Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdf
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptx
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 

Statewise Progress.pptx

  • 1. Andaman & Nicobar 1 Name of implementing agency ED, A&N Island 2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021 3 Capacity tendered 5 MW 4 No. of empaneled vendors 1 No. 5 Rates discovered Rs 86405 to Rs 59180 per kW 6 Online portal of DISCOMs YES 7 Applications received - 8 Applications approved - 9 Capacity of projects installed nil 10 Amount of CFA disbursed to the vendors Nil out of Rs. 35.40 lakh released by MNRE 11 Issues Latest MPR not Submitted. Only 9 days is left for validity. Solar City selected by State Govt. : Shaheed Dweep
  • 2. Andhra Pradesh 1 Name of implementing agency APEPDCL 2 Capacity Sanctioned by MNRE 8 MW in FY 2020-21 valid up to 23.09.2022 3 Capacity tendered 8 MW 4 No. of empaneled vendors More than 16 Nos 5 Rates discovered Rs (50,000-36,000) per kWp 6 Online portal of DISCOMs Yes 7 Applications received 106 Nos. Applications, for 454 KWp 8 Applications approved 70 Nos. applications for 289 KWp 9 Capacity of projects installed 7 Nos for 27 KWp 10 Amount of CFA disbursed to the vendors NIL (Advance released Rs. 2.01 crores by MNRE recently) 11 Issues Need to popularise the scheme Solar City selected by State Govt. : Nil
  • 3. Andhra Pradesh 1 Name of implementing agency APSPDCL 2 Capacity Sanctioned by MNRE 17 MW in FY 2020-21 valid up to 24.03.2022 3 Capacity tendered No progress 4 No. of empaneled vendors No progress 5 Rates discovered No progress 6 Online portal of DISCOMs No progress 7 Applications received - 8 Applications approved - 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues MPR not Submitted Solar City selected by State Govt. : NIL
  • 4. Arunachal Pradesh 1 Name of implementing agency 2 Capacity Sanctioned by MNRE No Proposal received 3 Capacity tendered - 4 No. of empaneled vendors (slab wise) - 5 Rates discovered (slab wise) - 6 Online portal of DISCOMs - 7 Applications received - 8 Applications approved - 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues MPR not Submitted Solar City selected by State Govt. :Nil
  • 5. Assam 1 Name of implementing agency Assam Power Distribution Company Limited (APDCL) 2 Capacity Sanctioned by MNRE 2 MW in FY 2020-21 valid up to 24.03.2022 3 Capacity tendered 2 MW 4 No. of empaneled vendors (slab wise) Minimum 06 vendors 5 Rates discovered (slab wise) Rs 50001.50 to 43005.00 per kW 6 Online portal of DISCOMs Yes 7 Applications received 1317 Nos. and 4.798 MW 8 Applications approved 60 Nos. and 0.221 MW 9 Capacity of projects installed Nil 10 Amount of CFA disbursed to the vendors Nil 11 Issues Facing issue in submission of UC/refund details in pfms portal due to which release of advance CFA could not be processed. There is huge difference between number of application received vs. approved Solar City selected by State Govt. : Majuli District
  • 6. Bihar 1 Name of implementing agency NBPDCL 2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 21.11.2021 10 MW in 20-21 valid upto 30.06.2022 3 Capacity tendered 2 MW 4 No. of empaneled vendors (slab wise) 11 nos. 5 Rates discovered (slab wise) 1kW -10 kW: Rs. 49,710 per kW 10kW -100 kW: Rs. 46,210 per kW 6 Online portal Yes 7 Applications received 4231 nos for 7.184 MW 8 Applications approved 2 MW 9 No. and capacity of projects installed 121 nos for 0.368 MW 10 Total amount of CFA disbursed to the vendors Rs. 0.0123 Crore against Rs. 0.59 Crore 11 Issues Extension requested upto December 2021 No provision to submit new application in portal. Not using EAT module Solar City selected by State Govt. : Gaya
  • 7. Bihar 1 Name of implementing agency SBPDCL 2 Capacity Sanctioned by MNRE 3 MW in 19-20 valid upto 21.11.2021 10 MW in 20-21 valid upto 30.06.2022 3 Capacity tendered 3 MW 4 No. of empaneled vendors (slab wise) 11 nos. 5 Rates discovered (slab wise) 1kW -10 kW: Rs. 49,710 per kW 10kW -100 kW: Rs. 46,210 per kW 6 Online portal Yes 7 Applications received 2355 nos. (5.286 MW) 8 Applications approved 3 MW 9 No. and capacity of projects installed 220 nos ( 0.725 MW) 10 Total amount of CFA disbursed to the vendors Rs. 0.55 Crore against Rs. 0.894 Crore (as per EAT report) 11 Issue Latest MPR Not Submitted. Extension requested upto December 2021 No provision to submit new application in portal. Solar City selected by State Govt. : Gaya
  • 8. Chhattisgarh 1 Name of implementing agency CSPDCL 2 Capacity Sanctioned by MNRE 5 MW in FY 2019-20 valid upto 03.10.2021 3 Capacity tendered 5 MW 4 No. of empaneled vendors (slab wise) 1-10 kW: 20 nos, 10-100 kW: 14 nos, 100 kW to 500 kW: 15 nos. 5 Rates discovered (slab wise) Rs. 40,000 per kW to Rs. 36,000 per kW 6 Online portal of DISCOMs Yes 7 Applications received 83 nos. 0.909 MW 8 Applications approved 83 nos. 0.909 MW 9 Capacity of projects installed 22 nos. (0.223 MW) 10 Amount of CFA disbursed to the vendors Nil. MNRE has released the funds recently ( Rs. 1.2 crore) 11 Issues New proposal of 5 MW submitted by CSPDCL Solar City selected by State Govt. : New Raipur
  • 9. Chandigarh 1 Name of implementing agency Electricity Department through CREST 2 Capacity Sanctioned by MNRE 15 MW in 19-20 valid upto 03.10.2021 70 MW in 20-21 valid upto 23.06.2022 3 Capacity tendered 2019-20: 3 MW 2020-21: Nil - EOI invited/20 received. 4 No. of empanelled vendors (slab wise) 12 nos ( Note: Fresh EOI invited on June 28, 2021 and 20 EOI received ) 5 Rates discovered (slab wise) 1 kWp – 3 – Rs. 51,200 per kW >1 to 2 kWp – 4 – Rs. 43,000 per KW >2 to 3 kWp – 10 – Rs. 40,400 per kW >3 to 10 kWp – 12 – Rs. 39,050 per kW 6 Online portal Yes 7 Applications received 785 applications for 4.220 MW 8 Applications approved 785 applications for 4.220 MW 9 No. and capacity of projects installed 708 applications for 3.239 MW 10 Total amount of CFA disbursed to the vendors Rs. 33.38 lacs against Rs. 84.60 Lakh 11 Issue Latest MPR Not Submitted. Not using EAT Solar City selected by UT : Nil
  • 10. Delhi 1 Name of implementing agency TATA Power DDL 2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 19.08.2021 8 MW in 20-21 valid upto 20.05.2022 3 Capacity tendered 10 MW 4 No. of empanelled vendors (slab wise) Capex:1-3 kW: 5 nos, 4-10 kW: 13 nos, 11-100 nos: 9 nos, 101-500kW : 1 nos., 1-3 kW ( elevated ) : 3 nos RESCO : 2 nos. 5 Rates discovered (slab wise) Rs. 37000 per kW to 33,931 per kW 6 Online portal Yes 7 Applications received 73 nos. (638 KW ) 8 Applications approved 54 nos. ( 504 KW ) 9 No. and capacity of projects installed 39 nos. (244.45 KW ) 10 Total amount of CFA disbursed to the vendors Not disbursed. 11 Issues Timeline of 1st project expired. Solar City selected by State Govt. : NDMC Area
  • 11. Delhi 1 Name of implementing agency BRPL 2 Capacity Sanctioned by MNRE 10 MW for FY 2019-20 upto 03.10.2021 3 Capacity tendered 30 MW Common Tender (10MW for BRPL,10MWp for BYPL and 10 MW for TPDDL) 4 No. of empanelled vendors (slab wise) 43 vendors in CAPEX (General & Open category) and 5 vendors in RESCO 5 Rates discovered (slab wise) Rs. 37000 per kW to Rs. 33,931 per kW 6 Online portal Yes 7 Applications received 193 nos (1.499 MW) 8 Applications approved 193 nos ( 1.431 MW) 9 No. and capacity of projects installed 103 nos. (0.776 MW) 10 Total amount of CFA disbursed to the vendors Rs. 5.55 Lakh against Rs. 1.11 Crore 11 Issues Latest MPR not Submitted. New proposal of 5 MW for FY 21-22 submitted by BRPL Not using EAT module Solar City selected by State Govt. : NDMC Area
  • 12. Delhi 1 Name of implementing agency BYPL 2 Capacity Sanctioned by MNRE 10 MW in 19-20 valid upto 03.10.2021 3 Capacity tendered 10 MW 4 No. of empanelled vendors (slab wise) Capex:1-3 kW: 5 nos, 4-10 kW: 13 nos, 11-100 nos: 9 nos, 101-500kW : 1 nos., 1-3 kW ( elevated ) : 3 nos RESCO : 2 nos. 5 Rates discovered (slab wise) Rs. 37000 per kW to 33,931 per kW 6 Online portal Yes 7 Applications received 28 nos. (284.91 kW) 8 Applications approved 27 nos. (281.91 kW) 9 No. and capacity of projects installed 10 nos. ( 64.67 kW ) 10 Total amount of CFA disbursed to the vendors Nil against MNRE release of Rs.0.56 crore 11 Issues Latest MPR not Submitted. New proposal of 3 MW for FY 21-22 submitted by BRPL Not using EAT module Solar City selected by State Govt. : NDMC Area
  • 13. Delhi 1 Name of implementing agency NDMC 2 Capacity Sanctioned by MNRE 1.5 MW valid upto 23rd June 2022 3 Capacity tendered Adopted same selected bidders of 3 DISCOMs of Delhi 4 No. of empaneled vendors (slab wise) Capex:1-3 kW: 5 nos, 4-10 kW: 13 nos, 11-100 nos: 9 nos, 101-500kW : 1 nos., 1-3 kW ( elevated ) : 3 nos RESCO : 2 nos. 5 Rates discovered (slab wise) Rs. 37000 per kW to 33,931 per kW 6 Online portal No 7 Applications received 4 nos ( hardcopy) 8 Applications approved 4 nos ( hardcopy) 9 No. and capacity of projects installed 10 Total amount of CFA disbursed to the vendors Nil 11 Issues Submitted advance request. However UC and refund of unspent and interest are pending under phase I of the RTS programme .Portal to be developed Solar City selected by State Govt. : NDMC Area
  • 14. Goa 1 Name of implementing agency Electricity Department 2 Capacity Sanctioned by MNRE 80 MW in FY 2020-21 valid upto 23.06.2022 3 Capacity tendered 80 MW out of which 16 MW LoA issued 4 No. of empaneled vendors (slab wise) 1 kW : 11 nos , 2 kW: 12 nos., 3 kW: 14 nos.,4 -10 kW:14 nos.,11 kW to 100 KW: 7 nos and 101-500 kW: 10 nos. 5 Rates discovered (slab wise) Rs. 46949 to Rs. 35949 per kW 6 Online portal of DISCOMs No 7 Applications received nil 8 Applications approved Nil 9 Capacity of projects installed nil 10 Amount of CFA disbursed to the vendors nil 11 Issue Latest MPR not Submitted Solar City selected by State Govt. :Nil
  • 15. Gujarat 1 Name of implementing agency MGVCL, UGVCL, PGVCL, DGVCL,Torrent (Surat), Torrent ( Ahmd) 2 Capacity Sanctioned by MNRE FY-2019-20 :- 440 MW , FY-2020-21 :- 492 MW Total :- 932 MW (valid upto 20-08-2021, 04-10-2021, 21-12-2021 & 24-06-2022) 3 Capacity tendered Tender-I :- 600MW & Tender-II :- 600MW 4 No. of empaneled vendors (slab wise) Tender-I :- 459 (In all slab) & Tender-II :- 548 (In all slab) 5 Rates discovered (slab wise) Tender-I: Rs. 46827 per kW to Rs. 33999 per kW Tender-II: Rs. 46827 per kW to Rs. 30492 per kW 6 Online portal of DISCOMs yes 7 Applications received 269222 nos. for 1048.2 MW 8 Applications approved 257351 nos. for 997.6 MW 9 Capacity of projects installed 225070 Nos., 866.2 MW 10 Amount of CFA disbursed to the vendors Rs. 1134.21 Cr. against CFA released by MNRE Rs. 429.47 Cr 11 Issues Request of release of CFA received from DISCOMs with PCRs/Ucs/SoEs which is under process Additional capacity request has been submitted by GUVNL for about 258 MW Solar City selected by State Govt. :Dwarka
  • 16. Haryana 1 Name of implementing agency UHBVN 2 Capacity Sanctioned by MNRE 5 MW in 19-20 valid upto 03.10.2021 10 MW in 20-21 valid upto 23.06.2022 (likely to surrender) 3 Capacity tendered 5 MW 4 No. of empaneled vendors (slab wise) 9 vendors 5 Rates discovered (slab wise) 1-10 kW : Rs. 45780 per kW Above 10-100 kW : Rs. 41000 per kW Above 100-500 kW : Rs. 36950 per kW 6 Online portal Developed 7 Applications received 1025 Nos (6.071 MW ) 8 Applications approved 929 Nos (5.529 MW ) 9 No. and capacity of projects installed 864 Nos (5.137 MW ) 10 Total amount of CFA disbursed to the vendors Rs. 1.37 crore out of Rs. 1.37 Crore 11 Issues Additional capacity request for 1.5 MW. 3 months timeline extension request received . Demand for release of 2nd instalment may be submitted by UHBVN Solar City selected by State Govt. : Panchkula
  • 17. Haryana 1 Name of implementing agency DHBVN 2 Capacity Sanctioned by MNRE 10 MW in 19-20 valid upto 03.10.2021 15 MW in 20-21 valid upto 23.06.2022 3 Capacity tendered 10 MW 4 No. of empaneled vendors (slab wise) 12 vendors 5 Rates discovered (slab wise) 1-10 kW : Rs. 45780 per kW Above 10-100 kW : Rs. 41000 per kW Above 100-500 kW : Rs. 36950 per kW 6 Online portal Developed 7 Applications received 2434 Nos (15.498 MW) 8 Applications approved 2213 Nos. (14.264 MW ) 9 No. and capacity of projects installed 2041 Nos. (13.152 MW) 10 Total amount of CFA disbursed to the vendors Rs. 2.74 crore out of Rs. 2.74Crore released by MNRE 11 Issues Additional capacity request for 5 MW. 6 months timeline extension request received . Demand for release of 2nd instalment may be submitted by DHBVN
  • 18. Himachal Pradesh 1 Name of implementing agency HPSEB through Himurja 2 Capacity Sanctioned by MNRE 15 MW in FY 2019-20 valid upto 26.01.2022 3 Capacity tendered 15 MW 4 No. of empaneled vendors (slab wise) 22 nos. 5 Rates discovered (slab wise) Rs. 42000 per kW to Rs. 35000 per kW 6 Online portal of DISCOMs No 7 Applications received 361 Nos ( 1.038 MW) 8 Applications approved 361 Nos ( 1.038 MW) 9 Capacity of projects installed 147 nos. 10 Amount of CFA disbursed to the vendors Rs. 74,16,318/- ( Advance CFA request not received from HPSEB) 11 Issues MPR not Submitted. HPSEB has submitted advance CFA request. Bank details not updated in pfms Solar City selected by State Govt. : Shimla
  • 19. Jharkhand 1 Name of implementing agency JBVNL 2 Capacity Sanctioned by MNRE 10 MW in 19-20 valid upto 21.11.2021 50 MW in 19-20 valid upto 23.06.2022 3 Capacity tendered 10 MW in FY 19-20 25 MW on 12.04.2021 4 No. of empaneled vendors (slab wise) 11 nos under 10 MW 5 Rates discovered (slab wise) 1-3 kW : 45000 per kW, 3-10 kW: 42000 per kW and 10-100 kW : 40500 per kW 6 Online portal yes 7 Applications received 505 nos and (3.504 MW ) 8 Applications approved 87 nos and (0.470 MW) 9 No. and capacity of projects installed 36 Nos and (0.170 MW) 10 Total amount of CFA disbursed to the vendors Nil . 11 Issues Latest MPR not Submitted. Release of Rs. 0.56 Crore pending due to non-mapping of bank details in pfms Solar City selected by State Govt. : Giridih
  • 20. Jharkhand 1 Name of implementing agency TSUISL(Submitted on 03.08.2021) 2 Capacity Sanctioned by MNRE 0.1 MW in FY 2019-20 valid upto 03.10.2021 3 Capacity tendered Same tender of JBVNL 4 No. of empanelled vendors (slab wise) 11 nos under 10 MW 5 Rates discovered (slab wise) 1-3 kW : 45000 per kW, 3-10 kW: 42000 per kW and 10-100 kW : 40500 per kW 6 Online portal yes 7 Applications received Nil (As of 31-07-2021) 8 Applications approved Nil 9 No. and capacity of projects installed Nil 10 Total amount of CFA disbursed to the vendors Nil 11 Issues MPR not Submitted Solar City selected by State Govt. : Giridih
  • 21. Jharkhand 1 Name of implementing agency Tata Steel Limited (Submitted on 03.08.2021) 2 Capacity Sanctioned by MNRE 0.6 MW in Fy 19-20 valid upto 03.10.2021 3 Capacity tendered Same tender of JBVNL 4 No. of empanelled vendors (slab wise) 11 nos under 10 MW 5 Rates discovered (slab wise) 1-3 kW : 45000 per kW, 3-10 kW: 42000 per kW and 10-100 kW : 40500 per kW 6 Online portal yes 7 Applications received 02 Nos and (13 Kwp) 8 Applications approved 02 Nos and (13 Kwp) 9 No. and capacity of projects installed 02 Nos and (13 Kwp) 10 Total amount of CFA disbursed to the vendors Nil 11 Issues MPR Not Submitted Solar City selected by State Govt. : Giridih
  • 22. Karnataka 1 Name of implementing agency BESCOM 2 Capacity Sanctioned by MNRE 30 MW in FY 2019-20 valid up to 03.10.2021 and 300 MW in FY 2020-21 valid up to 23.06.2022 3 Capacity tendered 30 MW for FY 2019-20 4 No. of empaneled vendors 01 vendor 5 Rates discovered Rs 46,999 to Rs 35,950 per kW 6 Online portal of DISCOMs Yes 7 Applications received 1110 Nos. for 3.633 MW capacity 8 Applications approved Nil approval. 9 Capacity of projects installed nil 10 Amount of CFA disbursed to the vendors Nil 11 Issues • Only one vendor. Extension may be required ( say upto 15th November 2021) • Pre bid meeting held. Tender may be floated for 300 MW by next month. • Bank details not mapped in pfms portal ( for CFA/incentive) Solar City selected by State Govt. : Hosapete City in Bellari
  • 23. Karnataka 1 Name of implementing agency HESCOM 2 Capacity Sanctioned by MNRE 20 MW in FY 2019-20 valid up to 26.01.2022 3 Capacity tendered 20MW 4 No. of empaneled vendors 3 vendors finalized, LOA yet to be issued 5 Rates discovered Rs 53,500 to Rs 34,500 per kW 6 Online portal of DISCOMs No 7 Applications received --- 8 Applications approved --- 9 Capacity of projects installed --- 10 Amount of CFA disbursed to the vendors --- 11 Issues No application received . Bank details has not mapped in pfms. Solar City selected by State Govt. : Hosapete City in Bellari
  • 24. Karnataka 1 Name of implementing agency CSEC 2 Capacity Sanctioned by MNRE 10 MW in FY 2020-21 valid up to 24.03.2022 3 Capacity tendered 10MW. What is the tentative date of vendor selection ??? ( 30.09.2021) 4 No. of empaneled vendors - 5 Rates discovered - 6 Online portal of DISCOMs No. Server installed and Integration with BESCOM Portal is under process ( target date 20.09.2021). 7 Applications received 1441 Nos (11.176 MW ) 8 Applications approved 1419 Nos (6MW) 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues Latest MPR not received Solar City selected by State Govt. : Hosapete City in Bellari
  • 25. Karnataka 1 Name of implementing agency GESCOM 2 Capacity Sanctioned by MNRE 10 MW in FY 2019-20 valid up to 26.01.2022 3 Capacity tendered 500kWp (Minimum) 4 No. of empaneled vendors Earlier vendor selection through tender cancelled ….Retender done …024.09.2021 is the last date of bid submission. 5 Rates discovered - 6 Online portal of DISCOMs Under process 7 Applications received 16 Nos and 50 Kwp 8 Applications approved - 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 issues Latest MPR not received. Requested for extension for 6 month. May surrender the capacity and request for fresh capacity Solar City selected by State Govt. : Hosapete City in Bellari
  • 26. Karnataka 1 Name of implementing agency MESCOM 2 Capacity Sanctioned by MNRE 2 MW in FY 2020-21 valid up to 24.03.2022 3 Capacity tendered No Progress 4 No. of empaneled vendors No Progress 5 Rates discovered No Progress 6 Online portal of DISCOMs No Progress 7 Applications received - 8 Applications approved 9 Capacity of projects installed 10 Amount of CFA disbursed to the vendors 11 Issues MPR not Submitted Solar City selected by State Govt. : Hosapete City in Bellari
  • 27. Kerala 1 Name of implementing agency KSEBL 2 Capacity Sanctioned by MNRE 50 MW in FY 2019-20 valid up to 20.08.2021 and 200 MW in FY 2020-21 valid up to 23.06.2022 3 Capacity tendered 150 MW in FY 19-20 and 200 MW in FY 20-21 4 No. of empaneled vendors 3nos. in FY 19-20 and 7 nos.in FY 20-21 5 Rates discovered Rs 42999 to Rs 37999 per kW in FY 19-20 and Rs 53651 to Rs 39900 per kW in FY 19-20 6 Online portal of DISCOMs YES 7 Applications received 21219 Nos and 71.997 MW 8 Applications approved 3722 Nos and 14.172 MW 9 Capacity of projects installed 229 Nos and 0.790 MW 10 Amount of CFA disbursed to the vendors 0.65 Lakh out of 10.49 Cr 11 Issues -- Solar City selected by State Govt. : Thiruvananthapuram
  • 28. Lakshadweep 1 Name of implementing agency LED 2 Capacity Sanctioned by MNRE 10 MW in FY 2020-21 valid up to 23.06.2022 3 Capacity tendered 0 4 No. of empaneled vendors NA as above 5 Rates discovered NA as above 6 Online portal of DISCOMs Portal is developed (Deployment and integration with MNRE to pin portal is pending) 7 Applications received - 8 Applications approved - 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues MPR not Submitted Solar City selected by State Govt. :Nil
  • 29. Madhya Pradesh 1 Name of implementing agency MPCZ 2 Capacity Sanctioned by MNRE 20 MW in FY 19-20 valid upto 22.12.2021 3 Capacity tendered 20 MW 4 No. of empaneled vendors 17 nos 5 Rates discovered (slab wise) 1-3 kW: Rs. 37000 per kW 3-10 kW:Rs. 39800 per kW 10-100kW: Rs 36500 per kW 100-500kW: Rs 34900 per kW 6 Online portal of DISCOMs Yes 7 Applications received 1477 nos. ( 5.928 MW) 8 Applications approved 1246 nos. (5.193 MW) 9 Capacity of projects installed 863 nos. (3.647 MW) 10 Amount of CFA disbursed to the vendors Rs. 1.69 Crore against 4.06 Crore 11 Issues Request received from Vendor for extension. Solar City selected by State Govt. :Sanchi
  • 30. Madhya Pradesh 1 Name of implementing agency MPEZ 2 Capacity Sanctioned by MNRE 10 MW in FY 19-20 valid upto 01.01.2022 3 Capacity tendered 5.67 MW 4 No. of empaneled vendors (slab wise) 11 nos 5 Rates discovered (slab wise) 1-3 kW: Rs. 37000 per kW 3-10 kW:Rs. 39800 per kW 10-100kW: Rs 36700 per kW 100-500kW: Rs 34900 per kW 6 Online portal of DISCOMs 7 Applications received 390 Nos. for 1600 KW 8 Applications approved 240 Nos.1008 KW 9 Capacity of projects installed 187 Nos. 868 KW 10 Amount of CFA disbursed to the vendors Nil against MNRE advance release of Rs. 1.34 Crore 11 Issues --- Solar City selected by State Govt. :Sanchi
  • 31. Madhya Pradesh 1 Name of implementing agency MPWZ 2 Capacity Sanctioned by MNRE 15 MW in FY19-20 valid upto 12.01.2022 3 Capacity tendered 15 MW 4 No. of empaneled vendors (slab wise) 1-3 kW: 5 nos, 3-10kW: 10 nos and 100 -500 kW:15 nos 5 Rates discovered (slab wise) 1-3 kW: Rs. 37000 per kW 3-10 kW:Rs. 39800 per kW 10-100kW: Rs 36500 per kW 100-500kW: Rs 34900 per kW 6 Online portal of DISCOMs yes 7 Applications received 1018 Nos and 4.607 MW 8 Applications approved 764 Nos and 3.385 MW 9 Capacity of projects installed 613 Nos and 2.734 MW 10 Amount of CFA disbursed to the vendors Rs. 1.35 crore released against MNRE advance of Rs. 3.10 Crore 11 Issues --- Solar City selected by State Govt. : Sanchi
  • 32. Maharashtra 1 Name of implementing agency MSEDCL 2 Capacity Sanctioned by MNRE 25 MW in FY 19-20 valid upto 01.01.2022 500 MW in FY 20-21 valid upto 23.06.2022 3 Capacity tendered 25 MW 4 No. of empaneled vendors (slab wise) Total 26 Nos ( 06 Nos for slab from 1KW to 100KW and 20 Nos for slab from 1KW to 10KW) 5 Rates discovered (slab wise) 1KW – 46.82 Rs/Watt Above 1KW & up to 2KW – 42.47 Rs/Watt Above 2KW & up to 3KW – 41.38 Rs/Watt Above 3KW & up to 10KW – 40.29 Rs/Watt Above 10KW & up to 100KW – 37.02 Rs/Watt 6 Online portal of DISCOMs yes 7 Applications received 898nos. ( 3.039MW) 8 Applications approved 713 nos. (2.305 MW) 9 Capacity of projects installed 202 nos. (0.804 MW) 10 Amount of CFA disbursed to the vendors Nil released out of MNRE advance of Rs. 3.21 Crore 11 Issues 500 MW new proposal by surrendering 500 MW of proposal of FY 2020-21 Solar City selected by State Govt. :nil
  • 33. Maharashtra 1 Name of implementing agency Tata Power Mumbai 2 Capacity Sanctioned by MNRE 0.4 MW in FY 19-20 valid upto 19.08.2021 2 MW in FY 20-21 valid upto 23.07.2022 3 Capacity tendered 0.4 MW and 2 MW 4 No. of empaneled vendors (slab wise) 1-100 KW slab - 8 nos; 100-500 KW slab-4 nos. 5 Rates discovered (slab wise) 1KW=Rs.46000/-, 1 to 2 KW=Rs.42000/-, 2 to 3 KW=Rs.41000/-, 3 to10 KW=Rs.40000/-, 10 to 100KW=Rs.37000/-, 100 to 500KW=Rs.34000/- 6 Online portal of DISCOMs Yes 7 Applications received 1 number of 5 KW capacity 8 Applications approved 1 number of 5 KW capacity 9 Capacity of projects installed Nil 10 Amount of CFA disbursed to the vendors Nil 11 Issues Needs publicity Solar City selected by State Govt. :nil
  • 34. Maharashtra 1 Name of implementing agency AEML 2 Capacity Sanctioned by MNRE 3.5 MW in FY 19-20 valid upto 22.12.2021 3 Capacity tendered 3.5 MW 4 No. of empaneled vendors (slab wise) 1kW:2 nos,1-2 kW: 2 nos,2-3 kW: 2 nos,3-10 kW: 3 nos.,10-100 kW: 4 nos and 100-500 kW: 2 nos. 5 Rates discovered (slab wise) Rs. 46000 per kW to Rs. 34000 per kW 6 Online portal of DISCOMs Yes 7 Applications received 8 nos (0.081 MW) 8 Applications approved 8 nos (0.081 MW) 9 Capacity of projects installed 7 nos (0.071 MW) 10 Amount of CFA disbursed to the vendors nil 11 Issues Needs publicity Solar City selected by State Govt. :Nil
  • 35. Maharashtra 1 Name of implementing agency BEST 2 Capacity Sanctioned by MNRE 0.58 MW in FY 19-20 valid upto 21.11.2021 3 Capacity tendered 0.58 MW 4 No. of empaneled vendors (slab wise) 3 nos 5 Rates discovered (slab wise) Rs (50,400-36,500) per KW 6 Online portal of DISCOMs Yes 7 Applications received nil 8 Applications approved nil 9 Capacity of projects installed nil 10 Amount of CFA disbursed to the vendors nil 11 Issues Latest MPR not submitted Solar City selected by State Govt. :Nil
  • 36. Manipur 1 Name of implementing agency Manipur State Power Distribution Company Limited (MSPDCL) 2 Capacity Sanctioned by MNRE 1 MW in FY 2020-21 valid up to 24.03.2022 3 Capacity tendered 1 MW 4 No. of empaneled vendors (slab wise) 12 5 Rates discovered (slab wise) Rs 48828 to 39438 per KW 6 Online portal of DISCOMs Yes 7 Applications received 48 Nos. ( 347 KW) 8 Applications approved 32 Nos. (227 KW ) 9 Capacity of projects installed Nil 10 Amount of CFA disbursed to the vendors nil 11 Issues Advance request with document not recived Solar City selected by State Govt. :
  • 37. Meghalaya 1 Name of implementing agency Meghalaya Power Distribution Corporation Limited (MePDCL) 2 Capacity Sanctioned by MNRE 70 MW in FY 2020-21 valid up to 20.06.2022 3 Capacity tendered 10 MWp 4 No. of empaneled vendors (slab wise) Seven (07) 5 Rates discovered (slab wise) Rs 52000 to 42000 per Kw 6 Online portal of DISCOMs Yes 7 Applications received 551 (5722 kWp Including Non-Subsidized RTS Projects) 8 Applications approved Nil 9 Capacity of projects installed Nil 10 Amount of CFA disbursed to the vendors nil 11 Issues Latest MPR not Submitted. Release of advance CFA is pending due to non submission of UC Solar City selected by State Govt. : Tura
  • 38. Mizoram 1 Name of implementing agency Power & Electricity Department, Government of Mizoram 2 Capacity Sanctioned by MNRE 0.5 MW in FY 2019-20 valid up to 21.11.2021 and 1 MW in FY 2020-21 valid up to 23.06.2022 3 Capacity tendered 0.5 MW 4 No. of empaneled vendors (slab wise) Minimum 2 nos. 5 Rates discovered (slab wise) Rs. 54990/- for 1-10kW 6 Online portal of DISCOMs No 7 Applications received 21 nos. (88.46 kW) 8 Applications approved Nil 9 Capacity of projects installed Nil 10 Amount of CFA disbursed to the vendors Nil 11 Issues Latest MPR not recived Solar City selected by State Govt. :Saitual
  • 39. Nagaland 1 Name of implementing agency EDN 2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 21.11.2021 and 3.8 MW in FY 2020-21 valid up to 23.06.2022 3 Capacity tendered No progress 4 No. of empaneled vendors (slab wise) - 5 Rates discovered (slab wise) - 6 Online portal of DISCOMs - 7 Applications received - 8 Applications approved - 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues MPR not Submitted Solar City selected by State Govt. :nil
  • 40. Odisha 1 Name of implementing agency TPCODL (Earlier CESU) 2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021 3 Capacity tendered 1 MW(Tender By OREDA) 4 No. of empaneled vendors 8 empanelled against which 3 LoA issued 5 Rates discovered Rs. 38000 to 32000 per KW 6 Online portal of DISCOMs Yes 7 Applications received 1.267 MW 8 Applications approved 1.267 MW 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues Latest MPR not Submitted. Requested for extension of 6 months Solar City selected by State Govt. :Bhubaneswar
  • 41. Odisha 1 Name of implementing agency TPSODL (Earlier SOUTHCO) 2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021 3 Capacity tendered 1 MW (Tender By OREDA) 4 No. of empaneled vendors 8 empaneled vendors of which 6 LoA issued 5 Rates discovered - 6 Online portal of DISCOMs Yes 7 Applications received - 8 Applications approved - 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues Latest MPR not Submitted. Requested for extension of 6 months Solar City selected by State Govt. : Bhubaneswar
  • 42. Odisha 1 Name of implementing agency TPWODL (Earlier WESCO) 2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021 3 Capacity tendered 1MW (Tender By OREDA) 4 No. of empaneled vendors LOI Issued to 8 vendors out of which only 1 vendors has submitted BG. 5 Rates discovered Rs. 38000 to 32000 per KW 6 Online portal of DISCOMs Yes (http://rts.Odisha.gov.in/) 7 Applications received 143nos. (1.3 MW) 8 Applications approved 9 Capacity of projects installed 10 Amount of CFA disbursed to the vendors 11 Issues MPR not Submitted Solar City selected by State Govt. : Bhubaneswar
  • 43. Odisha 1 Name of implementing agency TPNODL (Earlier NESCO) 2 Capacity Sanctioned by MNRE 1 MW in FY 2019-20 valid up to 03.10.2021 3 Capacity tendered 1 MW(Tender By OREDA) 4 No. of empaneled vendors LOA issued to 3 nos. of vendors out of 8nos. 5 Rates discovered (slab wise) Rs. 38000 to 32000 per KW 6 Online portal of DISCOMs Yes (http://rts.odisha.gov.in) 7 Applications received 202 nos. with capacity 3125 KW 8 Applications approved 1 no. with capacity 2.5KW 9 Capacity of projects installed 1 no. with capacity 2.5KW 10 Amount of CFA disbursed to the vendors NIL 11 Issues MPR not Submitted Solar City selected by State Govt. : Bhubaneswar
  • 44. Puducherry 1 Name of implementing agency Electricity Department, Puducherry 2 Capacity Sanctioned by MNRE 5 MW in FY 2019-20 valid up to 03.10.2021 and 25 MW in FY 2020-21 valid up to 23.02.2022 3 Capacity tendered 30 MW 4 No. of empaneled vendors 5 5 Rates discovered Rs. 35,900/ KW to Rs. 34,350/ KW 6 Online portal of DISCOMs Online portal is functional. 7 Applications received - 8 Applications approved - 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues Latest MPR not Submitted. Advance CFA release request not received. Solar City selected by State Govt. : NIL
  • 45. Punjab 1 Name of implementing agency PSPCL 2 Capacity Sanctioned by MNRE 30 MW in 19-20 valid upto 03.10.2021 50 MW in 20-21 valid upto 23.07.2022 3 Capacity tendered 80 MW 4 No. of empanelled vendors (slab wise) 1kW – 06 nos.,1kW to 2kW- 07 nos,2kW to 3kW- nos., 3kW to 10kW- 10 nos,10kW to 100kW- 02 nos,100kW to 500kW- 01 nos 5 Rates discovered (slab wise) Rs. 45000 per kW to Rs. 32000 per kW 6 Online portal Developed 7 Applications received 3764 Nos (19.724 MW) 8 Applications approved 3718 Nos ( 19.489MW) 9 No. and capacity of projects installed 2730 Nos (14.314 MW) 10 Total amount of CFA disbursed to the vendors About Rs. 3.3 Crore out of advance release of Rs. 3.3 Crore. 11 Issues Further release of 3.3 Crore under process ( sanction issued) Solar City selected by State Govt. : Amritsar
  • 46. Rajasthan 1 Name of implementing agency JVVNL through RREC 2 Capacity Sanctioned by MNRE 25 MW in 19-20 valid upto 03.10.2021 3 Capacity tendered 25 MW through RREC 4 No. of empaneled vendors (slab wise) 22 (Established Category), 70 (Startup) 5 Rates discovered (slab wise) 1-3 kW: Rs. 43000 per kW 3-10kW:Rs. 42210 per kW 10-50 kW: Rs. 35000 per kW 50-500 kW:Rs. 32000 per kW 6 Online portal of DISCOMs Portal developed but not deployed. 7 Applications received 2823 nos. (20.063 MW) 8 Applications approved 2666 nos ( 19 MW) 9 Capacity of projects installed 1851 nos ( 14.079 MW) 10 Amount of CFA disbursed to the vendors Released Rs. 6.21 Crore out of Rs. 6.45 Crore released by MNRE 11 Issues 3 months extension request received from RREC Not using EAT. Request for release of 2nd trance of CFA not received Solar City selected by State Govt. :Jaipur and Jodhpur
  • 47. Rajasthan 1 Name of implementing agency JdVVNL through RREC 2 Capacity Sanctioned by MNRE 15 MW in 19-20 valid upto 03.10.2021 3 Capacity tendered 15 MW through RREC 4 No. of empaneled vendors (slab wise) 8 (Established Category), 7 (Startup) 5 Rates discovered (slab wise) 1-3 kW: Rs. 43250 per kW 3-10kW:Rs. 42600 per kW 10-50 kW: Rs. 35000 per kW 50-500 kW:Rs. 32000 per kW 6 Online portal of DISCOMs Portal developed but not deployed. 7 Applications received 2044 nos. (12.874 MW) 8 Applications approved 1933 nos. (12.158 MW) 9 Capacity of projects installed 995 nos. (6.880 MW) 10 Amount of CFA disbursed to the vendors Rs. 2.59 crore released against Rs. 2.61 Crore released by MNRE 11 Issues 3 months extension request received from RREC Not using EAT. Request for release of 2nd trance of CFA not received Solar City selected by State Govt. :Jaipur and Jodhpur
  • 48. Rajasthan 1 Name of implementing agency AVVNL through RREC 2 Capacity Sanctioned by MNRE 5 MW in 19-20 valid upto 03.10.2021 3 Capacity tendered 5 MW through RREC 4 No. of empaneled vendors (slab wise) 11 (Established Category), 17 (Startup) 5 Rates discovered (slab wise) 1-3 kW: Rs. 43620 per kW 3-10kW:Rs. 42600 per kW 10-50 kW: Rs. 35000 per kW 50-500 kW:Rs. 32000 per kW 6 Online portal of DISCOMs Portal developed but not deployed. 7 Applications received 634 nos (3.69 MW) 8 Applications approved 607 nos. (3.544 MW) 9 Capacity of projects installed 355 nos (3.026 MW) 10 Amount of CFA disbursed to the vendors Rs. 1.29 Crore out of Rs. 1.29 Crore released by MNRE 11 Issues Latest MPR not submitted. 3 months extension request received from RREC.Request for release of 2nd trance of CFA not received Solar City selected by State Govt. :Jaipur and Jodhpur
  • 49. Sikkim 1 Name of implementing agency Power Department, Government of Sikkim 2 Capacity Sanctioned by MNRE (5 MW allocated on 22/01/2020 surrendered due to no progress) 2 MW in FY 2021-22 valid up to 17.09.2022 3 Capacity tendered Under process 4 No. of empaneled vendors (slab wise) Not Applicable 5 Rates discovered (slab wise) Yet to be finalised 6 Online portal of DISCOMs Yes 7 Applications received Nil 8 Applications approved Nil 9 Capacity of projects installed Nil 10 Amount of CFA disbursed to the vendors Nil 11 Issues Latest MPR not Submitted. SPIN ID to be created by MNRE Solar City selected by State Govt. : Jorethang
  • 50. Tamil Nadu 1 Name of implementing agency TANGEDCO 2 Capacity Sanctioned by MNRE 5 MW in FY 2019-20 valid up to 01.01.2022 and 50 MW in FY 2020-21 valid up to 23.06.2022 3 Capacity tendered 5 MW 4 No. of empaneled vendors LoI issued under the 5 MW sanction. LoA will be issued shortly. 5 Rates discovered (slab wise) 1 KW - Rs.41,470/-, > 1 to 2 KW – Rs.40,470/-, > 2 to 3 KW – Rs.39,970/-, > 3 to10 KW – Rs.39,770/-, > 10 to 100 KW - Rs.36,170/- , > 100 to 500 KW –Rs.34,879/- 6 Online portal of DISCOMs Yes 7 Applications received - 8 Applications approved - 9 Capacity of projects installed - 10 Amount of CFA disbursed to the vendors - 11 Issues May like to surrender the 50 MW capacity and seek frash allocation when ready as tender is yet to be floated for 50 MW capacity allocated in FY 20-21 Solar City selected by State Govt. : NIL
  • 51. Telangana 1 Name of implementing agency TSNPDCL 2 Capacity Sanctioned by MNRE 1.5 MW in FY 2019-20 valid up to 19.08.2021 and 5 MW in FY 2020-21 valid up to 24.03.2022 3 Capacity tendered 6.5 MW 4 No. of empaneled vendors Minimum 75 no. in FY 19-20 Minimum 66 no. in FY 19-20 5 Rates discovered Rs. 52000 to Rs 43500 per kW in FY 19-20 and Rs. 52000 to Rs 39200 per kW in FY 20-21 6 Online portal of DISCOMs Yes 7 Applications received 527 Nos.(2.155 MW) 8 Applications approved 509 Nos.(2.093 MW) 9 Capacity of projects installed 342 Nos. (1.314 MW) 10 Amount of CFA disbursed to the vendors Rs.0. 46 crore out of Rs 1.72 crore released by MNRE 11 Issues CFA and Incentives are not being released due to pending EAT entry. Solar City selected by State Govt. : NIL
  • 52. Telangana 1 Name of implementing agency TSSPDCL 2 Capacity Sanctioned by MNRE 10.78 MW in FY 2019-20 valid up to 19.08.2021 and 20 MW in FY 2020-21 valid up to 24.03.2022 3 Capacity tendered 30.78 MW 4 No. of empaneled vendors About 75 no. in FY 19-20 About 66 no. in FY 19-20 5 Rates discovered Rs 52000 to Rs 43500 per kW in FY 19-20 and Rs 52000 to Rs 39200 per kW in FY 20-21 6 Online portal of DISCOMs Yes 7 Applications received 3658 no. (15.774 MW) 8 Applications approved 3598 Nos. (15.505 MW) 9 Capacity of projects installed 2594 no. (10.545 MW) 10 Amount of CFA disbursed to the vendors Rs. 6.65 Crore out of Rs 11.66 Crore released by MNRE 11 Issues --- Solar City selected by State Govt. :Nil
  • 53. Tripura 1 Name of implementing agency Tripura State Electricity Corporation Limited (TSECL) 2 Capacity Sanctioned by MNRE 1 MW in FY 2021-22 valid up to 17.09.2022 3 Capacity tendered Nil (Tender is under approval Stage) 4 No. of empaneled vendors (slab wise) Nil 5 Rates discovered (slab wise) Nil 6 Online portal of DISCOMs No 7 Applications received Nil 8 Applications approved Nil 9 Capacity of projects installed Nil 10 Amount of CFA disbursed to the vendors Nil 11 Issues MPR Not Submitted. Tendering process may be expedited Solar City selected by State Govt. : Udaipur Town
  • 54. Uttarakhand 1 Name of implementing agency UPCL 2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 21.11.2021 10 MW in 20-21 valid upto 20.05.2022 16 MW in 20-21valid upto 23.06.2022 3 Capacity tendered 10 MW 4 No. of empaneled vendors (slab wise) 15 vendors 5 Rates discovered (slab wise) • Rs.50800 per KW upto 4 KW (For hilly areas- 53800 per KW upto 4KW) • Rs. 48900 per KW from 5 KW to 10 KW (For hilly areas- 51900 per KW from 5KW to 10 KW) 6 Online portal Developed 7 Applications received 2259 of 13.227 MW 8 Applications approved 2077 of 11.492 MW 9 No. and capacity of projects installed 1002 of 5.458 MW 10 Total amount of CFA disbursed to the vendors Rs. 2.51 crore released against Rs. 2.52 Crore advance releasesed by MNRE 11 Issues Pending EAT entry. May submit 2nd instalment release request with online UC and PCRs of 1/3rd sanctioned capacity
  • 55. Uttar Pradesh 1 Name of implementing agency MVVNL 2 Capacity Sanctioned by MNRE 19 MW in 19-20 upto 03.10.2021 3 Capacity tendered 19 MW 4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw) 6Nos.(FOR 11-100kw) 5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw) Rs.32000/- (For 11-100kw) 6 Online portal Yes, developed by UPNEDA (upneda solarrooftopportal.com) 7 Applications received 4476 Nos. and 19 MW 8 Applications approved 2783 Nos. and 14.038 MW 9 No. and capacity of projects installed 2159 Nos. and 10.694 MW 10 Total amount of CFA disbursed to the vendors Rs. 4.30 nos. of Rs.4.33 Crore advance release 11 Issues Release of 2nd instalment request received recently . No fresh proposal received. Allocated capacity expires in 9 days. Solar City selected by State Govt. : Ayodhya and Prayagraj
  • 56. Uttar Pradesh 1 Name of implementing agency PuVVNL 2 Capacity Sanctioned by MNRE 10 MW in FY 19-20 vaid upto 03.10.2021 3 Capacity tendered 10 MW 4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw) 6Nos.(FOR 11-100kw) 5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw) Rs.32000/- (For 11-100kw) 6 Online portal Yes, developed by UPNEDA (upneda solarrooftopportal.com) 7 Applications received 1074 Nos and 4.218 MW 8 Applications approved 282 Nos and 1.294 MW 9 No. and capacity of projects installed 210 Nos and 0.985 MW 10 Total amount of CFA disbursed to the vendors -- 11 Issues No fresh proposal received. Allocated capacity expires in 9 days. Solar City selected by State Govt. : Ayodhya and Prayagraj
  • 57. Uttar Pradesh 1 Name of implementing agency PVVNL 2 Capacity Sanctioned by MNRE 12 MW in FY 19-20 valid upto 03.10.2021 3 Capacity tendered 12 MW 4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw) 6Nos.(FOR 11-100kw) 5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw) Rs.32000/- (For 11-100kw) 6 Online portal Yes, developed by UPNEDA (upneda solarrooftopportal.com) 7 Applications received 830 nos ( 3.704 MW) 8 Applications approved 254 nos. (1.408 MW) 9 No. and capacity of projects installed 164 nos. ( 1.010 MW) 10 Total amount of CFA disbursed to the vendors ---- 11 Issues Latest MPR not Submitted. No fresh proposal received. Allocated capacity expires in 9 days. Solar City selected by State Govt. : Ayodhya and Prayagraj
  • 58. Uttar Pradesh 1 Name of implementing agency DVVNL 2 Capacity Sanctioned by MNRE 11 MW in 19-20 upto 03.10.2021 3 Capacity tendered 11 MW 4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw) 6Nos.(FOR 11-100kw) 5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw) Rs.32000/- (For 11-100kw) 6 Online portal Yes, developed by UPNEDA (upneda solarrooftopportal.com) 7 Applications received 659 No, 2.29252 MW 8 Applications approved 185 No, 0.82496 MW 9 No. and capacity of projects installed 110 No, 0.456 MW 10 Total amount of CFA disbursed to the vendors Rs. 7.59 lakh out of Rs. 2.508 Crore 11 Issues Latest MPR Not Submitted. No fresh proposal received. Allocated capacity expires in 9 days. Solar City selected by State Govt. : Ayodhya and Prayagraj
  • 59. Uttar Pradesh 1 Name of implementing agency KESCO 2 Capacity Sanctioned by MNRE 4 MW in 19-20 valid upto 03.10.2021 3 Capacity tendered 4 MW 4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw) 6Nos.(FOR 11-100kw) 5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw) Rs.32000/- (For 11-100kw) 6 Online portal Yes, developed by UPNEDA (upneda solarrooftopportal.com) 7 Applications received 171 Nos and 0.814 MW 8 Applications approved 111 Nos and 0.476 MW 9 No. and capacity of projects installed 71 Nos and 0.238 MW 10 Total amount of CFA disbursed to the vendors - 11 Issues No fresh proposal received. Allocated capacity expires in 9 days. Solar City selected by State Govt. : Ayodhya and Prayagraj
  • 60. Uttar Pradesh 1 Name of implementing agency NPCL 2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 03.10.2021 3 Capacity tendered 2 MW 4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw) 6Nos.(FOR 11-100kw) 5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw) Rs.32000/- (For 11-100kw) 6 Online portal Yes, developed by UPNEDA (upneda solarrooftopportal.com) 7 Applications received 50 nos ( 0.269 MW) 8 Applications approved 44 nos. ( 0.269 MW) 9 No. and capacity of projects installed 25 nos ( 0.145 MW) 10 Total amount of CFA disbursed to the vendors nil 11 Issues No fresh proposal received. Allocated capacity expires in 9 days. Solar City selected by State Govt. : Ayodhya and Prayagraj
  • 61. Uttar Pradesh 1 Name of implementing agency Torrent Power , Agra 2 Capacity Sanctioned by MNRE 2 MW in 19-20 valid upto 03.10.2021 3 Capacity tendered 2 MW 4 No. of empanelled vendors (slab wise) 71Nos. (FOR 1-10kw) 6Nos.(FOR 11-100kw) 5 Rates discovered (slab wise) Rs.38000/- (For 1-10kw) Rs.32000/- (For 11-100kw) 6 Online portal Yes, developed by UPNEDA (upneda solarrooftopportal.com) 7 Applications received 317 Nos. and 1.778 MW 8 Applications approved 182 Nos. and 1.308 MW 9 No. and capacity of projects installed 170 Nos. and 1.238 MW 10 Total amount of CFA disbursed to the vendors nil 11 Issues No fresh proposal received. Allocated capacity expires in 9 days. Solar City selected by State Govt. : Ayodhya and Prayagraj
  • 62. West Bengal 1 Name of implementing agency WBSEDCL 2 Capacity Sanctioned by MNRE 50 MW in FY 2020-21 valid up to 23/07/2022 3 Capacity tendered No progress 4 No. of empaneled vendors No progress 5 Rates discovered No progress 6 Online portal of DISCOMs Not developed 7 Applications received -- 8 Applications approved -- 9 Capacity of projects installed -- 10 Amount of CFA disbursed to the vendors -- 11 Issues MPR Not Submitted. Tendering process may be expedited. • Solar City selected by State Govt. :Prantik in Birbhum, Shantiniketan • Proposal from other DISCOMs not received for RTS