SlideShare a Scribd company logo
1 of 81
LEED GOALS
● Reverse contribution to climate change
● Protect water resources
● Better human health
● Greener economy
● Enhance biodiversity
● Social equity, environmental justice
LEED Goals
BENEFITS
LEED CERTIFICATION PROCESS
● Owner selects the rating system and registers the project
● Project team meets the requirements
● Documentation submission for certification
● Final review of project
Final review contains the project’s final score and certification level.
LEED has 4 levels of certification
40-49POINTS: CERTIFIED
50-59 POINTS: SILVER
60-79 POINTS: GOLD
80+ POINTS: PLATIMUN
LEED Credit Categories
PROJECT GOALS
ENVIRONMENTAL
● ENERGY SIGNATURE
● ENERGY BENCHMARK
● SITE ANALYSIS
ORGANIZATIONAL
● CORPORATE SOCIAL
RESPONSIBILITY REPORT
● HUMAN RESOURCES POLICIES
● STAKEHOLDER’S CONCERN
FACTORS
ESTABLISHMENT
● STATIC AND FOUNDATIONAL
PREFORMANCE
● DYNAMIC AND RECURRING
BUILDING COMPONENTS&
SITE INFRASTRUCTURE
POLICIES
ACTIONS
POLICIES
LEED WORK PLAN
MINIMUM PROGRAM
REQUIREMENTS
Minimum characteristics or conditions that make a project
appropriate to pursue LEED certification
● permanent location on existing land
● Use reasonable LEED boundaries
● Compliance with project size requirements
LOCATION AND TRANPORTAION
● LT Category rewards thoughtful project teams about building locations and how that
location affects commuting patterns. Making alternative transportation an important
part of project’s overall environmental performance.
ALTERNATIVE
TRANSPOTRATION
● INTENT:
To reduce pollution and land development effects from automobile use for
transportation
CREDIT APPLIES TO:
EXISTING BUILDINGS
DATA CENTRES
SCHOOLS
RETAIL
HOSPITALITY
WAREHOUSES
DISTRIBUTION CENTRES
ALTERNATIVE
TRANSPORTATION
This credit focuses on the transportation pattern of building occupants. This operation &
maintenance credit determines how building occupants actually travel to and from the
project.
Takes a single performance-based approach to evaluating a building’s transportation
characteristics.
A transportation survey is required of all projects attempting this credit.
SURVEY OPTIONS
OPTION 1
TRANSPORTATION SURVEY
OPTION 2
ALTERNATIVE TRANSPORTATION RATE
OPTION 3
COMPREHENSIVE ALTERNATIVE
TRANSPORTATION PROGRAM
STEPS TO CONDUCT SURVEY
OPTION 1:
1. Choose survey approach for regular building occupants
2. Select survey instrument for regular building occupants
3. Determine whether visitors must be surveyed
4. Develop transportation survey
5. Schedule survey
6. Finalize logistics for conducting survey
7. Distribute surveys
8. Analyze survey results for regular occupants
9. Analyze survey results for visitors, if applicable
10. Calculate overall alternative transportation rate
STEPS TO CONDUCT SURVEY
OPTION 2
1. Complete option1
2. Demonstrate reduction in conventional commuting trips
OPTION 3
1. Complete option 1
2. Develop alternative transportation program
3. Implement initiatives
TIPS TO OPTIMIZE SURVEY
● To encourage an increase in alternative transportation rates (for Option 2), consider implementing
components of an alternative transportation program a few months before (but not right before) the survey.
The following strategies can help the project team achieve higher survey response rates and more accurate
results.
● · Incentives. Offer an incentive to encourage people to respond, such as coffee, a snack, a free lunch, a small-
denomination gift card, or something else not related to transportion (e.g., transit passes are not allowed) that
will appeal to building occupants but not skew the results.
● · Style. Do not call it a survey: people are generally survey-averse. If the survey is conducted in person, lead
with a survey question rather than asking respondents whether they are willing to participate. They will let the
surveyors know if they do not want to.
● · Convenience. Make the survey quick and easy. Encourage people to take the survey by assuring them that the
survey has, say, only three questions or will take only 30 seconds.
● Choose the right peak window to survey building occupants; starting too late or ending too early may
significantly affect the survey response rate. Do not overlook back doors and other entries that are not the
main entrance to the building.
SUSTAINABLE SITES
SUSTAINABLE
SITES
● The SUSTAINABLE SITES(SS) class rewards choices
about the climate encompassing the structure,
with credits that underscore the fundamental
connections among structures, environments, and
biological system administrations. It centers
around reestablishing project site components,
coordinating the site with neighborhood and
provincial environments, and protecting the
biodiversity that normal frameworks depend on.
● In LEED v4, the SS classification joins conventional
methodologies with a few new techniques. These
incorporate working with preservation associations
to target monetary help for off-site natural
surroundings insurance , utilizing low-influence
improvement to deal with a percentile storm
occasion, involving three-year matured SRI values
for rooftops and SR values for nonroof hardscape,
and making a five-year improvement plan for the
venture site.
Protect and restore habitat
To save natural uprightness and energize
ecologically touchy site executives rehearses
that give a perfect, very much kept up with,
and safe structure outside while supporting
superior execution incorporating activities and
reconciliation into the encompassing
scene.Great outside support practices can
essentially influence a task site and its
environmental elements.. Besides, a solid and
very much kept up with project site that is
interesting to tenants and guests can benefit
human wellbeing.
Acknowledgment of such advantages starts
with an unmistakable, intensive site the
executives strategy. Creating and executing a
site the board strategy right off the bat in the
LEED cycle give the group time to streamline
items, gear, and procedures. At last, a very
much created site the board strategy
empowers a group to address unforeseen
inconveniences.
On-site
restoration
Exploration and audit the best administration rehearses for
each functional component determined in the essential
prerequisites, as well as any functional components that might
be novel to the venture site.Acquiring a thorough
comprehension of how the venture site is presently overseen
and kept up with ·One should Figure out how current practices
line up with best administration rehearses. Gathering and
survey any site the executives documentation that might be
applicable to the approach.
Property administrators, site and grounds supervisors, and
pertinent sellers can all help recognize objectives and open
doors for further developing site the executives.Revision of
contract records as important to help the arrangement
prerequisites.The site the executives strategy can uphold
nearby natural surroundings and biodiversity through
monitoring of the site's local or adjusted vegetation.
Site Development— Protect or Restore Habitat
● IT WORKS To monitor existing normal regions and reestablish harmed regions to give
natural surroundings and advance biodiversity. Protection and preservation of
unblemished or excellent local biological systems, including their dirts, local
vegetation,delicate species territory, natural life passages, and hydrology, adds to
keeping up with by and large environment wellbeing.Rebuilding of soils, hydrology, and
local plants additionally works on the reasonability of environmental networks, makes a
difference oversee and channel water, and can recover other biological system
capabilities.
● At the point when site limitations forestall nearby reclamation, think about off-site
preservation and rebuilding. An off-site approach might give more prominent all out
environment benefits than could somehow or another be accomplished nearby. That's
what for projects can't give enormous, adjacent packages of on location land for long
haul protection, giving monetary backing to a perceived land trust or protection
association can be a viable instrument.
Rain water management
● To decrease overflow volume and further develop water quality by repeating the regular hydrology and water
equilibrium of the site, in view of authentic circumstances and lacking biological systems in the district to
abstain from adding to flooding downstream in cutting edge networks.
● The v4 credit tends to the administration of both the amount and nature of water spillover. This is finished
through the expected utilization of green framework and low-influence advancement techniques, which get
to the next level upon the ordinary methodology by mirroring a site's normal hydrology and overseeing water
as near the source as could really be expected
● The methodologies additionally center around reestablishing or planning scenes to work hydrologically more
like the regular undisturbed scene of a given area.
● This credit's cycle is iterative in nature, and that implies that the venture should conceptualize, ascertain, and
refine the plan until the necessities are accomplished to guarantee that both the aim of the credit and the
venture’s objectives are met.
Rain water
management
Working with site experts to recognize regions to
be reestablished with local or adjusted
vegetation, decide reclamation systems, and
characterize the cycle for rebuilding work.
Improvement of normal site components can
incorporate existing lakes,vegetation, and other
regular highlights.
Regions that normally don't contain vegetation
can combine with reestablished region. Project
groups might have to submit documentation
showing that the project site contains normally
unvegetated land or regular water bodies.
Characterize the territory region limit on plans
that are essential for the site. Make a five-to
seven-year site the board plan that incorporates
fire the executives, flooding, and obtrusive
species the executives.
To decrease overflow volume and further develop
water quality by repeating the regular hydrology and
water equilibrium of the site, in view of verifiable
conditions and lacking environments in the locale
rainwater is managed and handled.
A typical rainfall management approach for a
conventional site is to handle runoff as a byproduct to
be disposed of by piping and transporting it as rapidly
as possible into centralised, massive facilities at the
foot of drainage regions. However, while intended to
prevent flooding and promote efficient drainage, such
a strategy can harm watersheds by increasing the
volume, temperature, peak flow, and duration of
runoff and types of pollutants discharged to surface
waters The v4 credit covers the control of rainwater
runoff in terms of both quantity and quality.
The compulsory steps for management involves get a
drawn out everyday precipitation informational index
for the project area, import the information into the
precipitation occasions number cruncher given by
USGBC and elimination of any wrong or hailed data of
interest.
Heat island
reduction
To limit consequences for microclimates and human and
untamed life natural surroundings by diminishing intensity
islands.
The purpose is to limit consequences for microclimates and
human and untamed life natural surroundings by lessening
heat islands.
The LEED intent is to minimize impact on microclimate and
human and wildlife habitat by reducing heat islands.It is LEED
requirements Provide for 50% of the site hardscape, including
roads, sidewalks, courtyards, and parking lots using any
combination of the strategies
The LEED expectation is to limit influence on microclimate and
human and natural life living space by decreasing intensity
islands (warm angle contrasts among created and lacking
regions).Ordinarily utilized on rooftops and in some cases at
grade, the USGBC determines green rooftops for the purpose
of alleviating the metropolitan intensity island impact.
use of planting on
balconies, and roofs,
which can significantly
enhance the
environment and
provide habitat for
wildlife and decorative
gardens. Moderately
sloped and flat roofs
can be planted
Applying environmental landscape principles
the Mitigation of Urban Heat Island Effect.
Illustration
Light
pollution
reduction
The Light Contamination Decrease gives rules to lessening
inside and outside lighting levels. These changes, thusly, give
progressing energy reserve funds.
The credit's purpose is to:
Limit light trespass from the structure and site,Diminish
skyglow to increment night sky access,Further develop evening
perceivability through glare decrease and Lessen improvement
influence from lighting on nighttime conditions.
Lessening the total for mean light lumens can likewise decrease
energy use and expenses for outside lighting. A few fluorescent
lights and all extreme focus release require that the balance be
supplanted when it is light as well as wattage explicit.
Substitution lights should have the option to squeeze into
something very similarattachment as the current lights or the
attachment will likewise should be supplanted.
Information gathered for the mean light lumens for outside
luminaires may likewise support computations expected to
decide the picograms of mercury each lumen-hour for all
mercury-containing lights for the connected credit. Guarantee
that recently bought outside lights meet the connected credit's
low-mercury lighting plan
SITE IMPROVEMENT
PLAN
This credit applies to: Hospitality (1 point)
Warehouses & Distribution Centers (1 point)
Existing Buildings (1 point)
Schools (1 point)
Retail (1 point)
Data Centers (1 point)
INTENT
To preserve and improve ecological
integrity while supporting high-
performance building operations.
The purpose of this credit is to outline how site
improvement plans can help organize improvements over
time. A good site improvement plan requires the team to
engage qualified people, follow an established process,
map out meaningful improvement initiatives, and work
toward implementing identified no- and low-cost
measures
ESTABLISHMENT
5 Year Improvement plan that includes:
Documentation of
existing conditions
Site improvement
objectives
performance standards
to evaluate ongoing
progress; and
monitoring protocols.
Addressing;
● Hydrology
● Vegetation
● Soils
OBJECTIVES
Documentation of
existing condition
Increase vegetated
areas.
Transition turf and annual
areas toward native
perennials.
Reduce hardscape.
Collect and reuse rainwater
& its management.
Decrease irrigation
water consumption.
OBJECTIVES
Protect or improve water
bodies.
Protect threatened,
endangered, native, and
keystone species.
Conserve or restore healthy
soils & Reduce site
maintenance activities
Establish food gardens
& Reduce heat island
effect.
Increase green space and
open spaces for public or
occupants’ use.
Qualification of Professional
Consultants
REQUIRED DOCUMENTATION
E
Site plan noting planned
elements and measurements
E
Site improvement plan
document
E P
Description and rationale of
no-cost and low-cost site
improvement measure
JOINT USE OF
FACILITIES
SUSTAINABLE SITES CREDIT
This credit applies to: Schools (1 point)
INTENT
To integrate the school with the
community by sharing the building and
its playing fields for nonschool events
and functions.
encourages community
organizations and businesses to
share existing amenity spaces.
environmental, economic, and
social benefits to the local
community;
reduce the need for new
development,
thereby preserving previously
undeveloped land and avoiding
the financial costs and
environmental consequences of
new construction.
Shared costs of construction,
operation and maintenance
benefit local communities the
most
Buildings are put to maximum
use which otherwise go unused
after business hours
Maximum Useful Life of a Building
ESTABLISHMENT
MAKE BUILDING SPACE
OPEN TO GENERAL
PUBLIC (1 POINT)
CONTRACT WITH SPECIFIC
ORGANIZATIONS TO SHARE
BUILDING SPACE (1 POINT)
USE SHARED SPACE
OWNED BY OTHER
ORGANIZATIONS (1 POINT)
Signed agreements between
school authorities and
occupying organizations
REQUIRED DOCUMENTATION
E
Floor plan highlighting joint-
use spaces, restroom
facilities, and room names
E
Shared use policy describing
terms and conditions, and
communications to the public
E E
Signed agreements
stipulating how spaces will be
shared with students
Site plan showing
pedestrian access route and
distance from school to
joint-use spaces
E
The Energy and Atmosphere (EA)
category approaches energy from a
holistic perspective, addressing
energy use reduction, energy-
efficient design strategies, and
renewable energy sources. It
recognizes that the reduction of fossil
fuel use extends far beyond the walls
of the building.
Energy Efficiency Best
Management Practices
ENERGY & ATMOSPHERE PREREQUISITE
This prerequisite applies to: Existing Buildings
Schools ,
Retails,
Data Centers
Hospitality
Warehouses and Distribution Centers
INTENT
To promote continuity of information to
ensure that energy-efficient operating
strategies are maintained and provide a
foundation for training and system
analysis.
This prerequisite provides a foundation for establishing energy-efficient operating
strategies and training staff in system maintenance, monitoring, and evaluation
over the life of the building.
The prerequisite requires an energy audit that complies with the standards
outlined in the ASHRAE Procedures for Commercial Building Energy Audits. An
energy auditor gathers energy consumption data for the entire building so that
facilities teams can develop performance indicators and identify no-cost and low-
cost energy conservation measures to improve overall energy performance
Output from DC Pro Profiling
Tool
REQUIRED DOCUMENTATION
E
Summary of ASHRAE
preliminary energy use
analysis
E
Summary of results of
ASHRAE Level 1 walk-
through
E E
Current facility requirements
and operations and
maintenance plan
MINIMUM ENERGY
PERFORMANCE
ENERGY & ATMOSPHERE PREREQUISITE
This prerequisite applies to: Existing Buildings
Schools ,
Retails,
Data Centers
Hospitality
Warehouses and Distribution Centers
INTENT
To reduce the environmental and
economic harms associated with
excessive energy use by establishing a
minimum level of operating energy
performance.
CASE. 1 CASE. 2
ENERGY STAR RATING
Min. 75.
PROJECTS NOT ELIGIBLE FOR ENERGY
STAR RATING
OPTION 1 OPTION 2
BENCHMARK AGAINST TYPICAL
BUILDINGS
BENCHMARK AGAINST HISTORICAL DATA
● Projects that are eligible for an ENERGY STAR rating are
required to benchmark their buildings’ energy
performance using Portfolio Manager. This tool ensures
consistency in benchmarking and allows teams to
compare their buildings’ energy efficiency with that of
similar buildings.
● Teams whose buildings are not eligible for ENERGY STAR
can use alternative methods for benchmarking, such as
comparisons with national source energy data for similar
buildings or the project building’s historical energy use
This prerequisite
requires benchmarking
the project building’s
energy performance
against comparable
buildings with similar
space use, occupancy,
operations, and
location, to encourage
exceptional energy
efficiency.
Statement of energy
performance stamped by
professional engineer or
licensed architect
REQUIRED DOCUMENTATION
E
Meter calibration report,
E
Access to ENERGY STAR
Portfolio Manager account
P P
Letter from ENERGY STAR, copy
of ENERGY STAR recognition
certificate, or screenshot of
ENERGY STAR website
Weather-normalized source
EUI
REQUIRED DOCUMENTATION
P
Data verification checklist
P
Copies of utility bill summary
pages or cover pages for 3
months of performance
period for each fuel source
P P
Weather-normalized source
EUI from 3 similar buildings
Calculations supporting
additional normalization
REQUIRED DOCUMENTATION
P
Descriptions of 3 similar
buildings and comparability
to project building
P
Weather-normalized source
EUI from 3 recent years
P
BUILDING LEVEL
ENERGY METERING
ENERGY & ATMOSPHERE PREREQUISITE
This prerequisite applies to: Existing Buildings
Schools ,
Retails,
Data Centers
Hospitality
Warehouses and Distribution Centers
INTENT
To support energy management and
identify opportunities for additional
energy savings by tracking building-
level energy use
OBJECTIVES
Installation of building
level meters or
submeters
Provide building level
data representing
total building energy
consumption
Fulfilling meter related
conditions
Commitment of sharing
resulting energy
consumption data and
electrical demand data
with USGBC (conditions
applied)
Compilation of data
into summaries
Confirmation of data sharing
source
REQUIRED DOCUMENTATION
E
Confirmation of permanently
installed meters
E
Letter of commitment
E
FUNDAMENTAL
REFRIGERANT
MANAGEMENT
ENERGY & ATMOSPHERE PREREQUISITE
This prerequisite applies to: Existing Buildings
Schools ,
Retails,
Data Centers
Hospitality
Warehouses and Distribution Centers
INTENT
To reduce stratospheric ozone
depletion.
New construction projects cannot
install new CFC-based
refrigeration. However, CFCs may
still be used in previously installed
HVAC equipment. CFCs must be
phased out when replacement or
conversion has a simple payback
of less than 10 years
OBJECTIVES
Recycling of
maximum amount of
ozone depleting
compounds
Repair of substantial
leaks in air-conditioning
and refrigeration
equipment
Safe disposal and
removal of refrigerants
Replacing such
equipment that
contains cfcs
Installation Date
REQUIRED DOCUMENTATION
E
Equipment Type
E
Refrigerant Type
E E
CFC conversion and
replacement plan
Leakage reduction plan
REQUIRED DOCUMENTATION
E
Refrigerant leakage rate or
quantity
E
Phase-out completion date
E E
New equipment or conversion
cost
Predicted Savings
E
ENERGY & ATMOSPHERE
• Renewable Energy and Carbon
Offsets
• Existing Building Commissioning—
Analysis
• Ongoing Commissioning
• Existing Building Commissioning—
Implementation
• Optimize Energy Performance
• Demand response
• Advanced Energy Metering
Existing Building
Commissioning—
Analysis
Existing Building Commissioning (EBCx) is a process of analyzing and optimizing the performance of
building systems and equipment in existing buildings. It is an important step towards achieving energy
efficiency, reducing operating costs, and improving indoor air quality, occupant comfort, and safety.
EBCx begins with a detailed analysis of the building systems, including HVAC, lighting, and water
systems, to identify areas of inefficiency and opportunities for improvement. The data collected from
the analysis is then used to develop a plan for optimizing the performance of the building systems,
which may include upgrades, retrofits, and operational changes.
One important aspect of EBCx is the ongoing monitoring and measurement of building performance, to
ensure that the improvements made are delivering the expected results. This includes regular testing of
building systems and equipment and collecting data on energy usage and indoor environmental quality.
Existing Building
Commissioning—
Implementation
After analysis comes to the implementation of the existing building commission. The LEED EBCx Implementation
process involves the following steps: planning, investigation, implementation, and handoff.
In the planning phase, building owners and operators identify the goals and objectives of the EBCx process,
establish a project team, and develop a commissioning plan. During the investigation phase, the project team
conducts a comprehensive review of the building systems and operations to identify opportunities for
optimization and improvement.
In the implementation phase, the project team develops and implements a plan to address the issues identified
in the investigation phase. This may include upgrades, retrofits, and operational changes to the building
systems and equipment. The team also conducts ongoing testing and monitoring to ensure that the improvements
made are delivering the expected results.
Finally, in the handoff phase, the project team documents the EBCx process and provides training to building
operators and occupants on how to maintain the optimized performance of the building systems.
Overall, LEED EBCx Implementation is a critical process for achieving sustainable
building operation and reducing the environmental impact of existing buildings.
By optimizing the performance of building systems and equipment, EBCx can help
improve the comfort, safety, and productivity of building occupants, reducing
energy costs and greenhouse gas emissions.
Ongoing
Commissioning
The goal of OCx is to maintain optimal energy performance and reduce energy consumption throughout the life
of the building.
The OCx process involves continuous monitoring and analysis of building systems, including HVAC, lighting,
and water systems, to identify areas of inefficiency and opportunities for improvement. The data collected
from the monitoring is then used to develop a plan for optimizing the performance of the building systems,
which may include upgrades, retrofits, and operational changes.
One of the key benefits of OCx is its ability to identify and address issues before they become major
problems. By continuously monitoring building systems and equipment, building operators can detect issues
early and take corrective action before they cause a significant impact on energy consumption, occupant
comfort, or safety.
Optimize Energy
Performance
The Optimize Energy Performance credit encourages building owners and operators to take a whole-building
approach to energy efficiency, from design and construction to ongoing operation and maintenance. This
involves identifying energy-saving strategies and implementing them across all building systems and
equipment, such as HVAC, lighting, and water systems.
One of the key features of the Optimize Energy Performance credit is the requirement to use an energy
model to evaluate the building's energy performance. The energy model helps to identify opportunities for
energy savings and evaluate the effectiveness of energy-saving strategies.
In addition to optimizing energy performance, the credit also requires building owners and operators to
establish energy performance targets and monitor and report on the building's energy performance over
time. This ensures that the building continues to operate at peak efficiency and achieves the energy
performance goals set out in the credit.
Overall, the LEED Optimize Energy Performance credit is an integral part of sustainable building design,
construction, and operation. By optimizing the performance of building systems and equipment and setting
energy performance targets, building owners and operators can reduce energy consumption, improve occupant
comfort, and lower environmental impact.
Advanced Energy
Metering
The Advanced Energy Metering credit encourages building owners and operators to install
energy metering systems that provide detailed and comprehensive data on energy consumption
across all building systems and equipment, including HVAC, lighting, and water systems. This
data enables building operators to identify areas of inefficiency and take corrective action
to optimize the performance of building systems and equipment.
One of the key features of the Advanced Energy Metering credit is the requirement to install
sub-metering systems for at least 10% of the total connected load of the building. This
enables building operators to track energy consumption at a granular level and identify areas
of inefficiency more easily.
In addition to sub-metering, the credit also requires building owners and operators to
install real-time energy monitoring systems and provide building occupants with access to
energy consumption data. This transparency enables building occupants to understand their
energy use and take steps to reduce energy consumption.
Demand
response
Demand response programs enable building owners and operators to reduce energy consumption during
periods of peak demand, such as hot summer afternoons when air conditioning use is high. By reducing
energy consumption during these periods, demand response programs help to stabilize the grid, avoid
blackouts, and reduce the need for new power plants.
The Demand Response credit encourages building owners and operators to participate in demand response
programs by installing systems that allow for the automatic reduction of energy consumption during peak
demand periods. This may include the installation of building automation systems, advanced metering
systems, and energy management systems.
In addition to participating in demand response programs, the credit also requires building owners and
operators to develop and implement an energy management plan that includes demand response strategies.
This plan helps to ensure that the building is prepared to participate in demand response programs and
can reduce energy consumption effectively during peak demand periods.
By participating in demand response programs and implementing demand response strategies, building
owners and operators can promote energy efficiency, reduce energy consumption, and lower environmental
impact while contributing to grid stability and reliability.
Renewable Energy
and Carbon
Offsets
The Renewable Energy and Carbon Offsets credit encourages building owners and operators
to invest in renewable energy sources, such as solar, wind, or geothermal, to power their
buildings. Building owners can also purchase carbon offsets, which help to offset the
carbon emissions associated with building operation by supporting carbon reduction
projects in other locations.
To achieve this credit, building owners and operators must generate or purchase renewable
energy or carbon offsets equivalent to at least 35% of the building's total energy
consumption. This helps to promote the use of renewable energy and carbon offsets and
reduces the carbon footprint of building operation.
Enhanced
Refrigerant
Management
The Enhanced Refrigerant Management credit encourages building owners and operators to
adopt strategies that reduce the emissions of refrigerants from HVAC systems, refrigeration
equipment, and other sources. This may include the use of low-global-warming-potential
refrigerants, the installation of refrigerant leak detection systems, and the
implementation of refrigerant management plans.
To achieve this credit, building owners and operators must demonstrate that they have
implemented strategies that reduce refrigerant emissions and that they have trained their
staff on proper refrigerant handling and management. This helps to promote responsible
refrigerant management and reduces the environmental impact of refrigerant use in
buildings.
The goal of enhanced refrigerant management is to minimize the emissions of these chemicals
by implementing measures such as using low-global-warming-potential refrigerants, installing
leak detection systems, and developing refrigerant management plans. These strategies help
building owners and operators to detect and repair leaks promptly, properly handle and
dispose of refrigerants, and reduce overall refrigerant consumption.
Enhanced refrigerant management is a significant step toward sustainability because it
reduces the environmental impact of refrigerant use in buildings. By minimizing refrigerant
leaks and promoting responsible refrigerant handling, building owners and operators can
reduce the depletion of the ozone layer and greenhouse gas emissions, contributing to a more
sustainable future.
Additionally, implementing enhanced refrigerant management strategies can lead to energy
savings, as refrigerant leaks can lead to reduced cooling efficiency and increased energy
consumption. Reducing energy consumption helps to reduce the overall environmental impact of
building operation and can lower operating costs for building owners and operators.
● https://www.usgbc.org/credits/ss8#:~:text=on%20nocturnal%20environm
ents.-
,Eliminate%20light%20trespass%20from%20the%20building%20and%20si
te%2C%20improve%20night,sky%20access%2C%20improve%20nighttime
%20visibility%2C
● https://projectific.com/blogs/projectific-blog/leed-heat-island-reduction-
credit-explained
● https://www.usgbc.org/articles/sustainable-sites-leed-v4
REFRENCES

More Related Content

Similar to building services and systems leed review

LEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfLEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfihjjvv1
 
Watershed Management_Social,ecology,economic
Watershed Management_Social,ecology,economicWatershed Management_Social,ecology,economic
Watershed Management_Social,ecology,economicshrutik57
 
Sustainability & Csr
Sustainability & CsrSustainability & Csr
Sustainability & Csrarunmit
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTGreen Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTReenaRanaGCET
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentNasiru Ibrahim Barda
 
Watershed management
Watershed management Watershed management
Watershed management Vishal Meena
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIGAURAV. H .TANDON
 
Environmental Audit
Environmental Audit Environmental Audit
Environmental Audit ForamVala
 
Observations of Random Approaches to Remediation Planning in Australia
Observations of Random Approaches to Remediation Planning in AustraliaObservations of Random Approaches to Remediation Planning in Australia
Observations of Random Approaches to Remediation Planning in AustraliaPeter Gringinger
 

Similar to building services and systems leed review (20)

Eng Malek C V
Eng  Malek C VEng  Malek C V
Eng Malek C V
 
LEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfLEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdf
 
Watershed Management_Social,ecology,economic
Watershed Management_Social,ecology,economicWatershed Management_Social,ecology,economic
Watershed Management_Social,ecology,economic
 
Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Sustainability & Csr
Sustainability & CsrSustainability & Csr
Sustainability & Csr
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
Watershed Restoration by Neil Stichert
Watershed Restoration by Neil Stichert Watershed Restoration by Neil Stichert
Watershed Restoration by Neil Stichert
 
eia.ppt
eia.ppteia.ppt
eia.ppt
 
eia.ppt
eia.ppteia.ppt
eia.ppt
 
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTGreen Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
 
USGBC LEED sheet Watertown 040411
USGBC LEED sheet Watertown 040411USGBC LEED sheet Watertown 040411
USGBC LEED sheet Watertown 040411
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
 
Watershed management
Watershed management Watershed management
Watershed management
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Hydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing ClimateHydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing Climate
 
Environmental Audit
Environmental Audit Environmental Audit
Environmental Audit
 
Mallikarjun.S.D_original
Mallikarjun.S.D_originalMallikarjun.S.D_original
Mallikarjun.S.D_original
 
Observations of Random Approaches to Remediation Planning in Australia
Observations of Random Approaches to Remediation Planning in AustraliaObservations of Random Approaches to Remediation Planning in Australia
Observations of Random Approaches to Remediation Planning in Australia
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

building services and systems leed review

  • 1.
  • 2.
  • 3.
  • 4. LEED GOALS ● Reverse contribution to climate change ● Protect water resources ● Better human health ● Greener economy ● Enhance biodiversity ● Social equity, environmental justice
  • 7. LEED CERTIFICATION PROCESS ● Owner selects the rating system and registers the project ● Project team meets the requirements ● Documentation submission for certification ● Final review of project Final review contains the project’s final score and certification level.
  • 8. LEED has 4 levels of certification 40-49POINTS: CERTIFIED 50-59 POINTS: SILVER 60-79 POINTS: GOLD 80+ POINTS: PLATIMUN
  • 10. PROJECT GOALS ENVIRONMENTAL ● ENERGY SIGNATURE ● ENERGY BENCHMARK ● SITE ANALYSIS ORGANIZATIONAL ● CORPORATE SOCIAL RESPONSIBILITY REPORT ● HUMAN RESOURCES POLICIES ● STAKEHOLDER’S CONCERN
  • 11. FACTORS ESTABLISHMENT ● STATIC AND FOUNDATIONAL PREFORMANCE ● DYNAMIC AND RECURRING BUILDING COMPONENTS& SITE INFRASTRUCTURE POLICIES ACTIONS POLICIES
  • 13. MINIMUM PROGRAM REQUIREMENTS Minimum characteristics or conditions that make a project appropriate to pursue LEED certification ● permanent location on existing land ● Use reasonable LEED boundaries ● Compliance with project size requirements
  • 14. LOCATION AND TRANPORTAION ● LT Category rewards thoughtful project teams about building locations and how that location affects commuting patterns. Making alternative transportation an important part of project’s overall environmental performance.
  • 15. ALTERNATIVE TRANSPOTRATION ● INTENT: To reduce pollution and land development effects from automobile use for transportation CREDIT APPLIES TO: EXISTING BUILDINGS DATA CENTRES SCHOOLS RETAIL HOSPITALITY WAREHOUSES DISTRIBUTION CENTRES
  • 16. ALTERNATIVE TRANSPORTATION This credit focuses on the transportation pattern of building occupants. This operation & maintenance credit determines how building occupants actually travel to and from the project. Takes a single performance-based approach to evaluating a building’s transportation characteristics. A transportation survey is required of all projects attempting this credit.
  • 17. SURVEY OPTIONS OPTION 1 TRANSPORTATION SURVEY OPTION 2 ALTERNATIVE TRANSPORTATION RATE OPTION 3 COMPREHENSIVE ALTERNATIVE TRANSPORTATION PROGRAM
  • 18. STEPS TO CONDUCT SURVEY OPTION 1: 1. Choose survey approach for regular building occupants 2. Select survey instrument for regular building occupants 3. Determine whether visitors must be surveyed 4. Develop transportation survey 5. Schedule survey 6. Finalize logistics for conducting survey 7. Distribute surveys 8. Analyze survey results for regular occupants 9. Analyze survey results for visitors, if applicable 10. Calculate overall alternative transportation rate
  • 19. STEPS TO CONDUCT SURVEY OPTION 2 1. Complete option1 2. Demonstrate reduction in conventional commuting trips OPTION 3 1. Complete option 1 2. Develop alternative transportation program 3. Implement initiatives
  • 20. TIPS TO OPTIMIZE SURVEY ● To encourage an increase in alternative transportation rates (for Option 2), consider implementing components of an alternative transportation program a few months before (but not right before) the survey. The following strategies can help the project team achieve higher survey response rates and more accurate results. ● · Incentives. Offer an incentive to encourage people to respond, such as coffee, a snack, a free lunch, a small- denomination gift card, or something else not related to transportion (e.g., transit passes are not allowed) that will appeal to building occupants but not skew the results. ● · Style. Do not call it a survey: people are generally survey-averse. If the survey is conducted in person, lead with a survey question rather than asking respondents whether they are willing to participate. They will let the surveyors know if they do not want to. ● · Convenience. Make the survey quick and easy. Encourage people to take the survey by assuring them that the survey has, say, only three questions or will take only 30 seconds. ● Choose the right peak window to survey building occupants; starting too late or ending too early may significantly affect the survey response rate. Do not overlook back doors and other entries that are not the main entrance to the building.
  • 22. SUSTAINABLE SITES ● The SUSTAINABLE SITES(SS) class rewards choices about the climate encompassing the structure, with credits that underscore the fundamental connections among structures, environments, and biological system administrations. It centers around reestablishing project site components, coordinating the site with neighborhood and provincial environments, and protecting the biodiversity that normal frameworks depend on. ● In LEED v4, the SS classification joins conventional methodologies with a few new techniques. These incorporate working with preservation associations to target monetary help for off-site natural surroundings insurance , utilizing low-influence improvement to deal with a percentile storm occasion, involving three-year matured SRI values for rooftops and SR values for nonroof hardscape, and making a five-year improvement plan for the venture site.
  • 23.
  • 24. Protect and restore habitat To save natural uprightness and energize ecologically touchy site executives rehearses that give a perfect, very much kept up with, and safe structure outside while supporting superior execution incorporating activities and reconciliation into the encompassing scene.Great outside support practices can essentially influence a task site and its environmental elements.. Besides, a solid and very much kept up with project site that is interesting to tenants and guests can benefit human wellbeing. Acknowledgment of such advantages starts with an unmistakable, intensive site the executives strategy. Creating and executing a site the board strategy right off the bat in the LEED cycle give the group time to streamline items, gear, and procedures. At last, a very much created site the board strategy empowers a group to address unforeseen inconveniences.
  • 25. On-site restoration Exploration and audit the best administration rehearses for each functional component determined in the essential prerequisites, as well as any functional components that might be novel to the venture site.Acquiring a thorough comprehension of how the venture site is presently overseen and kept up with ·One should Figure out how current practices line up with best administration rehearses. Gathering and survey any site the executives documentation that might be applicable to the approach. Property administrators, site and grounds supervisors, and pertinent sellers can all help recognize objectives and open doors for further developing site the executives.Revision of contract records as important to help the arrangement prerequisites.The site the executives strategy can uphold nearby natural surroundings and biodiversity through monitoring of the site's local or adjusted vegetation.
  • 26. Site Development— Protect or Restore Habitat ● IT WORKS To monitor existing normal regions and reestablish harmed regions to give natural surroundings and advance biodiversity. Protection and preservation of unblemished or excellent local biological systems, including their dirts, local vegetation,delicate species territory, natural life passages, and hydrology, adds to keeping up with by and large environment wellbeing.Rebuilding of soils, hydrology, and local plants additionally works on the reasonability of environmental networks, makes a difference oversee and channel water, and can recover other biological system capabilities. ● At the point when site limitations forestall nearby reclamation, think about off-site preservation and rebuilding. An off-site approach might give more prominent all out environment benefits than could somehow or another be accomplished nearby. That's what for projects can't give enormous, adjacent packages of on location land for long haul protection, giving monetary backing to a perceived land trust or protection association can be a viable instrument.
  • 27. Rain water management ● To decrease overflow volume and further develop water quality by repeating the regular hydrology and water equilibrium of the site, in view of authentic circumstances and lacking biological systems in the district to abstain from adding to flooding downstream in cutting edge networks. ● The v4 credit tends to the administration of both the amount and nature of water spillover. This is finished through the expected utilization of green framework and low-influence advancement techniques, which get to the next level upon the ordinary methodology by mirroring a site's normal hydrology and overseeing water as near the source as could really be expected ● The methodologies additionally center around reestablishing or planning scenes to work hydrologically more like the regular undisturbed scene of a given area. ● This credit's cycle is iterative in nature, and that implies that the venture should conceptualize, ascertain, and refine the plan until the necessities are accomplished to guarantee that both the aim of the credit and the venture’s objectives are met.
  • 28. Rain water management Working with site experts to recognize regions to be reestablished with local or adjusted vegetation, decide reclamation systems, and characterize the cycle for rebuilding work. Improvement of normal site components can incorporate existing lakes,vegetation, and other regular highlights. Regions that normally don't contain vegetation can combine with reestablished region. Project groups might have to submit documentation showing that the project site contains normally unvegetated land or regular water bodies. Characterize the territory region limit on plans that are essential for the site. Make a five-to seven-year site the board plan that incorporates fire the executives, flooding, and obtrusive species the executives.
  • 29. To decrease overflow volume and further develop water quality by repeating the regular hydrology and water equilibrium of the site, in view of verifiable conditions and lacking environments in the locale rainwater is managed and handled. A typical rainfall management approach for a conventional site is to handle runoff as a byproduct to be disposed of by piping and transporting it as rapidly as possible into centralised, massive facilities at the foot of drainage regions. However, while intended to prevent flooding and promote efficient drainage, such a strategy can harm watersheds by increasing the volume, temperature, peak flow, and duration of runoff and types of pollutants discharged to surface waters The v4 credit covers the control of rainwater runoff in terms of both quantity and quality. The compulsory steps for management involves get a drawn out everyday precipitation informational index for the project area, import the information into the precipitation occasions number cruncher given by USGBC and elimination of any wrong or hailed data of interest.
  • 30. Heat island reduction To limit consequences for microclimates and human and untamed life natural surroundings by diminishing intensity islands. The purpose is to limit consequences for microclimates and human and untamed life natural surroundings by lessening heat islands. The LEED intent is to minimize impact on microclimate and human and wildlife habitat by reducing heat islands.It is LEED requirements Provide for 50% of the site hardscape, including roads, sidewalks, courtyards, and parking lots using any combination of the strategies The LEED expectation is to limit influence on microclimate and human and natural life living space by decreasing intensity islands (warm angle contrasts among created and lacking regions).Ordinarily utilized on rooftops and in some cases at grade, the USGBC determines green rooftops for the purpose of alleviating the metropolitan intensity island impact.
  • 31. use of planting on balconies, and roofs, which can significantly enhance the environment and provide habitat for wildlife and decorative gardens. Moderately sloped and flat roofs can be planted Applying environmental landscape principles the Mitigation of Urban Heat Island Effect. Illustration
  • 32. Light pollution reduction The Light Contamination Decrease gives rules to lessening inside and outside lighting levels. These changes, thusly, give progressing energy reserve funds. The credit's purpose is to: Limit light trespass from the structure and site,Diminish skyglow to increment night sky access,Further develop evening perceivability through glare decrease and Lessen improvement influence from lighting on nighttime conditions. Lessening the total for mean light lumens can likewise decrease energy use and expenses for outside lighting. A few fluorescent lights and all extreme focus release require that the balance be supplanted when it is light as well as wattage explicit. Substitution lights should have the option to squeeze into something very similarattachment as the current lights or the attachment will likewise should be supplanted. Information gathered for the mean light lumens for outside luminaires may likewise support computations expected to decide the picograms of mercury each lumen-hour for all mercury-containing lights for the connected credit. Guarantee that recently bought outside lights meet the connected credit's low-mercury lighting plan
  • 33. SITE IMPROVEMENT PLAN This credit applies to: Hospitality (1 point) Warehouses & Distribution Centers (1 point) Existing Buildings (1 point) Schools (1 point) Retail (1 point) Data Centers (1 point) INTENT To preserve and improve ecological integrity while supporting high- performance building operations. The purpose of this credit is to outline how site improvement plans can help organize improvements over time. A good site improvement plan requires the team to engage qualified people, follow an established process, map out meaningful improvement initiatives, and work toward implementing identified no- and low-cost measures
  • 34. ESTABLISHMENT 5 Year Improvement plan that includes: Documentation of existing conditions Site improvement objectives performance standards to evaluate ongoing progress; and monitoring protocols. Addressing; ● Hydrology ● Vegetation ● Soils
  • 35. OBJECTIVES Documentation of existing condition Increase vegetated areas. Transition turf and annual areas toward native perennials. Reduce hardscape. Collect and reuse rainwater & its management. Decrease irrigation water consumption.
  • 36. OBJECTIVES Protect or improve water bodies. Protect threatened, endangered, native, and keystone species. Conserve or restore healthy soils & Reduce site maintenance activities Establish food gardens & Reduce heat island effect. Increase green space and open spaces for public or occupants’ use.
  • 37. Qualification of Professional Consultants REQUIRED DOCUMENTATION E Site plan noting planned elements and measurements E Site improvement plan document E P Description and rationale of no-cost and low-cost site improvement measure
  • 38. JOINT USE OF FACILITIES SUSTAINABLE SITES CREDIT This credit applies to: Schools (1 point) INTENT To integrate the school with the community by sharing the building and its playing fields for nonschool events and functions.
  • 39. encourages community organizations and businesses to share existing amenity spaces. environmental, economic, and social benefits to the local community; reduce the need for new development, thereby preserving previously undeveloped land and avoiding the financial costs and environmental consequences of new construction. Shared costs of construction, operation and maintenance benefit local communities the most Buildings are put to maximum use which otherwise go unused after business hours Maximum Useful Life of a Building
  • 40. ESTABLISHMENT MAKE BUILDING SPACE OPEN TO GENERAL PUBLIC (1 POINT) CONTRACT WITH SPECIFIC ORGANIZATIONS TO SHARE BUILDING SPACE (1 POINT) USE SHARED SPACE OWNED BY OTHER ORGANIZATIONS (1 POINT)
  • 41. Signed agreements between school authorities and occupying organizations REQUIRED DOCUMENTATION E Floor plan highlighting joint- use spaces, restroom facilities, and room names E Shared use policy describing terms and conditions, and communications to the public E E Signed agreements stipulating how spaces will be shared with students Site plan showing pedestrian access route and distance from school to joint-use spaces E
  • 42. The Energy and Atmosphere (EA) category approaches energy from a holistic perspective, addressing energy use reduction, energy- efficient design strategies, and renewable energy sources. It recognizes that the reduction of fossil fuel use extends far beyond the walls of the building.
  • 43. Energy Efficiency Best Management Practices ENERGY & ATMOSPHERE PREREQUISITE This prerequisite applies to: Existing Buildings Schools , Retails, Data Centers Hospitality Warehouses and Distribution Centers INTENT To promote continuity of information to ensure that energy-efficient operating strategies are maintained and provide a foundation for training and system analysis.
  • 44. This prerequisite provides a foundation for establishing energy-efficient operating strategies and training staff in system maintenance, monitoring, and evaluation over the life of the building. The prerequisite requires an energy audit that complies with the standards outlined in the ASHRAE Procedures for Commercial Building Energy Audits. An energy auditor gathers energy consumption data for the entire building so that facilities teams can develop performance indicators and identify no-cost and low- cost energy conservation measures to improve overall energy performance
  • 45. Output from DC Pro Profiling Tool REQUIRED DOCUMENTATION E Summary of ASHRAE preliminary energy use analysis E Summary of results of ASHRAE Level 1 walk- through E E Current facility requirements and operations and maintenance plan
  • 46. MINIMUM ENERGY PERFORMANCE ENERGY & ATMOSPHERE PREREQUISITE This prerequisite applies to: Existing Buildings Schools , Retails, Data Centers Hospitality Warehouses and Distribution Centers INTENT To reduce the environmental and economic harms associated with excessive energy use by establishing a minimum level of operating energy performance.
  • 47. CASE. 1 CASE. 2 ENERGY STAR RATING Min. 75. PROJECTS NOT ELIGIBLE FOR ENERGY STAR RATING OPTION 1 OPTION 2 BENCHMARK AGAINST TYPICAL BUILDINGS BENCHMARK AGAINST HISTORICAL DATA
  • 48. ● Projects that are eligible for an ENERGY STAR rating are required to benchmark their buildings’ energy performance using Portfolio Manager. This tool ensures consistency in benchmarking and allows teams to compare their buildings’ energy efficiency with that of similar buildings. ● Teams whose buildings are not eligible for ENERGY STAR can use alternative methods for benchmarking, such as comparisons with national source energy data for similar buildings or the project building’s historical energy use This prerequisite requires benchmarking the project building’s energy performance against comparable buildings with similar space use, occupancy, operations, and location, to encourage exceptional energy efficiency.
  • 49. Statement of energy performance stamped by professional engineer or licensed architect REQUIRED DOCUMENTATION E Meter calibration report, E Access to ENERGY STAR Portfolio Manager account P P Letter from ENERGY STAR, copy of ENERGY STAR recognition certificate, or screenshot of ENERGY STAR website
  • 50. Weather-normalized source EUI REQUIRED DOCUMENTATION P Data verification checklist P Copies of utility bill summary pages or cover pages for 3 months of performance period for each fuel source P P Weather-normalized source EUI from 3 similar buildings
  • 51. Calculations supporting additional normalization REQUIRED DOCUMENTATION P Descriptions of 3 similar buildings and comparability to project building P Weather-normalized source EUI from 3 recent years P
  • 52. BUILDING LEVEL ENERGY METERING ENERGY & ATMOSPHERE PREREQUISITE This prerequisite applies to: Existing Buildings Schools , Retails, Data Centers Hospitality Warehouses and Distribution Centers INTENT To support energy management and identify opportunities for additional energy savings by tracking building- level energy use
  • 53. OBJECTIVES Installation of building level meters or submeters Provide building level data representing total building energy consumption Fulfilling meter related conditions Commitment of sharing resulting energy consumption data and electrical demand data with USGBC (conditions applied) Compilation of data into summaries
  • 54. Confirmation of data sharing source REQUIRED DOCUMENTATION E Confirmation of permanently installed meters E Letter of commitment E
  • 55. FUNDAMENTAL REFRIGERANT MANAGEMENT ENERGY & ATMOSPHERE PREREQUISITE This prerequisite applies to: Existing Buildings Schools , Retails, Data Centers Hospitality Warehouses and Distribution Centers INTENT To reduce stratospheric ozone depletion.
  • 56. New construction projects cannot install new CFC-based refrigeration. However, CFCs may still be used in previously installed HVAC equipment. CFCs must be phased out when replacement or conversion has a simple payback of less than 10 years
  • 57. OBJECTIVES Recycling of maximum amount of ozone depleting compounds Repair of substantial leaks in air-conditioning and refrigeration equipment Safe disposal and removal of refrigerants Replacing such equipment that contains cfcs
  • 58. Installation Date REQUIRED DOCUMENTATION E Equipment Type E Refrigerant Type E E CFC conversion and replacement plan
  • 59. Leakage reduction plan REQUIRED DOCUMENTATION E Refrigerant leakage rate or quantity E Phase-out completion date E E New equipment or conversion cost Predicted Savings E
  • 60. ENERGY & ATMOSPHERE • Renewable Energy and Carbon Offsets • Existing Building Commissioning— Analysis • Ongoing Commissioning • Existing Building Commissioning— Implementation • Optimize Energy Performance • Demand response • Advanced Energy Metering
  • 62. Existing Building Commissioning (EBCx) is a process of analyzing and optimizing the performance of building systems and equipment in existing buildings. It is an important step towards achieving energy efficiency, reducing operating costs, and improving indoor air quality, occupant comfort, and safety. EBCx begins with a detailed analysis of the building systems, including HVAC, lighting, and water systems, to identify areas of inefficiency and opportunities for improvement. The data collected from the analysis is then used to develop a plan for optimizing the performance of the building systems, which may include upgrades, retrofits, and operational changes. One important aspect of EBCx is the ongoing monitoring and measurement of building performance, to ensure that the improvements made are delivering the expected results. This includes regular testing of building systems and equipment and collecting data on energy usage and indoor environmental quality.
  • 64. After analysis comes to the implementation of the existing building commission. The LEED EBCx Implementation process involves the following steps: planning, investigation, implementation, and handoff. In the planning phase, building owners and operators identify the goals and objectives of the EBCx process, establish a project team, and develop a commissioning plan. During the investigation phase, the project team conducts a comprehensive review of the building systems and operations to identify opportunities for optimization and improvement. In the implementation phase, the project team develops and implements a plan to address the issues identified in the investigation phase. This may include upgrades, retrofits, and operational changes to the building systems and equipment. The team also conducts ongoing testing and monitoring to ensure that the improvements made are delivering the expected results. Finally, in the handoff phase, the project team documents the EBCx process and provides training to building operators and occupants on how to maintain the optimized performance of the building systems.
  • 65. Overall, LEED EBCx Implementation is a critical process for achieving sustainable building operation and reducing the environmental impact of existing buildings. By optimizing the performance of building systems and equipment, EBCx can help improve the comfort, safety, and productivity of building occupants, reducing energy costs and greenhouse gas emissions.
  • 67. The goal of OCx is to maintain optimal energy performance and reduce energy consumption throughout the life of the building. The OCx process involves continuous monitoring and analysis of building systems, including HVAC, lighting, and water systems, to identify areas of inefficiency and opportunities for improvement. The data collected from the monitoring is then used to develop a plan for optimizing the performance of the building systems, which may include upgrades, retrofits, and operational changes. One of the key benefits of OCx is its ability to identify and address issues before they become major problems. By continuously monitoring building systems and equipment, building operators can detect issues early and take corrective action before they cause a significant impact on energy consumption, occupant comfort, or safety.
  • 69. The Optimize Energy Performance credit encourages building owners and operators to take a whole-building approach to energy efficiency, from design and construction to ongoing operation and maintenance. This involves identifying energy-saving strategies and implementing them across all building systems and equipment, such as HVAC, lighting, and water systems. One of the key features of the Optimize Energy Performance credit is the requirement to use an energy model to evaluate the building's energy performance. The energy model helps to identify opportunities for energy savings and evaluate the effectiveness of energy-saving strategies. In addition to optimizing energy performance, the credit also requires building owners and operators to establish energy performance targets and monitor and report on the building's energy performance over time. This ensures that the building continues to operate at peak efficiency and achieves the energy performance goals set out in the credit. Overall, the LEED Optimize Energy Performance credit is an integral part of sustainable building design, construction, and operation. By optimizing the performance of building systems and equipment and setting energy performance targets, building owners and operators can reduce energy consumption, improve occupant comfort, and lower environmental impact.
  • 71. The Advanced Energy Metering credit encourages building owners and operators to install energy metering systems that provide detailed and comprehensive data on energy consumption across all building systems and equipment, including HVAC, lighting, and water systems. This data enables building operators to identify areas of inefficiency and take corrective action to optimize the performance of building systems and equipment. One of the key features of the Advanced Energy Metering credit is the requirement to install sub-metering systems for at least 10% of the total connected load of the building. This enables building operators to track energy consumption at a granular level and identify areas of inefficiency more easily. In addition to sub-metering, the credit also requires building owners and operators to install real-time energy monitoring systems and provide building occupants with access to energy consumption data. This transparency enables building occupants to understand their energy use and take steps to reduce energy consumption.
  • 73. Demand response programs enable building owners and operators to reduce energy consumption during periods of peak demand, such as hot summer afternoons when air conditioning use is high. By reducing energy consumption during these periods, demand response programs help to stabilize the grid, avoid blackouts, and reduce the need for new power plants. The Demand Response credit encourages building owners and operators to participate in demand response programs by installing systems that allow for the automatic reduction of energy consumption during peak demand periods. This may include the installation of building automation systems, advanced metering systems, and energy management systems. In addition to participating in demand response programs, the credit also requires building owners and operators to develop and implement an energy management plan that includes demand response strategies. This plan helps to ensure that the building is prepared to participate in demand response programs and can reduce energy consumption effectively during peak demand periods. By participating in demand response programs and implementing demand response strategies, building owners and operators can promote energy efficiency, reduce energy consumption, and lower environmental impact while contributing to grid stability and reliability.
  • 75. The Renewable Energy and Carbon Offsets credit encourages building owners and operators to invest in renewable energy sources, such as solar, wind, or geothermal, to power their buildings. Building owners can also purchase carbon offsets, which help to offset the carbon emissions associated with building operation by supporting carbon reduction projects in other locations. To achieve this credit, building owners and operators must generate or purchase renewable energy or carbon offsets equivalent to at least 35% of the building's total energy consumption. This helps to promote the use of renewable energy and carbon offsets and reduces the carbon footprint of building operation.
  • 76.
  • 78. The Enhanced Refrigerant Management credit encourages building owners and operators to adopt strategies that reduce the emissions of refrigerants from HVAC systems, refrigeration equipment, and other sources. This may include the use of low-global-warming-potential refrigerants, the installation of refrigerant leak detection systems, and the implementation of refrigerant management plans. To achieve this credit, building owners and operators must demonstrate that they have implemented strategies that reduce refrigerant emissions and that they have trained their staff on proper refrigerant handling and management. This helps to promote responsible refrigerant management and reduces the environmental impact of refrigerant use in buildings.
  • 79. The goal of enhanced refrigerant management is to minimize the emissions of these chemicals by implementing measures such as using low-global-warming-potential refrigerants, installing leak detection systems, and developing refrigerant management plans. These strategies help building owners and operators to detect and repair leaks promptly, properly handle and dispose of refrigerants, and reduce overall refrigerant consumption. Enhanced refrigerant management is a significant step toward sustainability because it reduces the environmental impact of refrigerant use in buildings. By minimizing refrigerant leaks and promoting responsible refrigerant handling, building owners and operators can reduce the depletion of the ozone layer and greenhouse gas emissions, contributing to a more sustainable future. Additionally, implementing enhanced refrigerant management strategies can lead to energy savings, as refrigerant leaks can lead to reduced cooling efficiency and increased energy consumption. Reducing energy consumption helps to reduce the overall environmental impact of building operation and can lower operating costs for building owners and operators.
  • 80.