HT/LT Supply , AC supply system
S.O.Katiyar
consultant
STG
MM
MW-160
MVA-188.23
186.2MVA
CT-1
CT-1
1189T
1189A
CVT
WT
BAY-10
SAMAYPUR-2
BAY-9
SAMAYPUR-1
M
M
M
M
M
MM
MM
BAY-8
GT-2
BAY-7
TBC
GT-2
BAY-3
PALLA-1
BAY-4
PALLA-2
BAY-5
BUS
COUPLER
BAY-6
GT-1
GT-1MW-144.6
MVA-170.117
MVA-153.5
M
889A
989T989L
989B
989A
1089T1089G1
1089B
1089A
1052
952
752
852
552
652
352
452
489B
789T
789B
789A
889G2
1189G2
889T889G1
889B
489A
589B
589A
689T689G1689B
689A
389T389L
389B
389A
489T489L
689G2
SINGLE LINE DIAGRAM OF 220 KV SWITCHYARD FGPS
220 KV MAIN BUS-1
220 KV MAIN BUS-2
220 KV TRANSFER BUS
LEGEND
M
220 KV C.B
220 KV ISOLATOR
WAVE TRAP
CVT
CT
2500 AMP,40 KA
2500 AMP,40 KA
BAY-11
STG
Auxilliary supply for coal power station
• Coal transfer from Track
hopper/wagon tippler to
bunker
• Coal crusher
• Coal mills and feeders and
PA fan
• FD fan APH
• Flue gas path
• ESP and ID Fan
• DM water path from BFP
to Boiler Drum
• Circulating water path
• Lub oil system of TG
• Seal oil system
• Equipment cooling water
system
• Stator water cooling system
• Hydrogen system
• DM water system
• Raw water system
• Ash handling plant
• Liquid fuel unloading station
27 November 2016 PMI Revision 00 5
AC Supply
System
27 November 2016 PMI Revision 00 6
•Importance of Elect System for
Auxiliary
•Classification of Auxiliaries
•Choice of Voltage for Aux
• Aux. Power supply system
•Emergency AC Supply
Presentation outline
27 November 2016 PMI Revision 00 7
Auxiliary Power Supply System
The purpose of an Electrical system is to generate
and supply electrical energy .
The system should be designed and managed to
deliver power with Reliability and Economy.
As these two requirements are quite opposed a
balance is required to have an optimum design of
Auxiliary power supply system
The auxiliaries have Ratings range from a few
watts to few Mega Watts & Located over a large
area
Work under varied Operating Conditions
27 November 2016 PMI Revision 00 8
Auxiliary Power Supply System
 Failure of Auxiliaries can cause Outage of Power Plant
 Auxiliaries need Reliable Power Supply
 System designed to cater to this need
 Loads segregated on the basis of
Rating (to decide Voltage)
Location (to decide the Feeding
Point)
 Change-over schemes & Alternate Power Supply arrangement
to ensure Reliability
27 November 2016 PMI Revision 00 9
Elements of Aux. Power System
More than 95% of the auxiliaries are driven by
Motors
Different Voltage levels are interconnected
through Transformers
Miscellaneous Elements
Incomers
Ties
Diesel Generators
27 November 2016 PMI Revision 00 10
Auxiliary Power Supply
• Voltage Rating of Motors Decided based on kW Rating
 Rating ≤ 160kW – 415V (LV), Contactor
 > 160kW & ≤ 200kW – 415V (LV), Breaker
 > 200kW & ≤ 1500kW – 3.3kV (MV), Breaker
 > 1500kW – 11kV (MV), Breaker
 Frequent Start / Stop Operations (Coal Conveyor
Motors) – MV Vacuum Contactor
• List of Boards / Feeding Points arrived at based on
Location of Load Centers / Systems
• Quantity & Rating of Transformers calculated based on
Load & Operational Requirements
• Rating of Board Calculated based on the Operating Load
& Transformer Rating
27 November 2016 PMI Revision 00 11
MV Switchgears – System Parameters
Nominal System voltage 6.6kV 11kV 3.3kV
Highest System voltage 7.2 kV 12kV 3.6kV
Rated Frequency 50Hz 50Hz 50Hz
Number of phases/ poles Three Three Three
System Neutral Earthing
Earthed through Resistance of 6.35Ω to Limit E/F
Current to 300A
One minute power frequency
withstand voltage
20kV 28kV 10kV
Impulse withstand voltage 60kV (peak) 75kV (peak) 40kV (peak)
Maximum System Fault Level 40kA (rms)
Short time rating of Eqpt. 40kA (rms) for 1 second
Dynamic withstand rating 100kA (peak)
27 November 2016 PMI Revision 00 12
LV Switchgears – System Parameters
Nominal System voltage 415V, ±10%
Rated Frequency 50Hz
Number of phases Three
System Neutral Earthing Solidly Earthed
Maximum System Fault
Level
45kA (rms)
Short time rating of Eqpt. 45kA (rms) for 1 second
Dynamic withstand rating 105kA (peak)
27 November 2016 PMI Revision 00 13
Auxiliary Power Supply System
• Sizing of Unit & Station transformer
• Start up source short circuit power
• Feeding offsite areas loads
• Rating of the Switchgear
• Loads
• Power Supply arrangement
• 6.6& 0.415kV System
• 11 & 3.3 & 0.415kV System
27 November 2016 PMI Revision 00 14
Auxiliary Power Supply
INTRODUCTION
• Commonly used voltage level up to 200 MW unit
size- 6.6kV, 415V
• Initially same voltage level (6.6 kv, 415v) were
adopted for 500 MW unit size as well.
• With 500 MW unit, quantitative and qualitative
change in auxiliaries took place.
• However no significant change in SWGR available in
market.Need for optimizing and cost effective
solution
27 November 2016 PMI Revision 00 15
Aux. Supply system(500MW)
• Grid Voltage- Normally 400kV for most of the200,
500MW units in India except few deviations
• Any Intermediate Voltage Available-to provide
reliable start-up power source and to meet initial
commissioning activities as well as to supply bulk
loads(CW system, make-up water etc.) away from
the main plants.Generally used Intermediate
voltage levels are 220kV, 132kV, 33kV
• Nature of Auxiliaries i.e. ratings, basic
characteristics and location
27 November 2016 PMI Revision 00 16
Auxiliary Power Supply-500MW
• Selection of voltage levels to be
adopted for 500MW and above unit
size.
• a) 6.6 KV and 415 V system
• b) 11& 3.3 kV system
27 November 2016 PMI Revision 00 17
HT/LT Supply System
G
UAT-A Dyn1
UAT-B
16.5 KV
6.6 KV Ynd11
GT
Ynyn0
Station TRF-1
UNIT SWGR--A
UNIT SWGR--B
Stn. SWGR-SA SB
UST
‘A’
ESP TRF-A
S/Serv.
Trf.-B
UST-B ESP TRF-B
USS-A USS-B 415 V Unit EMG SWGR
X
From DG SWGR
X
Blr MCC
Turb MCC
BFP
ID Fan
Air Compr
Trf
X X
X
Stn Serv
Trf-A
DMP Serv
Trf
1)SWYD
Serv
Trf-1
2)Ash
Handl T/
1600KVA
6.6 KV
B.C.
N.O.
TMCC
Fdr to
Clarif
Water
SWGR
27 November 2016 PMI Revision 00 18
Transformer feeder Details
To PMCC
MCC/PCCM
edium
Voltage
Magnetic
Contactor
SFUCB
To ACDB
Motor Feeder
Unit Service
Transformer
To PMCC
Magnetic
Contactor
SFU
To ACDB
Motor Feeder
Dyn11
C.B.
415 V
6.6 KV
27 November 2016 PMI Revision 00 19
X X
X X
X X
X X
DG-1 DG-3 DG-2
DG SWGR-1 DG SWGR-2
UNIT EMER
SWGR-1 UNIT EMER
SWGR-2
UNIT EMER
SWGR-3
UNIT EMER
SWGR-4
27 November 2016 PMI Revision 00 20
EMCC
(1) AOP-1 (2) Em. Lighting Trf.
(3) TVDC Reserve Supply (4) UPS Ch.
(5) Scanner Air Fan (6) BVDC Reserve Supply
(7) AC Seal Oil Pump (8) Air Heater Lub Oil Panel
(9) Jacking Oil Pump (10) Stator Water Pump-B
(11) Barring Gear (12) +26 v DC ATRS Ch. ‘B’
(13) -26V DC ATRS Ch.’B’ (14) 26V DC FSSS Ch. ‘B’
(15) 26V DC DDC (digital distribution control)Ch. ‘A’
27 November 2016 PMI Revision 00 21
From Unit SWGR ‘A’ Normally
(1) BFP-1C (2) BFP-1A
(3) PA Fan-1A (4) ID Fan -1A
(5) UST-1A (6) ESP T/F -1A
(7) FD Fan -1A (8) Coal Mill- 1A, C, E
(9) CEP-1A,C (10) ACW Booster Pump-1A
(11) Bus V.T.
27 November 2016 PMI Revision 00 22
USS ‘A’
(1) Unit Em. SWGR (2) Boiler MCC
(3) BVDC ‘A’ (4) Turb. MCC ‘A’
(5) 220V Dc Ch. ‘A’ (6) +24 DC ATRS Ch. ‘A’
(7) -24V DC ATRS Ch.’A’ (8) Turb ACDB ‘A’
(9) +24 V DDCMIS (monitoring information system)Ch. ‘B’
10 GRP
(11) Boiler ACDB ‘A’ a) Grav. Feeder A,B, C,D,E,F
b) S/B MCC Feeder-1
c) INC From USS ‘B’
(12) MOT Centrifuge
1B1A SA 2A 2B SB 3A 3B SC 4A 4B SD
GT-1
UAT-1A
UAT-1B
ST-1 GT-2
UAT-2A
UAT-2B
UAT-3A
UAT-3B
GT-3
ST-2
GT-4
UAT-4A
UAT-4B
GA DRAWING OF GT ST ,UAT AND 6.6 KB BUSES
G
4
G
3
G
2G
1
SA SC 1A 3A 2A 4A SB SD SA SC SB SD
DM PLANT SWGR AIR COMP SWGR-1 AIR COMP SWGR-2
SOFTENING SWGR FOPH SWGR WORK SHOP SWGR
SB SD SB SD
AMMIN SWGR SWYD SWGR
GA DRAWING OF OFF-SITE ELECTRICAL SYSTEM
SA 1A 1B SB 2A 2B SC 3A 3B SD 4A 4B
SSS-1 USS-1 ESP-1 SSS-2 USS-2 ESP-2 SSS-3 USS-3 ESP-3 SSS-4 USS-4 ESP-4
UES-1 UES-2 UES-3 UES-4
DG-1 DG-3 DG-2
GA DRAWING OF 6.6 KV/415 VOLTS SYSTEMS
LO MCC-1 LOMCC-2 LOMCC-3
LOMCC-4
B/C
D
M
T
R
A
N
S
F
O
R
M
E
R
-
A
T
R
A
N
S
F
O
R
M
E
R
-
1
0
O
D
A
X
M
E
R
-
2
A
O
DA
X
M
ER
-1
A
C
E
P
-
A
F
I
R
E
M
C
C
-
3
A
H
P
B
F
P
-
A
C
W
P
P
#
A
C
T
M
C
C
-
7
A
C
M
B
X
M
E
R
-
6
A
R
A
W
W
A
T
E
R
P
P
#
5
A
C
o
L
O
n
y
X
m
e
r
#
8
A
O
D
A
X
M
E
R
-
2
B
O
DA
X
M
ER
-1
B
C
E
P
-
B
F
I
R
E
M
C
C
-
3
B
H
P
B
F
P
-
B
C
W
P
P
#
B
C
T
M
C
C
-
7
B
C
M
B
X
M
E
R
-
6
B
R
A
W
W
A
T
E
R
P
P
#
5
B
C
o
l
o
n
y
X
m
e
r
#
8
B
GT1 UAT-1 UAT-2GT2
6.6 KC MCC-1 6.6 KC MCC-2
Motor feeder
46 – negative phase sequence
49- thermal overload
50-instantaneous o/c
50N-Instantenous E/F
50LR1-AC inverse time o/c
Motor feeder
Motor feeder
46 – negative phase sequence
49- thermal overload
50-instantaneous o/c
50N-Instantenous E/F
50LR1-AC inverse time o/c
Motor feeder
46 – negative phase sequence
49- thermal overload
50-instantaneous o/c
50N-Instantenous E/F
50LR1-AC inverse time o/c
Motor feeder
Motor feeder
Motor feeder
46 – negative phase sequence
49- thermal overload
50-instantaneous o/c
50N-Instantenous E/F
50LR1-AC inverse time o/c
Transformer
feeder
46- negative ph seq
50- instant. o/c
51-inverse time o/c
64- earth fault
Transformer
feeder
Transformer
feeder
46- negative ph seq
50- instant. o/c
51-inverse time o/c
64- earth fault
Transformer
feeder
46- negative ph seq
50- instant. o/c
51-inverse time o/c
64- earth fault
Transformer
feeder
Transformer
feeder
Transformer
feeder
46- negative ph seq
50- instant. o/c
51-inverse time o/c
64- earth fault
415 VAC I/C-A
415 VAC I/C-A
415 VAC I/C-A
415 VAC I/C-A
415 VAC I/C-A
415 VAC I/C-A
415 VAC I/C-A
27 November 2016 PMI Revision 00 55
THANK YOU

More Related Content

What's hot

Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devicesRahul Aman
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 
Measurement of hvac (High Voltage Engineering )
Measurement  of  hvac (High Voltage Engineering )Measurement  of  hvac (High Voltage Engineering )
Measurement of hvac (High Voltage Engineering )Abhishek Choksi
 
132kv Substation
132kv Substation132kv Substation
132kv Substationguestecdd58
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmissionprasantakcs
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersLiving Online
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxshivendra68
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of GeneratorRahuldey1991
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 

What's hot (20)

33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
 
132 kv
132 kv132 kv
132 kv
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
Measurement of hvac (High Voltage Engineering )
Measurement  of  hvac (High Voltage Engineering )Measurement  of  hvac (High Voltage Engineering )
Measurement of hvac (High Voltage Engineering )
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmission
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptx
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of Generator
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Electric substation
Electric substation Electric substation
Electric substation
 

Viewers also liked

NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC
 
Power Transmission & Distribution in India
Power Transmission & Distribution in IndiaPower Transmission & Distribution in India
Power Transmission & Distribution in IndiaIndian Energy Sector
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in indiaJasgt Singh
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system Ankush Bharti
 
HOME WIRING(domestic wiring)
HOME WIRING(domestic wiring)HOME WIRING(domestic wiring)
HOME WIRING(domestic wiring)Arshad Hussain
 
Distribution systems
Distribution systemsDistribution systems
Distribution systemsSURAJ PRASAD
 

Viewers also liked (8)

ELECTRICAL WIRING
ELECTRICAL WIRINGELECTRICAL WIRING
ELECTRICAL WIRING
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action Plan
 
Power Transmission & Distribution in India
Power Transmission & Distribution in IndiaPower Transmission & Distribution in India
Power Transmission & Distribution in India
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in india
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
 
HOME WIRING(domestic wiring)
HOME WIRING(domestic wiring)HOME WIRING(domestic wiring)
HOME WIRING(domestic wiring)
 
Distribution systems
Distribution systemsDistribution systems
Distribution systems
 
Electrical Wiring Practices and Diagrams
Electrical Wiring Practices and DiagramsElectrical Wiring Practices and Diagrams
Electrical Wiring Practices and Diagrams
 

Similar to HT/LT Supply AC supply system overview

Ac supply system
Ac supply systemAc supply system
Ac supply systemankitankesh
 
Ac supply system
Ac supply systemAc supply system
Ac supply systemankitankesh
 
Product: UPS: UniStar VP
Product: UPS: UniStar VPProduct: UPS: UniStar VP
Product: UPS: UniStar VPStaco Energy
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Emily Tan
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Emily Tan
 
Product: UPS: UniStar V
Product: UPS: UniStar VProduct: UPS: UniStar V
Product: UPS: UniStar VStaco Energy
 
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdfSwitching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdfssuserfe5963
 
Control & Isolation 5
Control & Isolation 5Control & Isolation 5
Control & Isolation 5Andy Birdsall
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfJayWin2
 
Ggel power distribution
Ggel power distributionGgel power distribution
Ggel power distributionBanwari Lal
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapHimmelstern
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapHimmelstern
 
Basics of Electrical Engineering & Maintenance Practices
Basics of Electrical Engineering & Maintenance PracticesBasics of Electrical Engineering & Maintenance Practices
Basics of Electrical Engineering & Maintenance PracticesMuhammadBilalHussain11
 
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.pptBASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.pptmancangkul1
 
2 electrical machines lab
2 electrical machines lab2 electrical machines lab
2 electrical machines labzeta eksa
 
Iskra Low Voltage Switchgear
Iskra Low Voltage SwitchgearIskra Low Voltage Switchgear
Iskra Low Voltage SwitchgearMinka Grdesic
 
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAMChad Kurdi, P.E.
 

Similar to HT/LT Supply AC supply system overview (20)

electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
 
Ac supply system
Ac supply systemAc supply system
Ac supply system
 
lift ppt
lift pptlift ppt
lift ppt
 
Ac supply system
Ac supply systemAc supply system
Ac supply system
 
Product: UPS: UniStar VP
Product: UPS: UniStar VPProduct: UPS: UniStar VP
Product: UPS: UniStar VP
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020
 
Product: UPS: UniStar V
Product: UPS: UniStar VProduct: UPS: UniStar V
Product: UPS: UniStar V
 
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdfSwitching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
 
Control & Isolation 5
Control & Isolation 5Control & Isolation 5
Control & Isolation 5
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdf
 
Ggel power distribution
Ggel power distributionGgel power distribution
Ggel power distribution
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
INPUT OUTPUT LIST.pdf
INPUT OUTPUT LIST.pdfINPUT OUTPUT LIST.pdf
INPUT OUTPUT LIST.pdf
 
Basics of Electrical Engineering & Maintenance Practices
Basics of Electrical Engineering & Maintenance PracticesBasics of Electrical Engineering & Maintenance Practices
Basics of Electrical Engineering & Maintenance Practices
 
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.pptBASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
 
2 electrical machines lab
2 electrical machines lab2 electrical machines lab
2 electrical machines lab
 
Iskra Low Voltage Switchgear
Iskra Low Voltage SwitchgearIskra Low Voltage Switchgear
Iskra Low Voltage Switchgear
 
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
 

Recently uploaded

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 

Recently uploaded (20)

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 

HT/LT Supply AC supply system overview

  • 1. HT/LT Supply , AC supply system S.O.Katiyar consultant
  • 3. Auxilliary supply for coal power station • Coal transfer from Track hopper/wagon tippler to bunker • Coal crusher • Coal mills and feeders and PA fan • FD fan APH • Flue gas path • ESP and ID Fan • DM water path from BFP to Boiler Drum • Circulating water path • Lub oil system of TG • Seal oil system • Equipment cooling water system • Stator water cooling system • Hydrogen system • DM water system • Raw water system • Ash handling plant • Liquid fuel unloading station
  • 4.
  • 5. 27 November 2016 PMI Revision 00 5 AC Supply System
  • 6. 27 November 2016 PMI Revision 00 6 •Importance of Elect System for Auxiliary •Classification of Auxiliaries •Choice of Voltage for Aux • Aux. Power supply system •Emergency AC Supply Presentation outline
  • 7. 27 November 2016 PMI Revision 00 7 Auxiliary Power Supply System The purpose of an Electrical system is to generate and supply electrical energy . The system should be designed and managed to deliver power with Reliability and Economy. As these two requirements are quite opposed a balance is required to have an optimum design of Auxiliary power supply system The auxiliaries have Ratings range from a few watts to few Mega Watts & Located over a large area Work under varied Operating Conditions
  • 8. 27 November 2016 PMI Revision 00 8 Auxiliary Power Supply System  Failure of Auxiliaries can cause Outage of Power Plant  Auxiliaries need Reliable Power Supply  System designed to cater to this need  Loads segregated on the basis of Rating (to decide Voltage) Location (to decide the Feeding Point)  Change-over schemes & Alternate Power Supply arrangement to ensure Reliability
  • 9. 27 November 2016 PMI Revision 00 9 Elements of Aux. Power System More than 95% of the auxiliaries are driven by Motors Different Voltage levels are interconnected through Transformers Miscellaneous Elements Incomers Ties Diesel Generators
  • 10. 27 November 2016 PMI Revision 00 10 Auxiliary Power Supply • Voltage Rating of Motors Decided based on kW Rating  Rating ≤ 160kW – 415V (LV), Contactor  > 160kW & ≤ 200kW – 415V (LV), Breaker  > 200kW & ≤ 1500kW – 3.3kV (MV), Breaker  > 1500kW – 11kV (MV), Breaker  Frequent Start / Stop Operations (Coal Conveyor Motors) – MV Vacuum Contactor • List of Boards / Feeding Points arrived at based on Location of Load Centers / Systems • Quantity & Rating of Transformers calculated based on Load & Operational Requirements • Rating of Board Calculated based on the Operating Load & Transformer Rating
  • 11. 27 November 2016 PMI Revision 00 11 MV Switchgears – System Parameters Nominal System voltage 6.6kV 11kV 3.3kV Highest System voltage 7.2 kV 12kV 3.6kV Rated Frequency 50Hz 50Hz 50Hz Number of phases/ poles Three Three Three System Neutral Earthing Earthed through Resistance of 6.35Ω to Limit E/F Current to 300A One minute power frequency withstand voltage 20kV 28kV 10kV Impulse withstand voltage 60kV (peak) 75kV (peak) 40kV (peak) Maximum System Fault Level 40kA (rms) Short time rating of Eqpt. 40kA (rms) for 1 second Dynamic withstand rating 100kA (peak)
  • 12. 27 November 2016 PMI Revision 00 12 LV Switchgears – System Parameters Nominal System voltage 415V, ±10% Rated Frequency 50Hz Number of phases Three System Neutral Earthing Solidly Earthed Maximum System Fault Level 45kA (rms) Short time rating of Eqpt. 45kA (rms) for 1 second Dynamic withstand rating 105kA (peak)
  • 13. 27 November 2016 PMI Revision 00 13 Auxiliary Power Supply System • Sizing of Unit & Station transformer • Start up source short circuit power • Feeding offsite areas loads • Rating of the Switchgear • Loads • Power Supply arrangement • 6.6& 0.415kV System • 11 & 3.3 & 0.415kV System
  • 14. 27 November 2016 PMI Revision 00 14 Auxiliary Power Supply INTRODUCTION • Commonly used voltage level up to 200 MW unit size- 6.6kV, 415V • Initially same voltage level (6.6 kv, 415v) were adopted for 500 MW unit size as well. • With 500 MW unit, quantitative and qualitative change in auxiliaries took place. • However no significant change in SWGR available in market.Need for optimizing and cost effective solution
  • 15. 27 November 2016 PMI Revision 00 15 Aux. Supply system(500MW) • Grid Voltage- Normally 400kV for most of the200, 500MW units in India except few deviations • Any Intermediate Voltage Available-to provide reliable start-up power source and to meet initial commissioning activities as well as to supply bulk loads(CW system, make-up water etc.) away from the main plants.Generally used Intermediate voltage levels are 220kV, 132kV, 33kV • Nature of Auxiliaries i.e. ratings, basic characteristics and location
  • 16. 27 November 2016 PMI Revision 00 16 Auxiliary Power Supply-500MW • Selection of voltage levels to be adopted for 500MW and above unit size. • a) 6.6 KV and 415 V system • b) 11& 3.3 kV system
  • 17. 27 November 2016 PMI Revision 00 17 HT/LT Supply System G UAT-A Dyn1 UAT-B 16.5 KV 6.6 KV Ynd11 GT Ynyn0 Station TRF-1 UNIT SWGR--A UNIT SWGR--B Stn. SWGR-SA SB UST ‘A’ ESP TRF-A S/Serv. Trf.-B UST-B ESP TRF-B USS-A USS-B 415 V Unit EMG SWGR X From DG SWGR X Blr MCC Turb MCC BFP ID Fan Air Compr Trf X X X Stn Serv Trf-A DMP Serv Trf 1)SWYD Serv Trf-1 2)Ash Handl T/ 1600KVA 6.6 KV B.C. N.O. TMCC Fdr to Clarif Water SWGR
  • 18. 27 November 2016 PMI Revision 00 18 Transformer feeder Details To PMCC MCC/PCCM edium Voltage Magnetic Contactor SFUCB To ACDB Motor Feeder Unit Service Transformer To PMCC Magnetic Contactor SFU To ACDB Motor Feeder Dyn11 C.B. 415 V 6.6 KV
  • 19. 27 November 2016 PMI Revision 00 19 X X X X X X X X DG-1 DG-3 DG-2 DG SWGR-1 DG SWGR-2 UNIT EMER SWGR-1 UNIT EMER SWGR-2 UNIT EMER SWGR-3 UNIT EMER SWGR-4
  • 20. 27 November 2016 PMI Revision 00 20 EMCC (1) AOP-1 (2) Em. Lighting Trf. (3) TVDC Reserve Supply (4) UPS Ch. (5) Scanner Air Fan (6) BVDC Reserve Supply (7) AC Seal Oil Pump (8) Air Heater Lub Oil Panel (9) Jacking Oil Pump (10) Stator Water Pump-B (11) Barring Gear (12) +26 v DC ATRS Ch. ‘B’ (13) -26V DC ATRS Ch.’B’ (14) 26V DC FSSS Ch. ‘B’ (15) 26V DC DDC (digital distribution control)Ch. ‘A’
  • 21. 27 November 2016 PMI Revision 00 21 From Unit SWGR ‘A’ Normally (1) BFP-1C (2) BFP-1A (3) PA Fan-1A (4) ID Fan -1A (5) UST-1A (6) ESP T/F -1A (7) FD Fan -1A (8) Coal Mill- 1A, C, E (9) CEP-1A,C (10) ACW Booster Pump-1A (11) Bus V.T.
  • 22. 27 November 2016 PMI Revision 00 22 USS ‘A’ (1) Unit Em. SWGR (2) Boiler MCC (3) BVDC ‘A’ (4) Turb. MCC ‘A’ (5) 220V Dc Ch. ‘A’ (6) +24 DC ATRS Ch. ‘A’ (7) -24V DC ATRS Ch.’A’ (8) Turb ACDB ‘A’ (9) +24 V DDCMIS (monitoring information system)Ch. ‘B’ 10 GRP (11) Boiler ACDB ‘A’ a) Grav. Feeder A,B, C,D,E,F b) S/B MCC Feeder-1 c) INC From USS ‘B’ (12) MOT Centrifuge
  • 23. 1B1A SA 2A 2B SB 3A 3B SC 4A 4B SD GT-1 UAT-1A UAT-1B ST-1 GT-2 UAT-2A UAT-2B UAT-3A UAT-3B GT-3 ST-2 GT-4 UAT-4A UAT-4B GA DRAWING OF GT ST ,UAT AND 6.6 KB BUSES G 4 G 3 G 2G 1
  • 24. SA SC 1A 3A 2A 4A SB SD SA SC SB SD DM PLANT SWGR AIR COMP SWGR-1 AIR COMP SWGR-2 SOFTENING SWGR FOPH SWGR WORK SHOP SWGR SB SD SB SD AMMIN SWGR SWYD SWGR GA DRAWING OF OFF-SITE ELECTRICAL SYSTEM
  • 25. SA 1A 1B SB 2A 2B SC 3A 3B SD 4A 4B SSS-1 USS-1 ESP-1 SSS-2 USS-2 ESP-2 SSS-3 USS-3 ESP-3 SSS-4 USS-4 ESP-4 UES-1 UES-2 UES-3 UES-4 DG-1 DG-3 DG-2 GA DRAWING OF 6.6 KV/415 VOLTS SYSTEMS LO MCC-1 LOMCC-2 LOMCC-3 LOMCC-4
  • 27. Motor feeder 46 – negative phase sequence 49- thermal overload 50-instantaneous o/c 50N-Instantenous E/F 50LR1-AC inverse time o/c
  • 29. Motor feeder 46 – negative phase sequence 49- thermal overload 50-instantaneous o/c 50N-Instantenous E/F 50LR1-AC inverse time o/c
  • 30. Motor feeder 46 – negative phase sequence 49- thermal overload 50-instantaneous o/c 50N-Instantenous E/F 50LR1-AC inverse time o/c
  • 33. Motor feeder 46 – negative phase sequence 49- thermal overload 50-instantaneous o/c 50N-Instantenous E/F 50LR1-AC inverse time o/c
  • 34. Transformer feeder 46- negative ph seq 50- instant. o/c 51-inverse time o/c 64- earth fault
  • 36. Transformer feeder 46- negative ph seq 50- instant. o/c 51-inverse time o/c 64- earth fault
  • 37. Transformer feeder 46- negative ph seq 50- instant. o/c 51-inverse time o/c 64- earth fault
  • 40. Transformer feeder 46- negative ph seq 50- instant. o/c 51-inverse time o/c 64- earth fault