WORKING OF DRAGLINE

         I. Satyanarayana,
                          M.Tech,MBA,MCA



Dy. Manager, Project Planning, SCCL,

       isnindian@gmail.com,

              visit at

   www.slideshare.net/isnindian


                   ISN
ISN
DRAGLINE
•   Walking draglines are for many years the most
    popular machine for opencast mining due to their
    flexibility, utility and availability.
•   their low operating costs for waste mining
•   Draglines are deployed wherever there is scope for
    side casting Overburden above coal seam into the
    de-coaled area.
•   It is very cost effective technology- cost of OB
    removal is cheaper than shovel dumper technology.
•   There are two draglines working at RGOC-I and RG
    OC-III with bucket size of 24 Cum and 30.6 Cum
    respectively.
•   Both these draglines are performing very well.
•   The bucket is maneuvered by means of a number of
    ropes and chains.


                            ISN
DRAGLINE
The dragline is a typical combined cyclic excavator and
   material carrier since it both excavates material and
   dumps it without the use of trucks or conveyor
   belts. The dragline sits above the waste or
   overburden block, usually 50m or so wide, on the
   highwall side and excavates the material in front of
   itself, to dump it on the low-wall or spoil side of the
   strip to uncover the coal seam below it.




                             ISN
OPERATION OF DRAGLINE
In a typical cycle of excavation, the bucket is positioned
above the material to be excavated.
The bucket is then lowered and the dragrope is then drawn so
that the bucket is dragged along the surface of the material.
The bucket is then lifted by using the hoist rope.
A swing operation is then performed to move the bucket to
the place where the material is to be dumped.
The dragrope is then released causing the bucket to tilt and
empty. This is called a dump operation.
It is a independent machine unlike a shovel.
A 30 cum Dragline can handle 40 Lakh cum of OB per annum.
The dragline works on the immediate OB bench above coal
and the benches from the surface to the Dragline are normally
handled by Shovel & Dumper combination. Hence adequate
capacity of Shovel & Dumper ISN capacity should be provided to
prevent idling of the Dragline.
OPERATION OF DRAGLINE
The Dragline has a long boom with a bucket capacity ranging
from 15 to 50 cum.
It can swing in 360 degrees, after dragging the loose material
below its level.
It swings normally between 90 to 120 degrees and side cast
the material in to the de-coaled area.
The nomenclature of the Dragline usually called as 24/99
which means 24 cum of bucket capacity and 96 m is the boom
length.
The same Dragline can have about 32 cum of bucket capacity
if the boom length of 71 m. normally
the Draglines is electrically driven with 6.6 KV power with 2
main motors of 1750 HP each. These motors inturn drive the
Generators and the Generators drive DC motors
Normally there are 7 DC motors for different operations like
                              ISN
marching, dragging, hoisting, swinging etc.,
DRAGLINE BUCKET




       ISN
LINE DIAGRAM OF DRAGLINE




             ISN
LINE DIAGRAM OF DRAGLINE




             ISN
APPLICATION OF DRAGLINE
1.   Gradients flatter than 1 in 6 (if gradient is more the
     dumped OB will slide towards the coal face and
     particularly in rainy season the extraction of coal
     become dangerous)
2.   Seams should be free of faults & other geological
     disturbances
3.   Deposits with Larger Strike length (>2 km) so that
     frequent shifting of the Dragline from one end to
     another can be reduced.
4.   Present cost of the Dragline is above 100 Cr and the
     life of the Dragline is 1.50 Lakh hours hence, the
     property should be large enough ensuring the life of
     about 25 yr or more.
5.   A hilly property is not suitable
                              ISN
6.   Property should have atleast 15 years life
DRAGLINE – Methods of Working
– Simple casing method with or without
  rehandling.
– Extended bench method.
– Horse shoe /Spoil Bank/Across Pit
  method.
– Continuous bench two pass method.
– Tandem dragline working i.e., two
  draglines working together, one dealing
  with part of the material dumped by the
  other.
                    ISN
Simple Casting
This is simple method of Dragline working. In this method the Dragline is sited
on immediate OB bench above Coal and removes the OB and dumps it in the
de-coaled area of previous cut.
The width of the cut normally less than 40 m so that re-handling of the OB will
be negligible. The method is extremely suitable for singly thin seam mining.




                                      ISN
ISN
ISN
ISN
Simple Casting




      ISN
BALANCING DIAGRAM




        ISN
ISN
ISN
BALANCING DIAGRAM OF
    WEST SECTION




         ISN
ISN
Extended Bench Method
• As the name is suggested, the Dragline bench is
  extended by dumping a part of OB by dragline into de-
  coal area and the space is levelled by dozing and the
  same Dragline can be sited in 2nd position on the
  dumped and dozzed OB.
• This enables the distance between 1st and 2nd position to
  be more when compared with simple casting method.
• The increasing distance increases the capability of the
  Dragline to dump OB further away in de-coaled area, so
  that sliding of OB on to the coal bench is to be minimized.
• A Dragline has to do more re handling now. This method
  is suitable for exposing relatively thicker seams.

                            ISN
ISN
ISN
ISN
ISN
Extended Bench Method




S.No      D/L      Excavating       Cut         Area m2    Dump
        Position                                 (solid)
 1        P-1        1st Dig    D’A’B’CFF’RST   480+19     YRQOU
                                                   2

                                 ISN
Extended Bench Method with cast Blast




                 ISN
Spoil Bank Method
• The method is adapted when there are 2 seams
  and having parting between 10 to 12 m.
• In the first position, the Dragline exposes the top
  seam by side casting the OB above the top
  seam.
• The side casting material is dozed and leveled.
• After extraction of the top seam the parting OB is
  loosened by blasting and the Dragline is placed
  on the already side casted leveled material and
  the remaining parting OB of above bottom seam
  is removed by the dragline and side casted
  exposing the bottom seam.
                         ISN
Spoil Bank Method




       ISN
ISN
Spoil Bank Method




  D/L      Operational   Excavation       Cut         Area m2     Dump
Position    position                                   (solid)
26M/81     Main Bench     1st Dig      ABCDEFGH       280+904     MPQRIS
  R        Position                                                 ’SU
           (MBP)
           Spoil Bench    1st Dig         IJKL          332
           Position
           (SBP)
                         Rehandle       ISN
                                      QPIS’ST+VV’N   513+17+152   MNOVW
                                            N’                    W’X’XY
Continuous Bench Two pass Method




               ISN
Tandem Working of Draglines
• In this method 2 Draglines are put into in
  tandem operation one above the other
  with a minimum horizontal distance of 100
  m between them. This method is adopted
  where the coal seam thickness is more
  than 30 m and to handle the OB bench of
  60 m above the coal seam.


                     ISN
Tandem Working of Draglines




   Dragline      Cut        Dump      Area m2
                                       (solid)      D/L 10/70 is
    10/70       ABCD         abcd      285.0
                                                 150-200m ahead of
    20/90       CDEF        kmnofci    570.0
                (Dig)
                                                     D/L 20/90
              Ijkl (R.H.)               9.6
              Ebf (R.H.)    ISN         1.0
Variables with Draglines

•Swing and boom angle of a dragline.
•Increase or decrease of bucket size (within
limits) with consequent decrease or increase of
boom length.
•Cut width and height of dragline bench.
•Method of use of dragline/draglines.
•More than one position of a dragline.
•Adopting cast-blasting to the desired extent.

                       ISN
Technical specifications of Dragline
             (24 x 96)
   - Boom length             : 74 - 95 m
   - Boom angle              : 30°- 38°
   - Bucket Capacity (nominal): 26 - 34 cu m
   - Dump height             : 38 - 40 m
   - Digging depth           : 44.3 - 53.4 m
   - Operating radius        : 64.6 - 88.2 m
   - Walking speed           : 0.24 kmph
   - Bearing Pressure        : 0.95 kg/cm2



                        ISN
SPECIFICATIONS OF OC-I DRAGLINE

    MAKE                        Ranson & Rapier
    Bucket Capacity             M3           24
    Annual capacity             mm3        3.31
    Boom Length                 Mtrs       95.6
    Operating Radius            Mtrs         88
    Dumping Height              Mtrs       39.6
    Base Dia                    Mtrs         16
    Shoe Length                 Mtrs         17
    Shoe Width                  Mtrs        2.8
    Movement of Machine         Mtrs        2.2
    Weight of Machine           Tonnes    2000
    Total H.P                   H.P.      3500
                          ISN
ISN

More Related Content

What's hot

Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blastingpartha sharma
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
Haul road design
Haul road designHaul road design
Haul road designVR M
 
Drilling in mining
Drilling in miningDrilling in mining
Drilling in miningEder Reyes
 
Surface miner and its performance
Surface miner and its performanceSurface miner and its performance
Surface miner and its performanceSafdar Ali
 
Mine locomotive ppt (under ground transport system )
Mine locomotive ppt (under ground transport system )Mine locomotive ppt (under ground transport system )
Mine locomotive ppt (under ground transport system )AMIT SAHU
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drillpavan kumar
 
Jack hammer drill
Jack hammer drillJack hammer drill
Jack hammer drillSafdar Ali
 
Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in miningRishabh Ranjan
 
Shovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptxShovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptxRiteshkumarMadhukar
 

What's hot (20)

Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blasting
 
Subsidence in coal mines
Subsidence in coal minesSubsidence in coal mines
Subsidence in coal mines
 
Surface miner
Surface minerSurface miner
Surface miner
 
Mine fan
Mine fanMine fan
Mine fan
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
Haul road design
Haul road designHaul road design
Haul road design
 
Drilling in mining
Drilling in miningDrilling in mining
Drilling in mining
 
Surface miner and its performance
Surface miner and its performanceSurface miner and its performance
Surface miner and its performance
 
Mine locomotive ppt (under ground transport system )
Mine locomotive ppt (under ground transport system )Mine locomotive ppt (under ground transport system )
Mine locomotive ppt (under ground transport system )
 
Scraper
ScraperScraper
Scraper
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
Shovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptxShovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptx
 
Jack hammer drill
Jack hammer drillJack hammer drill
Jack hammer drill
 
Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in mining
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Shovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptxShovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptx
 
High Wall Mining
High Wall MiningHigh Wall Mining
High Wall Mining
 

Viewers also liked

M.tech seminar
M.tech seminarM.tech seminar
M.tech seminarvartika07
 
Projet urbain sur Bardo Constantine
Projet urbain sur Bardo Constantine Projet urbain sur Bardo Constantine
Projet urbain sur Bardo Constantine Hayat GOUDJIL
 
Catalogue de dimensionnement des chaussees neuves (fascicule1)
Catalogue de dimensionnement des chaussees neuves (fascicule1)Catalogue de dimensionnement des chaussees neuves (fascicule1)
Catalogue de dimensionnement des chaussees neuves (fascicule1)Adel Nehaoua
 
Design optimization of excavator bucket using Finite Element Method
Design optimization of excavator bucket using Finite Element MethodDesign optimization of excavator bucket using Finite Element Method
Design optimization of excavator bucket using Finite Element MethodIjripublishers Ijri
 
Prestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upPrestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upAyaz Malik
 

Viewers also liked (9)

M.tech seminar
M.tech seminarM.tech seminar
M.tech seminar
 
Projet urbain sur Bardo Constantine
Projet urbain sur Bardo Constantine Projet urbain sur Bardo Constantine
Projet urbain sur Bardo Constantine
 
Atelier projet urbain
Atelier  projet urbain Atelier  projet urbain
Atelier projet urbain
 
Catalogue de dimensionnement des chaussees neuves (fascicule1)
Catalogue de dimensionnement des chaussees neuves (fascicule1)Catalogue de dimensionnement des chaussees neuves (fascicule1)
Catalogue de dimensionnement des chaussees neuves (fascicule1)
 
Thesis_3_10
Thesis_3_10Thesis_3_10
Thesis_3_10
 
13 21 (1)
13 21 (1)13 21 (1)
13 21 (1)
 
Design optimization of excavator bucket using Finite Element Method
Design optimization of excavator bucket using Finite Element MethodDesign optimization of excavator bucket using Finite Element Method
Design optimization of excavator bucket using Finite Element Method
 
Prestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upPrestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take up
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 

Similar to Working of dragline

Mine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxMine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxEmmanuelTokpahII
 
Design of earth dam at gorukallu
Design of earth dam at gorukalluDesign of earth dam at gorukallu
Design of earth dam at gorukallurohinibjn
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentationrajkumar_sm
 
Troughed Belt Conveyor & Flat Belt Conveyor
Troughed Belt Conveyor & Flat Belt ConveyorTroughed Belt Conveyor & Flat Belt Conveyor
Troughed Belt Conveyor & Flat Belt ConveyorMAKAUT
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam miningSafdar Ali
 
Mining Methods
Mining MethodsMining Methods
Mining MethodsVR M
 
Modelling Granular and Fluid Flows in Equipment Design
Modelling Granular and Fluid Flows in Equipment DesignModelling Granular and Fluid Flows in Equipment Design
Modelling Granular and Fluid Flows in Equipment DesignInnovation Centre WA
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavatorVivek Kumar
 
Drag line excavator
Drag line excavatorDrag line excavator
Drag line excavatorParth Desani
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator pptknowledge
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSSuyash Awasthi
 
Semimechanization sdls&lh ds
Semimechanization sdls&lh dsSemimechanization sdls&lh ds
Semimechanization sdls&lh dsSATYANARAYANA I
 

Similar to Working of dragline (20)

Mine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxMine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptx
 
PDF document lecture 3.pdf
PDF document lecture 3.pdfPDF document lecture 3.pdf
PDF document lecture 3.pdf
 
Design of earth dam at gorukallu
Design of earth dam at gorukalluDesign of earth dam at gorukallu
Design of earth dam at gorukallu
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
 
Troughed Belt Conveyor & Flat Belt Conveyor
Troughed Belt Conveyor & Flat Belt ConveyorTroughed Belt Conveyor & Flat Belt Conveyor
Troughed Belt Conveyor & Flat Belt Conveyor
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Miningmethods 1228473621975095-9
Miningmethods 1228473621975095-9Miningmethods 1228473621975095-9
Miningmethods 1228473621975095-9
 
Mining Methods
Mining MethodsMining Methods
Mining Methods
 
Modelling Granular and Fluid Flows in Equipment Design
Modelling Granular and Fluid Flows in Equipment DesignModelling Granular and Fluid Flows in Equipment Design
Modelling Granular and Fluid Flows in Equipment Design
 
Ch2 before
Ch2 beforeCh2 before
Ch2 before
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavator
 
Drag line excavator
Drag line excavatorDrag line excavator
Drag line excavator
 
Sizing
SizingSizing
Sizing
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator ppt
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
 
Semimechanization sdls&lh ds
Semimechanization sdls&lh dsSemimechanization sdls&lh ds
Semimechanization sdls&lh ds
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 
Selection of viable ug technology
Selection of viable ug technologySelection of viable ug technology
Selection of viable ug technology
 

More from SATYANARAYANA I

More from SATYANARAYANA I (12)

Chap9 anrep1314
Chap9 anrep1314Chap9 anrep1314
Chap9 anrep1314
 
Basics of drilling 4
Basics of drilling 4Basics of drilling 4
Basics of drilling 4
 
Basics of drilling 3
Basics of drilling 3Basics of drilling 3
Basics of drilling 3
 
Basics of drilling 2
Basics of drilling 2Basics of drilling 2
Basics of drilling 2
 
Basics of drilling 5
Basics of drilling 5Basics of drilling 5
Basics of drilling 5
 
Working of icc bwe-rock breaker
Working of icc bwe-rock breakerWorking of icc bwe-rock breaker
Working of icc bwe-rock breaker
 
Scraper ripper-grader-dozer
Scraper ripper-grader-dozerScraper ripper-grader-dozer
Scraper ripper-grader-dozer
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
 
Basics of openpit mining
Basics of openpit miningBasics of openpit mining
Basics of openpit mining
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
Extraction of developed pillars
Extraction of developed pillarsExtraction of developed pillars
Extraction of developed pillars
 
Differnt technologies in oc mines
Differnt technologies in oc minesDiffernt technologies in oc mines
Differnt technologies in oc mines
 

Recently uploaded

SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Hyundai Motor Group
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Working of dragline

  • 1. WORKING OF DRAGLINE I. Satyanarayana, M.Tech,MBA,MCA Dy. Manager, Project Planning, SCCL, isnindian@gmail.com, visit at www.slideshare.net/isnindian ISN
  • 2. ISN
  • 3. DRAGLINE • Walking draglines are for many years the most popular machine for opencast mining due to their flexibility, utility and availability. • their low operating costs for waste mining • Draglines are deployed wherever there is scope for side casting Overburden above coal seam into the de-coaled area. • It is very cost effective technology- cost of OB removal is cheaper than shovel dumper technology. • There are two draglines working at RGOC-I and RG OC-III with bucket size of 24 Cum and 30.6 Cum respectively. • Both these draglines are performing very well. • The bucket is maneuvered by means of a number of ropes and chains. ISN
  • 4. DRAGLINE The dragline is a typical combined cyclic excavator and material carrier since it both excavates material and dumps it without the use of trucks or conveyor belts. The dragline sits above the waste or overburden block, usually 50m or so wide, on the highwall side and excavates the material in front of itself, to dump it on the low-wall or spoil side of the strip to uncover the coal seam below it. ISN
  • 5. OPERATION OF DRAGLINE In a typical cycle of excavation, the bucket is positioned above the material to be excavated. The bucket is then lowered and the dragrope is then drawn so that the bucket is dragged along the surface of the material. The bucket is then lifted by using the hoist rope. A swing operation is then performed to move the bucket to the place where the material is to be dumped. The dragrope is then released causing the bucket to tilt and empty. This is called a dump operation. It is a independent machine unlike a shovel. A 30 cum Dragline can handle 40 Lakh cum of OB per annum. The dragline works on the immediate OB bench above coal and the benches from the surface to the Dragline are normally handled by Shovel & Dumper combination. Hence adequate capacity of Shovel & Dumper ISN capacity should be provided to prevent idling of the Dragline.
  • 6. OPERATION OF DRAGLINE The Dragline has a long boom with a bucket capacity ranging from 15 to 50 cum. It can swing in 360 degrees, after dragging the loose material below its level. It swings normally between 90 to 120 degrees and side cast the material in to the de-coaled area. The nomenclature of the Dragline usually called as 24/99 which means 24 cum of bucket capacity and 96 m is the boom length. The same Dragline can have about 32 cum of bucket capacity if the boom length of 71 m. normally the Draglines is electrically driven with 6.6 KV power with 2 main motors of 1750 HP each. These motors inturn drive the Generators and the Generators drive DC motors Normally there are 7 DC motors for different operations like ISN marching, dragging, hoisting, swinging etc.,
  • 8. LINE DIAGRAM OF DRAGLINE ISN
  • 9. LINE DIAGRAM OF DRAGLINE ISN
  • 10. APPLICATION OF DRAGLINE 1. Gradients flatter than 1 in 6 (if gradient is more the dumped OB will slide towards the coal face and particularly in rainy season the extraction of coal become dangerous) 2. Seams should be free of faults & other geological disturbances 3. Deposits with Larger Strike length (>2 km) so that frequent shifting of the Dragline from one end to another can be reduced. 4. Present cost of the Dragline is above 100 Cr and the life of the Dragline is 1.50 Lakh hours hence, the property should be large enough ensuring the life of about 25 yr or more. 5. A hilly property is not suitable ISN 6. Property should have atleast 15 years life
  • 11. DRAGLINE – Methods of Working – Simple casing method with or without rehandling. – Extended bench method. – Horse shoe /Spoil Bank/Across Pit method. – Continuous bench two pass method. – Tandem dragline working i.e., two draglines working together, one dealing with part of the material dumped by the other. ISN
  • 12. Simple Casting This is simple method of Dragline working. In this method the Dragline is sited on immediate OB bench above Coal and removes the OB and dumps it in the de-coaled area of previous cut. The width of the cut normally less than 40 m so that re-handling of the OB will be negligible. The method is extremely suitable for singly thin seam mining. ISN
  • 13. ISN
  • 14. ISN
  • 15. ISN
  • 18. ISN
  • 19. ISN
  • 20. BALANCING DIAGRAM OF WEST SECTION ISN
  • 21. ISN
  • 22. Extended Bench Method • As the name is suggested, the Dragline bench is extended by dumping a part of OB by dragline into de- coal area and the space is levelled by dozing and the same Dragline can be sited in 2nd position on the dumped and dozzed OB. • This enables the distance between 1st and 2nd position to be more when compared with simple casting method. • The increasing distance increases the capability of the Dragline to dump OB further away in de-coaled area, so that sliding of OB on to the coal bench is to be minimized. • A Dragline has to do more re handling now. This method is suitable for exposing relatively thicker seams. ISN
  • 23. ISN
  • 24. ISN
  • 25. ISN
  • 26. ISN
  • 27. Extended Bench Method S.No D/L Excavating Cut Area m2 Dump Position (solid) 1 P-1 1st Dig D’A’B’CFF’RST 480+19 YRQOU 2 ISN
  • 28. Extended Bench Method with cast Blast ISN
  • 29. Spoil Bank Method • The method is adapted when there are 2 seams and having parting between 10 to 12 m. • In the first position, the Dragline exposes the top seam by side casting the OB above the top seam. • The side casting material is dozed and leveled. • After extraction of the top seam the parting OB is loosened by blasting and the Dragline is placed on the already side casted leveled material and the remaining parting OB of above bottom seam is removed by the dragline and side casted exposing the bottom seam. ISN
  • 31. ISN
  • 32. Spoil Bank Method D/L Operational Excavation Cut Area m2 Dump Position position (solid) 26M/81 Main Bench 1st Dig ABCDEFGH 280+904 MPQRIS R Position ’SU (MBP) Spoil Bench 1st Dig IJKL 332 Position (SBP) Rehandle ISN QPIS’ST+VV’N 513+17+152 MNOVW N’ W’X’XY
  • 33. Continuous Bench Two pass Method ISN
  • 34. Tandem Working of Draglines • In this method 2 Draglines are put into in tandem operation one above the other with a minimum horizontal distance of 100 m between them. This method is adopted where the coal seam thickness is more than 30 m and to handle the OB bench of 60 m above the coal seam. ISN
  • 35. Tandem Working of Draglines Dragline Cut Dump Area m2 (solid) D/L 10/70 is 10/70 ABCD abcd 285.0 150-200m ahead of 20/90 CDEF kmnofci 570.0 (Dig) D/L 20/90 Ijkl (R.H.) 9.6 Ebf (R.H.) ISN 1.0
  • 36. Variables with Draglines •Swing and boom angle of a dragline. •Increase or decrease of bucket size (within limits) with consequent decrease or increase of boom length. •Cut width and height of dragline bench. •Method of use of dragline/draglines. •More than one position of a dragline. •Adopting cast-blasting to the desired extent. ISN
  • 37. Technical specifications of Dragline (24 x 96) - Boom length : 74 - 95 m - Boom angle : 30°- 38° - Bucket Capacity (nominal): 26 - 34 cu m - Dump height : 38 - 40 m - Digging depth : 44.3 - 53.4 m - Operating radius : 64.6 - 88.2 m - Walking speed : 0.24 kmph - Bearing Pressure : 0.95 kg/cm2 ISN
  • 38. SPECIFICATIONS OF OC-I DRAGLINE MAKE Ranson & Rapier Bucket Capacity M3 24 Annual capacity mm3 3.31 Boom Length Mtrs 95.6 Operating Radius Mtrs 88 Dumping Height Mtrs 39.6 Base Dia Mtrs 16 Shoe Length Mtrs 17 Shoe Width Mtrs 2.8 Movement of Machine Mtrs 2.2 Weight of Machine Tonnes 2000 Total H.P H.P. 3500 ISN