A H P
Ash Handling
Plant.
2
A H P
To Generate
Electricity In
Thermal Plant
Required
3
A H P
Generator
Turbine &
Boiler
4
A H P
To Generate 210 MW
Electricity approximately
3200 -3500MT Coal is
daily required.
If 40% of Ash contents
is considered then
1280 -1400 MT Ash is
produced every day from
one 210 MW set.
5
210 MW BOILER
Boiler Side View
Boiler Drum
Platen S/H
Reheater Final & Horri
S/H
Economizer
Air Heater
To ESP
Furnace
6
Flue Gas
Path
Platen S/H
10120c
Final S/H
Reheater
7870c
Horizontal S/H
Upper Bank 711oc
Horizontal S/H
Lower Bank 4600c
Economizer
3670c
Air Heater A
1470 c
D ESP C
1400c
Air Heater B
1470c
Flue Gas from
Combustion
Chamber (11240c)
B ESP A
ID-B
ID-A
Chimney
7
A H P
To Dispose such huge
quantity of Ash we required
a huge Ash Handling System.
This system is called
Ash Handling Plant.
8
A H P
Ash is Of Two Types
1.Fly Ash &
2.Bottom Ash.
9
A H P
Fly Ash is collected in
Electro Static Precipitator
is also called ESP
10
A H P
Bottom Ash is collected
at the Bottom side Hopper
of Boiler is called
Bottom Ash Hopper.
11
A H P
E S P
Hopper Hopper
To AHP
To AHP
To Chimney
From
Boiler
Fly Ash System
12
A H P
Plates
+ charged
- charged
60 KV
DC X’mer
ESP Internal Structure
13
In ESP there is DC field is created
which is of 60 KV.Where plates &
electrodes are vertically fitted. Due
to this field Ionization is happened &
Flue gas particles are charged by
+ve & -ve charged. Ash particles are
collected on plates & gas particles go
out through the Chimney.
A H P
14
A H P
There are 8 rows of 5 Hopper
In each line.
A1
1
A2
A1
3
A1
2
A1
4
A1
5
B1 B2 C1 C2 D1 D2
40
15
A1
1
A2
1
A1
3
A2
3
A1
4
A1
5
B1
1
B2
1
C1
1
C2
1
D1
1
D2
1
ESP Flue Gas from Boiler
A2
2
A1
2
A2
4
A2
5
ESP Flue Gas To Chimney ESP Flue Gas To Chimney
B1
3
B2
3
B1
4
B1
5
B2
2
B1
2
B2
4
B2
5
C1
3
C2
3
C1
4
C1
5
C2
2
C1
2
C2
4
C2
5
D1
3
D2
3
D1
4
D1
5
D2
2
D1
2
D2
4
D2
5
ESP Flue Gas from Boiler
16
A H P
Fly
Ash
Hopper
HP Water
To AHP
Gate
Nozzle
From AHP
C/R
Fly Ash Hopper
17
A H P
This is a over all
View of
Ash Handling System
In ESP.
18
A H P
AHP Control to Booster
Pump distance is around
4.0 Km. & BPH to Ash Bund
is around 9.0 Km.
19
Slurry Tank
RAW
Water
Tank
AHP Control Room Booster Pump House
Series
Series
HP
Pumps
S
L
U
R
R
Y
T
A
N
K
A1
A4
T
O
A
S
H
B
U
N
D
U#1
U#2
U#3
Fly
Ash
From
AHP Control Room
U#2
U#3
U#2
U#3
To
A2
A6
A5
A3
A7
B1
B4
B2
B6
B5
B3
B7
C1
C4
C2
C6
C5
C3
C7
D1
D4
D2
D6
D5
D3
D7
20
Bottom Ash Hopper
To IPH
Normal Level Of Water
Clinker
Grinder A B C D
HP Water
21
A H P
IPH to Booster
Pump distance is around
4.0 Km. & BPH to Ash Bund
is around 9.0 Km.
22
IPH BPH
Slurry Tank
In plant Pump House Booster Pump House
Series
Series
Seal
water
Pumps
S
L
U
R
R
Y
T
A
N
K
A
B
D C
T
O
A
S
H
B
U
N
D
U#1
U#2
U#3
Bottom
Ash
from
A1
B1 B2
B3
A3
B5
A5
A1
A2
B4

More Related Content

Similar to A H P Control Room In plant pump House BPH.pptx

Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
PRAN-RFL Group
 
Application of first law thermodynamics (yoga n zian)
Application of first law thermodynamics (yoga n zian)Application of first law thermodynamics (yoga n zian)
Application of first law thermodynamics (yoga n zian)
qiebti
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
SHIVAJI CHOUDHURY
 

Similar to A H P Control Room In plant pump House BPH.pptx (20)

Hellisheidi Power Plant - is there an optimal design?
Hellisheidi Power Plant - is there an optimal design?Hellisheidi Power Plant - is there an optimal design?
Hellisheidi Power Plant - is there an optimal design?
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
Mini project presentation
Mini project presentation   Mini project presentation
Mini project presentation
 
Boiler and cogeneration
Boiler and cogenerationBoiler and cogeneration
Boiler and cogeneration
 
Application of first law thermodynamics (yoga n zian)
Application of first law thermodynamics (yoga n zian)Application of first law thermodynamics (yoga n zian)
Application of first law thermodynamics (yoga n zian)
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishan
 
Urea 1
Urea 1Urea 1
Urea 1
 
210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW
 
Welcome to summer training presentation 2 (1)
Welcome to summer training presentation 2 (1)Welcome to summer training presentation 2 (1)
Welcome to summer training presentation 2 (1)
 
POWER PLANT.pdf
POWER PLANT.pdfPOWER PLANT.pdf
POWER PLANT.pdf
 
hindalco power
hindalco powerhindalco power
hindalco power
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
 
refrigeration and air conditioning
refrigeration and air conditioningrefrigeration and air conditioning
refrigeration and air conditioning
 
Super thermal power station,suratgarh,by rajesh nayak
Super thermal power station,suratgarh,by rajesh nayakSuper thermal power station,suratgarh,by rajesh nayak
Super thermal power station,suratgarh,by rajesh nayak
 
Pintu raj
Pintu rajPintu raj
Pintu raj
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
Coal to Electricity
Coal to Electricity Coal to Electricity
Coal to Electricity
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
Problems for power h.ppt
Problems for power         h.pptProblems for power         h.ppt
Problems for power h.ppt
 

Recently uploaded

21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 

Recently uploaded (20)

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 

A H P Control Room In plant pump House BPH.pptx

  • 1. 1 A H P Ash Handling Plant.
  • 2. 2 A H P To Generate Electricity In Thermal Plant Required
  • 4. 4 A H P To Generate 210 MW Electricity approximately 3200 -3500MT Coal is daily required. If 40% of Ash contents is considered then 1280 -1400 MT Ash is produced every day from one 210 MW set.
  • 5. 5 210 MW BOILER Boiler Side View Boiler Drum Platen S/H Reheater Final & Horri S/H Economizer Air Heater To ESP Furnace
  • 6. 6 Flue Gas Path Platen S/H 10120c Final S/H Reheater 7870c Horizontal S/H Upper Bank 711oc Horizontal S/H Lower Bank 4600c Economizer 3670c Air Heater A 1470 c D ESP C 1400c Air Heater B 1470c Flue Gas from Combustion Chamber (11240c) B ESP A ID-B ID-A Chimney
  • 7. 7 A H P To Dispose such huge quantity of Ash we required a huge Ash Handling System. This system is called Ash Handling Plant.
  • 8. 8 A H P Ash is Of Two Types 1.Fly Ash & 2.Bottom Ash.
  • 9. 9 A H P Fly Ash is collected in Electro Static Precipitator is also called ESP
  • 10. 10 A H P Bottom Ash is collected at the Bottom side Hopper of Boiler is called Bottom Ash Hopper.
  • 11. 11 A H P E S P Hopper Hopper To AHP To AHP To Chimney From Boiler Fly Ash System
  • 12. 12 A H P Plates + charged - charged 60 KV DC X’mer ESP Internal Structure
  • 13. 13 In ESP there is DC field is created which is of 60 KV.Where plates & electrodes are vertically fitted. Due to this field Ionization is happened & Flue gas particles are charged by +ve & -ve charged. Ash particles are collected on plates & gas particles go out through the Chimney. A H P
  • 14. 14 A H P There are 8 rows of 5 Hopper In each line. A1 1 A2 A1 3 A1 2 A1 4 A1 5 B1 B2 C1 C2 D1 D2 40
  • 15. 15 A1 1 A2 1 A1 3 A2 3 A1 4 A1 5 B1 1 B2 1 C1 1 C2 1 D1 1 D2 1 ESP Flue Gas from Boiler A2 2 A1 2 A2 4 A2 5 ESP Flue Gas To Chimney ESP Flue Gas To Chimney B1 3 B2 3 B1 4 B1 5 B2 2 B1 2 B2 4 B2 5 C1 3 C2 3 C1 4 C1 5 C2 2 C1 2 C2 4 C2 5 D1 3 D2 3 D1 4 D1 5 D2 2 D1 2 D2 4 D2 5 ESP Flue Gas from Boiler
  • 16. 16 A H P Fly Ash Hopper HP Water To AHP Gate Nozzle From AHP C/R Fly Ash Hopper
  • 17. 17 A H P This is a over all View of Ash Handling System In ESP.
  • 18. 18 A H P AHP Control to Booster Pump distance is around 4.0 Km. & BPH to Ash Bund is around 9.0 Km.
  • 19. 19 Slurry Tank RAW Water Tank AHP Control Room Booster Pump House Series Series HP Pumps S L U R R Y T A N K A1 A4 T O A S H B U N D U#1 U#2 U#3 Fly Ash From AHP Control Room U#2 U#3 U#2 U#3 To A2 A6 A5 A3 A7 B1 B4 B2 B6 B5 B3 B7 C1 C4 C2 C6 C5 C3 C7 D1 D4 D2 D6 D5 D3 D7
  • 20. 20 Bottom Ash Hopper To IPH Normal Level Of Water Clinker Grinder A B C D HP Water
  • 21. 21 A H P IPH to Booster Pump distance is around 4.0 Km. & BPH to Ash Bund is around 9.0 Km.
  • 22. 22 IPH BPH Slurry Tank In plant Pump House Booster Pump House Series Series Seal water Pumps S L U R R Y T A N K A B D C T O A S H B U N D U#1 U#2 U#3 Bottom Ash from A1 B1 B2 B3 A3 B5 A5 A1 A2 B4