‫بندی‬‫بارم‬
‫کالسی‬ ‫فعالیت‬
%
5
‫جایزه‬
%
5
‫ترم‬‫میان‬
%
20
‫ترم‬‫پایان‬
%
50
‫پروژه‬
%
25
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
1) Satter, A. & Thakur, G. C. (1996). Integrated Petroleum Reservoir Management: A
Team Approach, PennWell Corp.
2) Pathak, A. K. (2021). Petroleum Reservoir Management: Considerations and
Practices. CRC Press.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
1
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
2
Integrated sound reservoir management is the key to a successful operation
throughout a reservoir’s life.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
3
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
4
Reservoir management:
Utilization of available resources (i.e., human, technological
and financial) to maximize profits/profitability index from a
reservoir by optimizing recovery while minimizing capital
investments and operating expenses.
Main purpose:
To control operations to obtain the maximum possible
economic recovery from a reservoir based on facts,
information, and knowledge.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
5
The prime objective of reservoir management is the economic
optimization of oil and gas recovery, which can be obtain by the
following steps:
➢Identify and define all individual reservoirs in a particular field
and their petrophysical properties
➢Deduce past and predict future performance of reservoir
➢Minimize drilling of unnecessary wells
➢Define and modify (if necessary) wellbore and surface systems
➢Initiate operating controls at the proper time
➢Consider all pertinent economic and legal factors
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
6
When should reservoir management start?
The ideal time to start managing a reservoir is at its discovery. Early initiation
of a coordinated reservoir-management program not only provides a better
monitoring and evaluation tool, but also costs less in long term. For instance, an
additional time on a DST may provide better information than more expensive
core analysis. Besides, some early tests can indicate the size of a reservoir. If it
is of limited size, drilling of unnecessary wells can be prevented.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
7
What, how, and when to collect data?
➢ Are the data necessary, and what are we going to do with these data?
➢ What decisions will be made based on the results of the data collection?
➢ What are the benefits of these data, and how do we devise a plan to obtain
the necessary data at the minimum cost?
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
8
The modern reservoir management process involves setting,
planning, implementing, monitoring, evaluating, and revising
plans.
❑ Setting a reservoir management strategy requires knowledge of
the reservoir, availability of technology, and knowledge of the
business, political, and environmental climate.
❑ Formulating a comprehensive management plan involves
depletion and development strategies, data acquisition and
analyses, geological and numerical model studies, production
and reserves forecasts, facilities requirements, economic
optimization and management approval.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
9
❑ Implementing the plan requires management support, field
personnel commitment, and multidisciplinary and integrated
teamwork.
❑ Success of the project depends upon careful
monitoring/surveillance and thorough, ongoing evaluation of
its performance.
❑ If the actual behavior of the project does not agree with the
expected performance, the original plan needs to be revised,
and the cycle (i.e., implementing, monitoring, and
evaluating) reactivated.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
‫حداقل‬ ‫وجود‬
5
‫کانی‬ ‫درصد‬
‫سنگ‬ ‫در‬ ‫رسی‬
‫ترکیبات‬ ‫وجود‬
‫نفت‬ ‫در‬ ‫قطبی‬
‫وجود‬
‫دو‬ ‫های‬‫یون‬
‫ظرفیتی‬
‫محیط‬ ‫در‬
10
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
‫حداقل‬ ‫وجود‬
5
‫کانی‬ ‫درصد‬
‫سنگ‬ ‫در‬ ‫رسی‬
‫ترکیبات‬ ‫وجود‬
‫نفت‬ ‫در‬ ‫قطبی‬
‫وجود‬
‫دو‬ ‫های‬‫یون‬
‫ظرفیتی‬
‫محیط‬ ‫در‬
‫نفت‬ ‫شرایط‬
‫خنثی‬ ‫یا‬ ‫دوستی‬
‫مخزن‬ ‫سنگ‬
11
Recognizing the specific need and setting a realistic and
achievable purpose is the first step in reservoir management.
The key elements for setting a reservoir management goal are:
❑ Reservoir characteristics
❑ Total environment
❑ Available technology
Understanding of each of these elements is the prerequisite to
establishing short- and long-term strategies for managing
reservoirs.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
12
Understanding the nature of the reservoir requires a knowledge of
the geology, rock and fluid properties, fluid flow and recovery
mechanisms, drilling and well completions, and past production
performance.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
13
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
‫حداقل‬ ‫وجود‬
5
‫کانی‬ ‫درصد‬
‫سنگ‬ ‫در‬ ‫رسی‬
‫ترکیبات‬ ‫وجود‬
‫نفت‬ ‫در‬ ‫قطبی‬
‫وجود‬
‫دو‬ ‫های‬‫یون‬
‫ظرفیتی‬
‫محیط‬ ‫در‬
Understanding of the following environments is essential in
developing management strategy and effectiveness:
❖ Corporate goal, financial strength, culture, and attitude
❖ Economic-business climate, oil/gas price, inflation, capital and
personnel availability
❖ Social conservation, safety, and environmental regulations
14
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
15
The success of reservoir management depends upon the reliability
and proper utilization of the technology being applied concerning
exploration, drilling and completions, recovery processes, and
production.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
16
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
17
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
18
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
19
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
20
Once the goals and objectives have been set and an integrated
reservoir management plan has been developed, the next step is to
implement the plan.
➢ Start with a plan of action, involving all functions
➢ Flexible plan (adaptable to surrounding circumstances)
➢ Management support
➢ Commitment of field personnel
➢ Periodic review meeting, involving all team members (teach
each others)
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
21
An integrated and comprehensive program needs to be developed
for successful monitoring and surveillance of the management
project. The major areas of monitoring and surveillance involving
data acquisition and management include:
➢ Oil, water and gas production
➢ Gas and water injection
➢ Static and flowing bottom hole pressures
➢ Production and injection tests
➢ Injection and production profiles
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
22
The plan must be reviewed periodically to ensure that it is being
followed, that it is working, and it is still the best plan. The
success of the plan needs to be evaluated by checking the actual
reservoir performance against the anticipated behavior.
‫شکیبا‬ ‫محمود‬ ‫دکتر‬
‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬
23
‫شما‬ ‫به‬ ‫تقدیم‬

More Related Content

Similar to reservoir managment.pdf

Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivespetroEDGE
 
Robert Sharp CV May 2016
Robert Sharp CV May 2016Robert Sharp CV May 2016
Robert Sharp CV May 2016Robert Sharp
 
GEF Program Study on International Waters Lessons Learned
GEF Program Study on International Waters Lessons LearnedGEF Program Study on International Waters Lessons Learned
GEF Program Study on International Waters Lessons LearnedIwl Pcu
 
JAVIER MIRANDA_Petrophysicist_Sep29_2016
JAVIER MIRANDA_Petrophysicist_Sep29_2016JAVIER MIRANDA_Petrophysicist_Sep29_2016
JAVIER MIRANDA_Petrophysicist_Sep29_2016Javier Miranda
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015gufron gufron
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoringhydrologyproject001
 
Dickey-Collas Stock assessments-the rock of EBFM.pptx
Dickey-Collas Stock assessments-the rock of EBFM.pptxDickey-Collas Stock assessments-the rock of EBFM.pptx
Dickey-Collas Stock assessments-the rock of EBFM.pptxMark Dickey-Collas
 
A framework for aquaculture Park development in the Philippines
A framework for aquaculture Park development in the PhilippinesA framework for aquaculture Park development in the Philippines
A framework for aquaculture Park development in the PhilippinesPatrick White
 
Powering the Future: Expert Insights on Renewable Energy Feasibility and Proj...
Powering the Future: Expert Insights on Renewable Energy Feasibility and Proj...Powering the Future: Expert Insights on Renewable Energy Feasibility and Proj...
Powering the Future: Expert Insights on Renewable Energy Feasibility and Proj...Wavy Solutions Inc
 
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...IJERD Editor
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...petroEDGE
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013psmuga9
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 

Similar to reservoir managment.pdf (20)

Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual Perspectives
 
Robert Sharp CV May 2016
Robert Sharp CV May 2016Robert Sharp CV May 2016
Robert Sharp CV May 2016
 
GEF Program Study on International Waters Lessons Learned
GEF Program Study on International Waters Lessons LearnedGEF Program Study on International Waters Lessons Learned
GEF Program Study on International Waters Lessons Learned
 
UK submarine dismantling: A case study in programme management
UK submarine dismantling: A case study in programme managementUK submarine dismantling: A case study in programme management
UK submarine dismantling: A case study in programme management
 
JAVIER MIRANDA_Petrophysicist_Sep29_2016
JAVIER MIRANDA_Petrophysicist_Sep29_2016JAVIER MIRANDA_Petrophysicist_Sep29_2016
JAVIER MIRANDA_Petrophysicist_Sep29_2016
 
RESUME
RESUMERESUME
RESUME
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Dickey-Collas Stock assessments-the rock of EBFM.pptx
Dickey-Collas Stock assessments-the rock of EBFM.pptxDickey-Collas Stock assessments-the rock of EBFM.pptx
Dickey-Collas Stock assessments-the rock of EBFM.pptx
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
A framework for aquaculture Park development in the Philippines
A framework for aquaculture Park development in the PhilippinesA framework for aquaculture Park development in the Philippines
A framework for aquaculture Park development in the Philippines
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Powering the Future: Expert Insights on Renewable Energy Feasibility and Proj...
Powering the Future: Expert Insights on Renewable Energy Feasibility and Proj...Powering the Future: Expert Insights on Renewable Energy Feasibility and Proj...
Powering the Future: Expert Insights on Renewable Energy Feasibility and Proj...
 
Abu Bakr CV
Abu Bakr CVAbu Bakr CV
Abu Bakr CV
 
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and Gas
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

reservoir managment.pdf

  • 1. ‫مخازن‬ ‫از‬ ‫صیانت‬ ‫و‬ ‫مدیریت‬ ( ‫اول‬ ‫جلسه‬ ) ‫مدرس‬ : ‫شکیبا‬ ‫محمود‬ ‫دکتر‬
  • 2. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ ‫بندی‬‫بارم‬ ‫کالسی‬ ‫فعالیت‬ % 5 ‫جایزه‬ % 5 ‫ترم‬‫میان‬ % 20 ‫ترم‬‫پایان‬ % 50 ‫پروژه‬ % 25
  • 3. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 1) Satter, A. & Thakur, G. C. (1996). Integrated Petroleum Reservoir Management: A Team Approach, PennWell Corp. 2) Pathak, A. K. (2021). Petroleum Reservoir Management: Considerations and Practices. CRC Press.
  • 4. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 1
  • 5. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 2 Integrated sound reservoir management is the key to a successful operation throughout a reservoir’s life.
  • 6. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 3
  • 7. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 4 Reservoir management: Utilization of available resources (i.e., human, technological and financial) to maximize profits/profitability index from a reservoir by optimizing recovery while minimizing capital investments and operating expenses. Main purpose: To control operations to obtain the maximum possible economic recovery from a reservoir based on facts, information, and knowledge.
  • 8. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 5 The prime objective of reservoir management is the economic optimization of oil and gas recovery, which can be obtain by the following steps: ➢Identify and define all individual reservoirs in a particular field and their petrophysical properties ➢Deduce past and predict future performance of reservoir ➢Minimize drilling of unnecessary wells ➢Define and modify (if necessary) wellbore and surface systems ➢Initiate operating controls at the proper time ➢Consider all pertinent economic and legal factors
  • 9. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 6 When should reservoir management start? The ideal time to start managing a reservoir is at its discovery. Early initiation of a coordinated reservoir-management program not only provides a better monitoring and evaluation tool, but also costs less in long term. For instance, an additional time on a DST may provide better information than more expensive core analysis. Besides, some early tests can indicate the size of a reservoir. If it is of limited size, drilling of unnecessary wells can be prevented.
  • 10. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 7 What, how, and when to collect data? ➢ Are the data necessary, and what are we going to do with these data? ➢ What decisions will be made based on the results of the data collection? ➢ What are the benefits of these data, and how do we devise a plan to obtain the necessary data at the minimum cost?
  • 11. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 8 The modern reservoir management process involves setting, planning, implementing, monitoring, evaluating, and revising plans. ❑ Setting a reservoir management strategy requires knowledge of the reservoir, availability of technology, and knowledge of the business, political, and environmental climate. ❑ Formulating a comprehensive management plan involves depletion and development strategies, data acquisition and analyses, geological and numerical model studies, production and reserves forecasts, facilities requirements, economic optimization and management approval.
  • 12. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 9 ❑ Implementing the plan requires management support, field personnel commitment, and multidisciplinary and integrated teamwork. ❑ Success of the project depends upon careful monitoring/surveillance and thorough, ongoing evaluation of its performance. ❑ If the actual behavior of the project does not agree with the expected performance, the original plan needs to be revised, and the cycle (i.e., implementing, monitoring, and evaluating) reactivated.
  • 13. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ ‫حداقل‬ ‫وجود‬ 5 ‫کانی‬ ‫درصد‬ ‫سنگ‬ ‫در‬ ‫رسی‬ ‫ترکیبات‬ ‫وجود‬ ‫نفت‬ ‫در‬ ‫قطبی‬ ‫وجود‬ ‫دو‬ ‫های‬‫یون‬ ‫ظرفیتی‬ ‫محیط‬ ‫در‬ 10
  • 14. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ ‫حداقل‬ ‫وجود‬ 5 ‫کانی‬ ‫درصد‬ ‫سنگ‬ ‫در‬ ‫رسی‬ ‫ترکیبات‬ ‫وجود‬ ‫نفت‬ ‫در‬ ‫قطبی‬ ‫وجود‬ ‫دو‬ ‫های‬‫یون‬ ‫ظرفیتی‬ ‫محیط‬ ‫در‬ ‫نفت‬ ‫شرایط‬ ‫خنثی‬ ‫یا‬ ‫دوستی‬ ‫مخزن‬ ‫سنگ‬ 11 Recognizing the specific need and setting a realistic and achievable purpose is the first step in reservoir management. The key elements for setting a reservoir management goal are: ❑ Reservoir characteristics ❑ Total environment ❑ Available technology Understanding of each of these elements is the prerequisite to establishing short- and long-term strategies for managing reservoirs.
  • 15. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 12 Understanding the nature of the reservoir requires a knowledge of the geology, rock and fluid properties, fluid flow and recovery mechanisms, drilling and well completions, and past production performance.
  • 16. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 13
  • 17. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ ‫حداقل‬ ‫وجود‬ 5 ‫کانی‬ ‫درصد‬ ‫سنگ‬ ‫در‬ ‫رسی‬ ‫ترکیبات‬ ‫وجود‬ ‫نفت‬ ‫در‬ ‫قطبی‬ ‫وجود‬ ‫دو‬ ‫های‬‫یون‬ ‫ظرفیتی‬ ‫محیط‬ ‫در‬ Understanding of the following environments is essential in developing management strategy and effectiveness: ❖ Corporate goal, financial strength, culture, and attitude ❖ Economic-business climate, oil/gas price, inflation, capital and personnel availability ❖ Social conservation, safety, and environmental regulations 14
  • 18. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 15 The success of reservoir management depends upon the reliability and proper utilization of the technology being applied concerning exploration, drilling and completions, recovery processes, and production.
  • 19. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 16
  • 20. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 17
  • 21. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 18
  • 22. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 19
  • 23. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 20 Once the goals and objectives have been set and an integrated reservoir management plan has been developed, the next step is to implement the plan. ➢ Start with a plan of action, involving all functions ➢ Flexible plan (adaptable to surrounding circumstances) ➢ Management support ➢ Commitment of field personnel ➢ Periodic review meeting, involving all team members (teach each others)
  • 24. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 21 An integrated and comprehensive program needs to be developed for successful monitoring and surveillance of the management project. The major areas of monitoring and surveillance involving data acquisition and management include: ➢ Oil, water and gas production ➢ Gas and water injection ➢ Static and flowing bottom hole pressures ➢ Production and injection tests ➢ Injection and production profiles
  • 25. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 22 The plan must be reviewed periodically to ensure that it is being followed, that it is working, and it is still the best plan. The success of the plan needs to be evaluated by checking the actual reservoir performance against the anticipated behavior.
  • 26. ‫شکیبا‬ ‫محمود‬ ‫دکتر‬ ‫مشهد‬ ‫فردوسی‬ ‫دانشگاه‬ 23