➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men 🔝narsinghpur🔝 ...
Production schedule
1. Production Schedule
Date What needs to be done Location By Who Equipment Needed
11TH
December
2015
Pre-Production Tasks
Completed Pre Production
and put on Blogger
Ringwood
School
Jordan Wardle Computer with internet access
12TH
December
2015
Pre- Production – Health
and Safety Risk
Assessment of my
locations: Kitchen,
bathroom, living room.
House in
Bransgore
(location)
Angus Smith Computer
16th
December
2015
Look at the script with
the actors and get them
to understand their role,
locations and time.
Ringwood
School
Angus Smith
Thomas Atkinson
Script for actor
Location plans
Character analysis
4th January
2015
Production: Filming all
shots in the one day. I
will arrive at the
Actor’s house (location)
promptly at 10am to begin
shooting. Shots will not
necessarily be filmed in
order. For example
bathroom shots and speech
shots will be filmed in
the evening when there is
low light. I aim to
finish filming by 5pm.
This allows me enough
time to get the correct
shot, and have multiple
takes on a shot.
Bransgore
house
(location)
Angus Smith
Thomas Atkinson
600D Camera
Tripod
Microphone
SD card
All props
Scripts
Storyboards
Food (for breaks during
filming)
9th January
2016
Production: This is spare
time to use if I need to
film more shots, or re-
film some shots after
viewing the footage I
took on the first
production date. This
could be due to out of
focus shots. Same
Production schedule 10-
5pm if needed.
Bransgore
house
(location)
Angus Smith
Thomas Atkinson
600D Camera
Tripod
Microphone
SD card
All props
Scripts
Storyboards
Food (for breaks during
filming)
2. 11th
January
2016
Post Production: Put
all footage onto my PC
in a new folder named
: Angus Smith Media –
‘Fleeting existence’
Ringwood
School/Home
Angus Smith Computer, memory card and
headphones
11th
January
2016
Post Production:
Create an animated
title for the film
using Adobe
illustrator.
Ringwood
School
Angus Smith Computer,
Adobe illustrator Software
16th
January
2016
Post Production:
Find and select
royalty free music
from a trusted
website, Youtube or
from the artist. All
music must be
copyright free or I
must access the rights
to use it.
Ringwood
School/Home
Angus Smith Computer and Headphones
17th
January
2016
Post Production:
Upload footage to Sony
Vegas software, begin
editing initial shots
along with music.
Ringwood
School/Home
Angus Smith Computer and Headphones
Sony Vegas editing software
18th
January
2016
Post Production:
Continue editing,
moving onto the middle
section of the 2
minute opening.
Ringwood
School/Home
Angus Smith Computer and Headphones
Sony Vegas Software
19th
January
2016
Post Production:
Final editing for the
last section of the 2
minute opening.
Ringwood
School/Home
Angus Smith Computer and Headphones
Sony Vegas Software
20th
January
2016
Any final adjustments
to the editing, Then
colour grading and
correction of the
film. After that is
finished, render the
film.
Ringwood
School/Home
Angus Smith Computer and Headphones
Sony Vegas Software
3. 20th – 25th
January
2016
Show film opening to
an audience/different
people and ask for
their thoughts using a
questionnaire and if
there are any
improvements required.
Ringwood
School/Home
Angus Smith Media player (ipad,
computer)
Headphones
Questionaire
26th-28th
January
2016
Make any adjustments
in editing if needed
and then render the
final copy.
Ringwood
school/Home
Angus Smith Computer and Headphones
Sony Vegas Software
29th
February
2016
Complete the
evaluation questions 1
& 2
Ringwood
School
Angus Smith Computer and Headphones
7th March
2016
Complete evaluation
questions 3,4 & 5
Ringwood
School
Angus Smith Computer and Headphones
14th March
2016
Complete evaluation
questions 4,5 & 6
Ringwood
School
Angus Smith Computer and Headphones
21st March
2016
Complete evaluation
questions 6 & 7 Upload
all evaluation
questions to blog.
Ringwood
School
Angus Smith Computer and Headphones