Test Center: This project took a 1950’s
building back to beams, columns and slab.
The totally renovated 18,600-square-foot
building now houses modern office space,
light laboratory, data management,
computing, 3-D visualization, video editing,
dark room, video conferencing capabilities
and classified computing spaces. The
project was completed via design-build. It
was the first of the owner’s buildings to
incorporate formal sustainable design
elements and earned multiple industry
awards for “green” design and energy conservation $4.5Million (Owner: Sandia National
Laboratories)
Awards
State of New Mexico Green Zia Award
SNL Gold Presidents Quality Award
DOE Pollution Prevention Award
White House Closing the Circle award for
Sustainable Design
Served as blueprint for future Sandia sustainable
buildings
The Original Building
Project Role:
Fill responsibility for assessment of
alternatives, planning, development, design
and construction. Project was completed via
the Design-Build process.
• Project Manager
• Construction Manager
Representative Projects
Technology Project
Capability Modernization Program: This
multiple project “program” upgraded the
communications and control systems for full
scale environmental test capabilities
supporting the nation’s nuclear weapons
program. The projects included installing
fiber optic and copper cabling,
network/switch rooms, wireless (RF)
communications, remote and centralized
control systems, and data/video acquisition
and management systems. $19Million
(Owner: Sandia National Laboratories)
Project Role: Full responsibility for requirements definition, planning, design, procurement and
construction.
• Project/Construction Manager
Public Infrastructure
Sunport Boulevard: This new access
road to the Albuquerque International
Airport included two freeway
interchanges, excavation and disposal of
more than 200,000 tons of old municipal
landfill, and acquisition of rights-of-way
through a major commercial
development. The project utilized a
combination of Federal, State and local
The Halfway PointRepresentative Projects
funding. Sunport Boulevard took approximately 6 years to complete design and construction.
$26 Million (Owner: City of Albuquerque)
Project Role: Full responsibility for requirements definition, planning, design, procurement and
construction.
• Project/Construction Manager

More Related Content

What's hot

Chapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsChapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systems
Venkatesh S
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
aiahouston
 
Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case study
Inu shakya
 
Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Pr...
Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Pr...Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Pr...
Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Pr...
Umanotera
 
BREEAM
BREEAMBREEAM
BREEAM
misschand
 
Manitoba Hydro Place
Manitoba Hydro PlaceManitoba Hydro Place
Manitoba Hydro Place
Deb Bee
 
Chapter 5 National Association
Chapter 5 National AssociationChapter 5 National Association
Chapter 5 National Association
Galala University
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
SHRISTI SHAKYA
 
ACEC Award Winning AFRC_Middletown CT Design Build
ACEC Award Winning AFRC_Middletown CT Design BuildACEC Award Winning AFRC_Middletown CT Design Build
ACEC Award Winning AFRC_Middletown CT Design Build
William Naughton, P.G.
 
Estidama
EstidamaEstidama
Estidama
Sherif Mostafa
 
IGBC RATING SYSTEM
IGBC RATING SYSTEMIGBC RATING SYSTEM
IGBC RATING SYSTEM
SVKM'S IOT DHULE
 
LEED-EB O&M Basics
LEED-EB O&M BasicsLEED-EB O&M Basics
LEED-EB O&M Basics
Lida_Lewis
 
LEED-EB Presentation
LEED-EB PresentationLEED-EB Presentation
LEED-EB Presentation
Kevin Sneed
 
Leed for SWE WE 14
Leed for SWE WE 14Leed for SWE WE 14
The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria
amfacilities
 
Green Building Basics
Green Building BasicsGreen Building Basics
Green Building Basics
Sustainable Performance Institute
 
LEED Introduction
LEED IntroductionLEED Introduction
Opus Sustainable
Opus SustainableOpus Sustainable
Opus Sustainable
winstonh
 
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
Shanti Pless
 
Green Buildings - A Primer on Green Building and LEED
Green Buildings - A Primer on Green Building and LEEDGreen Buildings - A Primer on Green Building and LEED
Green Buildings - A Primer on Green Building and LEED
OHM Advisors
 

What's hot (20)

Chapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsChapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systems
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
 
Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case study
 
Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Pr...
Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Pr...Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Pr...
Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Pr...
 
BREEAM
BREEAMBREEAM
BREEAM
 
Manitoba Hydro Place
Manitoba Hydro PlaceManitoba Hydro Place
Manitoba Hydro Place
 
Chapter 5 National Association
Chapter 5 National AssociationChapter 5 National Association
Chapter 5 National Association
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
ACEC Award Winning AFRC_Middletown CT Design Build
ACEC Award Winning AFRC_Middletown CT Design BuildACEC Award Winning AFRC_Middletown CT Design Build
ACEC Award Winning AFRC_Middletown CT Design Build
 
Estidama
EstidamaEstidama
Estidama
 
IGBC RATING SYSTEM
IGBC RATING SYSTEMIGBC RATING SYSTEM
IGBC RATING SYSTEM
 
LEED-EB O&M Basics
LEED-EB O&M BasicsLEED-EB O&M Basics
LEED-EB O&M Basics
 
LEED-EB Presentation
LEED-EB PresentationLEED-EB Presentation
LEED-EB Presentation
 
Leed for SWE WE 14
Leed for SWE WE 14Leed for SWE WE 14
Leed for SWE WE 14
 
The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria
 
Green Building Basics
Green Building BasicsGreen Building Basics
Green Building Basics
 
LEED Introduction
LEED IntroductionLEED Introduction
LEED Introduction
 
Opus Sustainable
Opus SustainableOpus Sustainable
Opus Sustainable
 
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
 
Green Buildings - A Primer on Green Building and LEED
Green Buildings - A Primer on Green Building and LEEDGreen Buildings - A Primer on Green Building and LEED
Green Buildings - A Primer on Green Building and LEED
 

Viewers also liked

Assessment Feedback - Gerald & Sheila
Assessment Feedback - Gerald & Sheila Assessment Feedback - Gerald & Sheila
Assessment Feedback - Gerald & Sheila
Jeremy Tang
 
02. abecedario
02. abecedario02. abecedario
02. abecedario
José M. Blázquez
 
Selected Works - Institutional
Selected Works - InstitutionalSelected Works - Institutional
Selected Works - Institutionaltkress21
 
Skp global expansion updates-april 2016
Skp global expansion updates-april 2016Skp global expansion updates-april 2016
Skp global expansion updates-april 2016
Partha Pant
 
08. unidades y decenas
08. unidades y decenas08. unidades y decenas
08. unidades y decenas
José M. Blázquez
 
Cartilha faça voce mesmo
Cartilha faça voce mesmoCartilha faça voce mesmo
Cartilha faça voce mesmo
Bruno Da Montanha
 
Year 9AS Lesson 1 PPT
Year 9AS Lesson 1 PPTYear 9AS Lesson 1 PPT
Year 9AS Lesson 1 PPT
Jeremy Tang
 
Monosem no till planter
Monosem no till planterMonosem no till planter
Monosem no till planter
African Conservation Tillage Network
 
A Wife in London Lesson plan
A Wife in London Lesson planA Wife in London Lesson plan
A Wife in London Lesson plan
Jeremy Tang
 
01. actividad gráficas
01. actividad gráficas01. actividad gráficas
01. actividad gráficas
José M. Blázquez
 
Checking Out Me History - John Agard
Checking Out Me History - John AgardChecking Out Me History - John Agard
Checking Out Me History - John Agard
nten
 

Viewers also liked (11)

Assessment Feedback - Gerald & Sheila
Assessment Feedback - Gerald & Sheila Assessment Feedback - Gerald & Sheila
Assessment Feedback - Gerald & Sheila
 
02. abecedario
02. abecedario02. abecedario
02. abecedario
 
Selected Works - Institutional
Selected Works - InstitutionalSelected Works - Institutional
Selected Works - Institutional
 
Skp global expansion updates-april 2016
Skp global expansion updates-april 2016Skp global expansion updates-april 2016
Skp global expansion updates-april 2016
 
08. unidades y decenas
08. unidades y decenas08. unidades y decenas
08. unidades y decenas
 
Cartilha faça voce mesmo
Cartilha faça voce mesmoCartilha faça voce mesmo
Cartilha faça voce mesmo
 
Year 9AS Lesson 1 PPT
Year 9AS Lesson 1 PPTYear 9AS Lesson 1 PPT
Year 9AS Lesson 1 PPT
 
Monosem no till planter
Monosem no till planterMonosem no till planter
Monosem no till planter
 
A Wife in London Lesson plan
A Wife in London Lesson planA Wife in London Lesson plan
A Wife in London Lesson plan
 
01. actividad gráficas
01. actividad gráficas01. actividad gráficas
01. actividad gráficas
 
Checking Out Me History - John Agard
Checking Out Me History - John AgardChecking Out Me History - John Agard
Checking Out Me History - John Agard
 

Similar to 3. Project Profiiles

Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resume
Renee Thomas
 
CSuh Project Experience
CSuh Project ExperienceCSuh Project Experience
CSuh Project Experience
Charles Suh
 
KBE Laboratories 2011
KBE Laboratories 2011 KBE Laboratories 2011
KBE Laboratories 2011
charkins
 
WE Firm Profile
WE Firm ProfileWE Firm Profile
WE Firm Profile
Anthony Piriano
 
Whitfield resume
Whitfield   resume Whitfield   resume
Whitfield resume
William Whitfield
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
Cordoba Corp
 
James Ingle's Technology Portfolio
James Ingle's Technology PortfolioJames Ingle's Technology Portfolio
James Ingle's Technology Portfolio
James Ingle
 
Renee M Thomas Resume
Renee M Thomas ResumeRenee M Thomas Resume
Renee M Thomas Resume
rmthomas
 
Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfolio
tonytso
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010
guestfb56807
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010
Virtual ULI
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
Krashan Singhal
 
James Brew Portfolio Small
James Brew Portfolio SmallJames Brew Portfolio Small
James Brew Portfolio Small
James Scott Brew, FCSI, AIA, LEED AP, CPHC
 
Resume
ResumeResume
Resume
franz_k
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Future
juliekannai
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
8-koi
 
Chitnis Brochure
Chitnis BrochureChitnis Brochure
Chitnis Brochure
Gautam Chitnis
 
Case Study: James Hall, A Greener Home for Greener Sciences
Case Study: James Hall, A Greener Home for Greener SciencesCase Study: James Hall, A Greener Home for Greener Sciences
Case Study: James Hall, A Greener Home for Greener Sciences
Sustainable Performance Institute
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
Jerry Yudelson
 
CV
CVCV

Similar to 3. Project Profiiles (20)

Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resume
 
CSuh Project Experience
CSuh Project ExperienceCSuh Project Experience
CSuh Project Experience
 
KBE Laboratories 2011
KBE Laboratories 2011 KBE Laboratories 2011
KBE Laboratories 2011
 
WE Firm Profile
WE Firm ProfileWE Firm Profile
WE Firm Profile
 
Whitfield resume
Whitfield   resume Whitfield   resume
Whitfield resume
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
 
James Ingle's Technology Portfolio
James Ingle's Technology PortfolioJames Ingle's Technology Portfolio
James Ingle's Technology Portfolio
 
Renee M Thomas Resume
Renee M Thomas ResumeRenee M Thomas Resume
Renee M Thomas Resume
 
Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfolio
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
 
James Brew Portfolio Small
James Brew Portfolio SmallJames Brew Portfolio Small
James Brew Portfolio Small
 
Resume
ResumeResume
Resume
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Future
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
 
Chitnis Brochure
Chitnis BrochureChitnis Brochure
Chitnis Brochure
 
Case Study: James Hall, A Greener Home for Greener Sciences
Case Study: James Hall, A Greener Home for Greener SciencesCase Study: James Hall, A Greener Home for Greener Sciences
Case Study: James Hall, A Greener Home for Greener Sciences
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
 
CV
CVCV
CV
 

3. Project Profiiles

  • 1. Commercial Projects Model Validation and System Certification Test Center: This project took a 1950’s building back to beams, columns and slab. The totally renovated 18,600-square-foot building now houses modern office space, light laboratory, data management, computing, 3-D visualization, video editing, dark room, video conferencing capabilities and classified computing spaces. The project was completed via design-build. It was the first of the owner’s buildings to incorporate formal sustainable design elements and earned multiple industry awards for “green” design and energy conservation $4.5Million (Owner: Sandia National Laboratories) Awards State of New Mexico Green Zia Award SNL Gold Presidents Quality Award DOE Pollution Prevention Award White House Closing the Circle award for Sustainable Design Served as blueprint for future Sandia sustainable buildings The Original Building Project Role: Fill responsibility for assessment of alternatives, planning, development, design and construction. Project was completed via the Design-Build process. • Project Manager • Construction Manager Representative Projects
  • 2. Technology Project Capability Modernization Program: This multiple project “program” upgraded the communications and control systems for full scale environmental test capabilities supporting the nation’s nuclear weapons program. The projects included installing fiber optic and copper cabling, network/switch rooms, wireless (RF) communications, remote and centralized control systems, and data/video acquisition and management systems. $19Million (Owner: Sandia National Laboratories) Project Role: Full responsibility for requirements definition, planning, design, procurement and construction. • Project/Construction Manager Public Infrastructure Sunport Boulevard: This new access road to the Albuquerque International Airport included two freeway interchanges, excavation and disposal of more than 200,000 tons of old municipal landfill, and acquisition of rights-of-way through a major commercial development. The project utilized a combination of Federal, State and local The Halfway PointRepresentative Projects
  • 3. funding. Sunport Boulevard took approximately 6 years to complete design and construction. $26 Million (Owner: City of Albuquerque) Project Role: Full responsibility for requirements definition, planning, design, procurement and construction. • Project/Construction Manager