 India has been divided into five regions for power system planning and
operation. These regions are the Northern region, Western region, Eastern region
and North-eastern region.
 Present almost 70% of the population is enjoying the fruitsof electricity.
 The present day electricity power system is AC i.e. electric power is generated,
transmitted and distributed in the form of alternating current.
 The electric power is produced at the power station, which are located at
favourable place, generally quite away from the consumers
SITE INTRODUCTION-
Location-
 The Training site is located about 1.5 Km NE of ALLAHABAD town in UTTAR PRADESH state, location
being latitude- 25.4563o N & Longitude- 81.8361o E.
 The plant and township are located near Anglobangali Inter College.
Environment Impacts on Sub-station-
 Transmission requirements and Transmission lie routing.
Temporary Construction Impacts-
 Prior to the construction of a substation the entire area is cleared of vegetation and regarded. If non-suitable
soils are encountered they are excavated and replaced.
Permanent Construction Impacts-
 The permanent impacts related to construction and operation of a new sub-station may be substantial
depending on the location of the new site and its proximity to residences.
SOME KEY DATA
 Sub-station Capacity - 132/33KV (2X63MVA)
The equipment’s shall be suitable for the system whose are as below-
 Nominal System Voltage - 132/33 KV
 Highest System Voltage - 145KV/36KV
 Frequency - 50 Hz
 Number of phases - 3
 Neutral Earthing - Solidly effectively earthing
A Single Line Diagram (SLD) of an Electrical System isthe Line Diagram of the concerned Electrical
System which includes all the required Electrical Equipment connection sequence wise from the
point of entrance of Power up to the end of the scope of the mentioned Work.
 The diagram made on the control panel is
known as mimic diagram. Colors of signals
are synchronized as follows: -
 Red – For circuit breaker or isolator
switch is in closed position.
 Green - For circuit breaker is in open
condition.
 Amber – Indicates spring is charged.
 A transformer is an electrical device that
transfers energy between two or more
circuits through electromagnetic
induction.
 In 132/33 KV Sub-station at Allahabad
(U.P), two types of transformers are
provided-
- Inter Connecting transformer
- Miscellaneous Transformer
SequenceOfEquipmentsforan incomingoranoutgoingfeeder-
L. A.
P.T. / C.V.T
C. T.
C. B.
LIGHTNINGARRESTOR
POTENTIALX-MER/CVT
ISOLATOR
CURRENTTRANSFORMER
CIRCUITBREAKER
ISOLATOR
BUSBAR
 They are commonly used in metering and
protective relaying in the electrical power
industry where they facilitate the safety
measurement of large currents, often in the
presence of high voltages.
 The current transformer safely isolates
measurement and control circuitry from high
voltage typically present on the circuit being
measured.
 The CT acts as constant current series device
with an apparent power burden a fraction of
that of high voltage primary circuit.
 Potential transformer is designed for
monitoring single-phase and three-
phase line voltages in power metering
application.
 A Potential Transformer is a special
type of transformer that allows
meters to take reading from electrical
service connections with higher
voltage.
 Potential Transformer has an
accuracy of ± 5% from 0 to 130% of
.their rated voltage
 An Isolator is a manually operated
mechanical switch which separates a
part of the electrical power system
normally at off load condition.
 While opening the circuit, circuit
breaker opens first and then isolator
& while closing the circuit the
isolator closed first and then circuit
breaker.
Following are the main protections used in substation:
 Distance protection
 Differential Protection
 Overvoltage protection
 Overcurrent protection
 Earth fault protection
 Breaker lock-out protection
 It is a protective device that
reduces excessive voltage
resulting from lightning to a
safe level by grounding the
discharge.
 It shows dual characteristics.
 During Lightning it works as
super conductor whereas
normally it works as insulator.
 CVT in a substation is used for
measurement, protection and as coupling
device in PLCC.
 In its basic form the device consists of
three parts: -
 Two capacitors across which the
transmission line signal is split, an
inductive element to tune the device
to line frequency; and
 A transformer to isolate and further
step down the voltage for
instrumentation or protective relay.
 A Circuit Breaker is an
automatically operated electrical
switch designed to protect an
electrical circuit from damage
caused by excess current from an
overload or short circuit.
 Its basic function is to interrupt
current flow after a fault is
detected.
Oil Circuit Breaker
Air-Blast Circuit Breaker
SF6 Circuit Breaker
Vacuum Circuit Breaker
 It is an electrically operated switch.
 Major types of Relay are
Electromagnetic & Static type.
 It controls High Voltage Electrical
Circuits with low voltage signal
 In GSS control panels consisting of
Relay operates at 110V DC.
Relay working
Over Current Relay
Earth Fault Relay
Differential Protection
Relay
Distance Protection Relay
 It provides a surface under
the substation which has
uniform potential nearly equal
to zero or Absolute Earth
Potential.
 It is of two types –
 Neutral Earthing
 Equipment Body
Earthing
 Battery Bank forms the heart of
GSS
 It is responsible of supplying all
the relay panels which are
situated in control room
 Typically room containing the
battery bank is dark in color to
avoid the evaporation of solution
inside the battery
 The training at grid substation has improved my understanding of the subject
electrical power transmission and distribution. During the training period, I
came to know that, there is a much difference between theoretical
understanding and practical approach to the subject.
 If we see the transformer it is shown in textbooks two windings changing the
voltage level which seems very easy concept.
 But practically it is a huge machine with a no. of parts and fittings,
protection devices each of which is designed with a very specific purpose.
 But of course to design new technology, theoretical knowledge has its own
importance but without practical touch, it is of no use.
Power System Components and Their Functions

More Related Content

What's hot

SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 
Uttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training reportUttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training report19saurabh89
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training pptsitesh95074
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training ReportSWAPNILKUMARGUPTA
 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvamitietlko
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
Fault Location of Overhead Transmission Line
Fault Location of Overhead Transmission LineFault Location of Overhead Transmission Line
Fault Location of Overhead Transmission LineCHIRANJEEB DASH
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION Ravi Phadtare
 
Training report by shubham sachan
Training report by shubham sachanTraining report by shubham sachan
Training report by shubham sachanShubham Sachan
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
 
Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad ADARSH KUMAR
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv student
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclVISHAL VERMA
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurdilkhush009
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 

What's hot (20)

132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
Uttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training reportUttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training report
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
substation internship report
substation internship report substation internship report
substation internship report
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kv
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
Fault Location of Overhead Transmission Line
Fault Location of Overhead Transmission LineFault Location of Overhead Transmission Line
Fault Location of Overhead Transmission Line
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
 
Training report by shubham sachan
Training report by shubham sachanTraining report by shubham sachan
Training report by shubham sachan
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopur
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 

Similar to Power System Components and Their Functions

Substation equipment and its function 2
Substation equipment and its function 2Substation equipment and its function 2
Substation equipment and its function 2Zulfiqar Mangrio
 
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOWSatya Prakash Chaurasia
 
Inplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationInplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationshivashankar307
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power systemArvind Nathan
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxfallinhay
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)Sogendra Rajput
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSSMohitkalal4
 
Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLyohannes feleke
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingAkriti Gupta
 
powergrid presentation
powergrid presentationpowergrid presentation
powergrid presentationAkriti Gupta
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptxAsif682330
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Gangwal
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptxAsif682330
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFjang041
 
Report On Industrial Tour At Khulshi Grid Sub-Station
Report On Industrial Tour At Khulshi Grid Sub-StationReport On Industrial Tour At Khulshi Grid Sub-Station
Report On Industrial Tour At Khulshi Grid Sub-StationEkram Bin Mamun
 

Similar to Power System Components and Their Functions (20)

Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Substation equipment and its function 2
Substation equipment and its function 2Substation equipment and its function 2
Substation equipment and its function 2
 
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
 
Inplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationInplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substation
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power system
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
Design of substation
Design of substationDesign of substation
Design of substation
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
powergrid presentation
powergrid presentationpowergrid presentation
powergrid presentation
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
Industrail training
Industrail trainingIndustrail training
Industrail training
 
Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptx
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
Report On Industrial Tour At Khulshi Grid Sub-Station
Report On Industrial Tour At Khulshi Grid Sub-StationReport On Industrial Tour At Khulshi Grid Sub-Station
Report On Industrial Tour At Khulshi Grid Sub-Station
 

Recently uploaded

Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 

Recently uploaded (20)

Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 

Power System Components and Their Functions

  • 1.
  • 2.  India has been divided into five regions for power system planning and operation. These regions are the Northern region, Western region, Eastern region and North-eastern region.  Present almost 70% of the population is enjoying the fruitsof electricity.  The present day electricity power system is AC i.e. electric power is generated, transmitted and distributed in the form of alternating current.  The electric power is produced at the power station, which are located at favourable place, generally quite away from the consumers
  • 3. SITE INTRODUCTION- Location-  The Training site is located about 1.5 Km NE of ALLAHABAD town in UTTAR PRADESH state, location being latitude- 25.4563o N & Longitude- 81.8361o E.  The plant and township are located near Anglobangali Inter College. Environment Impacts on Sub-station-  Transmission requirements and Transmission lie routing. Temporary Construction Impacts-  Prior to the construction of a substation the entire area is cleared of vegetation and regarded. If non-suitable soils are encountered they are excavated and replaced. Permanent Construction Impacts-  The permanent impacts related to construction and operation of a new sub-station may be substantial depending on the location of the new site and its proximity to residences.
  • 4. SOME KEY DATA  Sub-station Capacity - 132/33KV (2X63MVA) The equipment’s shall be suitable for the system whose are as below-  Nominal System Voltage - 132/33 KV  Highest System Voltage - 145KV/36KV  Frequency - 50 Hz  Number of phases - 3  Neutral Earthing - Solidly effectively earthing
  • 5. A Single Line Diagram (SLD) of an Electrical System isthe Line Diagram of the concerned Electrical System which includes all the required Electrical Equipment connection sequence wise from the point of entrance of Power up to the end of the scope of the mentioned Work.
  • 6.  The diagram made on the control panel is known as mimic diagram. Colors of signals are synchronized as follows: -  Red – For circuit breaker or isolator switch is in closed position.  Green - For circuit breaker is in open condition.  Amber – Indicates spring is charged.
  • 7.  A transformer is an electrical device that transfers energy between two or more circuits through electromagnetic induction.  In 132/33 KV Sub-station at Allahabad (U.P), two types of transformers are provided- - Inter Connecting transformer - Miscellaneous Transformer
  • 8. SequenceOfEquipmentsforan incomingoranoutgoingfeeder- L. A. P.T. / C.V.T C. T. C. B. LIGHTNINGARRESTOR POTENTIALX-MER/CVT ISOLATOR CURRENTTRANSFORMER CIRCUITBREAKER ISOLATOR BUSBAR
  • 9.  They are commonly used in metering and protective relaying in the electrical power industry where they facilitate the safety measurement of large currents, often in the presence of high voltages.  The current transformer safely isolates measurement and control circuitry from high voltage typically present on the circuit being measured.  The CT acts as constant current series device with an apparent power burden a fraction of that of high voltage primary circuit.
  • 10.  Potential transformer is designed for monitoring single-phase and three- phase line voltages in power metering application.  A Potential Transformer is a special type of transformer that allows meters to take reading from electrical service connections with higher voltage.  Potential Transformer has an accuracy of ± 5% from 0 to 130% of .their rated voltage
  • 11.  An Isolator is a manually operated mechanical switch which separates a part of the electrical power system normally at off load condition.  While opening the circuit, circuit breaker opens first and then isolator & while closing the circuit the isolator closed first and then circuit breaker.
  • 12. Following are the main protections used in substation:  Distance protection  Differential Protection  Overvoltage protection  Overcurrent protection  Earth fault protection  Breaker lock-out protection
  • 13.  It is a protective device that reduces excessive voltage resulting from lightning to a safe level by grounding the discharge.  It shows dual characteristics.  During Lightning it works as super conductor whereas normally it works as insulator.
  • 14.  CVT in a substation is used for measurement, protection and as coupling device in PLCC.  In its basic form the device consists of three parts: -  Two capacitors across which the transmission line signal is split, an inductive element to tune the device to line frequency; and  A transformer to isolate and further step down the voltage for instrumentation or protective relay.
  • 15.  A Circuit Breaker is an automatically operated electrical switch designed to protect an electrical circuit from damage caused by excess current from an overload or short circuit.  Its basic function is to interrupt current flow after a fault is detected.
  • 16. Oil Circuit Breaker Air-Blast Circuit Breaker SF6 Circuit Breaker Vacuum Circuit Breaker
  • 17.  It is an electrically operated switch.  Major types of Relay are Electromagnetic & Static type.  It controls High Voltage Electrical Circuits with low voltage signal  In GSS control panels consisting of Relay operates at 110V DC. Relay working
  • 18. Over Current Relay Earth Fault Relay Differential Protection Relay Distance Protection Relay
  • 19.  It provides a surface under the substation which has uniform potential nearly equal to zero or Absolute Earth Potential.  It is of two types –  Neutral Earthing  Equipment Body Earthing
  • 20.  Battery Bank forms the heart of GSS  It is responsible of supplying all the relay panels which are situated in control room  Typically room containing the battery bank is dark in color to avoid the evaporation of solution inside the battery
  • 21.  The training at grid substation has improved my understanding of the subject electrical power transmission and distribution. During the training period, I came to know that, there is a much difference between theoretical understanding and practical approach to the subject.  If we see the transformer it is shown in textbooks two windings changing the voltage level which seems very easy concept.  But practically it is a huge machine with a no. of parts and fittings, protection devices each of which is designed with a very specific purpose.  But of course to design new technology, theoretical knowledge has its own importance but without practical touch, it is of no use.