AMRUT in MP
Details of SAAP
 34 Cities covered under the Mission.
 5 year Perspective Plan for Project size of Rs. 6459.78 Cr.
 Projects Under SAAP
Water Supply
2202.70 Cr 34%
Sewerage
3581.20 Cr 55%
Drainage
263.01 Cr 4.5%
Urban transport
261.89 Cr 4%
Green Spaces
150.98 Cr 2.5%
Water Supply: Sewerage Drainage Urban Transport Green Space and Parks
2
AMRUT in MP
State initiative- Funding Pattern
33.33%
50 %
50 %
40 %
16.67 %
10 %
Population > 10 Lakh Population up-to 10 Lakh
ULB Share State Share Central Share
20% Minimum
State Share
3
AMRUT in MP
Implementation Arrangements
1. Project Preparation by Towns through qualified Consultants.
2. Project appraisal by SLTC chaired by Mission Director and
SHPSC chaired by the C.S.
3. Project Implementation by Towns under closed supervision of
State PMU.
4. Fully Transparent e-procurement of works by ULBs on standard
Bidding Document having clear and objective qualification
condition and post construction maintenance.
5. Two consultancy organizations working as PDMC for supervision
and quality control under Engineer in Chief.
6. Third party monitoring by IRMA consultant.
4
AMRUT in MP
AMRUT in MP
State Initiatives
1. Water Supply
 Consequent to study existing water supply facility, DMA
restructuring of Towns including gaps in distribution network
and treatment facility taken up.
 Complete town covered by PLC and SCADA from source to
DMA for quantity and quality monitoring.
 O & M for complete town built up in the projects for 5 years
after completion.
 Financial approval of projects by calculating IRR and cities are
required to change user charges so calculated.
5
AMRUT in MP
2. Sewerage Projects
 Conventional methodology of drain tapping and sewage pumping to STP
discontinued. Conventional designing of centralized sewer network involving
multiple pumping reviewed.
 In all Sewerage Projects the work starting from house service connection to
Sewage Treatment Plant are being taken up based on geographical zoning.
 Decentralized or semi–centralized STPs to ensure gravity flow with no-pumping/
bare minimum pumping.
 10 years post construction O & M inbuilt in the projects.
 Technology free tendering with defined out put parameters. Bid criteria is
CAPEX+ (10 years O & M + Power guarantee) with NPV discount factor financial
approval of projects by calculating IRR and cities are required to change user
charges so calculated.
6
AMRUT in MP
State Initiatives
AMRUT in MP
(Rs. in Crores)
Sector
Sanctioned
Projects
Work Completed Under Progress Under Tendering
Expend-
iture
City
(Projects)
in Nos
Amount
City
(Projects)
in Nos
Amount
City
(Projects)
in Nos
Amount
City
(Projects)
in Nos
Amount
Water Supply 20 (29) 2115.8 03 (05) 89.99 17 (23) 2015.81 01 (01) 10 657.36
Sewerage and
Septage
Management
20 (24) 3580.2 01 (01) 66 19 (23) 3514.2 0 0 415.67
Drainage 08 (08) 202.35 06 (06) 179.47 02 (02) 22.88
Urban Transport 21 (32) 241.93 15 (17) 116.57 15 (15) 125.36
Others (Parks) 34 (92) 105.59 10 (17) 8.37 26 (60) 70.34 12 (15) 26.88 4.65
Grand Total 34 (185) 6245.87 10 (23) 164.36 33 (129) 5896.39 22 (33) 185.12 1077.68
Progress
AMRUT in MP
8
AMRUT in MP
Sewage Project Sehore MP
AMRUT in MP 9
Water Supply Project Rewa MP
10
AMRUT in MP

More Related Content

Similar to exp_sewage.pptx

Role of centre and state in finance of urban development project
Role of centre and state in finance of urban development projectRole of centre and state in finance of urban development project
Role of centre and state in finance of urban development project
anupriya sharma
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
Rajesh Prasad
 
Smart cities itpi
Smart cities itpiSmart cities itpi
Smart cities itpi
Surinder Dogra
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
Pankaj Maurya
 
EMC e City - Rev meeting Aug 2018.ppt
EMC e City - Rev meeting Aug 2018.pptEMC e City - Rev meeting Aug 2018.ppt
EMC e City - Rev meeting Aug 2018.ppt
SrikanthTirluka1
 
Manu Srivastava
Manu SrivastavaManu Srivastava
Manu Srivastava
eletseditorial
 
Construction Projects Feasibility studies
Construction Projects Feasibility studiesConstruction Projects Feasibility studies
Construction Projects Feasibility studies
Subhendu Datta
 
Aurangabad Smart City Proposal- Stage 2
Aurangabad Smart City Proposal- Stage 2Aurangabad Smart City Proposal- Stage 2
Aurangabad Smart City Proposal- Stage 2
Nikhil Bhalerao
 
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
Fairfax County
 
Pune Towards Smart City - Pune Municipal Corporation
Pune Towards Smart City - Pune Municipal CorporationPune Towards Smart City - Pune Municipal Corporation
Pune Towards Smart City - Pune Municipal Corporation
pmcpune
 
Alandur sewerage treatment plant project ppp model
Alandur sewerage treatment plant project   ppp modelAlandur sewerage treatment plant project   ppp model
Alandur sewerage treatment plant project ppp model
Ar.Apurva Sinkar
 
Item # 5 - Water and Wastewater Rate Study
Item # 5 - Water and Wastewater Rate StudyItem # 5 - Water and Wastewater Rate Study
Item # 5 - Water and Wastewater Rate Study
ahcitycouncil
 
Amrut gis 18-7-2018 -website uploaded
Amrut gis 18-7-2018 -website uploadedAmrut gis 18-7-2018 -website uploaded
Amrut gis 18-7-2018 -website uploaded
Shashikant Kumar, Ph.D
 
smart city.pptx
smart city.pptxsmart city.pptx
smart city.pptx
07AFZAALAHMAD
 
Smart Cities (India)
Smart Cities (India)Smart Cities (India)
Smart Cities (India)
Rathnavel Ponnuswami
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
Emmanuel Mongaya
 
Approaches to Project Selection
Approaches to Project SelectionApproaches to Project Selection
Approaches to Project Selection
ADR Nord
 
Dilg dbm joint memorandum circular 2017-2
Dilg dbm joint memorandum circular 2017-2Dilg dbm joint memorandum circular 2017-2
Dilg dbm joint memorandum circular 2017-2
Drickyriejhen
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
DBTGrupoIndia
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)
urbanranchi
 

Similar to exp_sewage.pptx (20)

Role of centre and state in finance of urban development project
Role of centre and state in finance of urban development projectRole of centre and state in finance of urban development project
Role of centre and state in finance of urban development project
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
Smart cities itpi
Smart cities itpiSmart cities itpi
Smart cities itpi
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
 
EMC e City - Rev meeting Aug 2018.ppt
EMC e City - Rev meeting Aug 2018.pptEMC e City - Rev meeting Aug 2018.ppt
EMC e City - Rev meeting Aug 2018.ppt
 
Manu Srivastava
Manu SrivastavaManu Srivastava
Manu Srivastava
 
Construction Projects Feasibility studies
Construction Projects Feasibility studiesConstruction Projects Feasibility studies
Construction Projects Feasibility studies
 
Aurangabad Smart City Proposal- Stage 2
Aurangabad Smart City Proposal- Stage 2Aurangabad Smart City Proposal- Stage 2
Aurangabad Smart City Proposal- Stage 2
 
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
 
Pune Towards Smart City - Pune Municipal Corporation
Pune Towards Smart City - Pune Municipal CorporationPune Towards Smart City - Pune Municipal Corporation
Pune Towards Smart City - Pune Municipal Corporation
 
Alandur sewerage treatment plant project ppp model
Alandur sewerage treatment plant project   ppp modelAlandur sewerage treatment plant project   ppp model
Alandur sewerage treatment plant project ppp model
 
Item # 5 - Water and Wastewater Rate Study
Item # 5 - Water and Wastewater Rate StudyItem # 5 - Water and Wastewater Rate Study
Item # 5 - Water and Wastewater Rate Study
 
Amrut gis 18-7-2018 -website uploaded
Amrut gis 18-7-2018 -website uploadedAmrut gis 18-7-2018 -website uploaded
Amrut gis 18-7-2018 -website uploaded
 
smart city.pptx
smart city.pptxsmart city.pptx
smart city.pptx
 
Smart Cities (India)
Smart Cities (India)Smart Cities (India)
Smart Cities (India)
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
 
Approaches to Project Selection
Approaches to Project SelectionApproaches to Project Selection
Approaches to Project Selection
 
Dilg dbm joint memorandum circular 2017-2
Dilg dbm joint memorandum circular 2017-2Dilg dbm joint memorandum circular 2017-2
Dilg dbm joint memorandum circular 2017-2
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)
 

Recently uploaded

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 

Recently uploaded (20)

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 

exp_sewage.pptx

  • 1. AMRUT in Madhya Pradesh 1 Urban Development and Housing Department Government of Madhya Pradesh Lucknow, Dated 27th July, 2018 AMRUT in MP
  • 2. Details of SAAP  34 Cities covered under the Mission.  5 year Perspective Plan for Project size of Rs. 6459.78 Cr.  Projects Under SAAP Water Supply 2202.70 Cr 34% Sewerage 3581.20 Cr 55% Drainage 263.01 Cr 4.5% Urban transport 261.89 Cr 4% Green Spaces 150.98 Cr 2.5% Water Supply: Sewerage Drainage Urban Transport Green Space and Parks 2 AMRUT in MP
  • 3. State initiative- Funding Pattern 33.33% 50 % 50 % 40 % 16.67 % 10 % Population > 10 Lakh Population up-to 10 Lakh ULB Share State Share Central Share 20% Minimum State Share 3 AMRUT in MP
  • 4. Implementation Arrangements 1. Project Preparation by Towns through qualified Consultants. 2. Project appraisal by SLTC chaired by Mission Director and SHPSC chaired by the C.S. 3. Project Implementation by Towns under closed supervision of State PMU. 4. Fully Transparent e-procurement of works by ULBs on standard Bidding Document having clear and objective qualification condition and post construction maintenance. 5. Two consultancy organizations working as PDMC for supervision and quality control under Engineer in Chief. 6. Third party monitoring by IRMA consultant. 4 AMRUT in MP AMRUT in MP
  • 5. State Initiatives 1. Water Supply  Consequent to study existing water supply facility, DMA restructuring of Towns including gaps in distribution network and treatment facility taken up.  Complete town covered by PLC and SCADA from source to DMA for quantity and quality monitoring.  O & M for complete town built up in the projects for 5 years after completion.  Financial approval of projects by calculating IRR and cities are required to change user charges so calculated. 5 AMRUT in MP
  • 6. 2. Sewerage Projects  Conventional methodology of drain tapping and sewage pumping to STP discontinued. Conventional designing of centralized sewer network involving multiple pumping reviewed.  In all Sewerage Projects the work starting from house service connection to Sewage Treatment Plant are being taken up based on geographical zoning.  Decentralized or semi–centralized STPs to ensure gravity flow with no-pumping/ bare minimum pumping.  10 years post construction O & M inbuilt in the projects.  Technology free tendering with defined out put parameters. Bid criteria is CAPEX+ (10 years O & M + Power guarantee) with NPV discount factor financial approval of projects by calculating IRR and cities are required to change user charges so calculated. 6 AMRUT in MP State Initiatives AMRUT in MP
  • 7. (Rs. in Crores) Sector Sanctioned Projects Work Completed Under Progress Under Tendering Expend- iture City (Projects) in Nos Amount City (Projects) in Nos Amount City (Projects) in Nos Amount City (Projects) in Nos Amount Water Supply 20 (29) 2115.8 03 (05) 89.99 17 (23) 2015.81 01 (01) 10 657.36 Sewerage and Septage Management 20 (24) 3580.2 01 (01) 66 19 (23) 3514.2 0 0 415.67 Drainage 08 (08) 202.35 06 (06) 179.47 02 (02) 22.88 Urban Transport 21 (32) 241.93 15 (17) 116.57 15 (15) 125.36 Others (Parks) 34 (92) 105.59 10 (17) 8.37 26 (60) 70.34 12 (15) 26.88 4.65 Grand Total 34 (185) 6245.87 10 (23) 164.36 33 (129) 5896.39 22 (33) 185.12 1077.68 Progress AMRUT in MP
  • 8. 8 AMRUT in MP Sewage Project Sehore MP
  • 9. AMRUT in MP 9 Water Supply Project Rewa MP