SlideShare a Scribd company logo
Wilkie Civil Engineering
PO Box 5778
St Georges Tce WA 6831
P: (+61 8) 9421 9080
F: (+61 8) 9325 8311
ABN 72 159 772 675
W: www.wilkieengineering.com.au
E: info@wilkieengineering.com.au
Wilkie Civil Engineering Capability Statement
A division of Midas Engineering Group
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
About Wilkie
Civil & Structural
Engineering Design
Subdivisions
Structural
Assessments
Demolition and Lifting
Services
Compaction Testing
Geotechnical
Retaining Walls
Stormwater/ Drainage
National
Independent
Consultant since
1985
Located Australia
wide with offices in:
Perth,
Newcastle,
Melbourne.
15000+ Jobs
Land subdivision
projects
Geotechnical
investigations
Drainage design and
solutions
30 Years Experience
Local and national
projects
Specialist in civil and
structural design
Investigation,
studying, execution,
verification of projects
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Key Attributes
• Delivering quality engineering services since 1985
• Dynamic and innovative niche consultancy
• Dedicated team providing customised service
• Specialist in civil and structural engineering design
• Unique solution finder
• A division of Midas Engineering Group
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Core Values
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Areas of Specific Expertise
CIVIL AND STRUCTURAL ENGINEERING SERVICES
• Subdivisions
• Geotechnical
• Demolition and Lifting Studies
• Retaining Walls
• Infrastructure & Light Construction
• Residential and Commercial Buildings
• Stormwater/ Drainage
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Subdivisions
All aspects of civil design including:
• Sewerage
• Water supply
• Earthworks
• Drawings
• Design
• Roads
• Retaining walls
• Gas reticulation
• Power and communication
• Planning and approvals
• Construction supervision
• Contract specification
• Contract administration
• Project management
Example of Previous Work
Job Name: Wandoo Valley Estate
Client: Hay Property Trust
Location: WA, Australia
Type: Subdivision
Wilkie was approached by Hay Property Trust to develop
a 36 hectare rural piece of land in Northam Perth. Wilkie
provided engineering design, consultancy, construction
supervision, contract administration and overall project
management.
The objective of the project was to successfully subdivide
the land and facilitate all the services and utilities that go
hand in hand with obtaining clearances for new titles.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Geotechnical
• Soil compaction testing
• Site classifications to AS
2810
• Site investigations
• Geotechnical interpretation
• Soil analysis
• Construction assessment for
residential, commercial and
industrial buildings
Example of Previous Work
Project Name: Lot 41 Hensbrook Loop
Client: Western Australia Building Company
Location: Forrestdale Business Park East WA,
Australia
Task name: Stormwater Drainage
Wilkie was approached by the Western Australia Building
Company (WABG) to provide geotechnical and civil
engineering design and detailing services for a new
office block and warehouse at Lot 41 Hensbrook Loop,
Forestdale Business Park.
Wilkie firstly had to undertake a geotech investigation to
determine the soil classification and infiltration
properties. Once the infiltration rate and soil classification
were determined, Wilkie then had the appropriate
information to design the stormwater drainage systems.
Thereafter, Wilkie produced a geotech and stormwater
drainage design report with design drawings for submittal
by the client to the local council.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
• Certification for cutting
penetrations through slabs
• Certifications of method studies
for the demolition of structures
• Lifting studies
• Temporary bracing/ propping
• Assessment of slabs for
placement of machinery and
other loads
• Assessment of wall removals
• Renovations
Demolition and Lifting Studies
Example of Previous Work
Project Name: Structural Engineering Designs of
Propping System.
Client: Delta Group
Location: Perth Metropolitan Region,
WA, Australia
Task name: Demolition of Buildings
Wilkie Civil Engineering has provided structural engineering
consultancy services for the part or whole demolition of various
buildings (residential and commercial) in the Perth Metropolitan
Region.
Wilkie provided efficient engineering design solutions for the
assessment of existing suspended slabs for the use of plant
and equipment to perform the demolition works. This includes
traditional reinforced slabs, pretensioned slabs and precast
decking systems. Engineering checks were performed on
adjacent structures to design efficient propping system to
maintain their stability and functionality during demolition
works. Challenges overcome included analysing old buildings
without structural drawings and limited client budget.
Wilkie worked with Delta group to develop the most efficient
demolition strategy with minimal propping while remaining on
schedule.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Infrastructure & Light Construction
• Small bridges for pedestrian use
and light vehicle access
• Driveways, car parks and
hardstands
• Levels and drainage
• Access/turning circles
• Pavement design
• Roads
• Geometric design
• Pavement design
• Signage
• Culverts
• Hardstands/ Pavements
• Jetties for mooring of boats
• Designs comply with the relevant
Australian Standards as well as
local council requirements
Example of Previous Work
Project Name: Works Depot
Client Name: City of Perth
Location: WA, Australia
Task: Hardstand Upgrade
Wilkie was commissioned by the City of Perth to review the
existing hardstand trafficable area at their works depot in
Osborne Park and provide design solutions for the repair and
construction supervision.
Based on the client’s scope of works, Wilkie developed three
initial design options and provided costs for each option. Upon
review of the options by the client, Wilkie finalised the design
and developed tender documentation including tender
evaluation. Wilkie then undertook site supervision and contract
management to deliver the scheme on time and within budget.
The outcome of the project was that Wilkie prepared three
design options with associated costs, Designed client preferred
option and determined costs, Prepared Tender Documentation,
Site Supervision and Contract Administration.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Residential Buildings
• Engineering designs and drawings for
new houses, extensions and renovations
• Design verification of unregistered
buildings and structures (retrospective
registration)
• Designs incorporate the latest industry
practices using up-to-date technology
• Building inspections, damage
assessments and reports
• Structural requirements of new buildings,
footings and beams
• Transportable housing and base
requirements
• Tension membrane structures e.g. shade
sails
• Engineering certifications
Example of Previous Work
Project Name: Various
Client Name: Parklyn Construction
Location: WA, Australia
Task: Residential House Engineering
Wilkie Engineering has provided structural engineering design
services for several new residential houses in the Perth
Metropolitan region.
Wilkie Engineering provides efficient engineering design
solutions for the foundations, floor and wall framing, and roof
design for various types of home construction such as single
and double storey homes; brick and tile homes; pole homes on
sloping sites; timber/steel framed homes, composite system
flooring and traditional reinforced concrete flooring.
The challenges successfully overcome included working
together with the builder and the architect to provide a workable
solution within limited budget and using refined engineering such
as piling and underpinning to protect adjacent structures.
Wilkie successfully built several homes according to
architectural plan, budget and satisfaction of the client.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
• Small offices, new buildings,
strata developments
• Design and drawings for
industrial warehouses, storage
units and commercial offices of
steel, masonry and concrete
construction
• Designing and certifying tension
membrane structures
• Pavement slabs with experience
in cool room/freezer room’s
temperature effects, heavy
machinery loadings, and
storage loadings
Commercial Buildings
Example of Previous Work
Project Name: Junior Club House and Wave
Protection
Client Name : Fremantle Sailing Club
Location: WA, Australia
Task Name: Engineering Design
A committee member of the Fremantle Sailing Club requested
Wilkie’s services to design a new junior club house including
wave protection to provide a calm area for junior club members
to rig their boats and set sail.
Wilkie provided structural design, detailed drawings and
architectural drawings for the clubhouse, and designed the wave
protection breakwater groyne to protect the building against
heavy seas. Wilkie carried out this work on a pro bono basis, so
that the Fremantle Sailing Club got a first-class junior clubhouse
at minimum cost.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Stormwater and Drainage
• Soak wells and drainage pits
• Provide practical and effective
drainage solutions
• Stormwater runoff assessment and
management plans
• Assess rainfall and corresponding
run off quantity for pre and post
development
• Hydraulic design
• Design the passage of water,
channel/pipe size, grade,
weirs/drops and energy dissipaters
• Basins and ponds
• Retention
• Detention
Example of Previous Work
Project Name: Crawford Court
Client: Shire of York & 4 Local Landowners
Location: WA, Australia
Task Name: Subdivision Task
Wilkie was approached by the Shire of York to provide storm
water drainage services for an 11 lot subdivision at Crawford
Court, York, WA.
Wilkie firstly had to undertake a geotech investigation to
determine the soil classification and infiltration properties.
Secondly, Wilkie had to determine the surface water catchment
areas and determine the impact of the proposed subdivision on
the existing hydrology. Once the infiltration rate and soil
classification were determined, Wilkie then had the appropriate
information to prepare a stormwater management plan.
Thereafter, Wilkie produced a Stormwater Management Plan
which was submitted to the local council.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Retaining Walls
• Design, certifications and performing
retaining wall inspection
• For the following types of retaining
walls:
• Cantilevered (Concrete)
• Gravity (Limestone)
• Sheet pile
• Post and panel
• Soil grouting
• Construction supervision
• Non-compliance reports
• Design and drawings
• Compliant with Australian regulations
Example of Previous Work
Project Name: Retaining Walls Certifications
Client Name: Confidential Client
Location: Perth Metropolitan Region
Task: Construction of limestone piers for
various land estates.
Wilkie Civil Engineering has provided structural engineering
certifications for the construction of limestone and concrete
cantilever retaining walls including limestone piers for various
land estates in the Perth Metropolitan Region.
Wilkie provides practical engineering inspections and
assessment of retaining walls during their construction to ensure
the walls are built in accordance with the design drawings and
Australian Standards. The testing of the compaction, blocks,
concrete, mortar are overseen and sighted prior to the
certification being released and job closed off.
The challenges overcome include inspecting hidden elements
such as geofabric and ties insides the walls.
Wilkie inspects walls independent of contractor, records all
information and issues certfication in case of compliant walls,
schedules inspection according to blocks being laid and client
specifications.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Examples of Previous Work
Danmar Homes Settlers Hill Village Centre
Settlers Hill, Rockingham City
WA, Australia
Infrastructure Design
Wilkie Civil engineering was commissioned by
Danmar Homes to provide an infrastructure
design services for housing schemes
comprising of 63 houses on a 2.5 hectare site in
Rockingham to sell individual houses to the
potential buyer.
Wilkie provided infrastructure design, facilitated
all services and utilities and supervised the
construction activities on site.
The key challenges faced were sites close
proximity to residential area and school as well
as tie in external infrastructure.
.
Minimum Cove
Octennial Pty Ltd
WA, Australia
Subdivision
Octennial retained Wilkie to create housing lots
on a severely polluted site after completion of
the remedial works. The objective of the
subdivision was to create river views for all
houses, which was challenging due to existing
council restrictions on retaining wall heights and
the very gentle upwards slope of the natural
ground level from the water.
An additional serious challenge was sewerage
removal from the lower level blocks which were
finished lower than the existing sewer pipe and
hence could not be connected for gravity feed.
We designed and detailed a pump station and
associated infrastructure to provide sewerage
removal from the lower levels houses.
Fremantle Fishermen’s Memorial
Fishermen Group
WA, Australia
Structural Design
Wilkie was approached by a group of
fishermen to assist in creating a memorial for
those who pioneered the professional fishing
industries in Fremantle and Rockingham. Our
engineers were involved in all aspects of the
structural design of a jetty, which was crafted
out of three different materials, each material
replicating a different era that the different
generations of fishermen had worked in.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Examples of Previous Work
St Mary & Archangel Michael Church
Coptic Orthodox Church of WA
WA, Australia
Structural Design
Wilkie’s services were requested for the
structural engineering design of the removal of
an existing load bearing wall at the St Mary &
Archangel Michael Church. Wilkie began with a
structural inspection and assessment report to
determine the proposed methodology for the
demolition and the design criteria for the new
lintel beam to be installed. The designs
complied with Australian Standards and building
code regulations for strength and serviceability.
220 KVA Electrical Pilon
Armadale Christian College
WA, Australia
Structural Design
Wilkie was approached by the sports master of
the Armadale Christian College to convert a 220
kVA electrical pylon into an abseiling tower.
Wilkie first checked the materials that were
available and took measurements. The tower
was approximately 15m tall. Compressed fibre
sheets were selected to cover the steel tower.
The footings were a combination of 2m square x
0.5m deep pad and anchor bolts drilled in
lateritic rock for each column to reduce the
required blasting, which with a traditional footing
required a depth of 2.2m and 2.6m square
excavation of rock. Three separate abseiling
walls of varying heights were designed and
constructed around the tower for the varying
abseiling skill levels with a platform at 9m, 17m
& 29m.
Lot 2 Foreshore Drive, Singleton
Private Developer
WA, Australia
Engineering Design
Wilkie was approached by a local developer
to design a sewer extension that would
service a newly planned subdivision of a
beachfront lot in Singleton, WA. Wilkie had to
design the sewer to conform to Water
Corporation requirements, meet
stakeholder’s needs and relevant standards
while keeping the client costs reasonable.
We were successfully granted approval for a
non-standard alignment for a portion of the
extension. Wilkie tendered to a range of
contractors to ensure the client got the best
price and quality, and followed through as the
construction engineers for the project.
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
Why Our Clients Choose Us?
j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE
THANK YOUwww.wilkieengineering.com.au

More Related Content

What's hot

March 2015 presentation to ASBC on slab heave and damages
March 2015 presentation to ASBC on slab heave and damagesMarch 2015 presentation to ASBC on slab heave and damages
March 2015 presentation to ASBC on slab heave and damages
Andrew Downie
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
Andrew White
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss
 
Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoJorge Cabaco
 
Nuprecon Soq
Nuprecon SoqNuprecon Soq
Nuprecon Soq
dignagni
 
25 years of Projects in a Nutshell
25 years of Projects in a Nutshell25 years of Projects in a Nutshell
25 years of Projects in a Nutshell
YusufDawood4
 
What is Mesa Segmental Retaining Wall System?
What is Mesa Segmental Retaining Wall System?What is Mesa Segmental Retaining Wall System?
What is Mesa Segmental Retaining Wall System?
Nilex Inc
 
Experience
ExperienceExperience
Experience
gueste79ac87c
 
Resume
ResumeResume
Resume
Wade Cormier
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012
Tom Stack
 
James Davidson - 18 March 2014
James Davidson - 18 March 2014James Davidson - 18 March 2014
James Davidson - 18 March 2014
Kate Hodge
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian Akl
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Communications Branding
 
Concrete Lego Block Ideas
Concrete Lego Block IdeasConcrete Lego Block Ideas
Concrete Lego Block Ideas
Fibo Intercon Concrete Batching Plant
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
Christian Akl
 

What's hot (18)

March 2015 presentation to ASBC on slab heave and damages
March 2015 presentation to ASBC on slab heave and damagesMarch 2015 presentation to ASBC on slab heave and damages
March 2015 presentation to ASBC on slab heave and damages
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1
 
Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge Cabaco
 
Simmons Nov 2014
Simmons Nov 2014Simmons Nov 2014
Simmons Nov 2014
 
Nuprecon Soq
Nuprecon SoqNuprecon Soq
Nuprecon Soq
 
25 years of Projects in a Nutshell
25 years of Projects in a Nutshell25 years of Projects in a Nutshell
25 years of Projects in a Nutshell
 
What is Mesa Segmental Retaining Wall System?
What is Mesa Segmental Retaining Wall System?What is Mesa Segmental Retaining Wall System?
What is Mesa Segmental Retaining Wall System?
 
Experience
ExperienceExperience
Experience
 
Resume
ResumeResume
Resume
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012
 
James Davidson - 18 March 2014
James Davidson - 18 March 2014James Davidson - 18 March 2014
James Davidson - 18 March 2014
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
Concrete Lego Block Ideas
Concrete Lego Block IdeasConcrete Lego Block Ideas
Concrete Lego Block Ideas
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 

Similar to Wilkie ccs master 090817

2201 Westlake/Enso
2201 Westlake/Enso2201 Westlake/Enso
2201 Westlake/Enso
PostTensioningInstitute
 
KN
KNKN
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015Andrew De Jong
 
Resume sol_2016
Resume sol_2016Resume sol_2016
Resume sol_2016
Sean O' Leary
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James Lee
 
My Resume
My ResumeMy Resume
My Resume
Alfred Socias
 
RESUME.test.pdf
RESUME.test.pdfRESUME.test.pdf
RESUME.test.pdf
Kevin Nemat
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016Raymond Guo
 
Nibor company profile presentation
Nibor company profile presentationNibor company profile presentation
Nibor company profile presentation
BrandWiz (Strategic, Branding & Design)
 
3. Project Profiiles
3. Project Profiiles3. Project Profiiles
3. Project ProfiilesBrett Locke
 
Phillip Rose - CV
Phillip Rose - CVPhillip Rose - CV
Phillip Rose - CV
PhillipRose14
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 

Similar to Wilkie ccs master 090817 (20)

2201 Westlake/Enso
2201 Westlake/Enso2201 Westlake/Enso
2201 Westlake/Enso
 
KN
KNKN
KN
 
Michael Sackler AIA_Portfolio
Michael Sackler AIA_PortfolioMichael Sackler AIA_Portfolio
Michael Sackler AIA_Portfolio
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015
 
Resume sol_2016
Resume sol_2016Resume sol_2016
Resume sol_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0
 
Canal City - Poster-
Canal City - Poster-Canal City - Poster-
Canal City - Poster-
 
My Resume
My ResumeMy Resume
My Resume
 
RESUME.test.pdf
RESUME.test.pdfRESUME.test.pdf
RESUME.test.pdf
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
Long Resume
Long ResumeLong Resume
Long Resume
 
Nibor company profile presentation
Nibor company profile presentationNibor company profile presentation
Nibor company profile presentation
 
3. Project Profiiles
3. Project Profiiles3. Project Profiiles
3. Project Profiiles
 
Phillip Rose - CV
Phillip Rose - CVPhillip Rose - CV
Phillip Rose - CV
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 

Recently uploaded

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 

Recently uploaded (20)

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 

Wilkie ccs master 090817

  • 1. Wilkie Civil Engineering PO Box 5778 St Georges Tce WA 6831 P: (+61 8) 9421 9080 F: (+61 8) 9325 8311 ABN 72 159 772 675 W: www.wilkieengineering.com.au E: info@wilkieengineering.com.au Wilkie Civil Engineering Capability Statement A division of Midas Engineering Group
  • 2. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE About Wilkie Civil & Structural Engineering Design Subdivisions Structural Assessments Demolition and Lifting Services Compaction Testing Geotechnical Retaining Walls Stormwater/ Drainage National Independent Consultant since 1985 Located Australia wide with offices in: Perth, Newcastle, Melbourne. 15000+ Jobs Land subdivision projects Geotechnical investigations Drainage design and solutions 30 Years Experience Local and national projects Specialist in civil and structural design Investigation, studying, execution, verification of projects
  • 3. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Key Attributes • Delivering quality engineering services since 1985 • Dynamic and innovative niche consultancy • Dedicated team providing customised service • Specialist in civil and structural engineering design • Unique solution finder • A division of Midas Engineering Group
  • 4. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Core Values
  • 5. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Areas of Specific Expertise CIVIL AND STRUCTURAL ENGINEERING SERVICES • Subdivisions • Geotechnical • Demolition and Lifting Studies • Retaining Walls • Infrastructure & Light Construction • Residential and Commercial Buildings • Stormwater/ Drainage
  • 6. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Subdivisions All aspects of civil design including: • Sewerage • Water supply • Earthworks • Drawings • Design • Roads • Retaining walls • Gas reticulation • Power and communication • Planning and approvals • Construction supervision • Contract specification • Contract administration • Project management Example of Previous Work Job Name: Wandoo Valley Estate Client: Hay Property Trust Location: WA, Australia Type: Subdivision Wilkie was approached by Hay Property Trust to develop a 36 hectare rural piece of land in Northam Perth. Wilkie provided engineering design, consultancy, construction supervision, contract administration and overall project management. The objective of the project was to successfully subdivide the land and facilitate all the services and utilities that go hand in hand with obtaining clearances for new titles.
  • 7. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Geotechnical • Soil compaction testing • Site classifications to AS 2810 • Site investigations • Geotechnical interpretation • Soil analysis • Construction assessment for residential, commercial and industrial buildings Example of Previous Work Project Name: Lot 41 Hensbrook Loop Client: Western Australia Building Company Location: Forrestdale Business Park East WA, Australia Task name: Stormwater Drainage Wilkie was approached by the Western Australia Building Company (WABG) to provide geotechnical and civil engineering design and detailing services for a new office block and warehouse at Lot 41 Hensbrook Loop, Forestdale Business Park. Wilkie firstly had to undertake a geotech investigation to determine the soil classification and infiltration properties. Once the infiltration rate and soil classification were determined, Wilkie then had the appropriate information to design the stormwater drainage systems. Thereafter, Wilkie produced a geotech and stormwater drainage design report with design drawings for submittal by the client to the local council.
  • 8. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE • Certification for cutting penetrations through slabs • Certifications of method studies for the demolition of structures • Lifting studies • Temporary bracing/ propping • Assessment of slabs for placement of machinery and other loads • Assessment of wall removals • Renovations Demolition and Lifting Studies Example of Previous Work Project Name: Structural Engineering Designs of Propping System. Client: Delta Group Location: Perth Metropolitan Region, WA, Australia Task name: Demolition of Buildings Wilkie Civil Engineering has provided structural engineering consultancy services for the part or whole demolition of various buildings (residential and commercial) in the Perth Metropolitan Region. Wilkie provided efficient engineering design solutions for the assessment of existing suspended slabs for the use of plant and equipment to perform the demolition works. This includes traditional reinforced slabs, pretensioned slabs and precast decking systems. Engineering checks were performed on adjacent structures to design efficient propping system to maintain their stability and functionality during demolition works. Challenges overcome included analysing old buildings without structural drawings and limited client budget. Wilkie worked with Delta group to develop the most efficient demolition strategy with minimal propping while remaining on schedule.
  • 9. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Infrastructure & Light Construction • Small bridges for pedestrian use and light vehicle access • Driveways, car parks and hardstands • Levels and drainage • Access/turning circles • Pavement design • Roads • Geometric design • Pavement design • Signage • Culverts • Hardstands/ Pavements • Jetties for mooring of boats • Designs comply with the relevant Australian Standards as well as local council requirements Example of Previous Work Project Name: Works Depot Client Name: City of Perth Location: WA, Australia Task: Hardstand Upgrade Wilkie was commissioned by the City of Perth to review the existing hardstand trafficable area at their works depot in Osborne Park and provide design solutions for the repair and construction supervision. Based on the client’s scope of works, Wilkie developed three initial design options and provided costs for each option. Upon review of the options by the client, Wilkie finalised the design and developed tender documentation including tender evaluation. Wilkie then undertook site supervision and contract management to deliver the scheme on time and within budget. The outcome of the project was that Wilkie prepared three design options with associated costs, Designed client preferred option and determined costs, Prepared Tender Documentation, Site Supervision and Contract Administration.
  • 10. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Residential Buildings • Engineering designs and drawings for new houses, extensions and renovations • Design verification of unregistered buildings and structures (retrospective registration) • Designs incorporate the latest industry practices using up-to-date technology • Building inspections, damage assessments and reports • Structural requirements of new buildings, footings and beams • Transportable housing and base requirements • Tension membrane structures e.g. shade sails • Engineering certifications Example of Previous Work Project Name: Various Client Name: Parklyn Construction Location: WA, Australia Task: Residential House Engineering Wilkie Engineering has provided structural engineering design services for several new residential houses in the Perth Metropolitan region. Wilkie Engineering provides efficient engineering design solutions for the foundations, floor and wall framing, and roof design for various types of home construction such as single and double storey homes; brick and tile homes; pole homes on sloping sites; timber/steel framed homes, composite system flooring and traditional reinforced concrete flooring. The challenges successfully overcome included working together with the builder and the architect to provide a workable solution within limited budget and using refined engineering such as piling and underpinning to protect adjacent structures. Wilkie successfully built several homes according to architectural plan, budget and satisfaction of the client.
  • 11. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE • Small offices, new buildings, strata developments • Design and drawings for industrial warehouses, storage units and commercial offices of steel, masonry and concrete construction • Designing and certifying tension membrane structures • Pavement slabs with experience in cool room/freezer room’s temperature effects, heavy machinery loadings, and storage loadings Commercial Buildings Example of Previous Work Project Name: Junior Club House and Wave Protection Client Name : Fremantle Sailing Club Location: WA, Australia Task Name: Engineering Design A committee member of the Fremantle Sailing Club requested Wilkie’s services to design a new junior club house including wave protection to provide a calm area for junior club members to rig their boats and set sail. Wilkie provided structural design, detailed drawings and architectural drawings for the clubhouse, and designed the wave protection breakwater groyne to protect the building against heavy seas. Wilkie carried out this work on a pro bono basis, so that the Fremantle Sailing Club got a first-class junior clubhouse at minimum cost.
  • 12. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Stormwater and Drainage • Soak wells and drainage pits • Provide practical and effective drainage solutions • Stormwater runoff assessment and management plans • Assess rainfall and corresponding run off quantity for pre and post development • Hydraulic design • Design the passage of water, channel/pipe size, grade, weirs/drops and energy dissipaters • Basins and ponds • Retention • Detention Example of Previous Work Project Name: Crawford Court Client: Shire of York & 4 Local Landowners Location: WA, Australia Task Name: Subdivision Task Wilkie was approached by the Shire of York to provide storm water drainage services for an 11 lot subdivision at Crawford Court, York, WA. Wilkie firstly had to undertake a geotech investigation to determine the soil classification and infiltration properties. Secondly, Wilkie had to determine the surface water catchment areas and determine the impact of the proposed subdivision on the existing hydrology. Once the infiltration rate and soil classification were determined, Wilkie then had the appropriate information to prepare a stormwater management plan. Thereafter, Wilkie produced a Stormwater Management Plan which was submitted to the local council.
  • 13. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Retaining Walls • Design, certifications and performing retaining wall inspection • For the following types of retaining walls: • Cantilevered (Concrete) • Gravity (Limestone) • Sheet pile • Post and panel • Soil grouting • Construction supervision • Non-compliance reports • Design and drawings • Compliant with Australian regulations Example of Previous Work Project Name: Retaining Walls Certifications Client Name: Confidential Client Location: Perth Metropolitan Region Task: Construction of limestone piers for various land estates. Wilkie Civil Engineering has provided structural engineering certifications for the construction of limestone and concrete cantilever retaining walls including limestone piers for various land estates in the Perth Metropolitan Region. Wilkie provides practical engineering inspections and assessment of retaining walls during their construction to ensure the walls are built in accordance with the design drawings and Australian Standards. The testing of the compaction, blocks, concrete, mortar are overseen and sighted prior to the certification being released and job closed off. The challenges overcome include inspecting hidden elements such as geofabric and ties insides the walls. Wilkie inspects walls independent of contractor, records all information and issues certfication in case of compliant walls, schedules inspection according to blocks being laid and client specifications.
  • 14. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Examples of Previous Work Danmar Homes Settlers Hill Village Centre Settlers Hill, Rockingham City WA, Australia Infrastructure Design Wilkie Civil engineering was commissioned by Danmar Homes to provide an infrastructure design services for housing schemes comprising of 63 houses on a 2.5 hectare site in Rockingham to sell individual houses to the potential buyer. Wilkie provided infrastructure design, facilitated all services and utilities and supervised the construction activities on site. The key challenges faced were sites close proximity to residential area and school as well as tie in external infrastructure. . Minimum Cove Octennial Pty Ltd WA, Australia Subdivision Octennial retained Wilkie to create housing lots on a severely polluted site after completion of the remedial works. The objective of the subdivision was to create river views for all houses, which was challenging due to existing council restrictions on retaining wall heights and the very gentle upwards slope of the natural ground level from the water. An additional serious challenge was sewerage removal from the lower level blocks which were finished lower than the existing sewer pipe and hence could not be connected for gravity feed. We designed and detailed a pump station and associated infrastructure to provide sewerage removal from the lower levels houses. Fremantle Fishermen’s Memorial Fishermen Group WA, Australia Structural Design Wilkie was approached by a group of fishermen to assist in creating a memorial for those who pioneered the professional fishing industries in Fremantle and Rockingham. Our engineers were involved in all aspects of the structural design of a jetty, which was crafted out of three different materials, each material replicating a different era that the different generations of fishermen had worked in.
  • 15. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Examples of Previous Work St Mary & Archangel Michael Church Coptic Orthodox Church of WA WA, Australia Structural Design Wilkie’s services were requested for the structural engineering design of the removal of an existing load bearing wall at the St Mary & Archangel Michael Church. Wilkie began with a structural inspection and assessment report to determine the proposed methodology for the demolition and the design criteria for the new lintel beam to be installed. The designs complied with Australian Standards and building code regulations for strength and serviceability. 220 KVA Electrical Pilon Armadale Christian College WA, Australia Structural Design Wilkie was approached by the sports master of the Armadale Christian College to convert a 220 kVA electrical pylon into an abseiling tower. Wilkie first checked the materials that were available and took measurements. The tower was approximately 15m tall. Compressed fibre sheets were selected to cover the steel tower. The footings were a combination of 2m square x 0.5m deep pad and anchor bolts drilled in lateritic rock for each column to reduce the required blasting, which with a traditional footing required a depth of 2.2m and 2.6m square excavation of rock. Three separate abseiling walls of varying heights were designed and constructed around the tower for the varying abseiling skill levels with a platform at 9m, 17m & 29m. Lot 2 Foreshore Drive, Singleton Private Developer WA, Australia Engineering Design Wilkie was approached by a local developer to design a sewer extension that would service a newly planned subdivision of a beachfront lot in Singleton, WA. Wilkie had to design the sewer to conform to Water Corporation requirements, meet stakeholder’s needs and relevant standards while keeping the client costs reasonable. We were successfully granted approval for a non-standard alignment for a portion of the extension. Wilkie tendered to a range of contractors to ensure the client got the best price and quality, and followed through as the construction engineers for the project.
  • 16. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE Why Our Clients Choose Us?
  • 17. j RETAINING WALLS DESIGN & VERIFICATION CIVIL STRUCTURAL ASSESSMENTS REPORTS PROJECT MANAGEMENT COMPLIANCE THANK YOUwww.wilkieengineering.com.au