SlideShare a Scribd company logo
1 of 3
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601

ASSIGNMENT
DRIVE
PROGRAM/SEMESTER
SUBJECT CODE & NAME
BOOK ID
CREDITS
MARKS

FALL DRIVE 2013
MBADS – (SEM 4/SEM 6) / MBAN2 /
MBAFLEX – (SEM 4) / PGDISMN (SEM 2)
OM 0016 – Quality Management
B1341
4
60

Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.

Q1. Explain Benchmarking, Quality Function Deployment (QFD)and their benefits 10 marks(300400) words
Answer : Benchmarking is the process of comparing one's business processes and performance
metrics to industry bests or best practices from other industries. Dimensions typically measured are
quality, time and cost. In the process of best practice benchmarking, management identifies the best
firms in their industry, or in another industry where similar processes exist, and compares the results
and processes of those studied (the "targets") to one's own results and processes. In this way, they
learn how well the targets perform and, more importantly, the business processes that explain why
these firms are successful.

Q2. Write a note on the Pre-requisites of Quality planning 10 marks(300-400) words
Answer : Project Quality Planning is a process for identifying quality standards and requirements for
the overall project as well as its final product, and for keeping records on how the project fits into
the planned quality expectations and levels.
Project quality planning is one of the key components of strategic project quality management. It’s
the starting point for creating a link between stakeholder expectations and product requirements.
The process for planning project quality should be performed in line with the change management
process, because in case of any changes applied to

Q3. What are the different statistical distributions used to model various reliability parameters
10marks(300-400) words
Answer : Introduction
Reliability modelling based on lifetime distributions is probably one of the most widely used
reliability engineering techniques. This technique allows to predict the reliability of a component or
system, or the probability that a component or system will perform its required function during a
specified period of time under stated conditions.
Problem
A company produces standard electronic circuits used to build more complex equipment. The goal is
to perform reliability modelling of considered circuits using a data set of 50 observed survival times.
Specifically,
develop an appropriate survival model, and
Q4. For modern products, explain the concepts on what on which design reviews are based 10
marks(300-400) words
Answer : Restorative development
Restorative design and development acknowledges that human activities have caused significant
negative impacts on the natural environment. It seeks to return polluted, degraded or damaged
sites back to a state of acceptable health through human intervention.
Cradle-to-cradle development
Cradle-to-cradle (eco-effectiveness) design and development, or eco-effectiveness can be described
as the next step on from eco-efficiency because it moves beyond simply reducing environmental
impact (‘less bad’) to the creation of products, buildings or systems with beneficial environmental or
social outcomes (McDonough and Braun art,

Q5. What are the important components of retest reliability? 10 marks(300-400) words
Answer : 'Reliability' of any research is the degree to which it gives an accurate score across a range
of measurement. It can thus be viewed as being 'repeatability' or 'consistency'. In summary:
Inter-ratter: Different people, same test.
Test-retest: Same people, different times.
Parallel-forms: Different people, same time, different test.
Internal consistency: Different questions, same construct.
Inter-Ratter Reliability

Q6. Explain the advantages and disadvantages of Six Sigma in brief 10 marks(300-400) words
Answer : Advantages :
(1) Six Sigma is driven by the customer and thus aims to achieve maximum customer satisfaction
and minimizing the defects. It targets the customer delight and new innovative ways to exceed the
customer expectations.
(2) Implementation of Six Sigma methodology leads to rise of profitability and reduction in costs.
Thus improvements achieved are directly related to financial results.
(3) Six Sigma is successfully implemented in

Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601

More Related Content

What's hot

VALUE ANALYSIS,VALUE ENGINEERING, BUSINESS PROCESS REENGINEERING
VALUE ANALYSIS,VALUE ENGINEERING, BUSINESS PROCESS REENGINEERINGVALUE ANALYSIS,VALUE ENGINEERING, BUSINESS PROCESS REENGINEERING
VALUE ANALYSIS,VALUE ENGINEERING, BUSINESS PROCESS REENGINEERINGT HARI KUMAR
 
VALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTVALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTAbhay Sharma
 
Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in constructionDr Ezzat Mansour
 
Value analysis and Value Engineering
Value analysis and Value EngineeringValue analysis and Value Engineering
Value analysis and Value EngineeringTushar Lohani
 
Design and Engineering Module-5: Product Centered Design and User Centered De...
Design and Engineering Module-5: Product Centered Design and User Centered De...Design and Engineering Module-5: Product Centered Design and User Centered De...
Design and Engineering Module-5: Product Centered Design and User Centered De...Naseel Ibnu Azeez
 
IRJET- Improving Labour Productivity in Construction Industries
IRJET- Improving Labour Productivity in Construction IndustriesIRJET- Improving Labour Productivity in Construction Industries
IRJET- Improving Labour Productivity in Construction IndustriesIRJET Journal
 
What is value engineering
What is value engineeringWhat is value engineering
What is value engineeringPuneet Pal
 
Pugh matrix concept evaluation in Design
Pugh matrix concept evaluation in DesignPugh matrix concept evaluation in Design
Pugh matrix concept evaluation in DesignYogesh Prasad
 
Pm0017 project quality management...
Pm0017  project quality management...Pm0017  project quality management...
Pm0017 project quality management...smumbahelp
 
Reliability And Validity Iv
Reliability And Validity IvReliability And Validity Iv
Reliability And Validity Ivrk1672
 
Value analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost ControlValue analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost Controlsunilrajpawar
 
Value analysis and value engineering
Value  analysis and value engineeringValue  analysis and value engineering
Value analysis and value engineeringudayravi2
 
Value engineering pom
Value engineering pomValue engineering pom
Value engineering pomVishal Naik
 
Mind map designthinking_transformation_product_engineering
Mind map designthinking_transformation_product_engineeringMind map designthinking_transformation_product_engineering
Mind map designthinking_transformation_product_engineeringAmandeep Bhatia
 
Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Projectajmal4
 
Hilary Martin CV 07 16
Hilary Martin CV 07 16Hilary Martin CV 07 16
Hilary Martin CV 07 16Hilary Martin
 

What's hot (19)

VALUE ANALYSIS,VALUE ENGINEERING, BUSINESS PROCESS REENGINEERING
VALUE ANALYSIS,VALUE ENGINEERING, BUSINESS PROCESS REENGINEERINGVALUE ANALYSIS,VALUE ENGINEERING, BUSINESS PROCESS REENGINEERING
VALUE ANALYSIS,VALUE ENGINEERING, BUSINESS PROCESS REENGINEERING
 
VALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTVALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPT
 
Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in construction
 
Value analysis and Value Engineering
Value analysis and Value EngineeringValue analysis and Value Engineering
Value analysis and Value Engineering
 
Design and Engineering Module-5: Product Centered Design and User Centered De...
Design and Engineering Module-5: Product Centered Design and User Centered De...Design and Engineering Module-5: Product Centered Design and User Centered De...
Design and Engineering Module-5: Product Centered Design and User Centered De...
 
IRJET- Improving Labour Productivity in Construction Industries
IRJET- Improving Labour Productivity in Construction IndustriesIRJET- Improving Labour Productivity in Construction Industries
IRJET- Improving Labour Productivity in Construction Industries
 
What is value engineering
What is value engineeringWhat is value engineering
What is value engineering
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Pugh matrix concept evaluation in Design
Pugh matrix concept evaluation in DesignPugh matrix concept evaluation in Design
Pugh matrix concept evaluation in Design
 
Pm0017 project quality management...
Pm0017  project quality management...Pm0017  project quality management...
Pm0017 project quality management...
 
Reliability And Validity Iv
Reliability And Validity IvReliability And Validity Iv
Reliability And Validity Iv
 
Value analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost ControlValue analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost Control
 
Value analysis and value engineering
Value  analysis and value engineeringValue  analysis and value engineering
Value analysis and value engineering
 
Value engineering pom
Value engineering pomValue engineering pom
Value engineering pom
 
Mind map designthinking_transformation_product_engineering
Mind map designthinking_transformation_product_engineeringMind map designthinking_transformation_product_engineering
Mind map designthinking_transformation_product_engineering
 
122 value engineering
122 value engineering122 value engineering
122 value engineering
 
Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Project
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Hilary Martin CV 07 16
Hilary Martin CV 07 16Hilary Martin CV 07 16
Hilary Martin CV 07 16
 

Viewers also liked

Pm0012 – project finance
Pm0012 – project financePm0012 – project finance
Pm0012 – project financesmumbahelp
 
Matkailumarkkinointia ulkomaalaisille asiakkaille
Matkailumarkkinointia ulkomaalaisille asiakkailleMatkailumarkkinointia ulkomaalaisille asiakkaille
Matkailumarkkinointia ulkomaalaisille asiakkailleJuho Pesonen
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance managementsmumbahelp
 
Om0011 – enterprise resource planning
Om0011 – enterprise resource planningOm0011 – enterprise resource planning
Om0011 – enterprise resource planningsmumbahelp
 
Matkailuyrityksen verkkonäkyvyyden rakentaminen
Matkailuyrityksen verkkonäkyvyyden rakentaminen Matkailuyrityksen verkkonäkyvyyden rakentaminen
Matkailuyrityksen verkkonäkyvyyden rakentaminen Juho Pesonen
 
Om0018 technology management
Om0018  technology managementOm0018  technology management
Om0018 technology managementsmumbahelp
 
Pm0011 – project planning
Pm0011 – project planningPm0011 – project planning
Pm0011 – project planningsmumbahelp
 
Identify before you Amplify
Identify before you AmplifyIdentify before you Amplify
Identify before you AmplifyKathy Bass
 
Pm0013 – managing human resources in projects
Pm0013 – managing human resources in projectsPm0013 – managing human resources in projects
Pm0013 – managing human resources in projectssmumbahelp
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
Sc0006 – global logistics and supply chain management
Sc0006 – global logistics and supply chain managementSc0006 – global logistics and supply chain management
Sc0006 – global logistics and supply chain managementsmumbahelp
 
Sc0007 – category management in purchasing
Sc0007 – category management in purchasingSc0007 – category management in purchasing
Sc0007 – category management in purchasingsmumbahelp
 
Sähköisen matkailumarkkinoinnin perusteet
Sähköisen matkailumarkkinoinnin perusteetSähköisen matkailumarkkinoinnin perusteet
Sähköisen matkailumarkkinoinnin perusteetJuho Pesonen
 
Pm0018 –contracts management in projects
Pm0018 –contracts management in projectsPm0018 –contracts management in projects
Pm0018 –contracts management in projectssmumbahelp
 
Matkailun verkkosivut ja sosiaalinen media matkailussa
Matkailun verkkosivut ja sosiaalinen media matkailussaMatkailun verkkosivut ja sosiaalinen media matkailussa
Matkailun verkkosivut ja sosiaalinen media matkailussaJuho Pesonen
 
Powerpoint gestion de projet (1)
Powerpoint gestion de projet (1)Powerpoint gestion de projet (1)
Powerpoint gestion de projet (1)nslimani84
 
Pm0016 –project risk management
Pm0016 –project risk managementPm0016 –project risk management
Pm0016 –project risk managementsmumbahelp
 
Om0012 – supply chain management
Om0012 – supply chain managementOm0012 – supply chain management
Om0012 – supply chain managementsmumbahelp
 
Pm0017 –project quality management
Pm0017 –project quality managementPm0017 –project quality management
Pm0017 –project quality managementsmumbahelp
 

Viewers also liked (20)

Pm0012 – project finance
Pm0012 – project financePm0012 – project finance
Pm0012 – project finance
 
Matkailumarkkinointia ulkomaalaisille asiakkaille
Matkailumarkkinointia ulkomaalaisille asiakkailleMatkailumarkkinointia ulkomaalaisille asiakkaille
Matkailumarkkinointia ulkomaalaisille asiakkaille
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance management
 
Om0011 – enterprise resource planning
Om0011 – enterprise resource planningOm0011 – enterprise resource planning
Om0011 – enterprise resource planning
 
Matkailuyrityksen verkkonäkyvyyden rakentaminen
Matkailuyrityksen verkkonäkyvyyden rakentaminen Matkailuyrityksen verkkonäkyvyyden rakentaminen
Matkailuyrityksen verkkonäkyvyyden rakentaminen
 
Personal social
Personal socialPersonal social
Personal social
 
Om0018 technology management
Om0018  technology managementOm0018  technology management
Om0018 technology management
 
Pm0011 – project planning
Pm0011 – project planningPm0011 – project planning
Pm0011 – project planning
 
Identify before you Amplify
Identify before you AmplifyIdentify before you Amplify
Identify before you Amplify
 
Pm0013 – managing human resources in projects
Pm0013 – managing human resources in projectsPm0013 – managing human resources in projects
Pm0013 – managing human resources in projects
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
Sc0006 – global logistics and supply chain management
Sc0006 – global logistics and supply chain managementSc0006 – global logistics and supply chain management
Sc0006 – global logistics and supply chain management
 
Sc0007 – category management in purchasing
Sc0007 – category management in purchasingSc0007 – category management in purchasing
Sc0007 – category management in purchasing
 
Sähköisen matkailumarkkinoinnin perusteet
Sähköisen matkailumarkkinoinnin perusteetSähköisen matkailumarkkinoinnin perusteet
Sähköisen matkailumarkkinoinnin perusteet
 
Pm0018 –contracts management in projects
Pm0018 –contracts management in projectsPm0018 –contracts management in projects
Pm0018 –contracts management in projects
 
Matkailun verkkosivut ja sosiaalinen media matkailussa
Matkailun verkkosivut ja sosiaalinen media matkailussaMatkailun verkkosivut ja sosiaalinen media matkailussa
Matkailun verkkosivut ja sosiaalinen media matkailussa
 
Powerpoint gestion de projet (1)
Powerpoint gestion de projet (1)Powerpoint gestion de projet (1)
Powerpoint gestion de projet (1)
 
Pm0016 –project risk management
Pm0016 –project risk managementPm0016 –project risk management
Pm0016 –project risk management
 
Om0012 – supply chain management
Om0012 – supply chain managementOm0012 – supply chain management
Om0012 – supply chain management
 
Pm0017 –project quality management
Pm0017 –project quality managementPm0017 –project quality management
Pm0017 –project quality management
 

Similar to Om0016 – quality management

Pm0017 summer-2016
Pm0017 summer-2016Pm0017 summer-2016
Pm0017 summer-2016smumbahelp
 
Qm0013 quality management tools
Qm0013  quality management toolsQm0013  quality management tools
Qm0013 quality management toolssmumbahelp
 
Qm0013 quality management tools
Qm0013   quality management toolsQm0013   quality management tools
Qm0013 quality management toolssmumbahelp
 
Quality systems management
Quality systems managementQuality systems management
Quality systems managementsmumbahelp
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Mit104 software engineering
Mit104  software engineeringMit104  software engineering
Mit104 software engineeringsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
How to Determine Appropriate Software Quality
How to Determine Appropriate Software QualityHow to Determine Appropriate Software Quality
How to Determine Appropriate Software QualitySamuel A. Fricker
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniquessmumbahelp
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project managementsmumbahelp
 
Qm0018 quality development methods
Qm0018   quality development methodsQm0018   quality development methods
Qm0018 quality development methodssmumbahelp
 
PASS grade must be achievedOutcomesLearner has demonstr.docx
PASS grade must be achievedOutcomesLearner has demonstr.docxPASS grade must be achievedOutcomesLearner has demonstr.docx
PASS grade must be achievedOutcomesLearner has demonstr.docxherbertwilson5999
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Qm0018 quality development methods
Qm0018   quality development methodsQm0018   quality development methods
Qm0018 quality development methodssmumbahelp
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality managementsmumbahelp
 

Similar to Om0016 – quality management (20)

Pm0017 summer-2016
Pm0017 summer-2016Pm0017 summer-2016
Pm0017 summer-2016
 
Qm0013 quality management tools
Qm0013  quality management toolsQm0013  quality management tools
Qm0013 quality management tools
 
Qm0013 quality management tools
Qm0013   quality management toolsQm0013   quality management tools
Qm0013 quality management tools
 
Quality systems management
Quality systems managementQuality systems management
Quality systems management
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Mit104 software engineering
Mit104  software engineeringMit104  software engineering
Mit104 software engineering
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
How to Determine Appropriate Software Quality
How to Determine Appropriate Software QualityHow to Determine Appropriate Software Quality
How to Determine Appropriate Software Quality
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniques
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project management
 
Qm0018 quality development methods
Qm0018   quality development methodsQm0018   quality development methods
Qm0018 quality development methods
 
Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)
 
PASS grade must be achievedOutcomesLearner has demonstr.docx
PASS grade must be achievedOutcomesLearner has demonstr.docxPASS grade must be achievedOutcomesLearner has demonstr.docx
PASS grade must be achievedOutcomesLearner has demonstr.docx
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Qm0018 quality development methods
Qm0018   quality development methodsQm0018   quality development methods
Qm0018 quality development methods
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality management
 
E0354033038
E0354033038E0354033038
E0354033038
 
PROACTVE
PROACTVEPROACTVE
PROACTVE
 

Recently uploaded

FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 

Recently uploaded (20)

FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 

Om0016 – quality management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : help.mbaassignments@gmail.com or call us at : 08263069601 ASSIGNMENT DRIVE PROGRAM/SEMESTER SUBJECT CODE & NAME BOOK ID CREDITS MARKS FALL DRIVE 2013 MBADS – (SEM 4/SEM 6) / MBAN2 / MBAFLEX – (SEM 4) / PGDISMN (SEM 2) OM 0016 – Quality Management B1341 4 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Q1. Explain Benchmarking, Quality Function Deployment (QFD)and their benefits 10 marks(300400) words Answer : Benchmarking is the process of comparing one's business processes and performance metrics to industry bests or best practices from other industries. Dimensions typically measured are quality, time and cost. In the process of best practice benchmarking, management identifies the best firms in their industry, or in another industry where similar processes exist, and compares the results and processes of those studied (the "targets") to one's own results and processes. In this way, they learn how well the targets perform and, more importantly, the business processes that explain why these firms are successful. Q2. Write a note on the Pre-requisites of Quality planning 10 marks(300-400) words Answer : Project Quality Planning is a process for identifying quality standards and requirements for the overall project as well as its final product, and for keeping records on how the project fits into the planned quality expectations and levels. Project quality planning is one of the key components of strategic project quality management. It’s the starting point for creating a link between stakeholder expectations and product requirements. The process for planning project quality should be performed in line with the change management process, because in case of any changes applied to Q3. What are the different statistical distributions used to model various reliability parameters 10marks(300-400) words Answer : Introduction
  • 2. Reliability modelling based on lifetime distributions is probably one of the most widely used reliability engineering techniques. This technique allows to predict the reliability of a component or system, or the probability that a component or system will perform its required function during a specified period of time under stated conditions. Problem A company produces standard electronic circuits used to build more complex equipment. The goal is to perform reliability modelling of considered circuits using a data set of 50 observed survival times. Specifically, develop an appropriate survival model, and Q4. For modern products, explain the concepts on what on which design reviews are based 10 marks(300-400) words Answer : Restorative development Restorative design and development acknowledges that human activities have caused significant negative impacts on the natural environment. It seeks to return polluted, degraded or damaged sites back to a state of acceptable health through human intervention. Cradle-to-cradle development Cradle-to-cradle (eco-effectiveness) design and development, or eco-effectiveness can be described as the next step on from eco-efficiency because it moves beyond simply reducing environmental impact (‘less bad’) to the creation of products, buildings or systems with beneficial environmental or social outcomes (McDonough and Braun art, Q5. What are the important components of retest reliability? 10 marks(300-400) words Answer : 'Reliability' of any research is the degree to which it gives an accurate score across a range of measurement. It can thus be viewed as being 'repeatability' or 'consistency'. In summary: Inter-ratter: Different people, same test. Test-retest: Same people, different times. Parallel-forms: Different people, same time, different test. Internal consistency: Different questions, same construct. Inter-Ratter Reliability Q6. Explain the advantages and disadvantages of Six Sigma in brief 10 marks(300-400) words Answer : Advantages : (1) Six Sigma is driven by the customer and thus aims to achieve maximum customer satisfaction and minimizing the defects. It targets the customer delight and new innovative ways to exceed the customer expectations. (2) Implementation of Six Sigma methodology leads to rise of profitability and reduction in costs. Thus improvements achieved are directly related to financial results. (3) Six Sigma is successfully implemented in Dear students get fully solved assignments Send your semester & Specialization name to our mail id : help.mbaassignments@gmail.com
  • 3. or call us at : 08263069601